| title = Rev 22 to Operational QA Program Description.
| title = Rev 22 to Operational QA Program Description.
| author name = SMITH G
| author name = Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Enclosure 2 OPERATIONAL QUALITY A.SS PROGRAM DESC (WPPSS-QA-004)
{{#Wiki_filter:Enclosure 2 OPERATIONAL QUALITYA.SS                       CE PROGRAM DESC                           ION (WPPSS-QA-004)
CE ION APPROVED: Director, ualiry Date+ective REVISION NO.22 ORIGINAL ISSUE: May 10, 1978 WASHINGTON PUBLIC POWER C>svpprv svsTEM 9508020121 950718 PDR ADOCK 05000397 P PDR 4>supp7i s7srz7i OPERATIONAL QUALITY ASSU$MMCE PROGRAM%DESCRIFI'ION PACE ill I.I F EFFE~PA E REMI~)RIQ 10 1V 1-1-1-21 2-1-2-4 3-1-,3-3 4-1&4-2 5-1 6-1-6-3 7-1-7-4 8-1&8-2 9-1&, 9-2 10-1&10-2 11-1&11-2 12-1&12-2 13-1 14-1 15-1&15-2 16-1 17-1&17-2 18-1&18-2 I-1-I-3 II-1-11-21 22 15 10 10 10 968-25060 (4I92) 4Q SUPFLY SYSTEM OPERATIONAL QUALITY ASSURANCE PROGRAMS DESCRIPTION, PhCE iv'22 TABLE F NTENTS N/A 2 10 15 17 18 APPENDIX I APPENDIX.II Approval Page Management Statement List of Effective Pages 7able of Contents ORGANIZATION QUALITY ASSURANCE (QA)PROGRAM DESIGN CONTROL PROCURFMEN'I'OCUMENT CONTROL INSTRUCTIONS, PROCEDURES, AND DRAWINGS DOCUMENT CONTROL CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES IDERIIFICATION AND CONTROL OF MATERIALS, PARIS, AND COMPONENTS CONTROL OF SPECIAL PROCESSES INSPECTION TEST CONTROL CONTROL OF MEASURING AND TEST EQUIPMENT'ANDLING, S'IORAGE, AND'HIPPING INSPECTION,'TEST, AND OPERATING STATUS NONCONFORMING MATER'~, PARTS, OR COMPONENTS CORRECTIVE ACTION QUALITY ASSURANCE RECORDS AUDITS QUALIFta TIQN RBQ~"POSITION STATEMENTS" 4P SUPPLY SYSTEM OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION PAGE 22 1-R ANIZATI N This section provides a description of the authorities and responsibilities assigned to Supply System organizational units and individuals involved in establishing, implementing, verifying implementation, and measuring the overall effectiveness of the administrative controls and quality assurance program during the initial testing (pre-operationaL and startup testing)and subsequent operations phases of Supply System nuclear power plants.1.2 R ANIZATI N The Supply System organization responsible for establishing, implementing, verifying implementation, and measuring the overall efFectiveness of the administrative controls and quality assurance program for its nuclear power plants is as depicted in Figures 1-1 and 1-2.Portions of these activities may be delegated to external organizations qualified to the requirements of this Operational QA Program, hereafter referred to as QA Program;however, the responsibility shall remain with the Supply System.1.3 A A EMENT RESP IBIL 1.3.1 The gnawn Direc o is.responsible for the establishment of policies and for overall management of Supply System operations.
APPROVED:
The Managing Director has issued a Management Statement which commits the Supply System to design, construct, and operate its nuclear power plants without jeopardy to the health and safety of the public.The Managing Director is the ultimate Supply System 1IIIS MANIIAL IS CLASSIHED hS h LEVEL ZB DOCUMKCT.968-25060 (4/92)Scc:4oal.P&A/OQAPDI WASNINOTOII iOOLIC Fow\R 4P SUPPLY SYSTEM OPERATIONAL QUALITY ASS&RACE PROGRAM DESCRIPTION PAGE REV.1-2 22 authority on matters involving quality.The Managing Director operates through the Vice President, Nuclear Operations; Director, Projects;Director, Information; and the Chief Financial Of5cer to provide for engineering, construction, procurement, quality assurance/quality control, and operations activities for Supply System nuclear power plants.1.3.2 The Vice P iden Nuclear erati ns reports to the Mana~g Director and is responsible for.a.Safe and eQicient operation of Supply System nuclear power plants.b.Safe and successful completion of initial testing activities for WNP-2 (through 1 the WNP-2 Plant General Manager).c.Establishing and monitoring maintenance systems common to operational nuclear power plants.d.Training of nuclear plant staff and support personnel.
Director, ualiry           Date +ective REVISION NO. 22 ORIGINAL ISSUE: May 10, 1978 WASHINGTON PUBLIC POWER C> svpprv     svsTEM 9508020121 950718 PDR ADOCK 05000397 P               PDR
e.Development of programs and procedures to ensure uniform application at operational nuclear power plants.f.Radiological protection, fire protection, plant security, emergency preparedness, and radioactive waste management.
 
%$.25060 (4/92)I.Pd4VOQAPDI WASNINCTOII tOSSIC tOWSA IYP SUPPLY SYSTEM OPERATIONAL QUALITY ASSURANCE PROGRAJUI DESCRD HON PhGE 1-3 22 g.Maintaining cognizance of changing regulatory requirements and providing controlled interface between the Supply System and regulatory agencies to assure that commitment documents receive the necessary degree and depth of reviews prior to transmittal.
PACE 4> supp7i   s7srz7i               ill OPERATIONAL QUALITYASSU$ MMCE PROGRAM% DESCRIFI'ION I.I     F EFFE
h.Providing licensing support functions in such areas as acquisition and maintenance of nuclear power plant construction permits and operating licenses.i.Quality Assurance program definition,.implementation and effectiveness.
                            ~PA E                 REMI~)RIQ 10 1V                     22 1-1 21 2 2-4               15 3-1   -,3-3 4-1   & 4-2 5-1 6 6-3 7 7-4 8-1   &   8-2 9-1 &, 9-2             10 10-1 & 10-2 11-1 & 11-2 12-1 & 12-2 13-1                   10 14-1 15-1 & 15-2 16-1 17-1 & 17-2 18-1 & 18-2 I I-3               10 II 11-21 968-25060 (4I92)
j.Reviewing in-house and extexnal events for determination of cause and necessaxy corrective action to minimize potential for recurrence at Supply System nuclear facilities; k.Engineexing design and analysis support for WNP-2.1.Appoint in writing the members to the Corporate Nuclear Safety Review Board (CNSRB)including the Chairman and Alternate Chairman.To accomplish this role, the Vice President, Nuc1ear Operations operates through the Plant General Manager;Director, Engineering; Director, Quality;Director, Nuclear Training;Director, Support Services;Manager, Planning and Controls;-Director, Regulatory and Industry Affairs;Corporate Chemist;and Corporate Radiological Health Officer.968-25060 (4/92)Scc6oal.P&A/QQhPDi 4>~47rz s7srm OPERATIONAL QUALHY ASSU&WCE PROGRAMS DESCRD"HON PhCE 22 1.3.2.1 T~hD Si p U Vi P'd,N 1 Dg di directly responsible for the definition, direction, and effectiveness of the overall Quality Assurance Program during design, construction, and operation phases of all Supply System nuclear power plants.Major functions of the Quality Assurance organization are: a.Establishing and maintaining assurance programs, Nuclear Operation Standards, and directorate procedures which incorporate nuclear safety considerations and comply with the Quality Assurance (QA)criteria delineated in Appendix B to 10CFR 50.b.Assuring through reviews, surveillances, assessments, inspections, and audits that Supply System and its suppliers'ctivities are being performed in a safe and legal manner in accordance with written and approved documents which comply with applicable requirements defined by the assurance programs and Nuclear Operation Standards.
 
C.Assessing the overall effectiveness of assurance programs'mplementation, including evaluation of plant performance and reporting conclusions to the Managing Director.d.Stopping unsatisfactory work and controlling further processing, delivery, or.installation of nonconforming material.e.Establishing and maintaining adequate and qualified assurance staSng levels based on workload analysis.96$.25060 (4/92)1.P&A/OQAPD1 WAININO'TON FVSLlC 10lft%4P surer'vsrm PACE 1-5 OPERATlONAL QUALITY ASSURANCE PROGRAM DESCRH.TION--22 f.Providing trending of deficiencies to identif'y areas where corrective actions have not minimized recurrence.
PhCE 4Q   SUPFLY SYSTEM iv OPERATIONAL QUALITYASSURANCE PROGRAMS DESCRIPTION,                             '22 TABLE F         NTENTS Approval Page Management Statement N/A             List of Effective Pages 7able of Contents ORGANIZATION 2          QUALITYASSURANCE (QA) PROGRAM DESIGN CONTROL PROCURFMEN'I'OCUMENT CONTROL INSTRUCTIONS, PROCEDURES, AND DRAWINGS DOCUMENT CONTROL CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES IDERIIFICATIONAND CONTROL OF MATERIALS, PARIS, AND COMPONENTS CONTROL OF SPECIAL PROCESSES 10        INSPECTION TEST CONTROL CONTROL OF MEASURING AND TEST EQUIPMENT'ANDLING, S'IORAGE, AND'HIPPING INSPECTION, 'TEST, AND OPERATING STATUS 15        NONCONFORMING MATER'~, PARTS, OR COMPONENTS CORRECTIVE ACTION 17        QUALITY ASSURANCE RECORDS 18        AUDITS APPENDIX I  QUALIFtaTIQN      RBQ~
g.Establishing, maintaining, and controlling the Operational QA Program Description (WPPSS-QA-004) and the Supply System Functional Manual for Nuclear Operation.
APPENDIX. II "POSITION STATEMENTS"
h.Cert''ying Supply System examination personnel for non-destructive examinations (NDE).i.Qualifying and certifying Supply System QC inspection and test personnel.
 
PAGE 4P   SUPPLY SYSTEM OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION                                                     22 1-   R ANIZATI N This section provides a description of the authorities and responsibilities assigned to Supply System organizational units and individuals involved in establishing, implementing, verifying implementation, and measuring the overall effectiveness of the administrative controls and quality assurance program during the initial testing (pre-operationaL and startup testing) and subsequent operations phases     of Supply System nuclear power plants.
1.2                                     R ANIZATI N The Supply System organization responsible for establishing, implementing, verifying implementation, and measuring the overall efFectiveness of the administrative controls and quality assurance program for its nuclear power plants is as depicted in Figures 1-1 and 1-2. Portions   of these activities may be delegated to external organizations qualified to the requirements of this Operational QA Program, hereafter referred to as QA Program; however, the responsibility shall remain with the Supply System.
1.3                 A A EMENT RESP               IBIL 1.3.1           The     gnawn   Direc o is. responsible for the establishment of policies and for overall management of Supply System operations.         The Managing Director has issued a Management Statement which commits the Supply System to design, construct, and operate its nuclear power plants without jeopardy to the health and safety of the public. The Managing Director is the ultimate Supply System 1IIIS MANIIALIS CLASSIHED hS h LEVEL ZB DOCUMKCT.
968-25060 (4/92)                                                                                 Scc:4oal.P&A/OQAPDI
 
PAGE WASNINOTOII iOOLIC Fow\R 4P   SUPPLY SYSTEM 1-2 OPERATIONAL                                                   REV.
QUALITYASS&RACE PROGRAM DESCRIPTION                                                         22 authority on matters involving quality. The Managing Director operates through the Vice President, Nuclear Operations; Director, Projects; Director, Information; and the Chief Financial Of5cer to provide             for engineering, construction, procurement, quality assurance/quality control, and operations activities for Supply System nuclear power plants.
1.3.2         The Vice P     iden   Nuclear           erati ns reports to the   Mana~g Director     and is responsible for.
: a. Safe and eQicient operation         of Supply System nuclear power plants.
: b. Safe and successful completion           of initial testing activities for WNP-2 (through 1
the WNP-2 Plant General Manager).
: c. Establishing and monitoring maintenance systems common to operational nuclear power plants.
: d. Training of nuclear plant staff and support personnel.
: e. Development of programs and procedures to ensure uniform application at operational nuclear power plants.
: f. Radiological protection, fire protection, plant security, emergency preparedness,   and radioactive waste management.
%$ .25060 (4/92)                                                                                           I.Pd4VOQAPDI
 
PhGE WASNINCTOII tOSSIC tOWSA IYP SUPPLY SYSTEM 1-3 OPERATIONAL QUALITYASSURANCE PROGRAJUI DESCRD HON                                             22
: g. Maintaining cognizance of changing regulatory requirements and providing controlled interface between the Supply System and regulatory agencies to assure that commitment documents receive the necessary degree and depth         of reviews prior to transmittal.
: h. Providing licensing support functions in such areas as acquisition and maintenance   of nuclear power plant construction permits and operating licenses.
: i. Quality Assurance program definition,.implementation and effectiveness.
: j. Reviewing in-house and extexnal events for determination of cause and necessaxy corrective action to minimize potential for recurrence at Supply System nuclear facilities;
: k. Engineexing design and analysis support for WNP-2.
: 1. Appoint in writing the members to the Corporate Nuclear Safety Review Board (CNSRB) including the Chairman and Alternate Chairman.
To accomplish this role, the Vice President, Nuc1ear Operations operates through the Plant General Manager; Director, Engineering; Director, Quality; Director, Nuclear Training; Director, Support Services; Manager, Planning and Controls;
                  -Director, Regulatory and Industry Affairs; Corporate Chemist; and Corporate Radiological Health Officer.
968-25060 (4/92)                                                                           Scc6oal.P&A/QQhPDi
 
PhCE 4> ~47rz s7srm OPERATIONAL QUALHYASSU&WCE PROGRAMS DESCRD"HON                                                 22 1.3.2.1     T~hD               Si   p       U   Vi   P   'd,N     1     Dg             di directly responsible for the definition, direction, and effectiveness of the overall Quality Assurance Program during design, construction, and operation phases of all Supply System nuclear power plants.     Major functions of the Quality Assurance organization are:
: a.     Establishing and maintaining assurance programs, Nuclear Operation Standards, and directorate procedures which incorporate nuclear safety considerations and comply with the Quality Assurance (QA) criteria delineated in Appendix B to 10CFR 50.
: b.     Assuring through reviews, surveillances, assessments,   inspections, and audits that Supply System and its suppliers'ctivities are being performed in a safe and legal manner in accordance with written and approved documents which comply with applicable requirements defined by the assurance programs and Nuclear Operation Standards.
C. Assessing the overall effectiveness of assurance programs'mplementation, including evaluation of plant performance and reporting conclusions to the Managing Director.
: d.     Stopping unsatisfactory work and controlling further processing, delivery, or.
installation of nonconforming material.
: e.     Establishing and maintaining adequate and qualified assurance staSng levels based on workload analysis.
96$ .25060 (4/92)                                                                                 1.P&A/OQAPD1
 
PACE WAININO'TON FVSLlC 10lft%
4P surer'vsrm 1-5 OPERATlONAL QUALITYASSURANCE PROGRAM DESCRH. TION                                     - -
22
: f.     Providing trending of deficiencies to identif'y areas where corrective actions have not minimized recurrence.
: g.       Establishing, maintaining, and controlling the Operational QA Program Description (WPPSS-QA-004) and the Supply System Functional Manual for Nuclear Operation.
: h.       Cert''ying Supply System examination personnel for non-destructive examinations (NDE).
: i.       Qualifying and certifying Supply System QC inspection and test personnel.
1 Acquiring and maintaining ASME Certificates of Authorization and/or Owners Certificates.
1 Acquiring and maintaining ASME Certificates of Authorization and/or Owners Certificates.
Ensuring that a written agreement with an Authorized Inspection Agency is obtained to provide for Authorized Nuclear In-Service Inspection Services.l.Establishing, mana~g, and administering the implementation and effectiveness of the Nuclear Safety Issues Program (NSIP).The Director, Quality has effective communication channels with all Supply System senior management positions and has no duties or responsibilities unrelated to quality assurance.
Ensuring that a written agreement with an Authorized Inspection Agency is obtained to provide for Authorized Nuclear In-Service Inspection Services.
To accomplish the above defined role, the Director, Quality operates through the Manager, Quality Support Services;
: l.      Establishing, mana~g, and administering the implementation and effectiveness  of the Nuclear Safety      Issues Program (NSIP).
The Director, Quality has effective communication channels with all Supply System senior management positions and has no duties or responsibilities unrelated to quality assurance. To accomplish the above defined role, the Director, Quality operates through the Manager, Quality Support Services; Manager, Quality Services; Manager, Plant Quality Control; Manager, Supplier Quality; and %NP-1 Quality Assurance staff.
968-25060 (4l921                                                                                  0CC4ioal.P 8th/OQAPD1
 
PAGE vssoworoa rcrauo rowra i> sudan        svsvam OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPI'ION                                                      22.
The qualification requirements for this position are as described in Appendix I, Qualification Requirements.
A representative from    the Quality Assurance Organization is a member            of the Plant Operating Committee (see Chapter 13          of the FSAR)  and has sufhcient authority and organizational freedom to identify problems; to initiate, recommend, or provide solutions; and to verify implementation        of solutions. The  representative has no duties or responsibilities unrelated to quality assurance matters and has effective communication channels with all plant supervisory and management personnel.
1.3.2.1.1    The    ana er    uali      ervices and
Combining all such initiatives in one report demonstrates that issues affecting regulatory performance have senior management's attention and will receive appropriate resources to assure effective implementation.
Combining all such initiatives in one report demonstrates that issues affecting regulatory performance have senior management's attention and will receive appropriate resources to assure effective implementation.
This document includes initiatives from Operations, Maintenance, Engineering, and applicable support organizations.
This document includes initiatives from Operations, Maintenance, Engineering, and applicable support organizations. Objectives and initiatives may be revised as appropriate to reflect changing conditions, or as necessary to assure the continued safe, reliable, cost-effective, and environmentally sound operation of WI%'-.2.
Objectives and initiatives may be revised as appropriate to reflect changing conditions, or as necessary to assure the continued safe, reliable, cost-effective, and environmentally sound operation of WI%'-.2.
 
INTRODVCTION In early 1995, the Supply System performed a Mid-Cycle SALP Self Assessment (Self Assessment).
INTRODVCTION In early 1995, the Supply System performed a Mid-Cycle SALP Self Assessment (Self Assessment). At the conclusion of this Self Assessment and as a part of its presentation of the results, the Supply System committed to provide the NRC with a document addressing the identified weaknesses within 45 days following the R-10 outage. This document fulfills our commitment.
At the conclusion of this Self Assessment and as a part of its presentation of the results, the Supply System committed to provide the NRC with a document addressing the identified weaknesses within 45 days following the R-10 outage.This document fulfills our commitment.
This document serves as a vehicle by which the Supply System and the NRC may accomplish the following goals:
This document serves as a vehicle by which the Supply System and the NRC may accomplish the following goals:~Develop a common understanding of the Supply System's weaknesses and strengths.
          ~     Develop a common understanding of the Supply System's weaknesses and strengths.
~Identify plans, programs, and initiatives designed to improve.regulatory performance.
          ~     Identify plans, programs,     and initiatives designed to improve
~Track and trend corresponding performance over time.During May through July 1995, a special team under the direction of Regulatory Programs and Industry Affairs worked closely with coordinators assigned by each WNP-2 functional organization to develop and compose this regulatory communication tool.Over the course of this period, functional coordinators were asked to develop objectives and corresponding actions which were either being undertaken or would be undertaken to address weak areas affecting their respective organizations which had been identified within the Self Assessment.
              . regulatory performance.
In addition, coordinators were asked to identify the results expected from their actions and establish standards by which these results could be measured to determine if they were accomplishing their intended purpose.The initial input from the functional coordinators was also evaluated by an ad-hoc Review Committee.
          ~     Track and trend corresponding performance over time.
The Review~Committee evaluation was to ensure that there were no conflicts between the goals of the various Supply System organizations and to confirm that the Self Assessment identified weakenesses were effectively addressed by the corrective actions.Although coordinators were instructed to specifically address the weaknesses set forth within the Self Assessment, they were also instructed to document and address additional weaknesses or improvement efforts affecting regulatory performance.
During May through July 1995, a special team under the direction of Regulatory Programs and Industry Affairs worked closely with coordinators assigned by each WNP-2 functional organization to develop and compose this regulatory communication tool. Over the course of this period, functional coordinators were asked to develop objectives and corresponding actions which were either being undertaken or would be undertaken to address weak areas affecting their respective organizations which had been identified within the Self Assessment. In addition, coordinators were asked to identify the results expected from their actions and establish standards by which these results could be measured to determine if they were accomplishing their intended purpose. The initial input from the functional coordinators was also evaluated by an ad-hoc Review Committee. The Review
This increase in scope was made with the intention of establishing this document as a central repository in which WNP-2 improvement measures related to the Self Assessment can be documented, updated, tracked and trended in an effort to form a complete look at overall station health and improvement initiatives.
~ Committee evaluation was to ensure that there were no conflicts between the goals of the various Supply System organizations and to confirm that the Self Assessment identified weakenesses were effectively addressed by the corrective actions.
The functional coordinators were asked to assure that a demonstrable connection existed between the identified weaknesses and the associated objectives, initiatives, and measurement standards.
Although coordinators were instructed to specifically address the weaknesses set forth within the Self Assessment, they were also instructed to document and address additional weaknesses or improvement efforts affecting regulatory performance. This increase in scope was made with the intention of establishing this document as a central repository in which WNP-2 improvement measures related to the Self Assessment can be documented, updated, tracked and trended
 
in an effort to form     a complete look at overall station health and improvement initiatives. The functional coordinators were asked to assure that a demonstrable connection existed between the identified weaknesses and the associated objectives, initiatives, and measurement standards.
For this document to be successful and effectively serve its stated purpose,.it must be institutionalized through use of existing Supply System programs and processes.
For this document to be successful and effectively serve its stated purpose,.it must be institutionalized through use of existing Supply System programs and processes.
Therefore, this document, as well as issues surfacing from it which transverse functional lines (e.g., human performance errors), will be captured and addressed as initiatives within the Supply System Business Plan.This will ensure that the items receive proper resource allocation and management attention.
Therefore, this document, as well as issues surfacing from it which transverse functional lines (e.g., human performance errors), will be captured and addressed as initiatives within the Supply System Business Plan. This will ensure that the items receive proper resource allocation and management attention. The status of each item will be provided on a routine basis. In this manner objectives and initiatives will be assigned to a responsible individual and will be tracked, trended.
The status of each item will be provided on a routine basis.In this manner objectives and initiatives will be assigned to a responsible individual and will be tracked, trended.and monitored on a periodic basis, but no less than once each quarter.The NRC will be provided updates of this document in a timely manner.This document is organized along the functional lines contained in the Self Assessment.
and monitored on a periodic basis, but no less than once each quarter. The NRC will be provided updates of this document in a timely manner.
In addition, three sections were added based upon our review of our performance.
This document is organized along the functional lines contained in the Self Assessment. In addition, three sections were added based upon our review of our performance. The functional areas included are listed below, with the new. areas added in bold type:
The functional areas included are listed below, with the new.areas added in bold type: 0.0 Core Vice President-Nuclear Operations (VPNO)Objectives 1.0 Licensee Control Systems 2.0 Operations 3.0 Engineering 4.0 Maintenance 5.0 Plant Support 6.0 Training 7.0 Additional Improvement Initiatives Detailed areas of coverage are graphically represented on a Planning Tree which may be found behind the next tab.As an aid to reviewing this document, each functional area is preceded by a matrix containing a summary of the weakness identified in the Self Assessment and the corresponding objective designed to address that weakness.Not all issues identified in the Self Assessment continue today as weaknesses.
0.0 Core Vice President - Nuclear Operations (VPNO) Objectives 1.0 Licensee Control Systems 2.0 Operations 3.0 Engineering 4.0 Maintenance 5.0 Plant Support 6.0 Training 7.0 Additional Improvement Initiatives Detailed areas of coverage are graphically represented on a Planning Tree which may be found behind the next tab. As an aid to reviewing this document, each functional area is preceded by a matrix containing a summary of the weakness identified in the Self Assessment and the corresponding objective designed to
Items no longer requiring attention are identified as"complete" on the functional area matrix.One or two areas are presently being assessed to determine what action, if any, may be required to address the area of weakness.Those items are identified as"evaluating" on the functional area matrix.This document has strong potential to provide the Supply System and the NRC a common basis of understanding, interpreting, and assessing significant regulatory performance issues facing the Supply System.Fundamentally, however, this document is a management tool.As such, it is expected that refinements and revisions will be necessary from time to time.Its continued use will be based upon assessed needs and benefits internal to the Supply System.
 
REGULATORY PERFORMANCE ENHANCEMENT Preparation:
address that weakness. Not all issues identified in the Self Assessment continue today as weaknesses.     Items no longer requiring attention are identified as "complete" on the functional area matrix. One or two areas are presently being assessed to determine what action, if any, may be required to address the area of weakness. Those items are identified as "evaluating" on the functional area matrix.
May 1995-July 1995 Team Members: J.Holder, Regulatory
This document has strong potential to provide the Supply System and the NRC a common basis of understanding, interpreting, and assessing significant regulatory performance issues facing the Supply System. Fundamentally, however, this document is a management tool. As such, it is expected that refinements and revisions will be necessary from time to time. Its continued use will be based upon assessed needs and benefits internal to the Supply System.
&Industry Affairs S.Barwick, Legal Department S.Foraker, Legal Department M.Hatcher, Legal Department J.Marboe, Legal Department Measurement Assistance:
 
D.Embree, Planning and Controls G.Godfrey, Planning and Controls Ehnctional Coordinators:
REGULATORY PERFORMANCE ENHANCEMENT Preparation: May 1995 - July 1995 Team Members: J. Holder, Regulatory & Industry Affairs S. Barwick, Legal Department S. Foraker, Legal Department M. Hatcher, Legal Department J. Marboe, Legal Department Measurement Assistance:   D. Embree, Planning and Controls G. Godfrey, Planning and Controls Ehnctional Coordinators: J. Gearhart, Operations S. Kirkendall, Technical Support D. Martin, Security/Emergency Planning T. Messersmith, Maintenance J. Muth, Quality Assurance R. Patch/R. Winslow, Health Physics M. Price, Planning and Controls W. Shaeffer, Training W. Waddel, Licensee Control Systems D. Whitcomb, Engineering Review Committee:   W. Barley, Radiation Protection J. Engbarth, Administrative Auditor P. Robinson, Outside Legal Counsel J. Streeter, Managing Director Staff C. Van Hoff, Communications and External Affairs
J.Gearhart, Operations S.Kirkendall, Technical Support D.Martin, Security/Emergency Planning T.Messersmith, Maintenance J.Muth, Quality Assurance R.Patch/R.Winslow, Health Physics M.Price, Planning and Controls W.Shaeffer, Training W.Waddel, Licensee Control Systems D.Whitcomb, Engineering Review Committee:
 
W.Barley, Radiation Protection J.Engbarth, Administrative Auditor P.Robinson, Outside Legal Counsel J.Streeter, Managing Director Staff C.Van Hoff, Communications and External Affairs WNP-2 FINAL PERFORMANCE ASSESSMENT PLANNING TREE A SESSLIEHT OFWNP-2 PERFORAA E CORE VPHO OBJECTIVES LICENSEE SSYS IS OP NS ENG EERIHG LIADITENANCE 5.0 PLANT SUPPORT 0.0 TRAINING 7.0 ADDfAONAL IMPROVEMENT INITIATIVES 0.1 LIA NAG ERI SUPERVISOR PERFORMANCE PROBLEM IDEHTIRCATIOH THROUGH SELF-ASSESSMENT SA US MANAGELIENT DIVOLVEMENT SAFETY FOCUS LTANAGEMENT INVOLV EME MANAGEMENT INVOLVEMENT 5.1 SAFETY FOCUS MANAGEMENT DIVOLVEMENT 5.1 OPERATKHIS TRAINING 7.1 MAINTENANCE RULE HUMAN PERFORMANCE CORRECTIVE ACTION OA ADMINISTRATIVE PROCEDURES ROOT CAUSE ANALYSIS DIG AND EVALUAT N 1A CORRECTIVE AM N SIST 2'ROBLEIJ IDENTIFICATION PROBLEM RESOLUTION OPERATIO PROBLELI mENTIRCAIION PROBLELI RESOLUTION SA NDERSTANDING DESIGN 4JA PROBLEM IDENTIRCATION 40B PROBLEM RESOLUTIOH (PULNT)MATERIAL CONDITeN~PROBLEM IDENTIFlDATION
WNP-2 FINAL PERFORMANCE ASSESSMENT PLANNING TREE A SESSLIEHT OFWNP-2 PERFORAA E 5.0                 0.0                 7.0 LICENSEE                                                                                                                    ADDfAONAL CORE VPHO                                                                                                  PLANT              TRAINING        IMPROVEMENT OP        NS      ENG  EERIHG            LIADITENANCE OBJECTIVES          SSYS    IS                                                                        SUPPORT                                INITIATIVES 0.1                                                                                                     5.1                5.1                7.1 LIANAG ERI       PROBLEM         SA          US    SAFETY FOCUS                                SAFETY FOCUS IDEHTIRCATIOH                                                                                             OPERATKHIS        MAINTENANCE SUPERVISOR                                                                                                                  TRAINING              RULE THROUGH SELF-                                                                       MANAGEMENT PERFORMANCE ASSESSMENT                                                                         DIVOLVEMENT MANAGELIENT       LTANAGEMENT               MANAGEMENT DIVOLVEMENT        INVOLVEME                INVOLVEMENT
~PROBLEM RESOMTIO QUALITY OF AA SOB SM DD 5>E SEC H MAINTENANCE TRAINING ENGINEERING SUPPORT TRAINING eA CHEMSIRY AND HP TECHNICIAN TRAINIHG FSAR UPGRADE IMPROVED TECHNICAL SPECIFICATION 7A PLANHIHG AND CONTROL WORK PROCESSES QG EXCEPTIONAL PERFORLIAHCE AVERAGE PERFORMANCE Kl" PERFORLIANCE ADDED BY SUPPLY SYSTEM PROGRAMS AHD PROCEDURES 2.0 CORRECTIVE ACTIOHS QUAUIY OF ENGIHEERIHG WORK PROGRAMS AND PROCEDURES QUAUIY OF LIAINTENANCE WORK PROGRAMS AND PROCEDURES SA WOGRAMS AHD PROCEDIIRES 7$INTEGRATED PLANNING AND SCHEDULIHG PERFORMANCE IMPROVEMENT AREAS CORE VPNO OBJECTIVES 0.0 CORE VPNO OBJECTIVES 0.1 MANAGER/SUPERVISOR PERFORMANCE
                                                                                                        ~PROBLEM ROOT                                                                          IDENTIFlDATION        MAINTENANCE             FSAR HUMAN CAUSE 4JA PERFORMANCE                                                                                                                     TRAINING            UPGRADE ANALYSIS       2'ROBLEIJ               PROBLELI                  PROBLEM        ~PROBLEM IDENTIFICATION     mENTIRCAIION             IDENTIRCATION        RESOMTIO PROBLELI RESOLUTION             40B PROBLEM                                     PROBLEM           QUALITYOF DIG                                                                                            ENGINEERING          IMPROVED CORRECTIVE                            RESOLUTION                                  RESOLUTIOH       AA SOB     SM AND                                                                                                  SUPPORT            TECHNICAL ACTION                                                                                                                    TRAINING        SPECIFICATION EVALUAT N OA                  1A                                                                                    DD 5>E           eA                  7A SA SEC   H CORRECTIVE                                                            (PULNT)                            CHEMSIRY AND         PLANHIHG AND ADMINISTRATIVE                                            NDERSTANDING                                                      HP TECHNICIAN PROCEDURES AM    N                                                      MATERIAL                                                    CONTROL SIST            OPERATIO              DESIGN                  CONDITeN                                  TRAINIHG 7$
~Improve manager supervisor performance.
QUAUIYOF                    QUAUIY                                                    INTEGRATED WORK                              PROGRAMS                                        OF                                                    PLANNING AND AHD          ENGIHEERIHG PROCESSES                                                                        LIAINTENANCE                                                SCHEDULIHG PROCEDURES            WORK WORK 2.0                                                            SA CORRECTIVE PROGRAMS                  PROGRAMS        WOGRAMS AND                        AND                AHD EXCEPTIONAL          ACTIOHS        PROCEDURES                                    PROCEDIIRES PROCEDURES QG     PERFORLIAHCE AVERAGE PERFORMANCE Kl"   PERFORLIANCE ADDED BY SUPPLY SYSTEM
OBJECTIVE 0.1.1 0.2 HUMAN PERFORMANCE
 
~Improve human performance.
PERFORMANCE IMPROVEMENT AREAS CORE VPNO OBJECTIVES 0.0 CORE VPNO OBJECTIVES 0.1 OBJECTIVE MANAGER/
OBJECTIVE 0%1 0.3 CORRECTIVE ACllON~Improve effectiveness of corrective actions OBJECTIVE 0.3.1 0.4 ADMINISTRATIVE PROCEDURES
SUPERVISOR       ~ Improve manager supervisor performance.                         0.1.1 PERFORMANCE 0.2 OBJECTIVE HUMAN PERFORMANCE         ~ Improve human performance.                                     0%1 0.3 OBJECTIVE CORRECTIVE ACllON         ~ Improve effectiveness of corrective actions                     0.3.1 0.4 OBJECTIVE ADMINISTRATIVE PROCEDURES         ~ Simplify admlnlstratlve procedures.                             0.4.1 0.5 OBJECTIVE WORK PROCESSES         ~ Simplify management, design change, and procurement work       0.5.1 processes.
~Simplify admlnlstratlve procedures.
EXCEPTIONAL PERFORMANCE      ~
OBJECTIVE 0.4.1 0.5 WORK PROCESSES~Simplify management, design change, and procurement work processes.
                                    ~w     AVERAGE PERFORMANCE       ~     MNIMUM PERFORMANCE ~
OBJECTIVE 0.5.1 EXCEPTIONAL
                                                                                ~tt  ADDED BY SUPPLY SYSTEM 0504700.0.0 JULY 0$ . 1000
~w AVERAGE MNIMUM~tt ADDED BY PERFORMANCE
 
~PERFORMANCE
VICE PRESIDENT - XUCI.EAR OPERATIONS OBJECTIVES
~PERFORMANCE
                                                                                        't 0.1     MANAGER/SUPERVISOR PERFORMANCE (Reference Business Plan Management Initiative OP 6)
~SUPPLY SYSTEM 0504700.0.0 JULY 0$.1000 VICE PRESIDENT-XUCI.EAR OPERATIONS OB JECTIVES't 0.1 MANAGER/SUPERVISOR PERFORMANCE (Reference Business Plan Management Initiative OP 6)Objective:
Objective:       0.1.1       Improve manager/supervisor performance by changing cultural behavior.
0.1.1 Improve manager/supervisor performance by changing cultural behavior.Initiatives:
Initiatives:     0.1.1.A     Implement Leadership Expectations-plan, lead, organize and control.
0.1.1.A Implement Leadership Expectations-plan, lead, organize and control.Completed.
0.1.1.B Assess manager/supervisor development needs-assessment for key managers.Ongoing.0.1.1.C Develop initial and continuing supervisor/manager training program.Training Advisory Group (TAG)formed in October 1994;completed training needs assessment in March 1995;conducted the first cycle of continuing training in March 1995.Ongoing.0.1.1.D Periodically survey the workplace to assess the effectiveness of performance improvement efforts.Ongoing.0.1.1.E Implement succession planning process.Program evaluation complete with Senior Management approval of the revised process in 2/95.Program is currently in process to identify candidates and their development needs.12/95.Expected Results: Improvements in the performance and skills of Supply System managers and supervisors, identification and correction of Supply System issues through effective supervision, and improvement in the performance and the consistency of performance of Supply System workers.Measurement Standard: Feedback from employees through formal instruments and informal sessions.Page 1 0.2 HUMAN PERFORMANCE (Reference Business Plan Initiative OP 9)~~~~~~Objective:,0.2.1 Improve human performance at WNP-2.Actions: 0.2.1.A Approve Management Initiative to improve human performance.
Completed.
Completed.
0.2.1.B Establish Human Performance Coordinator position reporting to VPNO.Completed.
0.1.1.B     Assess manager/supervisor      development  needs assessment  for key managers. Ongoing.
0.2.1.C Identify internal and external attitudes regarding human performance.
0.1.1.C     Develop initial and continuing supervisor/manager training program.
9/30/95.0.2.1.D Identify current initiatives to improve human performance.
Training Advisory Group (TAG) formed in October 1994; completed training needs assessment in March 1995; conducted the first cycle of continuing training in March 1995. Ongoing.
9/30/95.0.2.1.E Assess devices being used to monitor human performance.
0.1.1.D    Periodically survey the workplace to assess        the effectiveness of performance improvement efforts. Ongoing.
9/30/95.0.2.1.F Assess effectiveness of each department's human performance and develop recommendations for enhancements e.g., site wide OI-9 and Gold Card program.9/30/95.0.2.1.G Integrate human performance improvement efforts.Ongoing.Expected Result: Reduced number and significance of human errors.Measurement Standards:
0.1.1.E    Implement succession planning process. Program evaluation complete with Senior Management approval of the revised process in 2/95.
0.2.1.a Number/rate of PERs caused by human performance.
Program is currently in process to identify candidates and their development needs. 12/95.
0.2.1.b Number/rate of significant PERs caused by human performance.
Expected Results:         Improvements in the performance and skills of Supply System managers and supervisors, identification and correction of Supply System issues through effective supervision, and improvement in the performance and the consistency of performance of Supply System workers.
Page 2 0.3 CORRECTIVE ACTION Objective:
Measurement Standard:       Feedback from employees through formal instruments and informal sessions.
~~~0.3.1 Improve the effectiveness of corrective actions in correcting and preventing the recurrence of significant deficiencies.
Page 1
Actions: 0.3.1.A Form and implement a Corrective Action Review Board (CARB).Completed.
 
0.3.1.B Review significant PERs and other PERs selected by CARB members to assess adequacy of corrective actions.Ongoing.0.3.1.C Provide CARB feedback to PER dispositioners on CARB lessons-learned.
0.2
Ongoing.Expected Results: Improved quality of PER dispositions.
  ~       HUMANPERFORMANCE (Reference           Business Plan Initiative OP 9)
Reduced number of recurring significant deficiencies.
    ~  ~
Measurement Standards:
Objective:,0.2.1
0.3.1.a Number/rate of recurring PERs.0.3.1.b Number/rate of recurring significant PERs.Page 3 0.4 ADMINISTRATIVE PROCEDUMB~~~~~~Objective:
          ~  ~ ~    Improve human performance at WNP-2.
0.4.1 Simplify administrative procedures (Reference Business Plan Management Initiative OP 7).Actions: 0.4.1.A 0.4.1.B Establish procedure hierarchy.
Actions:    0.2.1.A  Approve Management          Initiative to improve human performance.
Completed.
Completed.
Develop and implement a plan to simplify and clarify administrative procedures.
0.2.1.B  Establish Human Performance Coordinator position reporting to VPNO.
Completed.
Completed.
Implementation in progress.0.4.1.C Identify procedure requirements and commitments.
0.2.1.C  Identify internal and external attitudes regarding human performance.
9/30/95.
0.2.1.D  Identify current initiatives to improve human performance. 9/30/95.
0.2.1.E  Assess devices being used to monitor human performance.        9/30/95.
0.2.1.F  Assess  effectiveness of each department's      human performance and develop recommendations for enhancements        e.g., site wide OI-9 and Gold Card program. 9/30/95.
0.2.1.G  Integrate human performance improvement efforts. Ongoing.
Expected Result:      Reduced number and significance    of human errors.
Measurement Standards:  0.2.1.a  Number/rate    of PERs  caused by human performance.
0.2.1.b  Number/rate of significant PERs caused by human performance.
Page 2
 
0.3      CORRECTIVE ACTION
    ~  ~
Objective: ~  0.3.1    Improve the effectiveness of corrective actions in correcting and preventing the recurrence of significant deficiencies.
Actions:      0.3.1.A  Form and implement a Corrective Action Review Board (CARB).
Completed.
Completed.
0:4.1.D Develop tracking system for requirements and commitments.
0.3.1.B  Review significant PERs and other PERs selected by CARB members to assess adequacy of corrective actions. Ongoing.
0.3.1.C  Provide CARB feedback to PER dispositioners on CARB lessons-learned.
Ongoing.
Expected Results:      Improved quality of PER dispositions.
Reduced number  of recurring significant deficiencies.
Measurement Standards:    0.3.1.a  Number/rate of recurring PERs.
0.3.1.b  Number/rate of recurring significant PERs.
Page 3
 
0.4
~      ADMINISTRATIVEPROCEDUMB
    ~  ~
Objective:~  0.4.1
              ~ ~      Simplify    administrative procedures    (Reference    Business    Plan Management Initiative OP 7).
Actions:    0.4.1.A    Establish procedure hierarchy. Completed.
0.4.1.B    Develop and implement a plan to simplify and clarify administrative procedures. Completed. Implementation in progress.
0.4.1.C    Identify procedure requirements and commitments. Completed.
0:4.1.D     Develop tracking     system   for requirements     and commitments.
Completed.
Completed.
0.4.1.E Restructure administrative procedures.
0.4.1.E     Restructure administrative procedures. 12/96.
12/96.Erpected Results: Simple, cost-effective and efficient procedures and improved employee compliance to procedures.
Erpected Results:     Simple, cost-effective and efficient procedures and improved employee compliance to procedures.
Reduced number of administrative procedures and reduced number/rate of PERs caused by administrative procedure complexity and other shortcomings.
Reduced number of administrative procedures and reduced number/rate         of PERs caused by administrative procedure complexity and other shortcomings.
Measurement Standards:
Measurement Standards:   0.4.l.a     Number of administrative procedures.
0.4.l.a Number of administrative procedures.
0.4.1.b     Number/rate of PERs caused by administrative complexity and other shortcomings, Page 4
0.4.1.b Number/rate of PERs caused by administrative complexity and other shortcomings, Page 4 0.5 WORK PROCESSES Objective:
 
0.5.1~I t I~Simplify management process, design change process, and procurement process (Reference Business Plan Management Initiative OP 7).Actions: 0.5.1.A Form process improvement teams.~Work Management
0.5     WORK PROCESSES
-Completed~Procurement
    ~  I Objective:0.5.1 I ~       Simplify management process, design change process, and procurement process (Reference Business Plan Management Initiative OP 7).
-Completed~Design Change-9/11/95 0.5.1.B Evaluate process and identify improvements.
Actions:     0.5.1.A   Form process improvement teams.
~Work Management
                          ~ Work Management - Completed
-Completed~Procurement
                          ~ Procurement - Completed
-10/4/95~Design Change-11/13/95 0.5.1.C Develop implementation plan for improvements.
                          ~ Design Change - 9/11/95 0.5.1.B     Evaluate process and identify improvements.
~Work Management
                          ~ Work Management - Completed
-7/28/95~Procurement
                          ~ Procurement - 10/4/95
-11/I/95~Design Change-12/29/95 0.5.1.D Implement improvements.
                        ~ Design Change - 11/13/95 0.5.1.C     Develop implementation plan for improvements.
Expected Results:~Work Management
                        ~ Work Management - 7/28/95
-10/30/95~Procurement
                        ~ Procurement - 11/I/95
-I/I/96~Design Change-2/5/96 Simple, cost-effective, and efficient processes and improved employee compliance to procedures.
                        ~ Design Change - 12/29/95 0.5.1.D     Implement improvements.
Measurement Standards:
                        ~ Work Management - 10/30/95
0.5.1.a Staffing levels.0.5.1.b Overtime.0.5.l.c Work Order Inventory Age..0.5.1.d PERs related to ineffective controls.Page 5 1.0 LICENSEE C CAROL SYSTEMS PERFORMANCE IMPROVEMENT AREAS LICENSEE CONTROL SYSTEMS~Overall: lese than average performance PROBLEM IDENTIFICATION THROUGH SELF-ASSESSMENT
                        ~ Procurement -   I/I/96
~Increased selfwssessment needed-particularly In areas with long standing problems OBJECTIVE 1.1.3~O.A.reviews have been too narrow 5.3A.1~POC performance Identified as weak Complete~OER noted as not timely or acted upon 1.1.1 1.1.2 1.2'ROOT CAUSE ANALYSIS~Quantity of root cause analyses needs Improvement.
                        ~ Design Change - 2/5/96 Expected Results:    Simple, cost-effective, and efficient processes and improved employee compliance to procedures.
OBJECTIVE 1.2.1 1.3 TR NDING8a EVALIJh ON~PTL not used to fullest capacity despite slgnlflcant upgrade to PTL software OBJECTIVE 1.4 CO RECTIVE ACTION SYSTE~Actual or perceived complexity In Implementing corrective action process has resulted ln llmlted use of the system~O.A.I Une organlzatlon Interface requires Improvement to assure emerging problems are Identified OBJECTIVE Complete 5.3A.1 5.3A.2 EXCEPTIONAL AVERAGE MINIMuM PERFORMANCE W PERFORMANCE
Measurement Standards:   0.5.1.a     Staffing levels.
" PERFORMANCE QSOI76 I.O.O JULY 2$.100$
0.5.1.b     Overtime.
LICENSEE CONTROL SYSTEMS 1.1 PROBLEM IDENTIFICATION THROUGH SELF-ASSESSMENT Objective:
0.5.l.c     Work Order Inventory Age..
1.1.1 Improve the adequacy, timeliness, and efficiency of reviewing industry experience and applying it to WNP-2.Initiatives:
0.5.1.d     PERs related to ineffective controls.
1.1.1.A Revise PPM 1.10.4 (External Operational Experience Review).Completed.
Page 5
1.1.1.B Establish line organization commitment to perform reviews of OER, tracking process, and goals.8/15/95.1.1.1.C Provide training to line organization staff.9/15/95.1'.1.1.D Initiate line review of Operating Experience Reviews (OERs)~9/30/95.1.1.1.E Coach line staff on the adequacy and timeliness of review process.Through 12/31/95.1.1.1.F Review the process and results for quality and possible adjustments.
 
Ongoing.Erp ected Result: OER information will be reviewed in a thorough and timely manner with appropriate corrective actions resulting.
PERFORMANCE IMPROVEMENT AREAS LICENSEE CONTROL SYSTEMS 1.0
Measurement Standards:
                        ~ Overall: lese than average performance LICENSEE C    CAROL SYSTEMS PROBLEM                                                                           OBJECTIVE IDENTIFICATION THROUGH SELF-
1.1.1.a Monitor the monthly report on OER reviews for timeliness and corrective actions implemented.
                        ~ Increased selfwssessment needed - particularly In areas with long 1.1.3 ASSESSMENT          standing problems
1.1.1.b Appropriate corrective actions reviewed and taken by line management.
                        ~ O.A. reviews have been too narrow                                 5.3A.1
1.1.1.c Screen the PER database on a periodic basis to see if problems contained within OER information have occurred at WNP-2.Obj ective: 1.1.2 Evaluate the adequacy of original OER reviews.InMatives:
                        ~ POC performance Identified as weak                               Complete
1.1.2.A Establish a program to review selected OERs.9/30/95.Page 6 Expected Result: Either confirm that the original review and corrective action implementation process was effective or identify additional corrective actions necessary.
                        ~ OER noted as not timely or acted upon                             1.1.1 1.1.2 1.2 OBJECTIVE
Measurement Standard: Monitor percentage of reviewed OERs that require new corrective actions.Objective:
          'ROOT CAUSE         ~ Quantity of root cause analyses needs Improvement.                 1.2.1 ANALYSIS 1.3 OBJECTIVE TR NDING8a EVALIJh ON       ~ PTL not used to fullest capacity despite slgnlflcant upgrade to PTL software 1.4 OBJECTIVE CO RECTIVE       ~ Actual or perceived complexity In Implementing corrective action   Complete ACTION          process has resulted ln llmlted use of the system SYSTE
Improve the line organization's ability to perform self-assessments.
                        ~ O.A. I Une organlzatlon Interface requires Improvement to assure   5.3A.1 emerging problems are Identified                                  5.3A.2 EXCEPTIONAL PERFORMANCE     W AVERAGE PERFORMANCE
InMatives:
                                                      "   MINIMuM PERFORMANCE QSOI76 I.O.O JULY 2$ . 100$
1.1.3.A Establish guidelines for the self-assessment process.7/31/95.1.1.3.B Staff a self-assessment specialist to coach line organization.
 
9/1/95.1.1.3.C Begin first self-assessment with line organizations.
LICENSEE CONTROL SYSTEMS 1.1     PROBLEM IDENTIFICATIONTHROUGH SELF-ASSESSMENT Objective:   1.1.1       Improve the adequacy, timeliness, and efficiency of reviewing industry experience and applying it to WNP-2.
10/1/95.Expected Result: Line organization performance should improve.Measurement Standardt Monitor line organization performance indicators.
Initiatives: 1.1.1.A     Revise     PPM   1.10.4 (External   Operational Experience   Review).
Page 7 1.2 ROOT CAUSE ANALYSIS Objective:
t 1.2.1 Increase the frequency and quality of root cause analysis.Initiatives:
1.2.1.A Revise PPM 1.3.12A, Processing of Problem Evaluation Requests, to provide definitive guidance on when root cause analyses will be used in the dispositioning of PERs.8/31/95.1.2.1.B Significantly increase coaching of PER dispositioners in root cause analysis techniques.
Beginning 9/1/95.1.2.1.C Provide initial and continuing root cause analysis training to selected personnel.
Ongoing.Expected Result: The number of repeat problems should be reduced.Measurement Standards:
1.2.1.a Trend the number of repeat problems on a periodic basis, and assess data results at the end of the period.Trend the number of repeat problems due to incorrect or inadequate corrective action because a root cause analysis was not.performed..Page 8 PERFORMANCE IMPROVEMENT AREAS OPERATIONS OPE ONS~Overall: less than average performance 2.1 SAFE OCUS~Unsatisfactory Operator&Supervisor performance
~Poor questlonlng attitude~Conservative decision making still weak~Inadequate oversight of overall Plant Actlvltles OBJECllVE 2.1.1 212 2.1.1 2.14 2.1.3 2.1.1 2.14 2.2 MANAGEMENT INVOLVEMENT 2.3A PROBLEM IDENTIFICATION
~Need to Increase management presence&expectatlons
~Communlcatlon of management's expectatlons Is weak~Slgnlflcant PERs mostly self-Identified
~Varied perception of when to Inltlate PERs OB JECTIVE 2.2.1 2.2.2 2&1 2~OB JECTIVE Evaluating Evaluating 2.38 PROBLEM RESOLUTION 2.4 0 ALITYOF OPERATIONS
~Poor questlonlng attitude~Inadequate oversight of Plant Activities
~Incomplete compliance with Technical Speclflcatlon Requirements
~Need to reduce personnel errors~Lack of formal process to evaluate effectiveness of work around fixes~Need to ellmlnate numerous performance errors~Attention to detail needs emphasized
'BJECTIVE 2.1.1 2.1.2 2.1.1 2.4.1 2.4.1 2.4.1'BJECTIVE 2.1.1 PROGRAMS&PROCEDURES
~Procedural adherence rernalns a challenge~Need to complete procedure Improvements (remove amblgulty&streamline)
~Crews need to request assistance with subtle Issues OB JECTIVE 2.5.1 2.5.1 2.5.2 CORRECTIVE ACTIONS~Foster operation staff acceptance of Issues.OB JECTIVE 2.6.1 El EXCEP1IONAL PERFORMANCE AVERAGE PERFORMANCE MINIMUM PERFORMANCE ADDED BY SUPPLY SYSTEM 050lre-2.0.0 JULY 8, 1005 OPERATIONS 2.1 SAFETY FOCUS Objective:
2.1.1 Improve safety culture such that (1)staff members are constantly looking for subtle issues, (2)all staff members are actively.bringing safety issues to management's attention, and (3)management deals with the issues effectively such that they are resolved prior to significant affect on reliability.
InMatives:
2.1.1.A Implement a revision to the OI-9 Program enabling identified issues to be resolved effectively, including criteria dealing with issue identification and the use of Plant programs (PERs and WRs).8/1/95.2.1.1.B Implement the Management Oversight Program in the Control Room.This program places experienced, non-operations managers in the Control Room for the express purpose of identifying positive and negative behaviors and providing immediate feedback to the Operations staff on-shift.This allows human performance to be enhanced.This program was authorized on 4/15/95 as a temporary program to improve department performance.
It continues through 8/5/95, at which time it will be evaluated for continuation, revision or cancellation.
2.1.1.C Establish the expectation that either the Operations Manager or.the Assistant Operations Manager be involved in Technical Specification interpretations and that Licensing be contacted, as necessary, to develop consistent decisions.
Completed.
Completed.
2.1.1.D Issue guidance on items to consider and criteria necessary for making judgements regarding applicability of Technical-Specifications.
1.1.1.B    Establish line organization commitment to perform reviews      of OER, tracking process, and goals. 8/15/95.
9/30/95.2.1.1.E Initiate changes in crew make-up to infuse new ideas, expectations and attitudes through a mixing of experience and personalities.
1.1.1.C    Provide training to line organization staff. 9/15/95.
10/1/95.2.1.1.F Develop a program which involves Operations staff in identifying areas for positive and improved implementation of management expectations relating to human performance (similar to Calvert Cliff's Gold Card).Gold Card results will be used in crew discussions to reinforce, clarify and revise management expectations as a regular portion of the Operations Crew Training Cycle.This discussion will occur on a peer-to-peer level using real-life examples to reinforce behaviors in self-identification and assessment.
1'.1.1.D    Initiate line review of Operating Experience Reviews (OERs)  ~ 9/30/95.
In addition, Gold Card Program results Page 9 which indicate a trend of performance issues will be treated as a PER condition.
1.1.1.E    Coach line staff on the adequacy and timeliness      of review  process.
8/1/95.2.1.1.6 Improve Operations'articipation in the Quarterly System Walk-down Program to expose other personnel to Operations'hilosophies and problems.This program exposes Operations personnel to the views and problems of support organizations.
Through 12/31/95.
Ongoing.2.1~1.H Improve Operations staff participation on the PRG/PRC to help select project activities based upon operational needs.Ongoing.Expected Results: Improved Safety Culture in which Operations is more able to recognize subtle trends and problems resulting in improved response to equipment and personnel issues prior to their having an affect on Operations.
1.1.1.F    Review the process and results for quality and possible adjustments.
This should be reflected in fewer and shorter forced outages and improved teamwork among WNP-2 organizations.
Ongoing.
e Level Measurement.I I I*:~l 2.1.l.a Reduction in unplanned automatic scrams.2.l.l.b Increase safety system reliability.
Erp ected Result:      OER information willbe reviewed in a thorough and timely manner with appropriate corrective actions resulting.
2.1.1.c Fewer unplanned safety system actuations.
Measurement Standards:    1.1.1.a    Monitor the monthly report on OER reviews for timeliness and corrective actions implemented.
2.1.1.d Increase emergency generator reliability.
1.1.1.b    Appropriate corrective actions reviewed and taken by line management.
2.1.1.e Increased Net Electrical Generation, Capacity Factor, and Unit Capability Factor.2.l.l.f Reduced Unplanned Capability Loss Factor.2.1.1'.g Reduce the number of NOVs, LERs, and personnel errors.ea men vl 2.1.1.h OI-9 summaries indicating fewer instances of failure to meet expectations.
1.1.1.c                                                        if Screen the PER database on a periodic basis to see problems contained within OER information have occurred at WNP-2.
2.l.l.i Management Oversight observations indicating improved performance.
Obj ective:  1.1.2      Evaluate the adequacy    of original OER reviews.
2.1.1.j Fewer NOVs and LERs for technical specification violations with zero as a goal.2.1.l.k Feedback from other WNP-2 organizations (i.e., Maintenance, Plant Support, Health Physics and Quality Assurance) indicating improved Operations performance and better working relationships.
InMatives:    1.1.2.A    Establish a program to review selected OERs. 9/30/95.
Page 10 2.1.1.1 Increase in PER generation rate as issues are identified, followed by a PER reduction as those issues are corrected and do not recur.Objective:
Page 6
2.1.2 Create a Management Oversight presence which (1)leads to identification of issues before they affect reliability, (2)reinforces management expectations, and (3)allows management to make decisions to the greatest extent possible based on fact and not opinion.Initiatives:
 
2.1.2.A Implement the revised OI-9 Program as discussed in 2.1.1.A.The observations required under this program for Operations management, especially the Operations Manager, Assistant Operations Manager, Day-Shift Manager and Shift Managers, provide an increased oversight presence.8/1/95.2.1.2.B Use the Management Oversight Program in the Control Room, as discussed in 2.1.1.B.Ongoing.2;1.2.C Develop additional trending capability within Operations, which will allow management to address individual and systemic problems quicker.8/1/95.2.1.2.D Implement a pilot program that will provide managers and supervisors additional training on managerial techniques such as (1)pinpointing results and behaviors which support organizational goals, (2)developing measurement and feedback systems to communicate progress, and (3)managing and reinforcing desired behaviors and results, Pilot training to be completed by 9/1/95 followed by an implementation period.Improvements in performance will be monitored before additional staff.management members receive the training.Expected Results: Operations management will be more visible and active in reinforcing expectations.
Expected Result:     Either confirm that the original review and corrective action implementation process was effective or identify additional corrective actions necessary.
This visibility and activity will enable management to recognize problems at an earlier stage.This will result in not only identifying the need.to improve behaviors, but also successfully coaching individuals towards desired improvements or making changes in personnel who do not adapt to expectations.
Measurement Standard:  Monitor percentage of reviewed OERs that require new corrective actions.
e Lev Measurement S d d*:~UI 2.1.2.a Same as 2.1.1.a-2.1.1.g.De men Level 2.1.2.b Non-shift management time in the Control Room will be increased.
Objective:              Improve the line organization's ability to perform self-assessments.
Page 11 2.1.2.c Operations management will rate the quality of the OI-9 observations made by the on-shift management complement (SM and CRS).2.1.2.d 2.1.2.e The quality of the feedback from Shift Managers and Control Room Supervisors will be judged by individual contributors who have had interface with them each quarter.This will help evaluate the coaching and reinforcement techniques practiced by management personnel.
InMatives:  1.1.3.A    Establish guidelines for the self-assessment  process. 7/31/95.
Management Oversight observations are being reviewed for improved performance.
1.1.3.B    Staff a self-assessment specialist to coach line organization. 9/1/95.
2.1.2.f Industry peer evaluations, e.g., INPO assist visits, will be performed periodically to evaluate the effectiveness of the Management Oversight Program.Objective:
1.1.3.C    Begin first self-assessment with line organizations. 10/1/95.
2.1.3 Foster an environment in which all individuals make conservative decisions when responding to issues.Initiatives:
Expected Result:    Line organization performance should improve.
2.1.3.A Implement revised OI-9 management observations, as discussed in 2.1.1.A.Ongoing.2.1.3.B Implement revised Management Oversight Program, as discussed in 2.1.1.B.Ongoing.2.1.3.C Use simulator training scenarios during each training cycle which promote conservative decision-making.
Measurement Standardt  Monitor line organization performance indicators.
These scenarios specifically address implementation of Technical Specifications.
Page 7
Ongoing.2.1.3.D Continue Boss Talks, which involve example discussions with Operations team members and are used to reinforce expectations for conservative decision-making.
 
Ongoing.2.1.3.E Implement the Gold Card Program, as discussed in 2.1.1.F.8/1/95.Zxpected Results: Additional training and coaching will result in improvements in conservative decision-making.
1.2     ROOT CAUSE ANALYSIS Objective:t  1.2.1    Increase the frequency and quality  of root cause analysis.
Response to precursor problems will become more effective and thereby increase overall Plant reliability through fixing problems early, instead of waiting until they become challenges to current performance.
Initiatives: 1.2.1.A  Revise PPM 1.3.12A, Processing of Problem Evaluation Requests, to provide definitive guidance on when root cause analyses will be used in the dispositioning of PERs. 8/31/95.
Page 12 Measurement s~e:~l 2.1.3.a Same as standards 2.1.1.a, 2.1.1.b, 2.1.1.d, 2.1.1.e, and 2.1.l.f.De men Level 2.1.3.c Management Oversight observations should indicate improvement.
1.2.1.B  Significantly increase coaching of PER dispositioners in root cause analysis techniques. Beginning 9/1/95.
2.1.3.d NRC observations should indicate improvement.
1.2.1.C  Provide initial and continuing root cause analysis training to selected personnel. Ongoing.
2.1.3.e Management observations of the Gold Card Program should indicate that conservative decisions are being discussed and reinforced.
Expected Result:      The number of repeat problems should be reduced.
2.1.3.f Peer evaluations of performance will be conducted periodically to evaluate this area.Page 13 2.2 MANAGEMENT INVOLVEMENT Obj ective:~I t 2,2.1 Create an environment in which Operations staff accepts, implements and reinforces management expectations at all times.Initiatives:
Measurement Standards:  1.2.1.a  Trend the number of repeat problems on a periodic basis, and assess data results at the end of the period.
2.2.1.A Hold confirmatory meetings with Operations staff to focus on the acceptance, development, and implementation of management expectations.
Trend the number of repeat problems due to incorrect or inadequate corrective action because a root cause analysis was not.performed.
Beginning in the fourth quarter of 1995.2.2.1.B Implement the OI-9 Program, as discussed in 2.1.1.A.8/1/95.2.2.1.C Continue Boss Talks in Operations, as discussed in 2.1.3.D.Ongoing.2.2.1.D Implement pilot management training, as discussed in 2.1.2.D.This training will be used in conjunction with the regular performance appraisal program.9/1/95.Expected Results: Confirmatory meetings will enhance commitment to management expectations, Completing the balance of the initiatives will further reinforce and validate implementation of the expectations.
                                                                                      .Page 8
Overall, the expectations should result in more effective personnel performance and increased reliability in Plant operations.
 
Measurement R dA: v 2.2.1.a Same as the standards set forth in 2.1.1.a-2.1.1.g.2.2.l.b Same as the standards set forth in 2.1.1.h-2.l.l.m.2.2.1.c Performance appraisal results will identify, in detail, the implementation of management expectations.
PERFORMANCE IMPROVEMENT AREAS OPERATIONS
2.2.1.d Same as the standard set forth in 2.1.2.d.Objective:
                            ~ Overall: less than average performance OPE      ONS 2.1 OBJECllVE SAFE      OCUS                                                                          2.1.1
2.2.2 Use the Operations quarterly indicators to (1)reinforce management expectations, (2)facilitate identification of areas requiring additional work, and (3)facilitate identification of successes showing improvement from the'perspective of the Operations staff and WNP-2 management.
                      ~  Unsatisfactory Operator & Supervisor performance 212 2.1.1
In Natives: 2.2.2.A Select and analyze key Operations processes (e.g., Clearance Order processing) to identify in-process performance indicators which would assist implementers and staff in evaluating the quality of process implementation.
                      ~  Poor questlonlng attitude                                          2.14
Collect and chart data to allow improved performance Page 14 of a particular process.After certain process level improvements are made and solidified, select another process for similar review and continue until all Operations processes have been analyzed.Ongoing.2.2.2.B Revise the Operations quarterly indicators to track human performance trends requiring improvement.
                      ~  Conservative decision making still weak                            2.1.3
Assure these indicators have goals or control bands identified to focus management attention when necessary.
                      ~  Inadequate oversight of overall Plant Actlvltles                    2.1.1 2.14 2.2 OB JECTIVE MANAGEMENT                                                                                2.2.1 INVOLVEMENT      ~  Need to Increase management presence & expectatlons 2.2.2
Beginning 8/1/95.2.2.2.C Periodically review equipment trending data from Technical Staff to ensure Maintenance and Technical Staff personnel are focused on equipment trends which Operations believes require attention.
                      ~  Communlcatlon of management's expectatlons Is weak                2&1 2~
Validate equipment trends with operator workarounds and problem areas.Beginning 10/1/95.Expected Results: Analyzing processes and tracking in-process performance will allow performers and management to identify process or implementation problems earlier and implement fixes prior to the problem affecting Plant reliability.
2.3A OB JECTIVE PROBLEM IDENTIFICATION    ~ Slgnlflcant PERs mostly self-Identified                              Evaluating
In addition, establishing performance indicators will reinforce expectations and allow standards to be revised for added efficiencies.
                      ~  Varied perception of when to Inltlate PERs                        Evaluating 2.38
At the same time, data gathering will allow a greater degree of management by fact, rather than by assumption.
                                                                                          'BJECTIVE PROBLEM RESOLUTION      ~ Poor questlonlng attitude                                            2.1.1 2.1.2
These actions should translate into improved Plant reliability, better problem resolution and clearer expectations.
                      ~  Inadequate oversight of Plant Activities                            2.1.1
Measurement S de*: e Level 2.2.2.a Same as the standards set forth in 2.1.1.a-2.1.1.g.llgUKLal 2.2.2.b One process per quarter will be tracked, trended and evaluated to ensure demonstrated improvement.
                      ~ Incomplete compliance with Technical Speclflcatlon Requirements      2.4.1
2.2.2.c Feedback from operators and shift crews will be monitored to evaluate responsiveness to problems.2.2.2.d Human performance PERs for Operations'rrors, related to Operations'rocesses, will be monitored for reduction.
                      ~ Need to reduce personnel errors                                      2.4.1
2.2.2.e Management Oversight observations will be monitored for indications of improved performance.
                      ~ Lack of formal process to evaluate effectiveness                      2.4.1 of work around fixes 2.4
Page 15 2.3A PROBLEM IDENTIFICATION Obj ective: t 2.3A.1 Increase the number of PERs generated as a'esult of Operations'involvement in Plant activities.
                                                                                          'BJECTIVE 0 ALITYOF OPERATIONS      ~  Need to ellmlnate numerous performance errors                        2.1.1
Initiative:
                      ~  Attention to detail needs emphasized PROGRAMS                                                                              OB JECTIVE
2.3A.1.A Coaching by the Operations Manager, via the on-going OI-9 reviews and on-going Management Oversight, has provided additional clarification and expectations.
          &          ~ Procedural adherence rernalns a challenge                            2.5.1 PROCEDURES
As a result, the current threshold for generating PERs is considered adequate.No further action will be taken regarding this issue at this time.2.3A.1.B Generate statistical data demonstrating that the current PER level is truly representative of existing problems.3/96 Objective:
                      ~  Need to complete procedure Improvements                              2.5.1 (remove amblgulty & streamline)
2.3A.2 Develop a common understanding among Operations staff regarding the need to document problems so that they can be properly characterized and fixed.Initiative:
                      ~ Crews need to request assistance with subtle Issues                  2.5.2 OB JECTIVE CORRECTIVE ACTIONS
2.3A.2.A Coaching by the Operations Manager, via the ongoing OI-9 evaluations and in-progress Management Oversight observations, has provided additional clarification and improved consistency.
                      ~  Foster operation staff acceptance of Issues.                        2.6.1 El      EXCEP1IONAL PERFORMANCE AVERAGE PERFORMANCE MINIMUM PERFORMANCE ADDED BY SUPPLY SYSTEM 050lre-2.0.0 JULY 8, 1005
The current threshold for PER generation is consistent between shifts and is meeting management expectations.
 
No further action will be taken, regarding this issue at this time.Page 16 2.3B PROBLEM RESOLUTION Objective:
OPERATIONS 2.1    SAFETY FOCUS Objective: 2.1.1    Improve safety culture such that (1) staff members are constantly looking for subtle issues, (2) all staff members are actively. bringing safety issues to management's attention, and (3) management deals with the issues effectively such that they are resolved prior to significant affect on reliability.
~~2.3B.1 Improve the system for reviewing chronic problems and operator workarounds to ensure it is based on sound technical facts and judgments.
InMatives: 2.1.1.A Implement a revision to the OI-9 Program enabling identified issues to be resolved effectively, including criteria dealing with issue identification and the use of Plant programs (PERs and WRs). 8/1/95.
Clearly communicate this system to Operations staff so that misunderstandings about station priorities are avoided.InMatives:
2.1.1.B Implement the Management Oversight Program in the Control Room.
2.3B.l.A Revise OI-14 Chronic Equipment Problems.OI-14 documents the methods to track status and prioritize chronic equipment problems resulting in operator workarounds.
This program places experienced, non-operations managers in the Control Room for the express purpose of identifying positive and negative behaviors and providing immediate feedback to the Operations staff on-shift. This allows human performance to be enhanced. This program was authorized on 4/15/95 as a temporary program to improve department performance. It continues through 8/5/95, at which time it will be evaluated for continuation, revision or cancellation.
The revision will improve identification of issues for resolution.
2.1.1.C Establish the expectation that either the Operations Manager or.the Assistant Operations Manager be involved in Technical Specification interpretations and that Licensing be contacted, as necessary, to develop consistent decisions. Completed.
Beginning 9/1/95.2.3B.1.B Establish goals for reducing the number of workarounds.
2.1.1.D Issue guidance on items to consider and criteria necessary for making judgements regarding applicability of Technical-Specifications. 9/30/95.
9/1/95.Erpected Result: Improved focus will reduce the total number and duration of Operations workarounds, e Lev Measurement S de:~l 2.3B.l.a Control Room deficiencies will be monitored for improvement.
2.1.1.E Initiate changes in crew make-up to infuse new ideas, expectations and attitudes through a mixing of experience and personalities. 10/1/95.
2.3B.l.b The number of operator workarounds will be monitored for reduction.
2.1.1.F Develop a program which involves Operations staff in identifying areas for positive and improved implementation of management expectations relating to human performance (similar to Calvert Cliff's Gold Card).
2.3B.l.c The average time a work-around is in place will be monitored for reduction.
Gold Card results will be used in crew discussions to reinforce, clarify and revise management expectations as a regular portion of the Operations Crew Training Cycle. This discussion will occur on a peer-to-peer level using real-life examples to reinforce behaviors in self-identification and assessment. In addition, Gold Card Program results Page 9
2.3B.l.d Observations from Management will be monitored for indications of improved performance.
 
2.3B.1.e Feedback from the Operations staff will be monitored for indication of an improved ability to operate the Plant as designed.Page 17 2.4 QUALITY OF OPERATIONS Objective:
which indicate a trend of performance issues will be treated as a PER condition. 8/1/95.
2.4.1~t Improve the process and common understanding of issues among Operations staff which leads to preventing recurrence of minor events while they are precursors, rather than addressing them only when they become significant events.InMatives:
2.1.1.6    Improve Operations'articipation in the Quarterly System Walk-down Program to expose other personnel to Operations'hilosophies and problems. This program exposes Operations personnel to the views and problems of support organizations. Ongoing.
2.4.1.A Reinforce management expectations for dealing with issues through the use of the OI-9 Program, as discussed in 2.1.1.A.8/1/95.2.4.1.B Monitor issues raised and resolution of those issues through conducting additional operator log reviews and Quality assessments and by assessing feedback from Management Oversight in the Control Room.Oversight began in 5/95, log reviews began in 4/95 and Quality assessments are routine.Ongoing.2.4.1.C Use the quarterly human performance
2.1 1.H
'indicators for Operations (described under 2.2.2.B)to reinforce positive behaviors and correct weak behaviors.
                  ~      Improve Operations staff participation on the PRG/PRC to help select project activities based upon operational needs. Ongoing.
This will be done on an individual crew and manager basis.Beginning 8/1/95.2.4.1.D Use the Gold Card Program to reinforce human performance issue resolution at an early stage.Beginning 8/1/95.Zrp ected Result: Problems will be addressed before they become challenges to Operations.
Expected Results:     Improved Safety Culture in which Operations is more able to recognize subtle trends and problems resulting in improved response to equipment and personnel issues prior to their having an affect on Operations. This should be reflected in fewer and shorter forced outages and improved teamwork among WNP-2 organizations.
This should result in improved reliability.
Measurement
Measurement S dR*: e Leve 2.4.l.a Same as standards:
.I  I    I*: ~l             e Level 2.1.l.a     Reduction in unplanned automatic scrams.
set forth in 2.1.l.a-2.l.l.g.e men vl 2.4.1.b Feedback from Oversight personnel will be monitored for indications of improved performance.
2.l.l.b    Increase safety system reliability.
2.4.1.c Logs will be monitored for indication that issues are consistently being resolved through an established corrective processes.
2.1.1.c    Fewer unplanned safety system actuations.
2.4.1.d Observations of the Gold Card Program implementation will.be monitored for indications that Operations staff is being more aggressive in fixing human performance problems early.2.4.1.e The gross number of PERs will be monitored for an increase, followed by a decrease as problems are corrected and do not recur.PERS are also monitored for recurring trends of problem types or areas.Page 18 2.5 PROGRAMS AND PROCEDURES Objective:
2.1.1.d     Increase emergency generator reliability.
2.5.1~I t I~All staff members must strictly follow procedures unless they have reason to believe they should not, at which time they should secure their work area and seek procedural clarification or modification.
2.1.1.e     Increased  Net Electrical Generation,    Capacity  Factor, and   Unit Capability Factor.
Initiatives:
2.l.l.f     Reduced Unplanned Capability Loss Factor.
2.5.1.A Implement OI-9 Program, as discussed in 2.1.1.A.8/I/95.2.5.1.B Operations staff members express a persistent belief that traps exist in procedures.
2.1.1'.g    Reduce the number    of NOVs, LERs,  and personnel errors.
Survey the staff to determine whether this is an actual concern.If the concern is validated, correct the procedures and revise the training program to ensure that all staff members are made aware of the procedure requirements.
ea    men    vl 2.1.1.h    OI-9 summaries      indicating fewer instances    of failure to  meet expectations.
This training should be prioritized around the most frequently cited procedures of concern.8/1/95.Expected Result: Operations staff will strictly adhere to procedures.
2.l.l.i    Management Oversight observations indicating improved performance.
Operations will demonstrate recognizable leadership in adherence to this standard.ra e Level'Measurement S~N*:~l 2.5.1.a NOV rate, LERs, and personnel errors will be monitored for reduction.
2.1.1.j    Fewer NOVs and LERs for technical specification violations with zero as a goal.
n Lev 2.5.1.b Procedure compliance PERs will be monitored for reduction.
2.1.l.k    Feedback from other WNP-2 organizations (i.e., Maintenance, Plant Support, Health Physics and Quality Assurance) indicating improved Operations performance and better working relationships.
2.5.1.c Feedback from Management Oversight and the NRC will be monitored for indications of improvement.
Page 10
Objective:
 
2.5.2'nsure Operations management makes decisions regarding the need for procedure deviations in accordance with approved procedures.
2.1.1.1      Increase in PER generation rate as issues are identified, followed by a PER reduction as those issues are corrected and do not recur.
Initiatives:
Objective:  2.1.2       Create    a  Management    Oversight presence which (1) leads to identification of issues before they affect reliability, (2) reinforces management expectations, and (3) allows management to make decisions to the greatest extent possible based on fact and not opinion.
2.5.2.A Review of a sample of Operations'rocedure deviations will be completed by Quality.8/1/95.Expected Result: 2.5.2.B If a problem exists with inappropriate procedure deviations, develop appropriate corrective actions.To be assessed once analysis is complete.Operations staff will lead by example in implementing management's expectations regarding the use of procedure deviations.
Initiatives: 2.1.2.A      Implement the revised OI-9 Program as discussed in 2.1.1.A. The observations required under this program for Operations management, especially the Operations Manager, Assistant Operations Manager, Day-Shift Manager and Shift Managers, provide an increased oversight presence. 8/1/95.
Measurement Standanf: Procedure deviations processed in accordance with approved procedures.
2.1.2.B      Use the Management Oversight Program in the Control Room, as discussed in 2.1.1.B. Ongoing.
Page 19 2.6 CORRECTIVE ACTIONS Objective:
2;1.2.C      Develop additional trending capability within Operations, which will allow management to address individual and systemic problems quicker.
2.6.1~I t I~Ensure that Operations staff accepts issues brought to them by other station personnel in a manner that does not intimidate oi in any way demean the messenger.
8/1/95.
Operations staff should hold personnel accountable for gathering and reporting facts in this same non-threatening manner.InMatives:
2.1.2.D      Implement a pilot program that will provide managers and supervisors additional training on managerial techniques such as (1) pinpointing results and behaviors which support organizational goals, (2) developing measurement and feedback systems to communicate progress, and (3) managing and reinforcing desired behaviors and results, Pilot training to be completed by 9/1/95 followed by an implementation period.
2.6.1.A Perform a site-wide informational survey to determine whether station personnel elect to ignore issues rather than be subject to challenges associated with reporting them to the Control Room.To be initiated 9/15/95.2.6.1.B If a concern is validated, develop appropriate responses to the issues identified.
Improvements in performance will be monitored before additional staff.
To be assessed based upon survey results.Expected Result: A survey of station personnel will identify whether a concern exists in this area and if so, action can be taken to improve Operations staff performance..
management members receive the training.
This should'ultimately encourage station personnel to freely identify issues of concern so that they may be properly addressed.
Expected Results:    Operations management will be more visible and active in reinforcing expectations.
Measurement Standard: Subjective measure based on survey results.Page 20 3.0 ENGI EERBIG PERFORMANCE IMPROVEMENT AREAS ENGINEERING
This visibility and activity will enable management to recognize problems at an earlier stage. This will result in not only identifying the need.to improve behaviors, but also successfully coaching individuals towards desired improvements or making changes in personnel who do not adapt to expectations.
~Ovoralk porfcrmanco less than average 3.1 SAFETY FOCUS~Problem rosolutlon ls Inoffectlvo OBJECTIVE 3.1.1 ,~Safety focus needs further improvement action plans 4 priorities are lacking In key areas~Rect cause analyses aro Inadequate 3.1.1 3.1.1 MA AGEMENT INVOLgEMENT
Measurement S    d d*:  ~UI              e Lev 2.1.2.a      Same as 2.1.1.a - 2.1.1.g.
~Further Improvemonts are needed to managomont's Invclvoment within onglnoorlng organizations
De      men Level 2.1.2.b      Non-shift management time in the Control Room will be increased.
~Managomongsuporvlscry sldlls neod Imprcvoment
Page 11
~Inadoquato support given to Involving supervisors In systom rnanagemont program~Need to continuo emphasis on bacldog managoment OLIECTIVE 32.1 3A.1 3$.1 3%1 PROBLEM IDENTIFICATION
 
'PROBLEM ,'RESOLUTION 3A UNDERSTANDING DESIGN~Tlmoly resolution of probloms contlnuos to bo weak~Nood to further Improve ofloctlvonoss of multl<lsclpllned toams conducting s atom walkdowns~Folhw through on romedhrl offcrts Is brcklng~Problems with rosolvlng long~ndlng lssuos persist~Soveral plant 4 Industry issues not dealt with ofioctively
2.1.2.c    Operations management will rate the quality of the OI-9 observations made by the on-shift management complement (SM and CRS).
~Understanding of plant design 4 tho design chango rovtow process ls minimal~Inattention-to4etag errors Alack of appropriate proIect oversight problorns persist~Design reviews aro lacking In consbtency 4 quality~SlgnNlcant number cf deficiencies In Implomontatlcn of doslgn changes aro evident OBJECTIVE 38.1 3.3.1 38.1 33.1 39.1 OB JECTIVE 3A.t 3.5.1 6A.f 3A.1 3$.1 3.6.1%2.1 OUALITY OF ENGINEERING WORK~Process controls are weak~System managomont program tacks adequate support~Design reviews 6 their Implementation aro weak~Attention to detail lacking~Poor Intordopartmont coordination 4 cooperation
2.1.2.d    The quality of the feedback from Shift Managers and Control Room Supervisors will be judged by individual contributors who have had interface with them each quarter. This will help evaluate the coaching and reinforcement techniques practiced by management personnel.
~Poor managomont Invclvomont 6 oversight OB J ECTIVE 3A.1 3$.1 3A.1 3A.1 3$.1 33.1 3.1.1 T.f.f PROGRAMS KL PROCEDURES
2.1.2.e    Management Oversight observations are being reviewed for improved performance.
~Implemontatlon of 10CFR50.65 (aka"tho Maintonanco Rule)legs significantly bohlnd most of the Industry~Ouarterly team walkdcwns nct always adequately supported by other organizations
2.1.2.f    Industry peer evaluations, e.g., INPO assist visits, will be performed periodically to evaluate the effectiveness of the Management Oversight Program.
~Froquency of quarterly team walkdowns Is Inadequate
Objective:  2.1.3      Foster an environment in which all individuals make conservative decisions when responding to issues.
~Prccoduros, Instructions, 4 standards aro cumbersome 4 unwloldy 3.1.1 32.1 3.2.1 3.6.1 H I rr KXCKPTlONAL
Initiatives: 2.1.3.A    Implement revised OI-9 management        observations, as discussed  in 2.1.1.A. Ongoing.
~w AVKRAOK Mwuuu PKRFORMANCK
2.1.3.B    Implement revised Management Oversight Program, as discussed in 2.1.1.B. Ongoing.
~PKRFORMANCK
2.1.3.C    Use simulator training scenarios during each training cycle which promote conservative decision-making.       These scenarios specifically address implementation of Technical Specifications. Ongoing.
~PKRFORMANCK erc4reeae BAY 10, 1005 ENGINEERING 3.1 SAFETY FOCUS Objective:
2.1.3.D    Continue Boss Talks, which involve example discussions with Operations team members and are used to reinforce expectations for conservative decision-making. Ongoing.
3.1.1 Maintain Plant Nuclear Safety within the bounds of the Plant's license and the insights provided by the Probabilistic Safety Assessment.
2.1.3.E    Implement the Gold Card Program, as discussed in 2.1.1.F. 8/1/95.
InMatives:
Zxpected Results:    Additional training and coaching will result in improvements in conservative decision-making. Response to precursor problems will become more effective and thereby increase overall Plant reliability through fixing problems early, instead of waiting until they become challenges to current performance.
3.1.1.A Develop and communicate, management expectations for conservative decision-making, stressing safe operation, Plant operability, quality, timeliness and thoroughness of work products.Completed.
Page 12
Update training to emphasize conservative decision-making by 6/96.3.1.1.B Continue to prioritize initiatives, programs and projects through the Plant Review Committee process with a focus on maintaining nuclear safety and Plant support consistent with the Plant-wide prioritization process.Ongoing.3.1.1.C Increase and optimize staffing in the System Engineering group to provide better and more timely system support to Operations and Maintenance.
 
11/30/95.3.1.1.D Update the Engineering Qualification Guides to provide in-depth qualification training to Engineering staff, which will include the following:
Measurement s ~e:      ~l 2.1.3.a    Same as standards 2.1.1.a, 2.1.1.b, 2.1.1.d, 2.1.1.e, and  2.1.l.f.
10/31/95.~Senior Reactor Operator (SRO)level training to system engineers on their WNP-2 assigned systems.To be completed within.one year for present staff and within one year of hire date for new staff.~Integrated systems training based on the SRO systems training program within two years for present staff and one year from hire date for new systems engineers.
De      men Level 2.1.3.c    Management Oversight observations should indicate improvement.
~Design and licensing basis training, including the development of the required design basis documents and training materials.
2.1.3.d    NRC observations should indicate improvement.
To be completed within two years (10/97)for present staff and within two years of hire date for new staff.~Train Engineering staff on Plant Technical Specifications.
2.1.3.e    Management observations of the Gold Card Program should indicate that conservative decisions are being discussed and reinforced.
To be completed within one year for present staff and within one year of hire date for new staff.~Provide Engineering staff with annual refresher training on performing operability assessments, specifically addressing GL 91-18.Page 21
2.1.3.f    Peer evaluations    of performance will   be conducted  periodically to evaluate this area.
~Corrective action resolution training on root cause methods and effective corrective actions.To be completed within one year for present staff and within one year of hire date for new staff.~Probabilistic Safety Assessment applications and awareness training for appropriate staff personnel, emphasizing safety significance rankings of systems.To be completed within one year for present staff and within one year of hire date for new staff.~Continuing training program that focuses on refresher training, lessons learned and special topics (e.g., industry events).Ongoing.Expected Results: Minimization of errors associated with misunderstanding Plant interactions when implementing Plant design changes or performing post modification or maintenance testing or special test procedures.
Page 13
Enhanced engineering safety perspective through a better understanding of'how changes in Plant conditions and systems can affect Plant accident response.Improved quality of operability assessments performed on degraded Plant systems, components and structures.
 
Improved interface between Engineering and Operations.
2.2      MANAGEMENTINVOLVEMENT
With broader systems knowledge, the engineer will better understand the effect of degraded equipment on the ability of the operators to control the Plant during normal and off-normal conditions.
    ~  I Obj ective:t 2,2.1        Create an environment in which Operations staff accepts, implements and reinforces management expectations at all times.
Initiatives: 2.2.1.A      Hold confirmatory meetings with Operations staff to focus on the acceptance,  development,      and implementation      of management expectations. Beginning in the fourth quarter of 1995.
2.2.1.B      Implement the OI-9 Program, as discussed in 2.1.1.A. 8/1/95.
2.2.1.C      Continue Boss Talks in Operations, as discussed in 2.1.3.D. Ongoing.
2.2.1.D      Implement pilot management training, as discussed in 2.1.2.D. This training will be used in conjunction with the regular performance appraisal program. 9/1/95.
Expected Results:      Confirmatory meetings will enhance commitment to management expectations, Completing the balance of the initiatives will further reinforce and validate implementation of the expectations. Overall, the expectations should result in more effective personnel performance and increased reliability in Plant operations.
Measurement R      dA:                        v 2.2.1.a    Same as the standards set forth in 2.1.1.a    - 2.1.1.g.
2.2.l.b    Same as the standards set forth in 2.1.1.h -    2.l.l.m.
2.2.1.c    Performance appraisal results will identify, in detail, the implementation of management expectations.
2.2.1.d    Same as the standard set forth in 2.1.2.d.
Objective:    2.2.2       Use the Operations quarterly indicators to (1) reinforce management expectations, (2) facilitate identification of areas requiring additional work, and (3) facilitate identification of successes showing improvement from the'perspective of the Operations staff and WNP-2 management.
InNatives:    2.2.2.A    Select and analyze key Operations processes (e.g., Clearance Order processing) to identify in-process performance indicators which would assist implementers and staff in evaluating the quality of process implementation. Collect and chart data to allow improved performance Page 14
 
of a particular  process. After certain process level improvements are made and solidified, select another process for similar review and continue until all Operations processes have been analyzed. Ongoing.
2.2.2.B    Revise the Operations quarterly indicators to track human performance trends requiring improvement. Assure these indicators have goals or control bands identified to focus management attention when necessary.
Beginning 8/1/95.
2.2.2.C    Periodically review equipment trending data from Technical Staff to ensure Maintenance and Technical Staff personnel are focused on equipment trends which Operations believes require attention. Validate equipment trends with operator workarounds and problem areas.
Beginning 10/1/95.
Expected Results:   Analyzing processes and tracking in-process performance will allow performers and management to identify process or implementation problems earlier and implement fixes prior to the problem affecting Plant reliability. In addition, establishing performance indicators will reinforce expectations and allow standards to be revised for added efficiencies. At the same time, data gathering will allow a greater degree of management by fact, rather than by assumption. These actions should translate into improved Plant reliability, better problem resolution and clearer expectations.
Measurement S  de*:                   e Level 2.2.2.a    Same as the standards set forth in 2.1.1.a - 2.1.1.g.
llgUKLal 2.2.2.b    One process per quarter will be tracked, trended and evaluated to ensure demonstrated improvement.
2.2.2.c    Feedback from operators and shift crews      will be monitored to evaluate responsiveness to problems.
2.2.2.d    Human performance PERs for Operations'rrors, related to will be monitored for reduction.
Operations'rocesses, 2.2.2.e    Management Oversight observations      willbe monitored for indications of improved performance.
Page 15
 
2.3A PROBLEM IDENTIFICATION Obj ective:t 2.3A.1   Increase the number of PERs generated        as  a'esult of Operations'involvement in Plant activities.
Initiative:  2.3A.1.A Coaching by the Operations Manager, via the on-going OI-9 reviews and on-going Management Oversight, has provided additional clarification and expectations. As a result, the current threshold for generating PERs is considered adequate. No further action willbe taken regarding this issue at this time.
2.3A.1.B Generate statistical data demonstrating that the current PER level is truly representative  of existing problems. 3/96 Objective:   2.3A.2  Develop a common understanding among Operations staff regarding the need to document problems so that they can be properly characterized and fixed.
Initiative:  2.3A.2.A Coaching by the Operations Manager, via the ongoing OI-9 evaluations and in-progress    Management Oversight observations, has provided additional clarification and improved consistency. The current threshold for PER generation is consistent between shifts and is meeting management expectations. No further action will be taken, regarding this issue at this time.
Page 16
 
2.3B      PROBLEM RESOLUTION
        ~
Improve the system for reviewing chronic problems and operator
  ~
Objective:    2.3B.1 workarounds to ensure it is based on sound technical facts and judgments. Clearly communicate this system to Operations staff so that misunderstandings about station priorities are avoided.
InMatives:    2.3B.l.A Revise OI-14 Chronic Equipment Problems.             OI-14 documents the methods to track status and prioritize    chronic  equipment problems resulting in operator workarounds.          The revision will improve identification of issues for resolution. Beginning 9/1/95.
2.3B.1.B  Establish goals for reducing the number    of workarounds. 9/1/95.
Erpected Result:      Improved focus will reduce        the total number    and  duration  of Operations workarounds, Measurement S    de:      ~l            e Lev 2.3B.l.a  Control Room deficiencies will be monitored for improvement.
2.3B.l.b  The number of operator workarounds will be monitored for reduction.
2.3B.l.c  The average time a work-around is in place will be monitored for reduction.
2.3B.l.d  Observations from Management will be monitored for indications of improved performance.
2.3B.1.e  Feedback from the Operations staff will be monitored for indication    of an improved ability to operate the Plant as designed.
Page 17
 
2.4     QUALITYOF OPERATIONS Improve the process and common understanding of issues among
    ~
Objective:t 2.4.1 Operations staff which leads to preventing recurrence of minor events while they are precursors, rather than addressing them only when they become significant events.
InMatives:  2.4.1.A      Reinforce management expectations for dealing with issues through the use of the OI-9 Program, as discussed in 2.1.1.A. 8/1/95.
2.4.1.B      Monitor issues raised and resolution of those issues through conducting additional operator log reviews and Quality assessments and by assessing feedback from Management Oversight in the Control Room. Oversight began in 5/95, log reviews began in 4/95 and Quality assessments are routine. Ongoing.
2.4.1.C      Use the quarterly human performance 'indicators for Operations (described under 2.2.2.B) to reinforce positive behaviors and correct weak behaviors. This will be done on an individual crew and manager basis. Beginning 8/1/95.
2.4.1.D    Use the Gold Card Program to reinforce human performance issue resolution at an early stage. Beginning 8/1/95.
Zrp ected Result:     Problems will be addressed before they become challenges to Operations.           This should result in improved reliability.
Measurement S    dR*:                  e Leve 2.4.l.a    Same as standards: set forth in 2.1.l.a - 2.l.l.g.
e    men    vl 2.4.1.b    Feedback from Oversight personnel    will be monitored for indications of improved performance.
2.4.1.c    Logs will be monitored for indication that issues are consistently being resolved through an established corrective processes.
2.4.1.d    Observations of the Gold Card Program implementation will .be monitored for indications that Operations staff is being more aggressive in fixing human performance problems early.
2.4.1.e    The gross number of PERs will be monitored for an increase, followed by a decrease as problems are corrected and do not recur. PERS are also monitored for recurring trends of problem types or areas.
Page 18
 
2.5      PROGRAMS AND PROCEDURES I
    ~
Objective:t  2.5.1 I ~       All staff members must strictly follow procedures unless they have reason to believe they should not, at which time they should secure their work area and seek procedural clarification or modification.
Initiatives:  2.5.1.A    Implement OI-9 Program, as discussed in 2.1.1.A. 8/I/95.
2.5.1.B    Operations staff members express a persistent belief that traps exist in procedures. Survey the staff to determine whether this is an actual concern. If the concern is validated, correct the procedures and revise the training program to ensure that all staff members are made aware of the procedure requirements. This training should be prioritized around the most frequently cited procedures of concern. 8/1/95.
Expected Result:        Operations staff will strictly adhere to procedures. Operations  will demonstrate recognizable leadership in adherence to this standard.
'Measurement S  ~N*:      ~l            ra e Level 2.5.1.a      NOV rate, LERs, and personnel errors will be monitored for reduction.
n  Lev 2.5.1.b      Procedure compliance PERs    will be monitored for reduction.
2.5.1.c      Feedback from Management Oversight and the NRC          will be monitored for indications of improvement.
Objective:   2.5.2    'nsure      Operations management makes decisions regarding the need for procedure deviations in accordance with approved procedures.
Initiatives:  2.5.2.A      Review of a sample of Operations'rocedure            deviations  will be completed by Quality. 8/1/95.
2.5.2.B      If a  problem exists with inappropriate procedure deviations, develop appropriate corrective actions. To be assessed once analysis is complete.
Expected Result:      Operations staff will lead by example in implementing management's expectations regarding the use of procedure deviations.
Measurement Standanf:    Procedure deviations processed in accordance with approved procedures.
Page 19
 
2.6      CORRECTIVE ACTIONS I
Ensure that Operations staff accepts issues brought to them by other
    ~
Objective:t  2.6.1 I ~
station personnel in a manner that does not intimidate oi in any way demean the messenger.        Operations staff should hold personnel accountable for gathering and reporting facts in this same non-threatening manner.
InMatives:  2.6.1.A      Perform a site-wide informational survey to determine whether station personnel elect to ignore issues rather than be subject to challenges associated with reporting them to the Control Room. To be initiated 9/15/95.
2.6.1.B      If a  concern is validated, develop appropriate responses    to the issues identified. To be assessed based upon survey results.
Expected Result:      A survey of station personnel will identify whether a concern exists in this area and if so, action can be taken to improve Operations staff performance.. This should
            'ultimately encourage station personnel to freely identify issues of concern so that they may be properly addressed.
Measurement Standard:    Subjective measure based on survey results.
Page 20
 
PERFORMANCE IMPROVEMENT AREAS ENGINEERING 3.0
                              ~  Ovoralk porfcrmanco less than average ENGI EERBIG 3.1 OBJECTIVE SAFETY FOCUS          ~  Problem rosolutlon ls Inoffectlvo                                    3.1.1
                              ~  Safety focus needs further improvement action plans 4 priorities    3.1.1 are lacking In key areas
                              ~  Rect cause analyses aro Inadequate                                    3.1.1 OLIECTIVE MA AGEMENT INVOLgEMENT
                              ~  Further Improvemonts are needed to managomont's Invclvoment          32.1 within onglnoorlng organizations
                              ~  Managomongsuporvlscry sldlls neod Imprcvoment                        3A.1
                              ~  Inadoquato support given to Involving supervisors In systom          3$ .1 rnanagemont program
                              ~  Need to continuo emphasis on bacldog managoment                      3%1 PROBLEM                                                                                OBJECTIVE IDENTIFICATION
                              ~ Tlmoly resolution  of probloms contlnuos to bo weak                  38.1
          'PROBLEM
        'RESOLUTION
                              ~ Nood to further Improve ofloctlvonoss of multl<lsclpllned toams        3.3.1 conducting s atom walkdowns
                            ~    Folhw through on romedhrl offcrts Is brcklng                          38.1
                            ~    Problems with rosolvlng  long~ndlng lssuos persist                  33.1
                            ~  Soveral plant  4 Industry issues not dealt with ofioctively          39.1 3A OB JECTIVE UNDERSTANDING DESIGN
                          ~    Understanding of plant design 4 tho design chango rovtow              3A.t process ls minimal                                                    3.5.1 6A.f
                          ~    Inattention-to4etag errors Alack of appropriate proIect oversight    3A.1 problorns persist
                          ~
Design reviews aro lacking In consbtency    4 quality                3$ .1
                          ~    SlgnNlcant number cf deficiencies In Implomontatlcn of doslgn        3.6.1 changes aro evident                                                  %2.1 OB J ECTIVE OUALITYOF ENGINEERING    ~    Process controls are weak                                            3A.1 WORK
                          ~    System managomont program tacks adequate support                      3$ .1
                          ~    Design reviews 6 their Implementation aro weak                        3A.1
                          ~    Attention to detail lacking                                          3A.1
                          ~    Poor Intordopartmont coordination 4 cooperation                      3$ .1 33.1
                          ~    Poor managomont Invclvomont 6 oversight                              3.1.1 T.f.f PROGRAMS KL PROCEDURES      ~    Implemontatlon of 10CFR50.65 (aka "tho Maintonanco Rule )            3.1.1 legs significantly bohlnd most of the Industry
                          ~    Ouarterly team walkdcwns nct always adequately supported              32.1 by other organizations
                          ~    Froquency of quarterly team walkdowns Is Inadequate                  3.2.1
                          ~    Prccoduros, Instructions, 4 standards aro cumbersome                  3.6.1 4 unwloldy H
I rr      KXCKPTlONAL PKRFORMANCK    ~
                              ~w      AVKRAOK PKRFORMANCK      ~    Mwuuu PKRFORMANCK erc4reeae BAY 10, 1005
 
ENGINEERING 3.1    SAFETY FOCUS Objective:  3.1.1  Maintain Plant Nuclear Safety within the bounds of the Plant's license and the insights provided by the Probabilistic Safety Assessment.
InMatives:  3.1.1.A Develop and communicate, management expectations for conservative decision-making, stressing safe operation, Plant operability, quality, timeliness and thoroughness of work products. Completed. Update training to emphasize conservative decision-making by 6/96.
3.1.1.B Continue to prioritize initiatives, programs and projects through the Plant Review Committee process with a focus on maintaining nuclear safety and Plant support consistent with the Plant-wide prioritization process.
Ongoing.
3.1.1.C Increase and optimize staffing in the System Engineering group to provide better and more timely system support to Operations and Maintenance. 11/30/95.
3.1.1.D Update the Engineering Qualification Guides to provide in-depth qualification training to Engineering staff, which will include the following: 10/31/95.
                    ~ Senior Reactor Operator (SRO) level training to system engineers on their WNP-2 assigned systems. To be completed within. one year for present staff and within one year of hire date for new staff.
                    ~ Integrated systems training based on the SRO systems training program within two years for present staff and one year from hire date for new systems engineers.
                    ~ Design and licensing basis training, including the development of the required design basis documents and training materials.        To be completed within two years (10/97) for present staff and within two years of hire date for new staff.
                    ~ Train Engineering staff on Plant Technical Specifications. To be completed within one year for present staff and within one year of hire date for new staff.
                    ~ Provide Engineering staff with annual refresher training on performing operability assessments, specifically addressing GL 91-18.
Page 21
 
                        ~ Corrective action resolution training on root cause methods and effective corrective actions. To be completed within one year for present staff and within one year of hire date for new staff.
                        ~ Probabilistic Safety Assessment applications and awareness training for appropriate staff personnel, emphasizing safety significance rankings of systems. To be completed within one year for present staff and within one year of hire date for new staff.
                        ~ Continuing training program that focuses on refresher training, lessons learned and special topics (e.g., industry events). Ongoing.
Expected Results:    Minimization of errors associated with misunderstanding Plant interactions when implementing Plant design changes or performing post modification or maintenance testing or special test procedures.
Enhanced engineering safety perspective through a better understanding        of'how changes in Plant conditions and systems can affect Plant accident response.
Improved quality of operability assessments   performed on degraded Plant systems, components and structures.
Improved interface between Engineering and Operations. With broader systems knowledge, the engineer will better understand the effect of degraded equipment on the ability of the operators to control the Plant during normal and off-normal conditions.
Improved quality and timely completion of safety significant issues through better regulatory and risk-based Plant understanding.
Improved quality and timely completion of safety significant issues through better regulatory and risk-based Plant understanding.
Better and more timely support to Plant Operations and Maintenance on those initiatives, programs and projects of greatest impact to reliable and cost effective Plant operations.
Better and more timely support to Plant Operations and Maintenance on those initiatives, programs and projects of greatest impact to reliable and cost effective Plant operations.
Increased system engineering understanding and involvement with Plant systems to allow refocus of system engineering problem resolution performance to become proactive rather than reactive.Measurement Standanfs:
Increased system engineering understanding and involvement with Plant systems to allow refocus of system engineering problem resolution performance to become proactive rather than reactive.
3.1.1.a Use of Maintenance Rule criteria to monitor safety system availability and reliability.
Measurement Standanfs: 3.1.1.a     Use of Maintenance Rule criteria to monitor safety system availability and reliability.
3.l.l.b Number of LER/NOVs issued against safety systems.3.1.l.c WO backlog on safety systems.Page 22 3.1.1.d Timeliness, of closure of corrective actions on significant PERs.3.1.1.e Monitor schedule effectiveness in focusing work activities on risk significant systems and issues.Page 23 3.2 MANAGEMENT INVOLVEMENT Objective:
3.l.l.b     Number of LER/NOVs issued against safety systems.
3.2.1'ocus Engineering on an end product that ensures safe, reliable and cost-effective operation of WNP-2.IniMatives:
3.1.l.c     WO backlog on safety systems.
3.2.1.A Define Engineering support in terms of Plant performance indicators related to safe, reliable and cost-effective system operation.
Page 22
Adopt a definition of"success" that meets the following criteria:~End result oriented (i.e., fixed problem, enhanced Plant operation, reduced barriers, more effective maintenance).
 
~Not based solely on definition of an Engineering product (i.e., do not use a criteria based solely on the engineering quality of the design package).10/31/95.3.2.1.B Continue to eliminate low priority discretionary issues from work scope through application of the Project Review Committee processes including PSA/PRA.Items that do not meet the corporate goals of safe Plant Operation improved reliability, cost effectiveness and will be eliminated.
3.1.1.d Timeliness, of closure of corrective actions on significant PERs.
Ongoing.3.2.1.C Establish alignment between Engineering, Operations and Maintenance to identify process interfaces and define role, responsibility and accountability of each in the following activities:
3.1.1.e Monitor schedule effectiveness in focusing work activities on risk significant systems and issues.
12/29/95.~System walk-downs
Page 23
~Design change implementation and testing,~Scope reduction control 3.2.1.D Consolidate all technical resources under a single director.7/31/95.Expected Results: Improved quality and thoroughness of all Engineering products with a focus on customer satisfaction-measured in ability to implement, amount of rework and cost-effectiveness.
 
Enhanced ability to finalize design packages (error free).Decrease in long-standing/open issues.Improvement in teamwork, Better alignment between organizations with corporate expectations and goals provides focus for prioritizing work.Page 24 Engineering focus changes from internally defined measures of.success to measures that are directly measured in improved Plant performance, more effective maintenance and better Operations staff support.Reduced maintenance costs and reduced operator burden.Establishment and tracking of performance indicators will enhance directorate knowledge and ability to communicate performance level.Measurement Standanfs:
3.2     MANAGEMENTINVOLVEMENT Objective: 3.2.1   'ocus       Engineering on an end product that ensures safe, reliable and cost-effective operation of WNP-2.
3.2.1.a Reduction in work inventory age.3.2.1.b Timeliness of engineering responses-turnaround time.3.2.1.c Total design project costs defined in terms of engineering labor, implementation labor and capital costs within estimates.
IniMatives: 3.2.1.A     Define Engineering support in terms of Plant performance indicators related to safe, reliable and cost-effective system operation. Adopt a definition of "success" that meets the following criteria:
3.2.1.d Planning and schedule effectiveness (i.e., completing work on schedule).
                          ~ End result oriented (i.e., fixed problem, enhanced Plant operation, reduced barriers, more effective maintenance).
3;2.1.e Individual system performance
                          ~ Not based solely on definition of an Engineering product (i.e., do not use a criteria based solely on the engineering quality of the design package). 10/31/95.
-monitor total Plant costs, Plant efficiency, and total megawatts produced.3.2.l.f Number of operator workarounds.
3.2.1.B     Continue to eliminate low priority discretionary issues from work scope through application of the Project Review Committee processes including PSA/PRA. Items that do not meet the corporate goals of safe Plant Operation improved reliability, cost effectiveness and willbe eliminated.
3.2.1.g Number of Control Room deficiencies.
Ongoing.
3.2.1.h Total maintenance manhours expended on system maintenance.
3.2.1.C     Establish alignment between Engineering, Operations and Maintenance to identify process interfaces and define role, responsibility and accountability of each in the following activities: 12/29/95.
3.2.1.i Total dose received.Page 25 3.3 PROBLEM IDEN'HFICATION AND RESOLUTION 3.3.1 Identify and resolve operationally significant issues in a timely manner consistent with the corporate goals of continued safe Plant operation, improved reliability; and cost effectiveness.
                          ~ System walk-downs
InitiMves:
                          ~ Design change implementation and testing,
3.3.1.A Increase and optimize staffing-See 3.1.1.C.3.3.1.B Provide in-depth training to Engineering staff-see 3.1.1.D.3.3.1.C Prioritize work and eliminate low priority discretionary items-see 3.1.1.B and 3.2.1.B.3.3.1.D Strengthen management expectations for System Engineers to appropriately identify and categorize system weaknesses for resolution.
                          ~ Scope reduction control 3.2.1.D     Consolidate all technical resources under a single director. 7/31/95.
The following information sources will be used to aid the System Engineers in identifying weaknesses:
Expected Results:   Improved quality and thoroughness of all Engineering products with a focus on customer satisfaction-measured in ability to implement, amount of rework and cost-effectiveness.
9/15/95.~PER Generation
Enhanced ability to finalize design packages (error free).
~Operating Event Reports~Work Orders utilization
Decrease in long-standing/open issues.
.~Work History File utilization
Improvement in teamwork, Better alignment between organizations with corporate expectations         and goals provides focus for prioritizing work.
~Risk significant component identification
Page 24
~Operations and Maintenance (customer) feedback 3.3.1.E Develop and implement system report card assessing key system reliability characteristics.
 
12/30/95.3.3.1.F Reassess process for ensuring industry experience is reflected in system reliability, availability, and operability decisions-See section 1.1.2.3.3.1.H Establish-management expectations among Operations, Maintenance and Engineering that defines the System Engineer as the focal point for system problem resolution.
Engineering focus changes from internally defined measures of. success to measures that are directly measured in improved Plant performance, more effective maintenance and better Operations staff support.
Include emphasis on immediate notification of System Engineers on any significant issues associated with their systems.12/31/95.Erpected.'esults:
Reduced maintenance costs and reduced operator burden.
Decrease in long-standing/open issues.Improved quality and timely completion of safety significant issues.Better and more timely support to Plant operations and maintenance.
Establishment and tracking of performance indicators will enhance directorate knowledge and ability to communicate performance level.
Page 26 Improved cost-effectiveness and reliability of systems as measured by objective criteria.Establishment of a proactive approach to ensure industry experience is factored into maintaining safe, reliable, and cost effective system operations.
Measurement Standanfs: 3.2.1.a   Reduction in work inventory age.
Measurement Standards:
3.2.1.b   Timeliness of engineering responses - turnaround time.
3.3.1.a Timeliness of closure of corrective actions on significant PERs.3.3.1.b Reduce work order inventory age.3.3.1.c System report card-reflects key indicators on a system by system basis (e.g., Maintenance Rule criteria (risk significant actions), work order inventory age, PERs, overdue PTL items, failed tests, operator work-around, component performance).
3.2.1.c   Total design project costs defined in terms of engineering labor, implementation labor and capital costs within estimates.
3.3.1.d Results obtained from OER selective re-review effort (i.e., assessment of quality of reviews performed).
3.2.1.d   Planning and schedule effectiveness (i.e., completing work on schedule).
3;3.1.e System availability.
3;2.1.e   Individual system performance - monitor total Plant costs,         Plant efficiency, and total megawatts produced.
3.3.1.f Equivalent system availability.
3.2.l.f   Number of operator workarounds.
Page,27 3.4&3.5 UNDERSTANDING DESIGN AND QUALITY OF ENGINEERING WORK Objective:
3.2.1.g   Number of Control Room deficiencies.
3.4.1 t Maintain an Engineering organization that has the appropriate qualifications, education, training and tools to successfully meet the corporate goals of safe, reliable and cost-effective Plant operation.
3.2.1.h   Total maintenance manhours expended on system maintenance.
Initiatives:
3.2.1.i   Total dose received.
'3.4.1.A Optimize and staff the System Engineering group with highly qualified engineering personnel-see 3.1.1.C.3.4.1.B Provide in-depth training to Engineering staff-see 3.1.1.D.3.4.1.C Re-engineer design change process to simplify procedures, making the cognizant Engineer accountable for a larger scope of the design inter-relationships (i.e., minimize special reviews performed by experts).2/5/96.3.4.1.D Improve interorganizational process interfaces by establishing clearly defined roles and responsibilities
Page 25
-see 3.2.1.C.Expected Results: Minimize errors associated with misunderstanding Plant interactions when implementing Plant design changes or performing post-modification or-maintenance testing or special test procedures.
 
Enhance engineering safety perspective through a better understanding of how changes in Plant conditions and systems can affect Plant accident response.Improve the quality of operability assessments performed on degraded Plant systems, components and structures.
3.3               PROBLEM IDEN'HFICATION AND RESOLUTION 3.3.1       Identify and resolve operationally significant issues in a timely manner consistent with the corporate goals of continued safe Plant operation, improved reliability; and cost effectiveness.
Measurement Standard: Number of PER/LER/NOVs issued against system-related design implementation, post-maintenance testing and special test activities.
InitiMves:           3.3.1.A     Increase and optimize staffing - See 3.1.1.C.
Page 28 3.6 PROGRAMS AND PROCEDURE Objectives:
3.3.1.B     Provide in-depth training to Engineering staff - see 3.1.1.D.
3.5.1~~~~Ensure that Engineering programs are closely coupled with the System Engineer group such that the System Engineer is provided with the necessary tools and data to properly assess the health of the Plant systems.Maintain Engineering processes that provide high quality, efficient and responsive design products to maintain system health and support Plant operational needs.InMatives:
3.3.1.C     Prioritize work and eliminate low priority discretionary items - see 3.1.1.B and 3.2.1.B.
3.5.1.A Review current program charters and realign, if necessary, to ensure that direct communication links are established with the System Engineers for data related to their system.1/31/96.3.5.1.B Revise and streamline the design change process-see 3.4.1.C.3.5.1.C Complete development of Maintenance Rule Program-see 7.1.1.F.Expected Results:.Better use of programs to support System Engineers in maintaining their systems in a safe, reliable and cost-effective manner.Improved support and timeliness of Engineering products required to support Plant operations.
3.3.1.D     Strengthen     management     expectations   for System Engineers to appropriately identify and categorize system weaknesses for resolution.
Better Engineering versatility in addressing problems.Measurement Standards:
The following information sources will be used to aid the System Engineers in identifying weaknesses: 9/15/95.
3.5.1.a Performance indicators as defined on system report cards.3.5.1.b Timeliness of Engineering designs and implementation in the Plant.Page 29 4.0 MAINTENANCE PERFORMANCE IMPROVEMENT AREAS MAINTENANCE
                                  ~ PER Generation
~Overall: perlormanco ls avorago 4.1 SAFETY FOCUS~Continual personnel errors Indicate safety focus Is weak OLIECTIVE 41.1 4.1.2 82.1 MAIJAGEMENT INVOLVEMENT:
                                  ~ Operating Event Reports
~Increased supervisory field prosonco has been Ineffoctual In reducing porsonnol errors~Supervisory porfcrmance level noods Improvement
                                  ~ Work Orders utilization
~Need cantlnuod managomont emphasis on prccodural complhnco 6 neod to perform error.froo work OBJECTIVE 42.1 4&t T.t.f 42.1 62.1 43A PROBLEM IDENTIF CATION~Prcbleln'Identlflcatlcn Is untimely and weak OBJECTIVE 4AIL1 4DB PROBLEM RESOLUTION'
                                .~   Work History File utilization
~Corroctlvo actions have nct boon offectlve In ellmlnatlng procedural ncncomplhrnco 8 porsonnol errors OBJECTIVE 4DB.1 4.4 (PL ANTI MATERIAL CONDITION~Management'e goals for tho age of work ardors, number of backlogged work orders d tknoly ccmplotlon of PM's havo nct been met~Post.malntenanco testing ls woak~Procedural norPccm plhrnco has nct been olknlnated OBJECTIVE 4.*1 44.1 4&t QUAUTY OF MAINTENANCE WORK~Personnel errors 5 procedural nclPcompllanco continue to occur~Foreign matorfal exclusion In both drywoll 6 wotwog Is weak OBJECTIVE 42.1 4$.1 82.1 4.6.1 4.8 PROGRAMS ta PROCEDURES
                                  ~ Risk significant component identification
~Procoduro upgrado effort slow to completo~Work orders havo boon rovlsod without O.C.rovlew~Review of backlogged work requests has bosn untimely OBJECTIVE 4.8.1 4&1 4A.f EI CXCCPttCNAL
                                  ~ Operations and Maintenance (customer) feedback 3.3.1.E     Develop and implement system report card assessing               key system reliability characteristics. 12/30/95.
~w AVCRAaC Msauuu PCRFCRMANCC
3.3.1.F     Reassess   process for ensuring industry experience is reflected in system reliability, availability, and operability decisions - See section 1.1.2.
~PCRFORMANCC
3.3.1.H     Establish-management expectations among Operations, Maintenance and Engineering that defines the System Engineer as the focal point for system problem resolution. Include emphasis on immediate notification of System Engineers on any significant issues associated with their systems. 12/31/95.
~PCRFCRMANCC MAINTENANCE 4.1 SAFETY FOCUS Objective:
Erpected.'esults:
4.1.1 Improve the industrial safety consciousness and industrial safety performance of personnel involved in performing Maintenance activities.
Decrease in long-standing/open issues.
Initiatives:
Improved quality and timely completion of safety significant issues.
4.1~1.A Continue monthly trending and evaluation of lost time and recordable accidents for Maintenance personnel by maintenance management.
Better and more timely support to Plant operations and maintenance.
Ongoing.4.1.1.B Continue conducting routine safety meetings aimed at dealing with industrial safety issues for Maintenance personnel.
Page 26
Ongoing.4.1.1.C Continue monthly trending of errors by Maintenance personnel for management evaluation and action.Current trending shows continued improvement in both the number and significance of errors by Maintenance personnel.
 
Ongoing.4.1.1.D Evaluate the need for additional management actions (such as training, procedure revisions, establishing new management expectations, etc.)and implement them as needed based on performance.
Improved cost-effectiveness   and reliability of systems as measured   by objective criteria.
10/15/95.Erpected Result: A sustained reduction in the number of lost time and recordable accidents.
Establishment of a proactive approach to ensure industry experience is factored into maintaining safe, reliable, and cost effective system operations.
Measurement Standard: Representation of lost time and recordable accident trends and personnel.
Measurement Standards: 3.3.1.a   Timeliness   of closure of corrective actions on significant PERs.
error trends for Maintenance personnel.
3.3.1.b   Reduce work order inventory age.
Objective:
3.3.1.c   System report card - reflects key indicators on a system by system basis (e.g., Maintenance Rule criteria (risk significant actions), work order inventory age, PERs, overdue PTL items, failed tests, operator work-around, component performance).
4.1.2 Ensure decisions regarding the prioritization, scheduling, and implementation of maintenance activities (including the removal of Plant systems from service)are conservative from a nuclear safety perspective.
3.3.1.d   Results obtained from OER selective re-review effort (i.e., assessment of quality of reviews performed).
InMatives:
3;3.1.e   System availability.
4.1.2.A Continue SRO review and involvement in the assignment of priorities for corrective maintenance activities.
3.3.1.f   Equivalent system availability.
Ongoing.Page 30 Zrp ected Result: 4.1.2.B Continue evaluating the removal of safety systems from service using a probabalistic safety assessment and tracking of safety system out-of-service times to ensure conservatism regarding safety system availability.
Page,27
Ongoing.Conservatively maintaining safety system availability and reliability consistent with the probabalistic safety assessment.
 
Measurement Standard: Routine tracking and evaluation of safety system availability and reliability.
3.4 & 3.5     UNDERSTANDING DESIGN AND QUALITYOF ENGINEERING WORK Objective:3.4.1       Maintain an Engineering organization that has the appropriate qualifications, education, training and tools to successfully meet the corporate goals of safe, reliable and cost-effective Plant operation.
'Page 31 4.2 MANAGElVHWT INVOLVEMENT 4.2.1 Maintain a low personnel error rate (including cases of procedure non-compliance) by Maintenance personnel.
Initiatives: '3.4.1.A     Optimize and staff the System Engineering group with highly qualified engineering personnel - see 3.1.1.C.
InMatives:
3.4.1.B     Provide in-depth training to Engineering staff - see 3.1.1.D.
4.2.1.A Increase the Maintenance management perspective of craft supervisors by including craft supervisors in periodic meetings.This should be.aimed at systematically communicating Maintenance management:expectations and perspective in the areas of procedure compliance and craft supervisor performance expectations.
3.4.1.C     Re-engineer design change process to simplify procedures, making the cognizant Engineer accountable for a larger scope of the design inter-relationships (i.e., minimize special reviews performed by experts).
These meetings will begin no later than 9/15/95 and continue for as long as needed to accomplish their purpose.Ongoing.4.2.1.B Review current Maintenance management practices (including the Maintenance Observation Program)for evaluating and improving the effectiveness of Maintenance craft supervisors and implement corrective actions as needed.10/1/95.4.2.1.C Continue monthly trending of Maintenance personnel error rate and the number of Maintenance personnel errors per month for Maintenance management evaluation and action.Ongoing.Expected Results: I Improved understanding and embracing of Maintenance management expectations regarding craft supervisor performance expectations by craft supervisors.
2/5/96.
3.4.1.D     Improve interorganizational process interfaces by establishing clearly defined roles and responsibilities - see 3.2.1.C.
Expected Results:     Minimize errors       associated with misunderstanding Plant interactions when implementing     Plant design changes or performing post-modification or -maintenance testing or special test procedures.
Enhance engineering safety perspective through a better understanding           of how changes in Plant conditions and systems can affect Plant accident response.
Improve the quality of operability assessments performed on degraded Plant systems, components and structures.
Measurement Standard:   Number of PER/LER/NOVs issued against system-related design implementation, post-maintenance testing and special test activities.
Page 28
 
3.6       PROGRAMS AND PROCEDURE Ensure that Engineering programs are closely coupled with the System
    ~  ~
Objectives:  3.5.1
                ~ ~
Engineer group such that the System Engineer is provided with the necessary tools and data to properly assess the health of the Plant systems.
Maintain Engineering processes that provide high quality, efficient and responsive design products to maintain system health and support Plant operational needs.
InMatives:   3.5.1.A     Review current program charters and realign, ifnecessary, to ensure that direct communication links are established with the System Engineers for data related to their system. 1/31/96.
3.5.1.B     Revise and streamline the design change process - see 3.4.1.C.
3.5.1.C     Complete development     of Maintenance Rule Program -   see 7.1.1.F.
Expected Results:   .
Better use of programs to support System Engineers in maintaining their systems in a safe, reliable and cost-effective manner.
Improved support and timeliness of Engineering products required to support Plant operations.
Better Engineering versatility in addressing problems.
Measurement Standards:   3.5.1.a     Performance indicators as defined on system report cards.
3.5.1.b     Timeliness of Engineering   designs and implementation in the Plant.
Page 29
 
PERFORMANCE IMPROVEMENT AREAS MAINTENANCE 4.0
                                ~ Overall: perlormanco ls avorago MAINTENANCE 4.1 OLIECTIVE SAFETY FOCUS         ~   Continual personnel errors Indicate safety focus Is weak       41 .1 4.1 .2 82.1 OBJECTIVE MAIJAGEMENT INVOLVEMENT:
                          ~   Increased supervisory field prosonco has been Ineffoctual       42.1 In reducing porsonnol errors
                          ~ Supervisory porfcrmance level noods Improvement                 4&t T.t.f
                          ~  Need cantlnuod managomont emphasis on prccodural complhnco     42.1 6 neod to perform error. froo work                             62.1 43A OBJECTIVE PROBLEM IDENTIFCATION      ~ Prcbleln'Identlflcatlcn Is untimely and weak                     4AIL1 4DB OBJECTIVE PROBLEM RESOLUTION'       ~ Corroctlvo actions have nct boon offectlve In ellmlnatlng       4DB.1 procedural ncncomplhrnco 8 porsonnol errors 4.4 OBJECTIVE (PLANTI MATERIAL
                        ~   Management'e goals for tho age of work ardors, number of       4.*1 CONDITION          backlogged work orders d tknoly ccmplotlon of PM's havo nct been met
                        ~   Post.malntenanco testing ls woak                               44.1
                        ~   Procedural norPccm plhrnco has nct been olknlnated             4&t OBJECTIVE QUAUTYOF MAINTENANCE       ~   Personnel errors 5 procedural nclPcompllanco continue to occur 42.1 WORK                                                                            4$ .1 82.1
                        ~
Foreign matorfal exclusion In both drywoll 6 wotwog Is weak     4.6.1 4.8 OBJECTIVE PROGRAMS ta PROCEDURES       ~   Procoduro upgrado effort slow to completo                       4.8.1
                        ~   Work orders havo boon rovlsod without O.C. rovlew               4&1
                        ~  Review of backlogged work requests has bosn untimely             4A.f EI     CXCCPttCNAL PCRFCRMANCC    ~
                          ~w       AVCRAaC PCRFORMANCC      ~      Msauuu PCRFCRMANCC
 
MAINTENANCE 4.1     SAFETY FOCUS Objective:   4.1.1       Improve the industrial safety consciousness and industrial safety performance of personnel involved in performing Maintenance activities.
Initiatives: 4.1 1.A
                ~        Continue monthly trending and evaluation of lost time and recordable accidents for Maintenance personnel by maintenance management.
Ongoing.
4.1.1.B     Continue conducting routine safety meetings aimed at dealing with industrial safety issues for Maintenance personnel. Ongoing.
4.1.1.C     Continue monthly trending of errors by Maintenance personnel for management evaluation and action. Current trending shows continued improvement in both the number and significance of errors by Maintenance personnel. Ongoing.
4.1.1.D     Evaluate the need for additional management actions (such as training, procedure revisions, establishing new management expectations, etc.) and implement them as needed based on performance. 10/15/95.
Erpected Result:     A sustained reduction in the number of lost time and recordable accidents.
Measurement Standard:   Representation of lost time and recordable accident trends and personnel. error trends for Maintenance personnel.
Objective:   4.1.2       Ensure decisions regarding the prioritization, scheduling, and implementation of maintenance activities (including the removal of Plant systems from service) are conservative from a nuclear safety perspective.
InMatives:   4.1.2.A     Continue SRO review and involvement in the assignment     of priorities for corrective maintenance activities. Ongoing.
Page 30
 
4.1.2.B     Continue evaluating the removal of safety systems from service using a probabalistic safety assessment and tracking of safety system out-of-service times to ensure conservatism regarding safety system availability.
Ongoing.
Zrp ected Result:    Conservatively maintaining safety system availability and reliability consistent with the probabalistic safety assessment.
Measurement Standard:   Routine tracking and evaluation of safety system availability and reliability.
Page 31
 
4.2     MANAGElVHWTINVOLVEMENT 4.2.1     Maintain a low personnel error rate (including cases of procedure non-compliance) by Maintenance personnel.
InMatives:   4.2.1.A   Increase the Maintenance management perspective of craft supervisors by including craft supervisors in periodic meetings. This should be. aimed at systematically communicating Maintenance management:expectations and perspective in the areas of procedure compliance and craft supervisor performance expectations. These meetings will begin no later than 9/15/95 and continue for as long as needed to accomplish their purpose.
Ongoing.
4.2.1.B   Review current Maintenance management practices (including the Maintenance Observation Program) for evaluating and improving the effectiveness of Maintenance craft supervisors and implement corrective actions as needed. 10/1/95.
4.2.1.C     Continue monthly trending of Maintenance personnel error rate and the number of Maintenance personnel errors per month for Maintenance management evaluation and action. Ongoing.
Expected Results:   Improved understanding and embracing of Maintenance management expectations I            regarding craft supervisor performance expectations by craft supervisors.
A sustained reduction in the number and significance of human performance errors and procedure non-compliances for Maintenance personnel.
A sustained reduction in the number and significance of human performance errors and procedure non-compliances for Maintenance personnel.
Measurement Standard: Monthly trending of human performance errors (inclusive of procedure non-compliance events)for Maintenance personnel.
Measurement Standard:   Monthly trending of human performance errors (inclusive of procedure non-compliance events) for Maintenance personnel.
Page 32 4.3A PROBLEM IDENTIFICATION Objective:
Page 32
~I t 4.3A.1 Continued proactive problem identification by personnel involved in maintenance activities.
 
Initiative:
4.3A PROBLEM IDENTIFICATION I
4.3A.1.A Review with Maintenance staff and supervisory personnel Maintenance manager's expectations regarding identification and implementation of corrective actions.9/15/95.4.3A.1.B Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator.
Continued proactive problem identification by personnel involved in
for trending"rework" as a quality measure.9/15/95.4.3A.1.C Corrective actions associated with LER 94-019-00, Gasket Missing From Main Control Room Air Handle WMA-AH-51B Preclude Associated Emergency Fan WMA-FN-54B From Sufficiently Pressurizing The Control Room, have been implemented to deal with the issue of inadequate problem identification surrounding the Control Room HVAC system.Completed.
    ~
Expected Results: Timely and accurate identification of problems associated with maintenance activities and Plant equipment.
Objective:t 4.3A.1 maintenance activities.
Initiative: 4.3A.1.A Review with Maintenance staff and supervisory personnel Maintenance manager's expectations regarding identification and implementation of corrective actions. 9/15/95.
4.3A.1.B Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator. for trending "rework" as a quality measure. 9/15/95.
4.3A.1.C Corrective actions associated with LER 94-019-00, Gasket Missing From Main Control Room Air Handle WMA-AH-51B Preclude Associated Emergency Fan WMA-FN-54B From Sufficiently Pressurizing The Control Room, have been implemented to deal with the issue of inadequate problem identification surrounding the Control Room HVAC system. Completed.
Expected Results:   Timely and accurate identification of problems associated with maintenance activities and Plant equipment.
A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.
A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.
Measurement Standanf: System reliability, number of operator workarounds, unplanned reactor trips, management observation.
Measurement Standanf:   System reliability, number of operator workarounds, unplanned reactor trips, management observation.
Page 33 4.3B PROBLEM RESOLUTION Objective:
Page 33
~I t 4.3B.1 Strengthen Maintenance management's effectiveness in monitoring for and evaluating opportunities to improve the effectiveness of corrective actions and equipment repairs.Iriitiative:
 
4.3B.1.A Continue monthly trending of maintenance performance indicators such as trouble/breakdown work order inventory, work order inventory age, the number of Control Room deficiencies, the number of late preventive maintenance tasks and technical specification surveillance tests, personnel errors, schedule effectiveness, and personnel safety performance for management evaluation and action.Ongoing.4.3B.1.B Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending"rework" as.a quality measure.9/15/95.4.3B.1.C Continue monthly trending and management review of late corrective actions associated with PERs and regulatory commitments.
4.3B     PROBLEM RESOLUTION I
Ongoing.4.3B.1.D Review Maintenance manager's expectations regarding identification and implementation of corrective actions with Maintenance staff and supervisory personnel.
Strengthen Maintenance management's effectiveness in monitoring for
9/15/95.4.3B.1.E Continued participation by the Maintenance Manager in the PER Review Meetings.Ongoing.Expected Result: A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.
    ~
Measurement Standard: Track key word search"hits" that identify newly written PERs as repeat events.Page 34 4.4 PLANT MATEMAL CONDITION Objective:
Objective:t  4.3B.1 and evaluating opportunities to improve the effectiveness of corrective actions and equipment repairs.
4.4.1 Sustain a material condition for Plant components and systems which results in high levels of system availability and reliability and a low Plant heat rate.Initiatives:
Iriitiative: 4.3B.1.A Continue monthly trending of maintenance performance indicators such as trouble/breakdown work order inventory, work order inventory age, the number of Control Room deficiencies, the number of late preventive maintenance tasks and technical specification surveillance tests, personnel errors, schedule effectiveness, and personnel safety performance for management evaluation and action. Ongoing.
4.4.1.A Continue monthly trending of performance indicators associated with Plant material condition relative to established goals such as work order inventory, work order inventory age, the number of Control Room deficiencies, and the number of late preventive maintenance tasks for management evaluation and action.Current trending shows an overall positive improvement for these indicators.
4.3B.1.B   Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending "rework" as.a quality measure. 9/15/95.
Ongoing.4.4.1.B Institute system engineer reviews of corrective maintenance work orders for safety-related, quality class 1 equipment to verify the adequacy of testing activities intended to ensure the equipment is operable prior to its return to service.9/30/95.Expected Result: Sustained high levels of system availability and reliability, a continued low Plant heat rate, and meeting goals associated with Plant material conditions.
4.3B.1.C   Continue monthly trending and management review of late corrective actions associated with PERs and regulatory commitments. Ongoing.
Measurement Standanf: Graphical trends of system availability and reliability, Plant heat rate, and material condition performance indicators.
4.3B.1.D Review Maintenance manager's expectations regarding identification and implementation of corrective actions with Maintenance staff and supervisory personnel. 9/15/95.
Page 35 4.5 QUALIIY OF MAINTENANCE WORK Objective:
4.3B.1.E   Continued participation by the Maintenance Manager in the PER Review Meetings. Ongoing.
4.5.1 t Sustain a high level of performance regarding the quality of maintenance work performed.-
Expected Result:       A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.
InMatives:
Measurement Standard:     Track key word search "hits" that identify newly written PERs as repeat events.
4.5.1.A Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending"rework" as a quality measure.9/15/95.4.5.1.B Continue monthly trending of maintenance performance in the areas of preventive maintenance and technical specification surveillance testing for Maintenance management evaluation and action.Ongoing.Continue monthly trending of errors by Maintenance personnel for management evaluation and action.Current trending shows improvement in both the number and significance of errors by Maintenance personnel.
Page 34
Ongoing.4.5.1.D Train appropriate personnel on the requirements and implementation activities associated with foreign material exclusion requirements.
 
1/15/96.4.5.1.E Continue scheduled, routine training of-Maintenance personnel.
4.4     PLANT MATEMALCONDITION Objective:   4.4.1       Sustain a material condition for Plant components and systems which results in high levels of system availability and reliability and a low Plant heat rate.
Ongoing.Erp ected Result: Continued improved performance regarding the quality of maintenance work performed, continued reduction in the error rate by Maintenance personnel, and a minimization in the number of events involving inadequate foreign material controls.Measurement Standard: Graphical representation of maintenance rework, Maintenance personnel error rate, preventive maintenance, performance, and a reduction in the number of events involving inadequate foreign material exclusion, using a PER measure.Page 36 4.6 PROGRAMS AND PROCEDURES
Initiatives: 4.4.1.A     Continue monthly trending of performance indicators associated with Plant material condition relative to established goals such as work order inventory, work order inventory age, the number of Control Room deficiencies, and the number of late preventive maintenance tasks for management evaluation and action. Current trending shows an overall positive improvement for these indicators. Ongoing.
<gg Objective:
4.4.1.B     Institute system engineer reviews of corrective maintenance work orders for safety-related, quality class 1 equipment to verify the adequacy of testing activities intended to ensure the equipment is operable prior to its return to service. 9/30/95.
4.6.1 Provide technically accurate and usable maintenance procedures that can be used, as written, by Maintenance personnel in the field.InMatives:
Expected Result:     Sustained high levels of system availability and reliability, a continued low Plant heat rate, and meeting goals associated with Plant material conditions.
4.6.1.A Continue monthly progress trending of the maintenance procedure upgrade effort for management evaluation and action.Ongoing.4.6.1.B Complete a re-evaluation of the current time table and scope of the maintenance procedure upgrade effort from a value added, cost-effectiveness and regulatory commitment standpoint.
Measurement Standanf:   Graphical trends of system availability and reliability, Plant heat rate, and material condition performance indicators.
10/15/95.Expected Result: Based on the re-evaluation, either continue the current or revised maintenance procedures upgrade effort on the existing or revised schedule, or discontinue the maintenance procedure upgrade effort.Measurement Standard: Graphical, monthly trending of maintenance procedure upgrade completions.
Page 35
Page 37 6.0 PLANT SUPPORT PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT~Overall: porformanco ls average 6.1 SAFETY FOCUS MANAGEMENT INVOLVEMENT OBJECTIVE~Quality assuranco area needs Increased management Involvoment RSA.1 52A2.ROBLEM , IDENTIFICATION 0~~PER process kr cumbersome 4 Inconsistently used~PER trending program lacks moaning to management OBJECTIVE BLEM RESO N SPA bU)LIIY OF Q ALITY ASSURANCE~Problem rosolutlcn neods Improvement
 
~Uso of slop work order authority has boon underutlllzod
4.5     QUALIIYOF MAINTENANCEWORK Objective:t 4.5.1       Sustain a high level of performance regarding the quality of maintenance work performed.-
~Need to bo moro crltlcal 5 aggrosslvo w/emphasis on prcblom rosclutlon OBJECTlVE SDA2 SDA.I SPA.2 6.38 QUALITY OF,', EMERGENCY PREPAREDNESS'BJECTIVE SAC bUALIIY OF FIRE PROTECTION
InMatives: 4.5.1.A     Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending "rework" as a quality measure. 9/15/95.
~Technical Rro Issues, thormolag and fire barrier soal Installation exists~Fire Extinguisher Ins Factions and untroatod wood In protected area wore noted as prcblom areas.OBJECTIVE, 7.5.1 Comploto QUALITY OF SECURITY~Porlormanco has boon woak~Noed to ollmlnate sonso cf complacency to stop docllno In porlcrmance OBJECTIVE 6.3D.1 6.3OA SAD.1 63DA 0 ALITYOF v HE Ab PHYSIC~Radlatlcn exposuro tor both routine 4 outage actlvtgos too high~Scurco term roductlon efforts lag behind Industry avorago~Personnol vlchtlcns aro oxcosslvo~Apparent nogatlvo trond of porscnal contarnlnatlcn events OBJECTIVE SAE.1 SM.1 SDE2 SA.I SAR.3 SA , PR RAMSA PROCEDURES
4.5.1.B     Continue monthly trending of maintenance performance in the areas of preventive maintenance and technical specification surveillance testing for Maintenance management evaluation and action. Ongoing.
~Procedural adhoronco contlnuos as a slgnltlcant prcblom OBJECTIVE SNAB SABA SAE2 axcaenoNAL
Continue monthly trending of errors by Maintenance personnel for management evaluation and action. Current trending shows improvement in both the number and significance of errors by Maintenance personnel.
~AVEAAOK eanrorurANca w aanrorarANca pcarorurANCK E 0604704AAO AAY 25, 100$
Ongoing.
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0 PLANT SUPPORT~Overall: performance ls average 5.3A EQUALITY OF ai7AUTV ASSURANCE~Problem resolution needs Improvement
4.5.1.D     Train appropriate personnel on the requirements and implementation activities associated with foreign material exclusion requirements.
~Use of stop work order authority has been underutlllzed
1/15/96.
~Need to be more critical%aggressive wl emphasIs on problem resolution OBJECTIVE 6.3A.1 6.3A.2 6.3A.1 6.3A.2 OQH704.0A JUNE 1N$
4.5.1.E     Continue   scheduled,   routine training of Maintenance personnel.
QUALI1Y ASSURANCE 5.3A QUALITY ASSURANCE Objective:
Ongoing.
5.3A.1 Attain a higher level of quality involvement and line management buy-in on issue resolution, human performance, procedural adherence, and the effectiveness of corrective action programs.Initiatives:
Erp ected Result:     Continued improved performance regarding the quality of maintenance work performed, continued reduction in the error rate by Maintenance personnel, and a minimization in the number of events involving inadequate foreign material controls.
5.3A.1.A On 6/20/95 the Quality Directorate began a 100%review of'all PERS at the disposition and closure phase.This review focuses on the adequacy and completion of the corrective actions.Inadequate corrective actions are communicated to the appropriate line organization both verbally and in writing.This initiative will continue for a six-month period at which time it will be reevaluated.
Measurement Standard:   Graphical representation of maintenance rework, Maintenance personnel error rate, preventive maintenance, performance, and a reduction in the number of events involving inadequate foreign material exclusion, using a PER measure.
Ongoing.5;3A.1.B Quarterly, Functional Area Engineers will meet with line management to determine the needs of the line organization as well as obtain an assessment of the performance of the Quality organization in supporting those needs.Ongoing.5.3A.l.c Each Quality Directorate Manager will rotate two individuals from the Quality Directorate per fiscal year.This applies to both inter-and intra-organizational rotations.
Page 36
Rotations for Operations personnel into the Quality Directorate to commence by October 1995.Ongoing.5.3A.1.D The Line organization will participate as Audit Team Members in 50 percent of FY96 Quality audits.Ongoing.5.3A.1.E Outside utilities'ersonnel will participate as Audit Team Members in 50 percent of FY96 Quality audits.Ongoing.5.3A.1.F Functional Area Engineers will use Quality Control inspectors in a"Coordinated Approach" to Plant walk-downs.
 
Ongoing.5.3A.1.G Development and implementation of a training program for the Quality Directorate.
4.6     PROGRAMS AND PROCEDURES
The focus of this program will be on auditor performance and licensing basis requirements.
<gg Objective: 4.6.1     Provide technically accurate and usable maintenance procedures that can be used, as written, by Maintenance personnel in the field.
Ongoing.5.3A.1.H Implement a shop-peer inspection program.This will involve a reduction in QC hold points and training of craft personnel on how'to perform peer inspections.
InMatives: 4.6.1.A   Continue monthly progress trending of the maintenance procedure upgrade effort for management evaluation and action. Ongoing.
Ongoing.Page 38  
4.6.1.B   Complete a re-evaluation of the current time table and scope     of the maintenance procedure upgrade effort from a value added,         cost-effectiveness and regulatory commitment standpoint. 10/15/95.
, Expected Results: Effective communication between the line organization and the Quality staff should improve.An additional benefit is the expected alignment of goals for Quality and the line organizations.
Expected Result:     Based on the re-evaluation, either continue the current or revised maintenance procedures upgrade effort on the existing or revised schedule, or discontinue the maintenance procedure upgrade effort.
A thorough review of all PERs at disposition and closure should foster a consistent and improved standard on the quality and effectiveness of the corrective action process.Through rotation of personnel, Quality staff will gain an appreciation for the performance requirements of the line organization and line organizations will gain an increased awareness for the license-based requirements of their activities.
Measurement Standard:   Graphical, monthly trending of maintenance procedure upgrade completions.
Increased awareness of the Quality staff on the problems, issues, workarounds, and failures in the Plant.The resource of Quality Control has not been fully utilized for its unique perspective.
Page 37
This endeavor should transfer Plant awareness to all organizations.
 
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0
                            ~ Overall: porformanco ls average PLANT SUPPORT 6.1 OBJECTIVE SAFETY FOCUS MANAGEMENT
                            ~ Quality assuranco area needs Increased management Involvoment         RSA.1 52A2.
INVOLVEMENT OBJECTIVE ROBLEM       ~  PER process kr cumbersome 4 Inconsistently used 0~
IDENTIFICATION        ~  PER trending program lacks moaning to management BLEM RESO       N SPA OBJECTlVE bU)LIIYOF Q ALITY       ~ Problem rosolutlcn neods Improvement ASSURANCE
                            ~ Uso of slop work order authority has boon underutlllzod               SDA2
                            ~ Need to bo moro crltlcal 5 aggrosslvo w/emphasis on                   SDA.I prcblom rosclutlon                                                    SPA.2 6.38 PREPAREDNESS'BJECTIVE QUALITYOF, EMERGENCY SAC OBJECTIVE, bUALIIYOF FIRE         ~   Technical Rro Issues, thormolag and fire barrier soal Installation 7.5.1 PROTECTION            exists
                            ~   Fire Extinguisher Ins Factions and untroatod wood In protected       Comploto area wore noted as prcblom areas.
OBJECTIVE QUALITYOF SECURITY
                            ~ Porlormanco has boon woak                                             6.3D.1 6.3OA
                            ~ Noed to ollmlnate sonso cf complacency to stop docllno               SAD.1 In porlcrmance                                                      63DA OBJECTIVE 0vALITYOF        ~ Radlatlcn exposuro tor both routine   4 outage actlvtgos too high     SAE.1 HE Ab PHYSIC
                            ~ Scurco term roductlon efforts lag behind Industry avorago             SM.1
                            ~ Personnol vlchtlcns aro oxcosslvo                                     SDE2 SA.I
                            ~ Apparent nogatlvo trond of porscnal contarnlnatlcn events             SAR.3 SA OBJECTIVE PR   RAMSA                                                                                 SNAB PROCEDURES
                            ~ Procedural adhoronco contlnuos as a slgnltlcant prcblom SABA SAE2 axcaenoNAL eanrorurANca
                              ~w    AVEAAOK aanrorarANca     E      pcarorurANCK 0604704AAO AAY25, 100$
 
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0
                      ~ Overall: performance ls average PLANT SUPPORT 5.3A OBJECTIVE EQUALITY OF ai7AUTV   ~ Problem resolution needs Improvement                     6.3A.1 ASSURANCE
                  ~ Use of stop work order authority has been underutlllzed 6.3A.2
                  ~ Need to be more critical %aggressive wl emphasIs on     6.3A.1 problem resolution                                      6.3A.2 OQH704.0A JUNE 1N$
 
QUALI1YASSURANCE 5.3A QUALITYASSURANCE Objective:   5.3A.1   Attain a higher level of quality involvement and line management buy-in on issue resolution, human performance, procedural adherence, and the effectiveness of corrective action programs.
Initiatives: 5.3A.1.A On 6/20/95 the Quality Directorate began     a 100% review of 'all PERS at the disposition and closure phase. This review focuses on the adequacy and completion of the corrective actions. Inadequate corrective actions are communicated to the appropriate line organization both verbally and in writing. This initiative will continue for a six-month period at which time it will be reevaluated. Ongoing.
5;3A.1.B Quarterly, Functional Area Engineers will meet with line management to determine the needs of the line organization as well as obtain an assessment of the performance of the Quality organization in supporting those needs. Ongoing.
5.3A.l.c Each Quality Directorate Manager will rotate two individuals from the Quality Directorate per fiscal year. This applies to both inter- and intra-organizational rotations. Rotations for Operations personnel into the Quality Directorate to commence by October 1995. Ongoing.
5.3A.1.D The Line organization will participate as Audit Team Members in 50 percent of FY96 Quality audits. Ongoing.
5.3A.1.E Outside utilities'ersonnel will participate     as Audit Team Members in 50 percent   of FY96 Quality audits. Ongoing.
5.3A.1.F Functional Area Engineers will use Quality Control inspectors in a "Coordinated Approach" to Plant walk-downs. Ongoing.
5.3A.1.G Development and implementation of a training program for the Quality Directorate. The focus of this program will be on auditor performance and licensing basis requirements. Ongoing.
5.3A.1.H Implement a shop-peer inspection program. This willinvolve a reduction in QC hold points and training   of craft personnel on how'to perform peer inspections. Ongoing.
Page 38
 
, Expected Results:     Effective communication between the line organization and the Quality staff should improve. An additional benefit is the expected alignment of goals for Quality and the line organizations.
A thorough review of all PERs at disposition and closure should foster a consistent and improved standard on the quality and effectiveness        of the corrective action process.
Through rotation of personnel, Quality staff will gain an appreciation for the performance requirements of the line organization and line organizations will gain an increased awareness for the license-based requirements of their activities.
Increased awareness of the Quality staff on the problems, issues, workarounds, and failures in the Plant. The resource of Quality Control has not been fully utilized for its unique perspective.       This endeavor should transfer Plant awareness to all organizations.
Improve Craft personnel responsibility for delivering a quality product through involvement and exposure to PEER inspection.
Improve Craft personnel responsibility for delivering a quality product through involvement and exposure to PEER inspection.
Measurement Standards:
Measurement Standards:   5.3A.l.a     The Quality Directorate will track and report on the number and the specifics of returned PERS as a result of the Corrective Action Review Board and Quality Directorate review efforts.
5.3A.l.a The Quality Directorate will track and report on the number and the specifics of returned PERS as a result of the Corrective Action Review Board and Quality Directorate review efforts..5.3A.l.b Every quarter, the frequency of the Functional Area Engineer's-meeting with the line organization will be reviewed and reported in the Quality Directorate Quarterly Report.5.3A.l.c Organizational rotations will be reviewed and in the Directorate Quarterly Report.5.3A.l.d Line organization participation on audit teams will be reviewed and reported in the Quality Directorate Quarterly Report.on this goal.5.3A.l.e Report frequency and value achieved using the Quality/QC coordinated approach will be reviewed and the administrative staff will track and generate a quarterly report for the Director's review.Objective:
              .5.3A.l.b Every quarter, the frequency of the Functional Area Engineer's-meeting with the line organization will be reviewed and reported in the Quality Directorate Quarterly Report.
5.3A.2 The Quality Organization will focus their resources on, timely and effective intervention dealing with issues having an impact on human performance, station safety and a reduction in repeat problems.Page 39 Initiatives:
5.3A.l.c Organizational rotations will         be reviewed   and   in the Directorate Quarterly Report.
5.3A.2.A Quality Directorate Audits and Surveillances will have reports'generated within seven working days of the exit.Ongoing.5.3A.2.B Quarterly, Functional Area Engineers will meet with the line management to determine the needs of the organization as, well as the performance of the Quality organization in supporting those needs.Ongoing.5.3A.2.C Use the Critical Attribute Database to ensure a thorough and comprehensive coverage of the Functional Areas.Focusing on the fundamental aspects of the department's scope.Ongoing.5.3A.2.D Track the use of the"Stop Work" order by the Quality Directorate.
5.3A.l.d Line organization participation         on audit teams will be reviewed and reported in the Quality Directorate Quarterly Report. on this goal.
This applies to both the formal and the consensus"Stop Work" order.Ongoing.5.3A.2.E Functional Area Engineers will use Quality Control inspectors in a"Coordinated Approach" to Plant walk-downs.
5.3A.l.e Report frequency and value         achieved using the Quality/QC coordinated approach will be reviewed     and the administrative staff will track and generate a quarterly report for the Director's review.
Ongoing.Expected Results: With Audit and Surveillance Reports in the customer's hands within seven (7)working days of the exit, the value and applicability of the information to line management should be enhanced.Effective communication between the customer organization and the Quality staff should improve.The additional benefit is providing a clear focus for both organizations on the areas requiring improvement..Aggressive and appropriate use of the"Stop Work" tool should increase the effectiveness of the Quality Directorate in raising the standard of human performance and procedural compliance, The focus of the line organizations and Quality Directorate should be on the same issues-to identify potential and repetitive problems to management.
Objective:   5.3A.2       The Quality Organization will focus their resources on, timely and effective intervention dealing with issues having an impact on human performance, station safety and a reduction in repeat problems.
Increased awareness of the Quality staff of the problems, issues, workarounds, and failures in the Plant.The resource of Quality Control has not been fully utilized for its unique perspective.
Page 39
This endeavor should transfer the unique perspective Quality Control has on Plant activities to all organizations via Quality Directorate products.Measurement Standards:
 
5.3A.2.a The achievement of timely reports will be reviewed.The Quality-Directorate will track this parameter.
Initiatives:   5.3A.2.A Quality Directorate Audits and Surveillances will have reports'generated within seven working days of the exit. Ongoing.
5.3A.2.b Information from the Functional Areas Engineers meeting with the respective departments will be reported in the Quarterly Quality Directorate report.Page 40 5.3A.2.c Every six months, the scheduled due dates for the Critical Attributes Database will be queried to establish the percent completed.
5.3A.2.B Quarterly,       Functional Area Engineers will meet with the line management to determine the needs of the organization as, well as the performance of the Quality organization in supporting those needs.
5.3A.2.d The number and value added for the Stop Work Order will be reviewed.A log will be maintained by the directorate secretary and reported in the Quarterly Quality Directorate Report.Page 4I 5.0 PLANT SUPPORT PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 0 Overall: performance Is average 5.3B.,QUALITY'OF EMERGENCY PREPAREDNESS,'BJECTIVE 050075.aas JUNE 1005 EMERGENCY PREPAREDNESS 5.3B FMERGENCY PLAN AND IMPLIMENI'ING PROCEDUEU<B Objective:
Ongoing.
5.3B.1 Maintain and verify the current level of the Emergency Plan and Implementing Procedures.
5.3A.2.C Use the Critical Attribute Database             to ensure a thorough and comprehensive coverage of the Functional Areas. Focusing on the fundamental aspects of the department's scope. Ongoing.
Initiatives:
5.3A.2.D Track the     use of the "Stop Work" order by the Quality Directorate. This applies to both the formal and the consensus "Stop Work" order.
5-.3B.1.A Train Emergency Response Organization to the new plan and procedures.
Ongoing.
5.3A.2.E Functional Area Engineers will use Quality Control inspectors in a "Coordinated Approach" to Plant walk-downs. Ongoing.
Expected Results:     With Audit and Surveillance Reports in the customer's hands within seven (7) working days of the exit, the value and applicability of the information to line management should be enhanced.
Effective communication between the customer organization and the Quality staff should improve. The additional benefit is providing a clear focus for both organizations on the areas requiring improvement.
            .Aggressive and appropriate use of the "Stop Work" tool should increase the effectiveness of the Quality Directorate in raising the standard of human performance and procedural compliance, The focus of the line organizations and Quality Directorate should be on the same issues to identify potential and repetitive problems to management.
Increased awareness of the Quality staff of the problems, issues, workarounds, and failures in the Plant. The resource of Quality Control has not been fully utilized for its unique perspective. This endeavor should transfer the unique perspective Quality Control has on Plant activities to all organizations via Quality Directorate products.
Measurement Standards:   5.3A.2.a     The achievement of timely reports will be reviewed.         The Quality-Directorate will track this parameter.
5.3A.2.b     Information from the Functional Areas Engineers meeting with the respective departments will be reported in the Quarterly Quality Directorate report.
Page 40
 
5.3A.2.c Every six months, the scheduled due dates for the Critical Attributes Database will be queried to establish the percent completed.
5.3A.2.d The number and value added for the Stop Work Order will be reviewed.
A log will be maintained by the directorate secretary and reported in the Quarterly Quality Directorate Report.
Page   4I
 
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 5.0 0 Overall: performance Is average PLANT SUPPORT 5.3B PREPAREDNESS,'BJECTIVE
      .,QUALITY'OF EMERGENCY 050075.aas JUNE 1005
 
EMERGENCY PREPAREDNESS 5.3B   FMERGENCY PLAN AND IMPLIMENI'INGPROCEDUEU<B Objective:   5.3B.1     Maintain and verify the current level of the Emergency Plan and Implementing Procedures.
Initiatives: 5-.3B.1.A Train Emergency Response Organization to the new plan and procedures.
Completed.
Completed.
5.3B.1.B Develop training for NUMARC-Emergency Action Levels.Completed.
5.3B.1.B   Develop training for NUMARC-Emergency Action Levels. Completed.
5.3B.1.C Complete WNP-2 Accountability Drill.Completed.
5.3B.1.C   Complete WNP-2 Accountability Drill. Completed.
5.3B.1.D Complete Preparedness Drill for 10/95 Exercise.9/95.5.3B.1.E Conduct 10/95 Exercise.10/95.5.3B.1.F Develop procedures and training for severe accident management.
5.3B.1.D Complete Preparedness Drill for 10/95 Exercise. 9/95.
1/97.Expected Result: Successful evaluations during 8/95 NRC Inspection and 10/95 Exercise.Measurement Standard: No major areas of concern revealed during 8/95 NRC Inspection and 10/95 Exercise.Objective:
5.3B.1.E   Conduct 10/95 Exercise. 10/95.
5.3B.2 Maintain Emergency Response Facilities and Equipment.
5.3B.1.F   Develop procedures and training for severe accident management. 1/97.
Initiatives:
Expected Result:     Successful evaluations during 8/95 NRC Inspection and 10/95 Exercise.
5.3B.2.A Develop Emergency Response Facilities and Equipment Checklist.
Measurement Standard:   No major areas of concern revealed during 8/95 NRC Inspection and 10/95 Exercise.
Objective:   5.3B.2     Maintain Emergency Response Facilities and Equipment.
Initiatives: 5.3B.2.A Develop Emergency Response         Facilities and Equipment Checklist.
Completed.
Completed.
5.3B.2.B Develop Emergency Planning Position Papers.12/95.Expected Result: All emergency response centers and equipment maintained in a constant state of readmess.Page 42 Measurement Standard: No identified areas of concern noted during weekly walkdown of emergency response centers.Objective:
5.3B.2.B   Develop Emergency Planning Position Papers.     12/95.
5.3B.3 Develop Departmental Guidelines and Policies by 12/31/95 that clearly identify functions of Emergency Planning Organization.
Expected Result:     All emergency   response centers and equipment maintained in a constant state of readmess.
Initiatives:
Page 42
5.3B.3.A Develop instructional manual for drills and exercises.
 
Measurement Standard:   No identified areas of concern noted during weekly walkdown         of emergency response centers.
Objective:   5.3B.3     Develop Departmental Guidelines and Policies by 12/31/95 that clearly identify functions of Emergency Planning Organization.
Initiatives: 5.3B.3.A Develop instructional manual for drills and exercises. Completed.
5.3B.3.B  Develop reference materials for various Emergency Planning roles and responsibilities. 12/95.
5.3B.3.C  Develop six-year planning schedule. 8/95.
Expected Result:      Enhance the department's ability to maintain a high quality, effective Emergency Response Organization.
Measurement Standard:    Reduce the number of findings from Quality audits, NRC Inspections and FEMA Reviews.
Objective:  5.3B.4    Develop a Program Impro'vement Plan with State, Counties, and EFSEC by June 1996 to achieve program efficiencies.
Initiatives: 5.3B.4.A Conduct benchmarking with selected counties, states, and utilities.
Completed.
Completed.
5.3B.3.B Develop reference materials for various Emergency Planning roles and responsibilities.
5.3B.4.B   Use information obtained      from bench marking to identify work efficiencies. 12/95.
12/95.5.3B.3.C Develop six-year planning schedule.8/95.Expected Result: Enhance the department's ability to maintain a high quality, effective Emergency Response Organization.
5.3B.4.C   Implement work efficiencies to achieve reduction in program costs without affecting quality. 6/96.
Measurement Standard: Reduce the number of findings from Quality audits, NRC Inspections and FEMA Reviews.Objective:
Expected Result:     Achieve off-site cost savings.
5.3B.4 Develop a Program Impro'vement Plan with State, Counties, and EFSEC by June 1996 to achieve program efficiencies.
Measurement Standard:   Reduced expenditure for off-site emergency preparedness.
Initiatives:
Page 43
5.3B.4.A Conduct benchmarking with selected counties, states, and utilities.
 
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0
                    ~ Overall: performance Is average PLANT SUPPORT 6.3C OBJECTIVE bUALITYOF
          %RE      ~ Technical Fire Issues, thermolag and fire barrier seal      7.6.1 PROTEC I'ION    Installation exists
                    ~ Rre Extinguisher Inspections and untreated wood In protected Complete area were noted as problem areas.
0504754.5C JULY 25, 1005
 
FIRE PROTECTION 5.3C FIRE PROTECTION Objective:   5.3C.1      Complete fire protection projects relating to thermo-lag, fire-rated penetration seals, and safe shutdown (Appendix -R) procedures.
Initiatives: 5.3C.1.A Establish projects to address fire protection issues.      Complete.
5.3C.1.B    Complete plant modifications necessary to resolve safe shutdown fire barrier issues without reliance on thermo-lag. Spring 1999.
5.3C.1.C    Complete walkdown      of essential fire penetration seals. 12/97.
5:3C.1.D Revise safe shutdown analysis to incorporate necessary                changes.
Completed.
Completed.
5.3B.4.B Use information obtained from bench marking to identify work efficiencies.
Expected Result:     Resolve fire protection deficiencies.
12/95.5.3B.4.C Implement work efficiencies to achieve reduction in program costs without affecting quality.6/96.Expected Result: Achieve off-site cost savings.Measurement Standard: Reduced expenditure for off-site emergency preparedness.
Measurement Standard:   Completion of initiatives in accordance with established   schedules.
Page 43 PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0 PLANT SUPPORT~Overall: performance Is average 6.3C bUALITY OF%RE PROTEC I'ION~Technical Fire Issues, thermolag and fire barrier seal Installation exists~Rre Extinguisher Inspections and untreated wood In protected area were noted as problem areas.OBJECTIVE 7.6.1 Complete 0504754.5C JULY 25, 1005 FIRE PROTECTION 5.3C FIRE PROTECTION Objective:
Page 44
5.3C.1 Complete fire protection projects relating to thermo-lag, fire-rated penetration seals, and safe shutdown (Appendix-R)procedures.
 
Initiatives:
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0
5.3C.1.A Establish projects to address fire protection issues.Complete.5.3C.1.B Complete plant modifications necessary to resolve safe shutdown fire barrier issues without reliance on thermo-lag.
                  ~ Overall: performance Is average PLANT SUPPORT 6.3D OBJECTIVE QUALITYOF SECURITY
Spring 1999.5.3C.1.C Complete walkdown of essential fire penetration seals.12/97.5:3C.1.D Revise safe shutdown analysis to incorporate necessary changes.Completed.
                  ~ Some examples of poor performance Identified.                 6.3D.1 6.3D.4
Expected Result: Resolve fire protection deficiencies.
                  ~ Need to Implement programs to remove complacency and Improve 6.3D.1 performance                                                  5.3D.4 050l746.0 D JVLY 19. 1005
Measurement Standard: Completion of initiatives in accordance with established schedules.
 
Page 44 PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0 PLANT SUPPORT~Overall: performance Is average 6.3D QUALITY OF SECURITY~Some examples of poor performance Identified.
SEC URIZY 5.3D SECUMTY Objective:,5.3D.1       Eliminate complacency and improve human performance.
~Need to Implement programs to remove complacency and Improve performance OBJECTIVE 6.3D.1 6.3D.4 6.3D.1 5.3D.4 050l746.0 D JVLY 19.1005 SEC URIZY 5.3D SECUMTY Objective:,5.3D.1 Eliminate complacency and improve human performance.
InMatives:   5.3D.1.A Ensure Security Procedure compliance through the following initiatives:
InMatives:
                        ~ Develop and implement in-house compliance             audits using representatives from all Security departments.       Development completed 2/95; Implementation Ongoing.
5.3D.1.A Ensure Security Procedure compliance through the following initiatives:
                        ~ Gain Security Officer feedback on procedure reviews, concerns, and suggestions. 12/1/95.
~Develop and implement in-house compliance audits using representatives from all Security departments.
                        ~ Consolidate the number of Security procedures. Ongoing.
Development completed 2/95;Implementation Ongoing.~Gain Security Officer feedback on procedure reviews, concerns, and suggestions.
                        ~ Continue to communicate management expectations for procedural compliance. Ongoing.
12/1/95.~Consolidate the number of Security procedures.
5.3D.1.B Relieve boredom which contributes to complacency by adding duties relating to proper housekeeping and safety focus to ensure officers remain in a higher state of readiness. Ongoing.
Ongoing.~Continue to communicate management expectations for procedural compliance.
Expected Result:     Continuation of improvement in performance which has been observed           since completion of Mid-Cycle Assessment.
Ongoing.5.3D.1.B Relieve boredom which contributes to complacency by adding duties relating to proper housekeeping and safety focus to ensure officers remain in a higher state of readiness.
Measurement Standard:   Graphical representation of human performance errors against an established goal.
Ongoing.Expected Result: Continuation of improvement in performance which has been observed since completion of Mid-Cycle Assessment.
Obj ective: 5.3D.2     Optimize Security performance by using state-of-the-art equipment.
Measurement Standard: Graphical representation of human performance errors against an established goal.Obj ective: 5.3D.2 Optimize Security performance by using state-of-the-art equipment.
InNatives:   5.3D.2.A Install Hand Geometry at protected area entry turnstiles to allow employees to gain efficiencies. 11/95.
In Natives: 5.3D.2.A Install Hand Geometry at protected area entry turnstiles to allow employees to gain efficiencies.
5.3D.2.B Relocate the EOFCC and related equipment to the Alternate Access Point Badge Issue Station as part of the equipment upgrade. 11/95.
11/95.5.3D.2.B Relocate the EOFCC and related equipment to the Alternate Access Point Badge Issue Station as part of the equipment upgrade.11/95.Page 45 Expected Result: Reduction in badging errors.Measurement Standard: Badging error rate.Objective:
Page 45
5.3D.3 Increase availability and reliability of Security equipment.
 
InMatives:
Expected Result:     Reduction in badging errors.
5.3D.3.A Increase assessment of Alarm Station Operator (ASO)performance and increase operator assessment ability of Security equipment.
Measurement Standard:   Badging error rate.
Implemented 4/5/95.~Repair or replace 17" alarm monitors to improve picture resolution.
Objective: 5.3D.3     Increase availability and reliability of Security equipment.
InMatives: 5.3D.3.A Increase     assessment of Alarm Station Operator (ASO) performance and increase     operator assessment       ability of Security equipment.
Implemented 4/5/95.
                        ~ Repair or replace 17" alarm monitors to improve picture resolution.
Completed.
Completed.
~Train CAS operators on method to use the camera"template" for assessment purposes and methods for adjusting monitors.9/1/95.5.3D.3.B Reduce excessive alarm rates on vital area doors.12/19/95.~Implementation of multiple employee entries through card-reader doors.Ongoing.~Issue informational articles to Plant employees stating expectations for door closures.Ongoing.~Continue to develop and trend door alarm rates, gathering more detail data for an in-depth analysis to determine if there is a maintenance or human error problem.12/95.Expected Result: Reduction in Security Systems'quipment failures.Measurement Standard: Graphical representation of equipment failures against an established goal.Objective:
                        ~ Train CAS operators on method to use the camera "template" for assessment purposes and methods for adjusting monitors. 9/1/95.
5.3D.4 Strengthen the FFD&CBO programs.InMatives:
5.3D.3.B Reduce excessive alarm rates on vital area doors. 12/19/95.
5.3D.4.A Maintain existing quality of work, pride, and skill of FFD staff.'Upgrade equipment, incorporate DOT FFD program.Streamline FFD outage processing.
                        ~ Implementation of multiple employee entries through card-reader doors. Ongoing.
Ongoing.5.3D.4.B Increase employee awareness and understanding of the Supply System's Continued Behavioral Observation Program.Ongoing.Page 46 Maintain a drug-free and professional work force.Expected Result: Measurement Standard: Graphical representation of FFD testing results.Objective:
                        ~ Issue informational articles to Plant employees stating expectations for door closures. Ongoing.
5.3D.S Maintain high level of readiness.
                        ~ Continue to develop and trend door alarm rates, gathering more detail data for an in-depth analysis to determine ifthere is a maintenance or human error problem. 12/95.
:InMatives:
Expected Result:     Reduction in Security Systems'quipment failures.
5.3D.S.A Benchmark other Security training and Security Force organizations.
Measurement Standard:   Graphical representation of equipment failures against an established goal.
Ongoing.5.3D.5.8 Participate in peer self-assessments of the FFD/CBO and Security Programs.Ongoing.5.3D.S.C Prepare for Operational Safeguards Response Evaluation
Objective: 5.3D.4     Strengthen the FFD     & CBO programs.
{OSRE).Scheduled by NRC.Expected Result: An acceptable and working OSRE plan and increased Security Force efficiency.
InMatives: 5.3D.4.A Maintain existing quality of work, pride, and skill of FFD staff.
Measurement Standardt List of on-going/planned activities.
                      'Upgrade equipment, incorporate DOT FFD program. Streamline FFD outage processing. Ongoing.
Page 47 PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0 PLANT SUPPORT~Overall: performance ls average 6.3E 0 ALITYOF HEAb PHYSIC~Radiation exposure for both routine b.outage activities too high~Source term reduction efforts lag behInd Industry average~Personnel vlolatlons are excessive~Apparent negative trend of personnel contamlnatlon events OB JECTIVE 6.3E.1 6.3E.1 6.3E.2 6.4.1 62E.3 0504764.$E JUNE 1&OS HEALTH PHYSICS 5.3E HEALTH PHYSICS Objective:
5.3D.4.B Increase employee awareness and understanding of the Supply System's Continued Behavioral Observation Program. Ongoing.
5.3E.1 Reduce personnel radiation exposure to a level consistent with comparable Boiling Water Reactors.InMatives:
Page 46
5.3E.1.A Implement WNP-2 Business Plan (SOT2)concerning reduction of occupational and collective personnel radiation exposure.Ongoing.5:3E.1.B Improve and continue the plan for flushing high radiation dose rate components to remove contaminants causing increased dose rates.Ongoing.5.3E.l.c Identify high radiation dose rate contributors (e.g., turbine blades), evaluate for modification or removal and develop plans for implementation of modification in order to achieve lower dose rates.Identification
 
-by 9/96;Evaluation and Development
Expected Result:    Maintain a drug-free and professional work force.
-Ongoing.(Piping, which was causing elevated dose rates in the Reactor Water Cleanup Holdup Pump Room, was removed in July 1995.)5.3E.1.D Continue the plan for shielding components as evaluations deem appropriate.
Measurement Standard: Graphical representation of FFD testing results.
Ongoing.5.3E.1.E Continue the publication of the status of departmental dose accumulation and dose budget comparisons in the Plant newsletter.
Objective: 5.3D.S     Maintain high level of readiness.
Ongoing.5.3E.1.F Implement an incentive compensation plan based upon an ALARA goal.Completed.
:InMatives: 5.3D.S.A Benchmark other Security training and Security Force organizations.
Expected Result: Reduction of collective and occupational personnel radiation exposure.Measurement Standards:
Ongoing.
5.3E.l.a Annual dose accumulation and ranking on INPO quartiles.
5.3D.5.8 Participate in peer self-assessments     of the FFD/CBO and Security Programs. Ongoing.
5.3E.l.b Departments assessed based on monthly, outage and annual dose accumulation.
5.3D.S.C Prepare     for Operational Safeguards   Response Evaluation {OSRE).
5.3E.l.c Results from standardized radiation survey points.t t Objective:
Scheduled by NRC.
5.3E.2 Continue to foster an environment which encourages adherence to radiological requirements.
Expected Result:     An acceptable and working OSRE plan and increased Security Force efficiency.
Page 48 I nMatives: 5.3E.2.A Develop Advance Radiation Worker Training including practical exercise using the maintenance training skid and concurrent training of craft workers and health physics technicians.
Measurement Standardt   List of on-going/planned activities.
1/96.5.3E.2.B Add industry events to include personnel violations of radiological requirements at WNP-2 to General Employee Training.Ongoing.5.3E.2.C Develop and communicate management expectations for worker accountability in radiological environments including work group supervisor accountability on all shifts.10/95.5.3E.2.D Enhance the RWP/ALARA planning process to improve exposure controls and provide improved information to workers.9/95.Expected Result: Reduction in personnel violations of radiological requirements.
Page 47
Measurement Standard: The measurement standard will be a reduction in personnel violations of, radiological requirements which result in PERs as compared to the total number of PERs written.Objective:
 
5.3E.3 Ensure proper emphasis on personnel contamination events.5.3E.3.A Develop criteria which indicates a significant personnel contamination event.11/95.5.3E.3.B Implement trending program using criteria for significant personnel contamination event.1/96.5.3E.3.C Use information from trending program to develop baseline and inform management.
PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0
Ongoing.Expected Result: Reduction in personnel contamination events trended and investigated.
                  ~ Overall: performance ls average PLANT SUPPORT 6.3E OB JECTIVE 0 ALITYOF HEAb
Measurement Standard: The measurement standard will be determined as part of the development of the personnel contamination event program.Page 49 PERFORMANCE IMPROVEMENT AREAS TRAINING 6.0 TRAINING 6.1 OPERATIONS TRAINING~Continue training that Improves and enhances oporator porforma neo.OBJECTIVE 6.1.1~Enhance knowledge of plant operations and impact on operator performance 6.14 6.2 MAINTENANCE TRAINING~Foster training environment emphasizing proper safety focus OBJECTIVE 6.2.1 6.3 ENGINEERING SUPPORT TRAINING~Ensure undorstandlng of Plant Systems and Operations OBJECTIVE 6.3.1 6.4 CHEMISTRY AND HP TECHNICIAN TRAINING~Enhance and improvo chemistry and health technician performs neo.OBJECTIVE 6.4.1 EXCEPTIONAL PERFORMANCE AVERAGE W PERFORMANCE MINIMUM~B ADDED BY PERFORMANCE
                  ~ Radiation exposure for both routine b. outage activities too high 6.3E.1 PHYSIC  ~ Source term reduction efforts lag behInd Industry average         6.3E.1
~SUPPLY SYSTEM 0000704.0.0 JULY 10.1005 TRAINING 6.1 OPERATIONS TRAINING Objective:
                  ~ Personnel vlolatlons are excessive                                 6.3E.2 6.4.1
6.1.1 Continue to provide quality training that is specifically.designed to enhance and improve operator performance in the Plant.Initiatives:
                  ~ Apparent negative trend of personnel contamlnatlon events          62E.3 0504764.$ E JUNE 1&OS
6.1.1.A Continue development and integration of the following performance issues and attributes into licensed and non-licensed operator training materials and simulator scenarios:
 
Ongoing.~Attention to detail~Conservative decision-making
HEALTH PHYSICS 5.3E   HEALTH PHYSICS Objective: 5.3E.1   Reduce personnel radiation exposure         to a level consistent     with comparable Boiling Water Reactors.
~Problem resolution and a questioning attitude~Self-checking
InMatives: 5.3E.1.A Implement WNP-2 Business Plan (SOT2) concerning reduction of occupational and collective personnel radiation exposure. Ongoing.
~Component tagging practices~Technical specification case studies~Pre-evolution or pre-job briefs~Understanding design bases~Line management expectations
5:3E.1.B Improve and continue the plan for flushing high radiation dose rate components     to remove contaminants     causing increased   dose rates.
~Procedural adherence~Three-way communication 6.1.1.B Continue implementation of these performance attributes in classroom and simulator training sessions.As an example, in the present training cycle (95-4), Operations Training is re-emphasizing conservative decision-making and problem resolution during simulator scenarios which are based on Abnormal Operations.
Ongoing.
Self-checking is being evaluated by instructors and Operations Managers/Supervisors using Job Performance Measures (JPM)training in the simulator and the formal communications policy is being reviewed in the classroom as well as in the Plant simulator.
5.3E.l.c Identify   high radiation dose rate contributors (e.g., turbine blades),
Ongoing.Page'0 6.1.1.C Continuously evaluate ways to further enhance operator training programs, maintaining a"focus" on improved Plant and operator performance.
evaluate for modification or removal and develop plans for implementation of modification in order to achieve lower dose rates.
Use Training Advisory Group (TAG)meetings to ensure Training alignment with Operations line management expectations and needs.Ongoing.Expected Result: Increased emphasis on good performance attributes and management expectations in operator training will result in improved operator performance and reduced error rate.Measurement Standard: Operations Training will use the Operations line management measurement standards as indicators of success.Objective:
Identification - by 9/96; Evaluation and Development - Ongoing.
6.1.2 Enhance knowledge of Supply System managers, supervisors, and key staff to enable them to have a better operational understanding of how the discharge of their responsibilities impact Plant operations and operator perform ailce.InMatives:
(Piping, which was causing elevated dose rates in the Reactor Water Cleanup Holdup Pump Room, was removed in July 1995.)
6.1.2.A Continue presentation of the 13-week Management Certification training course into the foreseeable future to ensure that critical managers and supervisors receive this important training.Ongoing.6.1.2.B Involve Plant personnel from Operations, Maintenance, Technical Services and Engineering into this program as augmentation for the instructional staff in future management certification classes.9/30/95.6.1.2.C Evaluate increasing the student population of this class to effectively train and certify more people per unit of time.10/I/95.Expected Result: Providing SRO level training to managers, supervisors, and key staff will enable them to have a better operational understanding of the impact of their responsibilities on safe and efficient Plant operations.
5.3E.1.D   Continue the plan for shielding components         as evaluations   deem appropriate. Ongoing.
Measurement Standard: Operations Training will use the Operations line management measurement standards as indicators of success.Page 51 6.2 MAINTF22fANCE TRAINING~~~~~Objective:
5.3E.1.E   Continue the publication of the status of departmental dose accumulation and dose budget comparisons in the Plant newsletter. Ongoing.
6.2.1 Foster a training environment that emphasizes proper safety.focus.'Initiative:
5.3E.1.F   Implement an incentive compensation plan based upon an ALARAgoal.
6.2.1.A Reinforce management expectations when conducting training and evaluating performance by targeting the following attributes:
Ongoing.~Procedural adherence~Stop, Think, Act, Review (STAR)~Work practices (e.g., attention to detail and conservative decision-making)~Industrial/Radiological safety All Maintenance personnel have been through one cycle of this training.A second cycle with emphasis on these attributes will be completed by 4/96.Expected Result: Reduction in performance errors.Measurement Standard: Maintenance Training will use the Maintenance line management measurement standards as indicators of success.Page 52 6.3 ENGINEERING Objective:
6.3.1 SUPPORT TRAINING Ensure technical and engineering professionals possess a broad scope understanding of Plant systems and operations.
InMatives:
6.3.1.A Augment the Engineering Support Staff Training (ESST)Program participant population.
This initiative is presently in progress and will be completed by 6/96.6.3.1.B Institute training within the ESST Program to enhance the technical capabilities of the technical and engineering professionals on staff.This program will be in place by 1/97.Expected Results: Reduction in occurrences attributable to lack of understanding of the potential impact of engineering activities on Plant operations.
Compliance with regulatory and procedural guidance.Measurement Standards:
6.3.1.a ESST-training will use the Engineering line organization measurement standards as indicators of success.6.3.1.b Fewer issues surfacing in POC reviews of change documents.
6.3.1.c Reduction in PERs related to engineering activities.
6.3.1.d Fewer inadequate Corrective Actions involving engineering activities.
Page 53 6.4 CHEMISTRY TECHNICIAN AND HEALTH PHYSICS TECHNICIAN TRAINING Objective:
6.4.1 Continue to provide quality training that is specifically designed to enhance and improve chemistry technician and health physics technician performance in the Plant.InMatives:
6.4.1.A Continue to provide continuing training based on identified needs such as PERs, LERs, in-house operating events and industry events.Ongoing.6.4.1.B Continue to stress self-checking, procedure adherence, communications, questioning attitudes and conservative decision-making in all phases of training.Ongoing.6.4.1.C Continue to use line management as subject matter experts (SME)during training to reinforce management's expectations for performance.
Ongoing.Expected Result: Improved job performance.
Measurement Standard: Chemistry and Health Physics Training Group will use the line organizations measurement standards as indicators of success.'IPage 54 PERFORMANCE IMPROVEMENT AREAS ADDITIONAL IMPROVEMENT INITIATIVES 7.0 ADDITIONAL IMPROVEMENT INITIATIVES 7.1 MAINTENANCE RULE~Implement Maintenance Rule.OBJECTIVE 7.1.1 7.2 FSAR UPGRADE~Improve the FSAR.OBJECTIVE 7.3 IMPROVED TECHNICAL SPECIFICATIONS
~Improve the Technical Specifications OBJECTIVE 7.3.1 PLANNING AND CONTROL~Develop business plan Inltlatlves supporting NRC Communlcatlon Document Implementation
~Develop progress reporting for business plan Initlatlves OBJECTIVE'.4.1 7.4.2 7.5 INTEGRATED PLANNING AND SCHEDUUNG~Improve overall Integrated planning and scheduling of work OBJECTIVE 7.5.1'XCEPTIONAL
~w AVERAOE MINIMUM~B AteED BY PERFORMANCE
~PERFORMANCE
~PERFORMANCE
~SUPPLY SYSTEM 05o0raxo.o JULY 25.1005 ADDITIONAL IMPROVEMENT INITIATIVES INDEX 7.ADDITIONAL IMPRO~a~~e 55-61 7.1 MAINTENANCE RULE 56 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR)UPGRADE 57 7.3 IMPROVED TECHNICAL SPECIFICATIONS 58 7.4 PLAN5tING AND CONTROL 59-60 7.5 INTEGRATED PLANNING AND SCHEDULING 61 Page 55 MAINTENANCE RULE 7.1 MAINI ENANCE RULE Objective:
7.1.1 Implement the Maintenance Rule.Actions: 7.1.1.A Scope SSCs within the Maintenance Rule..Completed.
7.1.1.B Determine SSC risk significance.
Completed.
Completed.
7.1.1.C Complete data collection.
Expected Result:    Reduction of collective  and occupational personnel radiation exposure.
Completed.
Measurement Standards:  5.3E.l.a  Annual dose accumulation and ranking on INPO quartiles.
7.1.1.D Draft performance criteria.Completed.
5.3E.l.b  Departments assessed    based  on monthly, outage and annual dose accumulation.
7.1.1.E Complete identification of all"a(1)" SSCs.Completed.
5.3E.l.c  Results from standardized radiation survey points.
7.1.1.F Complete draft Program Plan.Completed.
t    t Objective:  5.3E.2    Continue to foster an environment which encourages          adherence  to radiological requirements.
7.1.1.G Draft goals for"a(l)" SSCs.Completed.
Page 48
7.1.1.H Performance criteria review by Expert Panel.8/31/95.7.1.1.I Begin trial implementation of Maintenance Rule.Ongoing.7.1.1.J Draft Annual Report-Program Review.10/95.Expected Result: Implementation of Maintenance Rule will bring the Supply System in line with industry practices and NRC requirements.
 
Measurement Standard: Meet milestones on all Action Items., i Page 56 FINAL SAFETY ANALYSIS REPORT (FSAR)UPGRADE 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR)UPGRADE Objective:
InMatives:  5.3E.2.A Develop Advance Radiation Worker Training including practical exercise using the maintenance training skid and concurrent training of craft workers and health physics technicians. 1/96.
7.2.1 Rewrite the FSAR to ensure the following:
5.3E.2.B    Add industry events to include personnel violations of radiological requirements at WNP-2 to General Employee Training. Ongoing.
~It contains the minimum information required by Regulatory Guide 1.70.Actions:~It accurately reflects existing design and operating procedures
5.3E.2.C    Develop and communicate management expectations for worker accountability in radiological environments including work group supervisor accountability on all shifts. 10/95.
.'It can be relied upon for 10 CFR 50.59 safety evaluations.
5.3E.2.D    Enhance the RWP/ALARA planning process to improve exposure controls and provide improved information to workers. 9/95.
7;2.1.A Establish project scope and develop upgrade plan.Completed.
Expected Result:     Reduction in personnel violations of radiological requirements.
7.2.1.B Present upgrade plan to Project Review Committee (PRC).Completed.
Measurement Standard:  The measurement standard will be a reduction in personnel violations of, radiological requirements which result in PERs as compared to the total number of PERs written.
7.2.1.C Prepare bid documents for upgrade project.Completed.
Objective: 5.3E.3      Ensure proper emphasis on personnel contamination events.
7.2.1.D Receive and evaluate upgrade project bids.8/20/95.7.2.1.E Begin upgrade project.9/15/95.7.2.1.F Complete upgrade project.'6/97.7.2.1.G Submit FSAR upgrade to the NRC.8/97.Expected Result: An upgraded FSAR will accurately reflect existing WNP-2 design, reflect aH information required by Regulatory Guide 1.70, and consolidate current.redundant data.This upgrade process will also allow for the development of an FSAR change process by which the future integrity of the document will be protected.
5.3E.3.A Develop criteria which indicates a significant personnel contamination event. 11/95.
Measurement Standard: Meet milestones on all Action Items.Page 57
5.3E.3.B    Implement trending program using criteria for significant personnel contamination event. 1/96.
'IMPROVED TECHNICAL SPECIFICATIONS
5.3E.3.C    Use information from trending program to develop baseline and inform management. Ongoing.
'7.3 INIPROVED TECHNICAL SPECIFICATIONS Objective:
Expected Result:    Reduction in personnel contamination events trended and investigated.
7.3.1 Convert the existing Supply System Technical Specifications to the Improved Technical Specifications in a manner similar to that described in NUREGs 1433 and 1434.Actions: 7.3.1.A Submit Improved Technical Specifications to NRC.In the 4th quarter of 1995.7.3.1.B Obtain NRC approval.Scheduled by NRC.7.3.1.C Implement Improved Technical Specifications.
Measurement Standard:  The measurement standard will be determined as part of the development of the personnel contamination event program.
In the 4th quarter of 1996.Expected Result: R (18 to 24 months).Measurement Standard: Meet milestones on all Action Items.Implementation of Improved Technical Specifications will result in improved operational safety, clearer understanding of the Technical Specification requirements, decreased administrative burden, and a six-month reduction in surveillance frequency ff ff Page 58 PLANNING AND CONTROL 7.4 BUSINESS PLAN ALIGNMENT AND MONTHLY PROGRESS REPORTING PLAN ALT NMENT Objective:
Page 49
7.4.1 Develop business plan initiative(s) to support key issues identified for performance enhancement (Reference Business Plan Initiative Form Attachment A).Initiatives:
 
7.4.1.A Develop global business plan initiatives addressing the purpose, objective, expected results and major action items required to successfully develop, implement and monitor activities in support of performance enhancement.
PERFORMANCE IMPROVEMENT AREAS TRAINING 6.0 TRAINING 6.1 OBJECTIVE OPERATIONS TRAINING      ~ Continue training that Improves and enhances oporator            6.1.1 porforma neo.
8/15/95.7;4.1.B Review performance enhancement objectives and identify common issues across organizations which would warrant the development of business plan initiatives (e.g., creating an environment that encourages a proper safety focus).8/15/95.7.4.1.C Draft Business Plan Initiatives as identified in Initiative 2 above.8/31/95.Expected Result: Alignment of performance enhancement objectives and initiatives and the Business Plan.Measurement Standard: Complete actions on schedule.NTHLY PR R REP TIN Objective:
                      ~ Enhance knowledge of plant operations and impact on              6.14 operator performance 6.2 OBJECTIVE MAINTENANCE TRAINING      ~ Foster training environment emphasizing proper safety focus      6.2.1 6.3 OBJECTIVE ENGINEERING SUPPORT      ~ Ensure undorstandlng of Plant Systems and Operations            6.3.1 TRAINING 6.4 CHEMISTRY                                                                          OBJECTIVE AND HP TECHNICIAN      ~ Enhance and improvo chemistry and health technician              6.4.1 TRAINING        performs neo.
7.4.2 Develop and implement monthly progress reporting for related business plan initiatives and other key actions.Initiatives:
EXCEPTIONAL PERFORMANCE  W AVERAGE PERFORMANCE MINIMUM PERFORMANCE    ~
7.4.2.A All business plan related initiatives'tatus will be reported on a monthly basis (reference Management Initiative Progress Report Attachment B).~o: Only performance enhancement objectives and related business plan initiatives require monthly status reports.All other initiatives will continue to be reported quarterly.
                                                                      ~B    ADDED BY SUPPLY SYSTEM 0000704.0.0 JULY 10. 1005
8/31/95.Page 59 7.4.2.8 All other key actions identified as performance enhancement objectives will require monthly status reports.8/31/95.Expected Result: Provide monthly status reporting for management review of progress and assessment of corrective actions.Measurement Standard: Complete actions on schedule.Page 60 INTEGRATED PLANNING AND SCHEDULING 7.5 INTEGRATED PLANNING AND SCHEDULING Objective:
 
7.5.1 Improve overall integrated planning and scheduling of work (see 0;5.1).InMatives:
TRAINING 6.1     OPERATIONS TRAINING Objective:  6.1.1  Continue to provide quality training that is specifically .designed to enhance and improve operator performance in the Plant.
7.5.1.A Implement a electronic work process.Completed.
Initiatives: 6.1.1.A Continue development and integration of the following performance issues and attributes into licensed and non-licensed operator training materials and simulator scenarios: Ongoing.
7.5.1.B Reorganize Planning and Scheduling organizations to combine similar functions.
                      ~ Attention to detail
Completed.
                      ~ Conservative decision-making
7.5.1.C Implement improved integrated daily scheduling process.Completed.
                    ~ Problem resolution and a questioning attitude
7;5.1.D Create Fix-It-Now (FIN)process.9/11/95.7.5.1.E Create Work Teams.10/13/95.7.5.1.F Implement Work Teams.10/30/95.Expected Result: Improved daily integrated schedule coordination, adherence, accountability, and efficiency within involved departments..
                    ~ Self-checking
Measurement Standard: Meet milestone schedule.Page 61}}
                    ~ Component tagging practices
                    ~ Technical specification case studies
                    ~ Pre-evolution or pre-job briefs
                    ~ Understanding design bases
                    ~ Line management expectations
                    ~ Procedural adherence
                    ~ Three-way communication 6.1.1.B Continue implementation of these performance attributes in classroom and simulator training sessions. As an example, in the present training cycle (95-4), Operations Training is re-emphasizing conservative decision-making and problem resolution during simulator scenarios which are based on Abnormal Operations. Self-checking is being evaluated by instructors and Operations Managers/Supervisors using Job Performance Measures (JPM) training in the simulator and the formal communications policy is being reviewed in the classroom as well as in the Plant simulator. Ongoing.
Page'0
 
6.1.1.C    Continuously evaluate ways to further enhance operator training programs, maintaining a "focus" on improved Plant and operator performance. Use Training Advisory Group (TAG) meetings to ensure Training alignment with Operations line management expectations and needs. Ongoing.
Expected Result:     Increased emphasis on good performance attributes and management expectations in operator training will result in improved operator performance and reduced error rate.
Measurement Standard:  Operations Training will use the Operations line management measurement standards as indicators of success.
Objective:  6.1.2      Enhance knowledge of Supply System managers, supervisors, and key staff to enable them to have a better operational understanding of how the discharge of their responsibilities impact Plant operations and operator perform ailce.
InMatives:  6.1.2.A      Continue presentation of the 13-week Management Certification training course into the foreseeable future to ensure that critical managers and supervisors receive this important training. Ongoing.
6.1.2.B    Involve Plant personnel        from Operations, Maintenance, Technical Services and Engineering into this program as augmentation for the instructional staff in future management certification classes. 9/30/95.
6.1.2.C      Evaluate increasing the student population of this class to effectively train and certify more people per unit of time. 10/I/95.
Expected Result:    Providing SRO level training to managers, supervisors, and key staff will enable them to have a better operational understanding of the impact of their responsibilities on safe and efficient Plant operations.
Measurement Standard:  Operations Training will use the Operations line management measurement standards as indicators of success.
Page 51
 
6.2
  ~        MAINTF22fANCETRAINING
    ~    ~
Objective:     6.2.1
                ~  ~      Foster a training environment that emphasizes proper safety. focus.
'Initiative:    6.2.1.A   Reinforce management expectations when conducting training and evaluating performance by targeting the following attributes: Ongoing.
                          ~ Procedural adherence
                          ~ Stop, Think, Act, Review (STAR)
                          ~ Work practices (e.g., attention to detail and conservative decision-making)
                          ~ Industrial/Radiological safety All Maintenance  personnel have been through one cycle  of this training.
A second cycle with emphasis on these attributes will be completed by 4/96.
Expected Result:        Reduction in performance errors.
Measurement Standard:      Maintenance Training will use the Maintenance line management          measurement standards as indicators of success.
Page 52
 
6.3    ENGINEERING SUPPORT TRAINING Objective:  6.3.1       Ensure technical and engineering professionals possess a broad scope understanding of Plant systems and operations.
InMatives:  6.3.1.A    Augment the Engineering Support Staff Training (ESST) Program participant population. This initiative is presently in progress and will be completed by 6/96.
6.3.1.B    Institute training within the ESST Program to enhance the technical capabilities of the technical and engineering professionals on staff. This program will be in place by 1/97.
Expected Results:    Reduction in occurrences attributable to lack of understanding  of the potential impact of engineering activities on Plant operations.
Compliance with regulatory and procedural guidance.
Measurement Standards:  6.3.1.a    ESST-training will use the Engineering line organization measurement standards as indicators of success.
6.3.1.b    Fewer issues surfacing in POC reviews of change documents.
6.3.1.c    Reduction in PERs related to engineering activities.
6.3.1.d    Fewer inadequate Corrective Actions involving engineering activities.
Page 53
 
6 .4    CHEMISTRY TECHNICIAN AND HEALTH PHYSICS TECHNICIAN TRAINING Objective: 6.4.1     Continue to provide quality training that is specifically designed to enhance and improve chemistry technician and health physics technician performance in the Plant.
InMatives: 6.4.1.A   Continue to provide continuing training based on identified needs such as PERs, LERs, in-house operating events and industry events.
Ongoing.
6.4.1.B   Continue to stress self-checking, procedure adherence, communications, questioning attitudes and conservative decision-making in all phases of training. Ongoing.
6.4.1.C   Continue to use line management as subject matter experts (SME) during training to reinforce management's expectations for performance.
Ongoing.
Expected Result:    Improved job performance.
Measurement Standard:  Chemistry and Health Physics Training Group will use the line organizations measurement standards as indicators of success.
'I Page 54
 
PERFORMANCE IMPROVEMENT AREAS ADDITIONALIMPROVEMENT INITIATIVES 7.0 ADDITIONAL IMPROVEMENT INITIATIVES 7.1 OBJECTIVE MAINTENANCE RULE        ~ Implement Maintenance Rule.                                         7.1.1 7.2 OBJECTIVE FSAR UPGRADE      ~ Improve the FSAR.
7.3 OBJECTIVE IMPROVED TECHNICAL      ~ Improve the Technical Specifications                                7.3.1 SPECIFICATIONS OBJECTIVE'.4.1 PLANNING AND CONTROL      ~ Develop business plan Inltlatlves supporting NRC Communlcatlon Document Implementation
                        ~ Develop progress reporting for business plan Initlatlves            7.4.2 7.5 OBJECTIVE INTEGRATED PLANNING AND      ~ Improve overall Integrated planning and scheduling of work SCHEDUUNG 7.5.1'XCEPTIONAL PERFORMANCE ~
                        ~w    AVERAOE PERFORMANCE        ~      MINIMUM PERFORMANCE    ~
                                                                        ~B      AteED BY SUPPLY SYSTEM 05o0raxo.o JULY 25. 1005
 
ADDITIONALIMPROVEMENT INITIATIVES INDEX
                                                    ~a~~e
: 7. ADDITIONALIMPRO                                    55-61 7.1 MAINTENANCERULE                                    56 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE        57 7.3 IMPROVED TECHNICAL SPECIFICATIONS                  58 7.4 PLAN5tING AND CONTROL                          59-60 7.5 INTEGRATED PLANNING AND SCHEDULING                61 Page 55
 
MAINTENANCERULE 7.1    MAINIENANCE RULE Objective:  7.1.1      Implement the Maintenance Rule.
Actions:    7.1.1.A    Scope SSCs within the Maintenance Rule.. Completed.
7.1.1.B    Determine SSC risk significance. Completed.
7.1.1.C    Complete data collection. Completed.
7.1.1.D    Draft performance criteria. Completed.
7.1.1.E    Complete identification of all "a(1)" SSCs. Completed.
7.1.1.F    Complete draft Program Plan. Completed.
7.1.1.G    Draft goals for "a(l)" SSCs. Completed.
7.1.1.H    Performance criteria review by Expert Panel. 8/31/95.
7.1.1.I    Begin trial implementation of Maintenance Rule. Ongoing.
7.1.1.J    Draft Annual Report-Program Review. 10/95.
Expected Result:    Implementation of Maintenance Rule will bring the Supply System in line with industry practices and NRC requirements.
Measurement Standard:  Meet milestones on all Action Items.
i Page 56
 
FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE 7.2    FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE Objective:  7.2.1    Rewrite the FSAR to ensure the following:
                        ~  It  contains the minimum information required          by Regulatory Guide 1.70.
                        ~  It accurately reflects existing design and operating procedures It can be relied upon for 10 CFR 50.59 safety evaluations.
Actions:    7;2.1.A    Establish project scope and develop upgrade plan. Completed.
7.2.1.B    Present upgrade plan to Project Review Committee (PRC). Completed.
7.2.1.C    Prepare bid documents for upgrade project. Completed.
7.2.1.D    Receive and evaluate upgrade project bids. 8/20/95.
7.2.1.E    Begin upgrade project. 9/15/95.
7.2.1.F    Complete upgrade project. '6/97.
7.2.1.G    Submit FSAR upgrade to the NRC. 8/97.
Expected Result:    An upgraded FSAR will accurately reflect existing WNP-2 design, reflect aH information required by Regulatory Guide 1.70, and consolidate current. redundant data. This upgrade process will also allow for the development of an FSAR change process by which the future integrity of the document will be protected.
Measurement Standard:  Meet milestones on all Action Items.
Page 57
 
'  IMPROVED TECHNICAL SPECIFICATIONS
  '7.3    INIPROVED TECHNICAL SPECIFICATIONS Objective:  7.3.1      Convert the existing Supply System Technical Specifications to the Improved Technical Specifications in a manner similar to that described in NUREGs 1433 and 1434.
Actions:    7.3.1.A    Submit Improved Technical Specifications to NRC.      In the 4th quarter of 1995.
7.3.1.B    Obtain NRC approval. Scheduled by NRC.
7.3.1.C    Implement Improved Technical Specifications.      In the 4th quarter of 1996.
Expected Result:      Implementation of Improved Technical Specifications will result in improved operational safety, clearer understanding of the Technical Specification requirements, decreased administrative burden, and a six-month reduction in surveillance frequency ff ff R (18 to 24 months).
Measurement Standard:    Meet milestones on all Action Items.
Page 58
 
PLANNING AND CONTROL 7.4    BUSINESS PLAN ALIGNMENTAND MONTHLYPROGRESS REPORTING PLAN ALT NMENT Objective:  7.4.1      Develop business plan initiative(s) to support key issues identified for performance enhancement (Reference Business Plan Initiative Form Attachment A).
Initiatives:  7.4.1.A  Develop global business plan initiatives addressing the purpose, objective, expected results and major action items required to successfully develop, implement and monitor activities in support of performance enhancement. 8/15/95.
7;4.1.B  Review performance enhancement objectives and identify common issues across organizations which would warrant the development of business plan initiatives (e.g., creating an environment that encourages a proper safety focus). 8/15/95.
7.4.1.C  Draft Business Plan Initiatives      as  identified in Initiative 2 above.
8/31/95.
Expected Result:      Alignment of performance enhancement objectives and initiatives and the Business Plan.
Measurement Standard:    Complete actions on schedule.
NTHLY PR      R    REP    TIN Objective:    7.4.2    Develop and implement monthly progress reporting for related business plan initiatives and other key actions.
Initiatives:  7.4.2.A  All business plan  related initiatives'tatus will be reported on a monthly basis (reference Management Initiative Progress Report Attachment B).
                        ~o:    Only performance enhancement objectives and related business plan initiatives require monthly status reports. All other initiatives will continue to be reported quarterly. 8/31/95.
Page 59
 
7.4.2.8    All other key actions identified as performance enhancement objectives will require monthly status reports. 8/31/95.
Expected Result:    Provide monthly status reporting for management review of progress and assessment of corrective actions.
Measurement Standard:  Complete actions on schedule.
Page 60
 
INTEGRATED PLANNING AND SCHEDULING 7.5    INTEGRATED PLANNING AND SCHEDULING Objective:  7.5.1      Improve overall integrated planning and scheduling of work (see 0;5. 1).
InMatives:  7.5.1.A    Implement a electronic work process. Completed.
7.5.1.B    Reorganize Planning and Scheduling organizations to combine similar functions. Completed.
7.5.1.C    Implement improved integrated daily scheduling process. Completed.
7;5.1.D    Create Fix-It-Now (FIN) process. 9/11/95.
7.5.1.E    Create Work Teams. 10/13/95.
7.5.1.F    Implement Work Teams. 10/30/95.
Expected Result:      Improved daily integrated schedule coordination, adherence,    accountability, and efficiency within involved departments..
Measurement Standard:    Meet milestone schedule.
Page 61}}

Latest revision as of 07:09, 4 February 2020

Rev 22 to Operational QA Program Description.
ML17291A927
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/20/1995
From: Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17291A926 List:
References
WPPSS-QA-004, WPPSS-QA-4, NUDOCS 9508020121
Download: ML17291A927 (119)


Text

Enclosure 2 OPERATIONAL QUALITYA.SS CE PROGRAM DESC ION (WPPSS-QA-004)

APPROVED:

Director, ualiry Date +ective REVISION NO. 22 ORIGINAL ISSUE: May 10, 1978 WASHINGTON PUBLIC POWER C> svpprv svsTEM 9508020121 950718 PDR ADOCK 05000397 P PDR

PACE 4> supp7i s7srz7i ill OPERATIONAL QUALITYASSU$ MMCE PROGRAM% DESCRIFI'ION I.I F EFFE

~PA E REMI~)RIQ 10 1V 22 1-1 21 2 2-4 15 3-1 -,3-3 4-1 & 4-2 5-1 6 6-3 7 7-4 8-1 & 8-2 9-1 &, 9-2 10 10-1 & 10-2 11-1 & 11-2 12-1 & 12-2 13-1 10 14-1 15-1 & 15-2 16-1 17-1 & 17-2 18-1 & 18-2 I I-3 10 II 11-21 968-25060 (4I92)

PhCE 4Q SUPFLY SYSTEM iv OPERATIONAL QUALITYASSURANCE PROGRAMS DESCRIPTION, '22 TABLE F NTENTS Approval Page Management Statement N/A List of Effective Pages 7able of Contents ORGANIZATION 2 QUALITYASSURANCE (QA) PROGRAM DESIGN CONTROL PROCURFMEN'I'OCUMENT CONTROL INSTRUCTIONS, PROCEDURES, AND DRAWINGS DOCUMENT CONTROL CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES IDERIIFICATIONAND CONTROL OF MATERIALS, PARIS, AND COMPONENTS CONTROL OF SPECIAL PROCESSES 10 INSPECTION TEST CONTROL CONTROL OF MEASURING AND TEST EQUIPMENT'ANDLING, S'IORAGE, AND'HIPPING INSPECTION, 'TEST, AND OPERATING STATUS 15 NONCONFORMING MATER'~, PARTS, OR COMPONENTS CORRECTIVE ACTION 17 QUALITY ASSURANCE RECORDS 18 AUDITS APPENDIX I QUALIFtaTIQN RBQ~

APPENDIX. II "POSITION STATEMENTS"

PAGE 4P SUPPLY SYSTEM OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION 22 1- R ANIZATI N This section provides a description of the authorities and responsibilities assigned to Supply System organizational units and individuals involved in establishing, implementing, verifying implementation, and measuring the overall effectiveness of the administrative controls and quality assurance program during the initial testing (pre-operationaL and startup testing) and subsequent operations phases of Supply System nuclear power plants.

1.2 R ANIZATI N The Supply System organization responsible for establishing, implementing, verifying implementation, and measuring the overall efFectiveness of the administrative controls and quality assurance program for its nuclear power plants is as depicted in Figures 1-1 and 1-2. Portions of these activities may be delegated to external organizations qualified to the requirements of this Operational QA Program, hereafter referred to as QA Program; however, the responsibility shall remain with the Supply System.

1.3 A A EMENT RESP IBIL 1.3.1 The gnawn Direc o is. responsible for the establishment of policies and for overall management of Supply System operations. The Managing Director has issued a Management Statement which commits the Supply System to design, construct, and operate its nuclear power plants without jeopardy to the health and safety of the public. The Managing Director is the ultimate Supply System 1IIIS MANIIALIS CLASSIHED hS h LEVEL ZB DOCUMKCT.

968-25060 (4/92) Scc:4oal.P&A/OQAPDI

PAGE WASNINOTOII iOOLIC Fow\R 4P SUPPLY SYSTEM 1-2 OPERATIONAL REV.

QUALITYASS&RACE PROGRAM DESCRIPTION 22 authority on matters involving quality. The Managing Director operates through the Vice President, Nuclear Operations; Director, Projects; Director, Information; and the Chief Financial Of5cer to provide for engineering, construction, procurement, quality assurance/quality control, and operations activities for Supply System nuclear power plants.

1.3.2 The Vice P iden Nuclear erati ns reports to the Mana~g Director and is responsible for.

a. Safe and eQicient operation of Supply System nuclear power plants.
b. Safe and successful completion of initial testing activities for WNP-2 (through 1

the WNP-2 Plant General Manager).

c. Establishing and monitoring maintenance systems common to operational nuclear power plants.
d. Training of nuclear plant staff and support personnel.
e. Development of programs and procedures to ensure uniform application at operational nuclear power plants.
f. Radiological protection, fire protection, plant security, emergency preparedness, and radioactive waste management.

%$ .25060 (4/92) I.Pd4VOQAPDI

PhGE WASNINCTOII tOSSIC tOWSA IYP SUPPLY SYSTEM 1-3 OPERATIONAL QUALITYASSURANCE PROGRAJUI DESCRD HON 22

g. Maintaining cognizance of changing regulatory requirements and providing controlled interface between the Supply System and regulatory agencies to assure that commitment documents receive the necessary degree and depth of reviews prior to transmittal.
h. Providing licensing support functions in such areas as acquisition and maintenance of nuclear power plant construction permits and operating licenses.
i. Quality Assurance program definition,.implementation and effectiveness.
j. Reviewing in-house and extexnal events for determination of cause and necessaxy corrective action to minimize potential for recurrence at Supply System nuclear facilities;
k. Engineexing design and analysis support for WNP-2.
1. Appoint in writing the members to the Corporate Nuclear Safety Review Board (CNSRB) including the Chairman and Alternate Chairman.

To accomplish this role, the Vice President, Nuc1ear Operations operates through the Plant General Manager; Director, Engineering; Director, Quality; Director, Nuclear Training; Director, Support Services; Manager, Planning and Controls;

-Director, Regulatory and Industry Affairs; Corporate Chemist; and Corporate Radiological Health Officer.

968-25060 (4/92) Scc6oal.P&A/QQhPDi

PhCE 4> ~47rz s7srm OPERATIONAL QUALHYASSU&WCE PROGRAMS DESCRD"HON 22 1.3.2.1 T~hD Si p U Vi P 'd,N 1 Dg di directly responsible for the definition, direction, and effectiveness of the overall Quality Assurance Program during design, construction, and operation phases of all Supply System nuclear power plants. Major functions of the Quality Assurance organization are:

a. Establishing and maintaining assurance programs, Nuclear Operation Standards, and directorate procedures which incorporate nuclear safety considerations and comply with the Quality Assurance (QA) criteria delineated in Appendix B to 10CFR 50.
b. Assuring through reviews, surveillances, assessments, inspections, and audits that Supply System and its suppliers'ctivities are being performed in a safe and legal manner in accordance with written and approved documents which comply with applicable requirements defined by the assurance programs and Nuclear Operation Standards.

C. Assessing the overall effectiveness of assurance programs'mplementation, including evaluation of plant performance and reporting conclusions to the Managing Director.

d. Stopping unsatisfactory work and controlling further processing, delivery, or.

installation of nonconforming material.

e. Establishing and maintaining adequate and qualified assurance staSng levels based on workload analysis.

96$ .25060 (4/92) 1.P&A/OQAPD1

PACE WAININO'TON FVSLlC 10lft%

4P surer'vsrm 1-5 OPERATlONAL QUALITYASSURANCE PROGRAM DESCRH. TION - -

22

f. Providing trending of deficiencies to identif'y areas where corrective actions have not minimized recurrence.
g. Establishing, maintaining, and controlling the Operational QA Program Description (WPPSS-QA-004) and the Supply System Functional Manual for Nuclear Operation.
h. Certying Supply System examination personnel for non-destructive examinations (NDE).
i. Qualifying and certifying Supply System QC inspection and test personnel.

1 Acquiring and maintaining ASME Certificates of Authorization and/or Owners Certificates.

Ensuring that a written agreement with an Authorized Inspection Agency is obtained to provide for Authorized Nuclear In-Service Inspection Services.

l. Establishing, mana~g, and administering the implementation and effectiveness of the Nuclear Safety Issues Program (NSIP).

The Director, Quality has effective communication channels with all Supply System senior management positions and has no duties or responsibilities unrelated to quality assurance. To accomplish the above defined role, the Director, Quality operates through the Manager, Quality Support Services; Manager, Quality Services; Manager, Plant Quality Control; Manager, Supplier Quality; and %NP-1 Quality Assurance staff.

968-25060 (4l921 0CC4ioal.P 8th/OQAPD1

PAGE vssoworoa rcrauo rowra i> sudan svsvam OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPI'ION 22.

The qualification requirements for this position are as described in Appendix I, Qualification Requirements.

A representative from the Quality Assurance Organization is a member of the Plant Operating Committee (see Chapter 13 of the FSAR) and has sufhcient authority and organizational freedom to identify problems; to initiate, recommend, or provide solutions; and to verify implementation of solutions. The representative has no duties or responsibilities unrelated to quality assurance matters and has effective communication channels with all plant supervisory and management personnel.

1.3.2.1.1 The ana er uali ervices and the Mana er uali u rt ervices report to the Director, Quality and are directly responsible for performing internal Supply System quality assurance functions that are necessary to verify that the QA Program is being effectively implemented. This includes maintaining a sufhcient number of qualified auditors to perform QA audits, as required.

Each Manager has the authority and responsibility to stop unsatisfactory work and control further processing, delivery, or installation of nonconforming material.

When the unit is operating, either Manager may recommend that the unit be shut down; the Plant General Manager, however, has the final responsibility for the .

overall evaluation of aLL aspects and implications of shutting down the operating unit.

Qualification requirements for these two positions are described in Appendix I, Qualification Requirements. The Managers, Quality Services and Quality Support Services, are specifically responsible for:

968-2$ 060 (4/92) Scctioa I.PAR/OQAPD1

PhGE WAlNINCTON tUSllC tDlftg 4> supp'cram 1-7 OPERATIONAL QUALITYASSURANCE PROGRAdrI DESCRIPTION ao Reviewing and concurring with documents affecting safety, including changes thereto, to assure that applicable qua1ity assurance requirements have been identified and specified therein. Documents subject to review and concurrence by Quality Assurance reviewers inc1ude, but are not limited to the following: (i) procedures which address: administrative controls, operations, maintenance, technical specifications, in-service inspection and testing, modifications, calibration, testing, and fuel handling; and nonconformance and corrective action reports.

b. Reviewing and concumng with programs, procedures, and/or instructions (including changes thereto) of off-site Supply System organizations to assure that they are clear, address applicab)e quality assurance requirements, and are technicaHy acceptable prior to approval for release.

Verifying internal Supply System activities to assure that they are being conducted in a safe and legal manner in accordance with approved programs, plans, procedures, or instructions. Such verifications will be in the form of audits, technical assessments, or quality assurance surveiQances. Included in the scope of these verifications are: (i) control room operations; post modification/major maintenance testing and operational tests; .maintenance, modification, repair, and calibration; personnel training; and refueling activities; (ii) activities associated with satisfying technical specifications and in-service inspection and testing; (iii) activities associated with the implementation of security, fire protection, and radiological protection programs; (iv) activities including engineering, maintenance, modifications, operational problem resolution, technical support activities, and operational 960-25060 (4/92) Scaioa1.PJ4VOQAPD1

PAGE i> supra 's7sTEM OPERATIONAL QUALITYASSURANCE PROGIU84 DESCRIPTION 22 analysis that acct plant nuclear safety and reliability; and (v) activities reIated to procurement, storage and issuance of parts, materials, and services to assure implementation of QA Program and management requirements.

d. Performing independent design, functional, and safety evaluations.
e. Performing quality assurance audits, surveillances, and technical assessments of Supply System organizations and on-site external organizations (e.g., the engineering and maintenance support contractors).
f. Developing evaluation schedules and selecting qualified personnel to perform the activities of this function.
g. Certifying Audit Team Leaders.
h. Qualifying Quality Assurance personnel.
i. Forwarding evaluation reports to the management positions responsible for the areas assessed and the Chairman of the Corporate Nuclear Safety Review Board for review, assessment, and/or correction of identified deficiencies.
j. Maintaining QA verification records.
k. Supply System initiated SSFL reviews and other similar plant safety system operability reviews.

Each Manager will be responsible for performance of the above activities within certain functional areas.

968-25060 (4191) Sccuooi.P&AlOQAPD1

PAGE C> si7iG sIl"sTm OPERATIONAL QUALrrYASSURANCE PROGKQN DESCRH. TION 1.3.2.1.2 e ana e lant uali n reports to the Director, Quality and is directly responsible for performance of in-plant QC functions. In accomplishing this role, the Manager, Plant QC is responsible for:

a. Evaluating procedures and instructions for accomplishing QC activities.
b. Determnung and establishing hold points for inspections, examinations, and/or measurements to be accomplished during maintenance, modification, repair, and testing.
c. Performing and evaluating the inspections, examinations, and/or measurements established.

d.. Assuring that proper stafBng is available to meet plant workloads; Qualification requirements for this position are described in Appendix I, Qualification Requirements.

96$ .25060 (4l92} }.PEA/OQAPD}

PAGE 4i su7e7z s7sTEM 1-10 OPERATIONAL QUALITYASSURANCE PROGRAIVl DESCRIPTION 1.3.2.1.3 The ana er u lie uali reports to the Director, Quality and is primarily responsible for the definition and implementation of the source surveillance/audit program for verification of activities performed by Supply System vendors (including the Nuclear Steam Supply System vendors). He is further responsible for assuring that items received for %NP-2 meet the required quality standards.

The Manager, Supplier Quality is responsible for:

a. Establishing vendor witness points for inspection and release of material/

equipment for shipment.

b. QC receipt inspection of materials and equipment received by the Supply System.
c. Establishing and maintaining evaluated vendors list.
d. Planning, coordinating, and performing source surveillances, source inspections, and external audits to verify implementation of vendors'A/QC

,programs.

e. Reviewing and approving vendor furnished QA/QC procedures and programs.
f. Reviewing for acceptance other utility audits furnished through the Nuclear Procurement Issues Committee (NUPIC) or Nuclear Energy Institute (NEI).

968-25060 (4/92) ~4oal.P&A/OQAPD I

PhGE i3 sUPFLY SYSTEM OPERATIONAL QUALITYASSURANCE PROGRAIVI DESCRY'TION 22 1.3.2.1.4 S p U D', Q~IY d P ~l' d assuring that the records and equipment of the project are maintained such, that they may be shown to meet quality standards on restart.

1.3.2.2 e Plant ene ana er for WNP-2 reports to the Vice President, Nuclear Operations and is directly responsible for safe and efficient operation of the plant in accordance with the requirements of the Operating License, the Plant Technical Specifications, and the Plant Procedures Manual. Some of the specific responsibilities of the Plant General Manager are:

a. Planning, coordinating, and directing aQ test, operation, modification, inspection, maintenance, and refueling activities subsequent to the issuance of an Operating License.
b. Authorizing all plant modifications subsequent to the issuance of an Operating License.
c. Qualifying and training plant staff.
d. Initiating and approving purchase requisitions.
e. Controlling purchased equipment and materials intended for plant use.
f. Ensuring calibrated measuring and test equipment {including instaQed instruments covered by the Plant Technical Specifications) is utilized at WNP-2.
g. Dispositioning of nonconforming items.

9tiS-25060 (4/92) 1.P&A/OQAPDl

PhGE 4i sv7~iz s7s7z7i 1-12 OPERATIONAL QUALITYASSURANCE PROGRAdrf DESCRIPTION

h. Implementing the in-service testing program.
i. Developing, maintaining and implementing a fire protection program.
j. Off-Site Dose Calculation Manual (ODCM).
k. The Radiological Environmental Monitoring Program and Bioassay Program.
l. Environmental sciences function which performs nonradiological monitoring and fitness for duty chemical analysis.
m. The supply, engineering, and efficient in-core management of nuclear fuel.
n. Transient analysis and licensing issue resolution to support technical specification changes and reload fuel licensing.

The Plant General Manager operates through the Operations Manager, Maintenance Manager, Technical Services Manager, Radiation. Protection Manager, Chemistry Manager, and Planning/Scheduling/Outage Manager. The plant organization and-functional responsibilities of key plant personnel are described in Chapter 13 of the Final Safety Analysis Report for %NP-2.

1.3.2.3 e D t r Nucl T nin reports to the Vice President, Nuclear Operations and is responsible for nuclear training policy and implementation, fire prevention and protection training, technical maintenance of the simulator to support operator training and testing, and training records management for nuclear plant operations.

968-15060 (4/92) Social.PAAIOQhP91

PhGE 4> s7i7en msrz7i 1-13 OPERATIONAL QUALITYASSURANCE PROCESS DESCRIFI'ION 22 1.3.2.4 The Direct r u ort ervic reports to the Vice President, Nuclear Operations and is responsible for the development aud implementation of policies and programs which support operation of Supply System nuclear power plants in the areas of safeguards and physical security, fitness for duty, emergency preparedness, and administration and records management. To accomplish this role, the Director, Support Services operates through the Manager, Security Programs; Manager, Emergency Preparedness; and Manager, Administration and Records Management.

1.3.2 4.1 e ana er ecuri P reports to the Director, Support Services and is responsible for overall Supply System security activities. The Manager, Security Programs is specifically responsible for:

a. Administering a security program which includes preemployment screening, physical security surveys and investigations, loss prevention, and fitness for duty.
b. Managing the security force by assuring that physical security is consistent with needs and is maintained within individual plant safeguards security plans.
c. Providing training, administrative, and technical support to the Plant General Manager in the area of plant security.

1.3.2.4.2 a er amer enc P aredne reports to the Director, Support Services and is responsible for developing and maintaining an emergency response program that includes plans, implementing procedures, training, and drills and exercises.

96$ -25060 {4/92) ace>onl.P84VOQhPD1

PAGE CQ SUPPLY SYSTEM OPERATIONAL QUALHYASSURANCE PRO.GRAVC DESCRD'TION 22 I.3.2.4.3 The Mana er Administration and Record Mana ement reports to the Director, Support Services and is responsible for.

a..- Developing and implementation of administrative controls for plant procedures, processes and systems to maintain nuclear, plant design, construction, and operating records.

b. Providing program definition and policy development'for Supply System.

records management activities, which includes processing, retrieval, storage and dispositioning of records.

c. Providing administrative support functions necessary for the maintenance of manuals and procedures.
d. Managing an administrative process by which engineering-related activities and commitments are assigned, scheduled, tracked, and dispositioned.

I."3.2.5 The rate hemist reports to the Vice President, Nuclear Operations and is responsible for policy development, oversight, and integration of matters pertaining to chemistry at WNP-2. 's 1.3.2.6 The ra e i lo ical Health fficer reports to the. Vice President, Nuclear Opexations and is responsible for the development and oversight of radiation protection policies and programs which support operation of WNP-2. The .

Corporate Radiological Health Ofhcer provides support to WNP-2 through coordination of radiation protection projects and long range planning, program oversite, audits and evaluation of the Radiation Protection Program.

Sccioa1. PCS/OQAPD1

PAGE 4> Rp7iz s7sii7i 1-15 OPERATIONAL QUALITYASSUWLNCE PROGRAM DESCRY'TION 22 1.3.2.7 e Direct r Re lat and Tndu Affai reports to the Vice President, Nuclear Operations and is responsible for:

a. Acquiring and maintaining operating licenses of Suyyly System nuclear power plants.
b. Dining and implementing programs which assure that licensing submittals

'eceive an adequate technical review from cognizant Suyyly System, NSSS,

.or AE personnel prior to transmittal.

c. Tracking licensing commitments and taking action necessary to assure that they are being met in a timely manner.
d. Providing coordinated development of responses and comments to new laws, regulations, regulatory guides, and other regulatory issuances.
e. Administering the WNP-2 industry and in-plant operating experience programs
f. Providing the Independent Safety Engineering Group gSEG) functions for assessing programs, processes and activities of various areas and operations that affect plant nuclear safety and reliability.

0cr Administering the nonconforming condition and corrective action processing including assisting the cognizant organization in evaluation and determination of the root cause for plant-related events.

968-25060 (4/92) Sccticel.P&A/OQAPD1

PhGE WASWIWCtON tCtltC tOWCC C> superz sxsTEM 1-16 OPERATIONAL QUALITYASSURANCE PROGRAMME DESCRXPTION 22

h. Reliability and availability analysis to improve plant performance, safety, and maintainability.

The Director, Regulatory and Industry- Affairs operates through the Manager, Licensing; Manager, Regulatory Services; Manager, Regulatory Support; and Manager, Special Projects.

1.3.2.8 e Direct r En 'neerin reports to the Vice President, Nuclear Operations and is responsible for providing project engineering and design control, nuclear fuel supply, and maintenance/surveillance engineering support as required for WNP-2.

The Director, Engineering is specifically responsible for:

a. Providing and implementing design control programs and processes by which plant design, and design changes, and modifications are defined, controlled, and verified.
b. Implementing programs for pre-service inspection, in-service inspection, and nondestructive examinations and materials and welding engineering.
c. Providing engineering support for technical resolution of nuclear safety and licensing issues.
d. Maintaining a current engineering data base for WNP-2 including; Master Equipment List (MEL), Safety Related Material (SRM), Class 1 Electrical (C1E), Restricted Use Equipment List (RUEL).
e. Implementing configuration control by establishing site-specific policy, procedures, and methods that allow control and accountability.

~25060 (4/92) L.P&AIOQhPDI

PAGE l3 si7iz ii7rsTHM 1-17 OPERATIONAL QUALITY ASSUWLNCE PROGWAI DESCRIPTION

f. Management of major plant modifications, maintenance tasks, and contractor support.

The Director, Engineexing operates through the Manager, Mechanical Design Engineering; Manager, Electrical/ISAAC Design Engineering; Manager, WNP-2 Projects; Manager, Engineering Programs; and Manager, Materials and Inspection.

The Engineezing organization and functional responsibilities of key personnel are desczibed in Chapter 13 of the Final Safety Analysis Report for WNP-2.

1.3.3 The Direct r P 'ects reports to the Managing Director and is responsible for providing pxoject management support for Supply System projects. The Director, Projects is specifically responsible for.

a. Providing project management and engineering for power projects under construction and preservation management and engineexing for mothballed power projects.
b. Providing for site restozation for power project sites which are to be abandoned.

C. Providing specialized project management for major construction projects which results in oC-line completion of major additions to operating plants and support facilities.

d. Providing specialized project management for major procurement acquisitions for operating power plants.

968-25060 (4/92) Seaioal.Pd4VOQAPD1

PhGE 0> su7eir s7s7z7vi 1-18 OPERATIONAL, QUALITYASSURANCE PROGRAM@ DESCRIPTION 22 The Director, Projects operates through the Manager, WNP-1 Project; Manager, Facilities Services and Construction; and Manager, Administrative Support Services.

1.3.4 e hief inancial fficer reports to the Managing Director and is responsible for providing procurement and storage control services that. are required to support I

operation and maintenance. of Supply System nuclear yower plants and for the sale and demolition of Projects WNP-3, WNP-4 and WNP-5. To accomplish this role, the Chief Financial Officer operates through the Manager, Procurement and

'aterials Management; and Manager WNP-3.

1.3.4.1 The Mana~er Procurement and aterials Mana~emerit reports to the Chief Financial Ofhcer and is responsible for:

a. Development of Supply System procurement policies and.procedures.
b. Procurement of items and services in response to approved.yurchase

. requisitions.

c. Coding, cataloguing, handling, storage, shipping, and disposal of procured items.
d. Providing project management for disposition of assets from terminated power projects and disposition of major assets surplus to operating power projects.

96$ -25060 (4I92) Scetioal PHD/OQAPD I

PACE 4> supp7z s7s7E7i 1-19 OPERATIONAL QUALITYASSURANCE PROGRAM'N DESCRQ'TION 22 1.3.4.2 e ana er WNP- reports to the Chief Financial Ofhcer and is responsible for:

a. Site restoration for the terminated project.
b. Completion and closeout of all construction phase related license and permit commitments.
c. Site management during restoration and sales activities.

968.25060 (4/92) Sec6oal.P64VOQAPDI

PAG'L 44 SUPPLY SYSTEM 1-20 OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION FIGURE 1-1 MANAGINGDIRECTOR VCE PRESIDENT. CHIEF PROJECTS NUCLEAR FINANCIAL DIRECTOR OPERATIONS OFFICER DUALITY ENGINEERING DIAECTOA DIRECTOR SUPPORT PROCUREMENT WNP. ~

SERVICES d MATLS. MGMT. PROJECT DIRECTOR MANAGER MANAGER OUAUTY MECHANICAL SUPPOAT DESIGN SERVCES ENGINEERING MANAGER MANAGEA FACIUTIES SECURITY NUCLEAR PROGRAMS TRAINING WHY SERVICE d MANAGEA CONSTRUCTION MANAGER DIRECTOR MANAGER OUAUTY ELECTRICAL IdC SEAVCES DESIGN MANAGEA ENGINEERING MANAGEA ADMINISTRATIVE EMEAGENCY PLANT SUPPORT PLANNING GENEAAL SEAVICES MANAGER MANAGEA MANAGEA PLANT OC ENGINEERING MANAGER PAOGAAM ADMINISTRATION MANAGER PLANNING AND AND RECORDS MANAG'EMENT CONTROLS MANAGEA MANAGER WNP I MATERIALAND OA STAFF INSPECTION MANAGER CORPORATE CHEMIST

'SUPPLIER WNP T DUALITY PRCUECTS MANAGER COAPOAATE MANAGER RADIOLOGICAL HEALTH OFFICER NUCLEAR SAFETY ISSUES PROGRAM REGULATORY AND INDUSTAY AFFAIRS DIRECTOR LICENS>NG MANAGEA REGULATORY SERvCES MANAGER REGUIATOAY SUPPOAT MANAGER 890853.1 SPECIAL PROJECTS MANAGER 968-25060 {12/93). Rev. 4/95 Section 1.PSIA/OQAPD)

~ ~ ~ a

~

~

~ ~ g

~ ~

I 0

t SIEESC tOWRR WAEWINCTOPS 0> sUpprz mrs 2-1 OPERATIONAL ASSURANCE PROGRIAI UESCIIU IION 2- L A 2.1 This section provides an ovexaH description of the QA Program that will be applied to initial testing and subsequent operation and maintenance activities throughout the life of Supply System nuclear power plants.

2.2 QQggML 2.2.1 The QA Program will be imylemented through a sezies of Nuclear Operation Standards (NOSs) contained in the Supply System Functional Manual 'for Nuclear

. Operation. In turn, these NOSs wiH be implemented by Supply System organizational procedures, programs, or plans which prescribe detailed methods for functional accomplishment. The NOSs will address the applicable requirements of Apyendix B to 10CFR 50 and Sections 1 through 18 of the QA Program. A matrix of Nuclear Operation Staadards cross referenced against each czitezia of Appendix B to 10CFR 50 is included in Table'2-1. The NOSs and implementing procedures, programs, or plans will collectively comply with the regulatory yositions of QA-related Regulatory Guides as identiQed and modified in Appendix 1X, Position Statements.

2.2.2 A list of safety-oelated items that wiH be subject to the applicable controls of the QA Progzam is included in the Final Safety Analysis Report (FSAR) for the applicable Supply System nuclear power plant. Changes to this listing shaH be controlled by the Director, Engiaeezing,and approved by the Plant General Manager.

Soaioa2.P&A/OQAPD1

PhG<

fk

'Ivg

~ASN INGTOÃ PIISLIC ROWS%

svppxz sE~M~vi 2-7 OPERATIONAL QUASI% ASSU&LNCE PROGXUDf DESCRIPHON 2.2.3 Applicable provisions of the QA Pxogram shall be implemented by the eadiest of the allowing and shall remain in eftect for the life of Supply System nuclear power plants:

a. Prior to inception of the activity.
b. At the time of temporary/permanent transfer of system/component custody to Test and Staxtup or~uzation.
c. Ninety (90) days pxior to initial fuel loading.

2.2.4 Revisions to the QA Program will be made by the Quality Assurance organization as follows:

a. Proposed changes to the QA Program will be evaluated to dete~e whether or not they would result in a reduction of commitments previously ace~ted by the ¹clear Regulatory Commission (NRC).
b. Changes that do not reduce the commitments may be implemented prior to forwarding such changes to the NRC. However, all such changes shall be forwarded to the NRC at least annually.
c. Changes that reduce commitments will be forwarded to the NRC for their review and acceptance prior to implementation. Such changes shall be regarded as accepted by the NRC upon rmipt of a letter from the NRC to this efi'ect or sixty (60) days after submittal to the NRC, whichever occurs first.

Seaiaa2.Pd4VOQAPDl

PAGE fk WSAERSSSSSEOSS RSSEESC ROARER 4> sUPPrz SrSn~m 2-3 OPERATIONAL ASSURANCE PROSRA!R UESCSUPPSON. 15 2.2.5. Managers of Supply System organizations responsible for implementing the applicable provisions of the QA Program shall assure that activities that afFect

,safety-related functions of plant items are performed by personnel who have been indoctrinated and ttained. The scope, objective, and method of implementing the indoctrination and tranung program. shall be documented. Proficiency of personneL performing activities that affect safety-rehash functions of plant items-shall be maintained by retraining, re-examitmion, and/or recertifying, as applicable.

Methods shall be provided for documenting trannng.

2.2R6 ,The scope, implementation, and effectiveness of the QA Program is routinely audited by the Quality Assurance or anization. Copies of audit reports are presented to Supply System management to provide for assessment of the etFectiveness of the QA Program. AdditionaHy, at'least one= per two (2) years, the Supply System management arranges for an independent evaluation of the adkquacy of the scope, implementation, and efFectiveness of the QA Program. This is accomplished by Knowledgeable personneL outside of the Quality Assurance o~ization to assure achievement of an objective program assessment. Results of these independent evaluations are reported to the Managing Director and Vice-President, Nuclear Operations.

968 25060 (V92) Sectioa2.P84V~DI

PACE 4> sUpp7z s7s7z7i OPERATIONAL QUALITYASSURANCE PROGIU84 DESCRIPI'ION 15

~TA8 E 2-1 OPERATIONAL gA PROGRAM DESCRIPTION IMPLEMENTING NUCLEAR OPERATION STANDARDS (Page 1 of 1)

Nuclear 0 eration Standards 10CFR50 A endix 8 Criterion Number Ti tl e 1234 567 8 9 10 11 12 13 14 15 16 17 18 NOS-1 Organizational Responsibilities/Changes NOS-2 Control of the Functional Manual for X X Nuclear Operation NOS-3 Operational gA Program Description Control NOS-4 Plant Operations and Maintenance X X X X X X Control NOS-5 Personnel Training, qualification and X X Certification NOS-6 Review Committees (CNSRB & POC)

NOS-8 Nuclear Safety Assurance Assessment Program S-9 Procedures/Instructions Control X X NOS-11 Conduct of Licensing Activities X NOS-13 Reporting of Incidents NOS-14 Operating Experience Review NOS-19 Plant gC Inspection Program X X NOS-20 guality Assurance Evaluations X X NOS-21 ASME Pressure Boundary Work X X XXX X X NOS-22 g-List Control NOS-23 Plant 'Modification Control NOS-24 Control of Records NOS-26 Computer Software gA X NOS-27 Procurement and Storage Control X X NOS-30 Control of Nonconformances and X X X Corrective Action NOS-32 Configuration Management Program X NOS-33 Inservice Inspections X X X NOS-34 Inservice Testing of Pumps and Valves X NOS-35 Nuclear Materials Control NOS-36 Chemistry NOS-37 Rad.. Environmental Mon. Program NOS-39 Fire Protection Program NOS-40 Radioactive Waste Management NOS =41 gA Program for Radioactive Materials Shipping Packages NOS-43 Nuclear Plant Security XXX OS-45 Simulator Certification XXX 968-2S060 (4/92) ScctioaZ.PChAI~D I

, ~ tl rS

'OklÃlWCTOk tlkllC fOwM PAGE'-1 surprz svsram OPERATIONAL

. QUALITYASSURANCE PROGRAM DESCRIPTION 7 7 - NTR L F PURCHASED MATERIAL E MENT AND SERAC 7.1 ~P~Q~E This section establishes controls to assure that safety-related items and services, whether purchased directly or through contractors and subcontractors, conform to proairement documents.

7.2 ENERAL 7.2.1 Procedures/instructions shall be established and implemented for the control of purchased'aterials, equipment, and services. These procedures/instructions shall

'I clearly describe the actions to be accomplished and identify those positions or groups responsible for performing those actions.

7.2.2 Material, equipment, services and spare/replacement parts (other than commercial de items as defined in 10CPR 21) for safety-related structures, systems and components:

a. Shall have a technical evaluation to assure that requirements for acceptable item(s) are specified in the procurement documents.
b. Shall be procured from vendors whose quality assurance qualifications have been affirmed, either prior to or after award of the contract; by Supplier Quality, and S68-25060 (%92) Scc&a7.P84VOQAPDi

WRRSSSECEOSA n.ESAC SNSrER PhCE 4p super@ srsxaz 7-2 OPERATXONAL ASSURANCE PROGRAlll UESCIUP11ON 7

c. Shall be subject to the quality assurance program controls and to technical requirements at least equal to the ozjpnal technical requirements or to revised controls that have been properly reviewed and approved.

Material, equipment, services and spar&replacement parts for safety-zeIated structures, 'systems and components that are commexcial grade items as deGned in 10CFR 21:

a. Shall have a technical evaluation to assure that requirements for ~table item(s) are specified in the procurement documents.
b. Shall have stance methods to provide reasonable amrance the item(s) received is the item(s) which was speciied..These may incIude one or more of the methods of Pazagzaphs 7.2.4., 7.2.5., or 7.2.6 as specified by the Technical Evaluation.

Evaluation of vendors, inctuding zeview and concurrence of vendors'A programs, shall be performed by QA using QA or Enginmriag personnel competent in deterinining the ability of vendors,to provide acceptable quality products.

Source selection will be based on one or more of the following:

a. We ability of the vendor to comply with those eIements of 10CFR 50 Appendix B applicable to the type of matexial, equipment, or servims being"

.procured.

b. A review of previous record and performance of vendors who have provided similar articles of the type being procured.

Soaiao7ZdbVOQhPD1

>>aaeiCroa nsuC ro>>I>> PhGE k3 sUpPKX SH>1.'EM

~cz 7-3 OP%RATIONAL rROGmm DZSC>>srXON

c. A suxvey of the vendor's facilities and QA program to determine his capability to supply a product which meets the design, manufacturing, and quality requirements.

7.2.5 Source veziication (vendor suxveQlance, inspection and audit) shall'be commensurate with the relative importance, complexity, and quantity of the items or service procured and the vendor's quality performanc=. In-process and Qnal surveillance requirements of vendor products shaH be detexnnned in advance and pexformed to assure conformance with procurement document requirements.

Source vezification is not required to be performed where the quality of the item can be verified by review of test reports, inspection upon receipt, or other means.

Source verification activities shall include evaluation of vendor 5unished Certificates oi Conformance and/or vendor's Certification System.

7.2.6 Receiving inspection of vendor Sunished items shall be pexfoxmed to assure that

a. The item is properly identiGed and coxresponds to the identification on the procurement document and the receiving documentation.
b. The item and the acceptance records satisfy the inspection instruction prior to relying upon the item to perform its safety unction.
c. SgeciQed inspection, test, and other records are complete and available at the site pxior to relying upon the item to perform its safety function.
d. Inspection status of accepted items is identi6ed pxior to their being released for storage, use or further work, 968-25060 (V92) Seaiaa7.P~OQhPD1

PhGE WISRIKTOA tlg4C /DE kP suppn amzaz OPS ~22ATIONAL QUALZITASKRANCE PROGRABd: DESAUPXXON 7.2.7 Documentary evidence that the vendor furnished items conform to the procurement requirements shall be retained at the site for the life of the items.

T.pWUQQhPD I

PAGE 0> sUppiV s7s7z7i OPERATIONAL QUALITYASSURANCE PROGRABrI DESCMPI'ION 10 APPENDIX I ALIFICATI N RE UIREME The minimum qualification requirements for key Quality Assurance personnel that will be met at the time of initial core loading or appointment to the active positions are as follows:

I. 1 D~i

a. Education: Bachelor Delve or equivalent in Engineering or a related science.
b. Experience: Ten (10) years experience in the field of quality assurance, or equivalent number of years of nuclear industry experience in a management position'or a combination of the two. The requirement that the director have at least two years of experience in the administration-of and adherence to the Quality Assurance Program in a significant management role directly involving- nuclear power plants is being deleted.

Because the director's duties encompass a much broader range of responsibilities than administration of the QA Program, it is not considered desirable, nor appropriate, to limit the choice of candidates to only those who have had detailed involvement in the administration of the QA Program.

L2 uali ervices and uali u rt ervices Mana e

a. Education: Bachelor Degree or equivalent~ in Engineering or a related science.

968-25060 (%92) ~OAPP.n~ai

~

PAGE

~~ i 4S SUPPLY SYSTEM I-2 OPERATIONAL QUAIL'YASSUWkNCE PROGRAM DESCRXFHON 10 APPENDIX

b. Experience: Four (4) years expe6ence in the field of quality asm@ance, or equivalent number of years of nuclear plant expexience in a supervisory position, preferably at an operating nuclear plant, or a combination of the two. At least one (1) of these four (4) years of exgexience shall be nuclear power plant expexience in the implementation of the quality assuranc= program.

L3 Plant ualitv C ntro Manger

a. Education: Bachelor Degree or equivalent" in Engineering or related science..
b. Experience: Four (4) year expeience in the fie1d, of quality assurance and/or quality control, or an equivalent number of years oi nuclear plant experience in a supervisory position-, preferably at an operating nuclear plant, or a combination of the two. At least one (1) year of this four (4) years expexience shall be in the implementation of the quality assurance/control program.

~Equivalency will be deternuned based upon an evaluation of the following fitctors:

-High school diploma or GED.

2. Sixty (60) semester hours of reiated technical education taught at the college level (900 classroom or instructor conducted hours).
3. Qualified as an NRC senior opexator at the assigned plant.
4. Four (4) years of additional expexience in his area of responsibility.

vaaswcrcw rmuc ~ia C> ~pmmmm I-3 OPERATIONAL QUALMYASSURANCE PROGRAM. DESCRXFI'ION 10 Pour (4) years of mpervisory or management experience.

Demonstrated ability to communicate clearly (verbalIy and in miting).

CertMcation of academic ability and knowledge by corporate management.

Successful completion of the Engineer-I'n -Training exanunation.

Professional Engine@ License.

Associated degree in Engineering or a xelated science.

OQAPDAPP.GOQAPDI

9508140106 9'50810 PDR 4DOCK 05000397 P PDR INDEX

~a~e.

INDEX SIGNA'IURE PAGE 1V PURPOSE AND SCOPE IXIRODUCTION Vl"1X PLANNING TREE matrix only

0. VICE PRESIDENT - NUCLEAR OPERATIONS OBJECTIVE 1-5 0.1 Manager/Supervisor Performance 0.2 Human Performance 0.3 Corrective Action OA Administrative Procedures 0.5 Work Processes
1. LICENSEE CONTROL SYS'ITS 1.1 Problem Identification Through Self-Assessment 6-7 1.2 Root Cause Analysis 8 1.3 Trending and Evaluation matrix only 1.4 Corrective Action Systems matrix only
2. OPERATIONS 9-20 2.1 Safety Focus 9-13 2.2 Management Involvement 14-15 2.3A Problem Identification 16 2.3B Problem Resolution 17 2.4 Quality of Operations 18 2.5 Prognuns and Procedures 19 2.6 Corrective Actions 20

~Pa ~~e

3. ENGINEERING 21-29 3.1 Safety Focus 21-23 3.2 Management Involvement 24-25 3.3 Problem IdentiTication and Resolution 26-27 3.4 & 3.5 Understanding Design and Quality of Engineering Work 28 3.6 Programs and Procedures 29 MAINTENANCE 30-37 4.1 Safety Focus 30-31 4.2 Management Involvement 32 4.3A Problem Identification 33 4.3B Problem Resolution 34 4.4 Plant Material Condition 35 4.5 Quality of Maintenance Work 36 4.6 Programs and Procedures 37
5. PLANT SUPPORT 38-49 5.1 Safety Focus/Management Involvement matrix only 5.2 Problem IdentiTication and Resolution matrix only 5.3A QUALITYASSURANCE 38-41 5.3B EINHKGENCY PREPAREDNESS 42-43 5.3C HIMPROTECTION 5.3D SECURITY 45-47 5.3E HEALTHPHYSICS 48-49 5.4 Programs and Procedures matrix only

50-54 6.1 Operations Training 50-51 6.2 Maintenance Training 52 6.3 Engineering Support Training 53 6.4 Chemistry Technician & Health Physics Technician Training 54 ADDITIONALIMPROVEMFKI'IVH.'IATIVESindex) 7.1 ANCE RULE 56 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE 57 7.3 IMPROVED TECHI.'6CAL SPECIFICATIONS 58 7.4 PLANNII'%G AND CONTROL 59-60 7.5 INIXGRATEDPLANNING AND SCHEDULING 61

-lll-

~0~

t'.

Recommended for Approval by:

W'.

Regulatory Director er Trainin Director P. R.

Programs and Industry AGhirs J . Burn Engineering Director G. O. Smith Quality As+mace Director J. . w le Plant ne er F/z<<

R. L. Webring Support Services Director Approved by:

. Parrish ice President-Nuclear Operations

PURPOSE AND SCOPE The purpose of this document is to identify, track, and trend initiatives that are being developed or implemented which have an affect on the Supply System's objective of achieving and sustaining superior regulatory performance.

Combining all such initiatives in one report demonstrates that issues affecting regulatory performance have senior management's attention and will receive appropriate resources to assure effective implementation.

This document includes initiatives from Operations, Maintenance, Engineering, and applicable support organizations. Objectives and initiatives may be revised as appropriate to reflect changing conditions, or as necessary to assure the continued safe, reliable, cost-effective, and environmentally sound operation of WI%'-.2.

INTRODVCTION In early 1995, the Supply System performed a Mid-Cycle SALP Self Assessment (Self Assessment). At the conclusion of this Self Assessment and as a part of its presentation of the results, the Supply System committed to provide the NRC with a document addressing the identified weaknesses within 45 days following the R-10 outage. This document fulfills our commitment.

This document serves as a vehicle by which the Supply System and the NRC may accomplish the following goals:

~ Develop a common understanding of the Supply System's weaknesses and strengths.

~ Identify plans, programs, and initiatives designed to improve

. regulatory performance.

~ Track and trend corresponding performance over time.

During May through July 1995, a special team under the direction of Regulatory Programs and Industry Affairs worked closely with coordinators assigned by each WNP-2 functional organization to develop and compose this regulatory communication tool. Over the course of this period, functional coordinators were asked to develop objectives and corresponding actions which were either being undertaken or would be undertaken to address weak areas affecting their respective organizations which had been identified within the Self Assessment. In addition, coordinators were asked to identify the results expected from their actions and establish standards by which these results could be measured to determine if they were accomplishing their intended purpose. The initial input from the functional coordinators was also evaluated by an ad-hoc Review Committee. The Review

~ Committee evaluation was to ensure that there were no conflicts between the goals of the various Supply System organizations and to confirm that the Self Assessment identified weakenesses were effectively addressed by the corrective actions.

Although coordinators were instructed to specifically address the weaknesses set forth within the Self Assessment, they were also instructed to document and address additional weaknesses or improvement efforts affecting regulatory performance. This increase in scope was made with the intention of establishing this document as a central repository in which WNP-2 improvement measures related to the Self Assessment can be documented, updated, tracked and trended

in an effort to form a complete look at overall station health and improvement initiatives. The functional coordinators were asked to assure that a demonstrable connection existed between the identified weaknesses and the associated objectives, initiatives, and measurement standards.

For this document to be successful and effectively serve its stated purpose,.it must be institutionalized through use of existing Supply System programs and processes.

Therefore, this document, as well as issues surfacing from it which transverse functional lines (e.g., human performance errors), will be captured and addressed as initiatives within the Supply System Business Plan. This will ensure that the items receive proper resource allocation and management attention. The status of each item will be provided on a routine basis. In this manner objectives and initiatives will be assigned to a responsible individual and will be tracked, trended.

and monitored on a periodic basis, but no less than once each quarter. The NRC will be provided updates of this document in a timely manner.

This document is organized along the functional lines contained in the Self Assessment. In addition, three sections were added based upon our review of our performance. The functional areas included are listed below, with the new. areas added in bold type:

0.0 Core Vice President - Nuclear Operations (VPNO) Objectives 1.0 Licensee Control Systems 2.0 Operations 3.0 Engineering 4.0 Maintenance 5.0 Plant Support 6.0 Training 7.0 Additional Improvement Initiatives Detailed areas of coverage are graphically represented on a Planning Tree which may be found behind the next tab. As an aid to reviewing this document, each functional area is preceded by a matrix containing a summary of the weakness identified in the Self Assessment and the corresponding objective designed to

address that weakness. Not all issues identified in the Self Assessment continue today as weaknesses. Items no longer requiring attention are identified as "complete" on the functional area matrix. One or two areas are presently being assessed to determine what action, if any, may be required to address the area of weakness. Those items are identified as "evaluating" on the functional area matrix.

This document has strong potential to provide the Supply System and the NRC a common basis of understanding, interpreting, and assessing significant regulatory performance issues facing the Supply System. Fundamentally, however, this document is a management tool. As such, it is expected that refinements and revisions will be necessary from time to time. Its continued use will be based upon assessed needs and benefits internal to the Supply System.

REGULATORY PERFORMANCE ENHANCEMENT Preparation: May 1995 - July 1995 Team Members: J. Holder, Regulatory & Industry Affairs S. Barwick, Legal Department S. Foraker, Legal Department M. Hatcher, Legal Department J. Marboe, Legal Department Measurement Assistance: D. Embree, Planning and Controls G. Godfrey, Planning and Controls Ehnctional Coordinators: J. Gearhart, Operations S. Kirkendall, Technical Support D. Martin, Security/Emergency Planning T. Messersmith, Maintenance J. Muth, Quality Assurance R. Patch/R. Winslow, Health Physics M. Price, Planning and Controls W. Shaeffer, Training W. Waddel, Licensee Control Systems D. Whitcomb, Engineering Review Committee: W. Barley, Radiation Protection J. Engbarth, Administrative Auditor P. Robinson, Outside Legal Counsel J. Streeter, Managing Director Staff C. Van Hoff, Communications and External Affairs

WNP-2 FINAL PERFORMANCE ASSESSMENT PLANNING TREE A SESSLIEHT OFWNP-2 PERFORAA E 5.0 0.0 7.0 LICENSEE ADDfAONAL CORE VPHO PLANT TRAINING IMPROVEMENT OP NS ENG EERIHG LIADITENANCE OBJECTIVES SSYS IS SUPPORT INITIATIVES 0.1 5.1 5.1 7.1 LIANAG ERI PROBLEM SA US SAFETY FOCUS SAFETY FOCUS IDEHTIRCATIOH OPERATKHIS MAINTENANCE SUPERVISOR TRAINING RULE THROUGH SELF- MANAGEMENT PERFORMANCE ASSESSMENT DIVOLVEMENT MANAGELIENT LTANAGEMENT MANAGEMENT DIVOLVEMENT INVOLVEME INVOLVEMENT

~PROBLEM ROOT IDENTIFlDATION MAINTENANCE FSAR HUMAN CAUSE 4JA PERFORMANCE TRAINING UPGRADE ANALYSIS 2'ROBLEIJ PROBLELI PROBLEM ~PROBLEM IDENTIFICATION mENTIRCAIION IDENTIRCATION RESOMTIO PROBLELI RESOLUTION 40B PROBLEM PROBLEM QUALITYOF DIG ENGINEERING IMPROVED CORRECTIVE RESOLUTION RESOLUTIOH AA SOB SM AND SUPPORT TECHNICAL ACTION TRAINING SPECIFICATION EVALUAT N OA 1A DD 5>E eA 7A SA SEC H CORRECTIVE (PULNT) CHEMSIRY AND PLANHIHG AND ADMINISTRATIVE NDERSTANDING HP TECHNICIAN PROCEDURES AM N MATERIAL CONTROL SIST OPERATIO DESIGN CONDITeN TRAINIHG 7$

QUAUIYOF QUAUIY INTEGRATED WORK PROGRAMS OF PLANNING AND AHD ENGIHEERIHG PROCESSES LIAINTENANCE SCHEDULIHG PROCEDURES WORK WORK 2.0 SA CORRECTIVE PROGRAMS PROGRAMS WOGRAMS AND AND AHD EXCEPTIONAL ACTIOHS PROCEDURES PROCEDIIRES PROCEDURES QG PERFORLIAHCE AVERAGE PERFORMANCE Kl" PERFORLIANCE ADDED BY SUPPLY SYSTEM

PERFORMANCE IMPROVEMENT AREAS CORE VPNO OBJECTIVES 0.0 CORE VPNO OBJECTIVES 0.1 OBJECTIVE MANAGER/

SUPERVISOR ~ Improve manager supervisor performance. 0.1.1 PERFORMANCE 0.2 OBJECTIVE HUMAN PERFORMANCE ~ Improve human performance. 0%1 0.3 OBJECTIVE CORRECTIVE ACllON ~ Improve effectiveness of corrective actions 0.3.1 0.4 OBJECTIVE ADMINISTRATIVE PROCEDURES ~ Simplify admlnlstratlve procedures. 0.4.1 0.5 OBJECTIVE WORK PROCESSES ~ Simplify management, design change, and procurement work 0.5.1 processes.

EXCEPTIONAL PERFORMANCE ~

~w AVERAGE PERFORMANCE ~ MNIMUM PERFORMANCE ~

~tt ADDED BY SUPPLY SYSTEM 0504700.0.0 JULY 0$ . 1000

VICE PRESIDENT - XUCI.EAR OPERATIONS OBJECTIVES

't 0.1 MANAGER/SUPERVISOR PERFORMANCE (Reference Business Plan Management Initiative OP 6)

Objective: 0.1.1 Improve manager/supervisor performance by changing cultural behavior.

Initiatives: 0.1.1.A Implement Leadership Expectations-plan, lead, organize and control.

Completed.

0.1.1.B Assess manager/supervisor development needs assessment for key managers. Ongoing.

0.1.1.C Develop initial and continuing supervisor/manager training program.

Training Advisory Group (TAG) formed in October 1994; completed training needs assessment in March 1995; conducted the first cycle of continuing training in March 1995. Ongoing.

0.1.1.D Periodically survey the workplace to assess the effectiveness of performance improvement efforts. Ongoing.

0.1.1.E Implement succession planning process. Program evaluation complete with Senior Management approval of the revised process in 2/95.

Program is currently in process to identify candidates and their development needs. 12/95.

Expected Results: Improvements in the performance and skills of Supply System managers and supervisors, identification and correction of Supply System issues through effective supervision, and improvement in the performance and the consistency of performance of Supply System workers.

Measurement Standard: Feedback from employees through formal instruments and informal sessions.

Page 1

0.2

~ HUMANPERFORMANCE (Reference Business Plan Initiative OP 9)

~ ~

Objective:,0.2.1

~ ~ ~ Improve human performance at WNP-2.

Actions: 0.2.1.A Approve Management Initiative to improve human performance.

Completed.

0.2.1.B Establish Human Performance Coordinator position reporting to VPNO.

Completed.

0.2.1.C Identify internal and external attitudes regarding human performance.

9/30/95.

0.2.1.D Identify current initiatives to improve human performance. 9/30/95.

0.2.1.E Assess devices being used to monitor human performance. 9/30/95.

0.2.1.F Assess effectiveness of each department's human performance and develop recommendations for enhancements e.g., site wide OI-9 and Gold Card program. 9/30/95.

0.2.1.G Integrate human performance improvement efforts. Ongoing.

Expected Result: Reduced number and significance of human errors.

Measurement Standards: 0.2.1.a Number/rate of PERs caused by human performance.

0.2.1.b Number/rate of significant PERs caused by human performance.

Page 2

0.3 CORRECTIVE ACTION

~ ~

Objective: ~ 0.3.1 Improve the effectiveness of corrective actions in correcting and preventing the recurrence of significant deficiencies.

Actions: 0.3.1.A Form and implement a Corrective Action Review Board (CARB).

Completed.

0.3.1.B Review significant PERs and other PERs selected by CARB members to assess adequacy of corrective actions. Ongoing.

0.3.1.C Provide CARB feedback to PER dispositioners on CARB lessons-learned.

Ongoing.

Expected Results: Improved quality of PER dispositions.

Reduced number of recurring significant deficiencies.

Measurement Standards: 0.3.1.a Number/rate of recurring PERs.

0.3.1.b Number/rate of recurring significant PERs.

Page 3

0.4

~ ADMINISTRATIVEPROCEDUMB

~ ~

Objective:~ 0.4.1

~ ~ Simplify administrative procedures (Reference Business Plan Management Initiative OP 7).

Actions: 0.4.1.A Establish procedure hierarchy. Completed.

0.4.1.B Develop and implement a plan to simplify and clarify administrative procedures. Completed. Implementation in progress.

0.4.1.C Identify procedure requirements and commitments. Completed.

0:4.1.D Develop tracking system for requirements and commitments.

Completed.

0.4.1.E Restructure administrative procedures. 12/96.

Erpected Results: Simple, cost-effective and efficient procedures and improved employee compliance to procedures.

Reduced number of administrative procedures and reduced number/rate of PERs caused by administrative procedure complexity and other shortcomings.

Measurement Standards: 0.4.l.a Number of administrative procedures.

0.4.1.b Number/rate of PERs caused by administrative complexity and other shortcomings, Page 4

0.5 WORK PROCESSES

~ I Objective:t 0.5.1 I ~ Simplify management process, design change process, and procurement process (Reference Business Plan Management Initiative OP 7).

Actions: 0.5.1.A Form process improvement teams.

~ Work Management - Completed

~ Procurement - Completed

~ Design Change - 9/11/95 0.5.1.B Evaluate process and identify improvements.

~ Work Management - Completed

~ Procurement - 10/4/95

~ Design Change - 11/13/95 0.5.1.C Develop implementation plan for improvements.

~ Work Management - 7/28/95

~ Procurement - 11/I/95

~ Design Change - 12/29/95 0.5.1.D Implement improvements.

~ Work Management - 10/30/95

~ Procurement - I/I/96

~ Design Change - 2/5/96 Expected Results: Simple, cost-effective, and efficient processes and improved employee compliance to procedures.

Measurement Standards: 0.5.1.a Staffing levels.

0.5.1.b Overtime.

0.5.l.c Work Order Inventory Age..

0.5.1.d PERs related to ineffective controls.

Page 5

PERFORMANCE IMPROVEMENT AREAS LICENSEE CONTROL SYSTEMS 1.0

~ Overall: lese than average performance LICENSEE C CAROL SYSTEMS PROBLEM OBJECTIVE IDENTIFICATION THROUGH SELF-

~ Increased selfwssessment needed - particularly In areas with long 1.1.3 ASSESSMENT standing problems

~ O.A. reviews have been too narrow 5.3A.1

~ POC performance Identified as weak Complete

~ OER noted as not timely or acted upon 1.1.1 1.1.2 1.2 OBJECTIVE

'ROOT CAUSE ~ Quantity of root cause analyses needs Improvement. 1.2.1 ANALYSIS 1.3 OBJECTIVE TR NDING8a EVALIJh ON ~ PTL not used to fullest capacity despite slgnlflcant upgrade to PTL software 1.4 OBJECTIVE CO RECTIVE ~ Actual or perceived complexity In Implementing corrective action Complete ACTION process has resulted ln llmlted use of the system SYSTE

~ O.A. I Une organlzatlon Interface requires Improvement to assure 5.3A.1 emerging problems are Identified 5.3A.2 EXCEPTIONAL PERFORMANCE W AVERAGE PERFORMANCE

" MINIMuM PERFORMANCE QSOI76 I.O.O JULY 2$ . 100$

LICENSEE CONTROL SYSTEMS 1.1 PROBLEM IDENTIFICATIONTHROUGH SELF-ASSESSMENT Objective: 1.1.1 Improve the adequacy, timeliness, and efficiency of reviewing industry experience and applying it to WNP-2.

Initiatives: 1.1.1.A Revise PPM 1.10.4 (External Operational Experience Review).

Completed.

1.1.1.B Establish line organization commitment to perform reviews of OER, tracking process, and goals. 8/15/95.

1.1.1.C Provide training to line organization staff. 9/15/95.

1'.1.1.D Initiate line review of Operating Experience Reviews (OERs) ~ 9/30/95.

1.1.1.E Coach line staff on the adequacy and timeliness of review process.

Through 12/31/95.

1.1.1.F Review the process and results for quality and possible adjustments.

Ongoing.

Erp ected Result: OER information willbe reviewed in a thorough and timely manner with appropriate corrective actions resulting.

Measurement Standards: 1.1.1.a Monitor the monthly report on OER reviews for timeliness and corrective actions implemented.

1.1.1.b Appropriate corrective actions reviewed and taken by line management.

1.1.1.c if Screen the PER database on a periodic basis to see problems contained within OER information have occurred at WNP-2.

Obj ective: 1.1.2 Evaluate the adequacy of original OER reviews.

InMatives: 1.1.2.A Establish a program to review selected OERs. 9/30/95.

Page 6

Expected Result: Either confirm that the original review and corrective action implementation process was effective or identify additional corrective actions necessary.

Measurement Standard: Monitor percentage of reviewed OERs that require new corrective actions.

Objective: Improve the line organization's ability to perform self-assessments.

InMatives: 1.1.3.A Establish guidelines for the self-assessment process. 7/31/95.

1.1.3.B Staff a self-assessment specialist to coach line organization. 9/1/95.

1.1.3.C Begin first self-assessment with line organizations. 10/1/95.

Expected Result: Line organization performance should improve.

Measurement Standardt Monitor line organization performance indicators.

Page 7

1.2 ROOT CAUSE ANALYSIS Objective:t 1.2.1 Increase the frequency and quality of root cause analysis.

Initiatives: 1.2.1.A Revise PPM 1.3.12A, Processing of Problem Evaluation Requests, to provide definitive guidance on when root cause analyses will be used in the dispositioning of PERs. 8/31/95.

1.2.1.B Significantly increase coaching of PER dispositioners in root cause analysis techniques. Beginning 9/1/95.

1.2.1.C Provide initial and continuing root cause analysis training to selected personnel. Ongoing.

Expected Result: The number of repeat problems should be reduced.

Measurement Standards: 1.2.1.a Trend the number of repeat problems on a periodic basis, and assess data results at the end of the period.

Trend the number of repeat problems due to incorrect or inadequate corrective action because a root cause analysis was not.performed.

.Page 8

PERFORMANCE IMPROVEMENT AREAS OPERATIONS

~ Overall: less than average performance OPE ONS 2.1 OBJECllVE SAFE OCUS 2.1.1

~ Unsatisfactory Operator & Supervisor performance 212 2.1.1

~ Poor questlonlng attitude 2.14

~ Conservative decision making still weak 2.1.3

~ Inadequate oversight of overall Plant Actlvltles 2.1.1 2.14 2.2 OB JECTIVE MANAGEMENT 2.2.1 INVOLVEMENT ~ Need to Increase management presence & expectatlons 2.2.2

~ Communlcatlon of management's expectatlons Is weak 2&1 2~

2.3A OB JECTIVE PROBLEM IDENTIFICATION ~ Slgnlflcant PERs mostly self-Identified Evaluating

~ Varied perception of when to Inltlate PERs Evaluating 2.38

'BJECTIVE PROBLEM RESOLUTION ~ Poor questlonlng attitude 2.1.1 2.1.2

~ Inadequate oversight of Plant Activities 2.1.1

~ Incomplete compliance with Technical Speclflcatlon Requirements 2.4.1

~ Need to reduce personnel errors 2.4.1

~ Lack of formal process to evaluate effectiveness 2.4.1 of work around fixes 2.4

'BJECTIVE 0 ALITYOF OPERATIONS ~ Need to ellmlnate numerous performance errors 2.1.1

~ Attention to detail needs emphasized PROGRAMS OB JECTIVE

& ~ Procedural adherence rernalns a challenge 2.5.1 PROCEDURES

~ Need to complete procedure Improvements 2.5.1 (remove amblgulty & streamline)

~ Crews need to request assistance with subtle Issues 2.5.2 OB JECTIVE CORRECTIVE ACTIONS

~ Foster operation staff acceptance of Issues. 2.6.1 El EXCEP1IONAL PERFORMANCE AVERAGE PERFORMANCE MINIMUM PERFORMANCE ADDED BY SUPPLY SYSTEM 050lre-2.0.0 JULY 8, 1005

OPERATIONS 2.1 SAFETY FOCUS Objective: 2.1.1 Improve safety culture such that (1) staff members are constantly looking for subtle issues, (2) all staff members are actively. bringing safety issues to management's attention, and (3) management deals with the issues effectively such that they are resolved prior to significant affect on reliability.

InMatives: 2.1.1.A Implement a revision to the OI-9 Program enabling identified issues to be resolved effectively, including criteria dealing with issue identification and the use of Plant programs (PERs and WRs). 8/1/95.

2.1.1.B Implement the Management Oversight Program in the Control Room.

This program places experienced, non-operations managers in the Control Room for the express purpose of identifying positive and negative behaviors and providing immediate feedback to the Operations staff on-shift. This allows human performance to be enhanced. This program was authorized on 4/15/95 as a temporary program to improve department performance. It continues through 8/5/95, at which time it will be evaluated for continuation, revision or cancellation.

2.1.1.C Establish the expectation that either the Operations Manager or.the Assistant Operations Manager be involved in Technical Specification interpretations and that Licensing be contacted, as necessary, to develop consistent decisions. Completed.

2.1.1.D Issue guidance on items to consider and criteria necessary for making judgements regarding applicability of Technical-Specifications. 9/30/95.

2.1.1.E Initiate changes in crew make-up to infuse new ideas, expectations and attitudes through a mixing of experience and personalities. 10/1/95.

2.1.1.F Develop a program which involves Operations staff in identifying areas for positive and improved implementation of management expectations relating to human performance (similar to Calvert Cliff's Gold Card).

Gold Card results will be used in crew discussions to reinforce, clarify and revise management expectations as a regular portion of the Operations Crew Training Cycle. This discussion will occur on a peer-to-peer level using real-life examples to reinforce behaviors in self-identification and assessment. In addition, Gold Card Program results Page 9

which indicate a trend of performance issues will be treated as a PER condition. 8/1/95.

2.1.1.6 Improve Operations'articipation in the Quarterly System Walk-down Program to expose other personnel to Operations'hilosophies and problems. This program exposes Operations personnel to the views and problems of support organizations. Ongoing.

2.1 1.H

~ Improve Operations staff participation on the PRG/PRC to help select project activities based upon operational needs. Ongoing.

Expected Results: Improved Safety Culture in which Operations is more able to recognize subtle trends and problems resulting in improved response to equipment and personnel issues prior to their having an affect on Operations. This should be reflected in fewer and shorter forced outages and improved teamwork among WNP-2 organizations.

Measurement

.I I I*: ~l e Level 2.1.l.a Reduction in unplanned automatic scrams.

2.l.l.b Increase safety system reliability.

2.1.1.c Fewer unplanned safety system actuations.

2.1.1.d Increase emergency generator reliability.

2.1.1.e Increased Net Electrical Generation, Capacity Factor, and Unit Capability Factor.

2.l.l.f Reduced Unplanned Capability Loss Factor.

2.1.1'.g Reduce the number of NOVs, LERs, and personnel errors.

ea men vl 2.1.1.h OI-9 summaries indicating fewer instances of failure to meet expectations.

2.l.l.i Management Oversight observations indicating improved performance.

2.1.1.j Fewer NOVs and LERs for technical specification violations with zero as a goal.

2.1.l.k Feedback from other WNP-2 organizations (i.e., Maintenance, Plant Support, Health Physics and Quality Assurance) indicating improved Operations performance and better working relationships.

Page 10

2.1.1.1 Increase in PER generation rate as issues are identified, followed by a PER reduction as those issues are corrected and do not recur.

Objective: 2.1.2 Create a Management Oversight presence which (1) leads to identification of issues before they affect reliability, (2) reinforces management expectations, and (3) allows management to make decisions to the greatest extent possible based on fact and not opinion.

Initiatives: 2.1.2.A Implement the revised OI-9 Program as discussed in 2.1.1.A. The observations required under this program for Operations management, especially the Operations Manager, Assistant Operations Manager, Day-Shift Manager and Shift Managers, provide an increased oversight presence. 8/1/95.

2.1.2.B Use the Management Oversight Program in the Control Room, as discussed in 2.1.1.B. Ongoing.

2;1.2.C Develop additional trending capability within Operations, which will allow management to address individual and systemic problems quicker.

8/1/95.

2.1.2.D Implement a pilot program that will provide managers and supervisors additional training on managerial techniques such as (1) pinpointing results and behaviors which support organizational goals, (2) developing measurement and feedback systems to communicate progress, and (3) managing and reinforcing desired behaviors and results, Pilot training to be completed by 9/1/95 followed by an implementation period.

Improvements in performance will be monitored before additional staff.

management members receive the training.

Expected Results: Operations management will be more visible and active in reinforcing expectations.

This visibility and activity will enable management to recognize problems at an earlier stage. This will result in not only identifying the need.to improve behaviors, but also successfully coaching individuals towards desired improvements or making changes in personnel who do not adapt to expectations.

Measurement S d d*: ~UI e Lev 2.1.2.a Same as 2.1.1.a - 2.1.1.g.

De men Level 2.1.2.b Non-shift management time in the Control Room will be increased.

Page 11

2.1.2.c Operations management will rate the quality of the OI-9 observations made by the on-shift management complement (SM and CRS).

2.1.2.d The quality of the feedback from Shift Managers and Control Room Supervisors will be judged by individual contributors who have had interface with them each quarter. This will help evaluate the coaching and reinforcement techniques practiced by management personnel.

2.1.2.e Management Oversight observations are being reviewed for improved performance.

2.1.2.f Industry peer evaluations, e.g., INPO assist visits, will be performed periodically to evaluate the effectiveness of the Management Oversight Program.

Objective: 2.1.3 Foster an environment in which all individuals make conservative decisions when responding to issues.

Initiatives: 2.1.3.A Implement revised OI-9 management observations, as discussed in 2.1.1.A. Ongoing.

2.1.3.B Implement revised Management Oversight Program, as discussed in 2.1.1.B. Ongoing.

2.1.3.C Use simulator training scenarios during each training cycle which promote conservative decision-making. These scenarios specifically address implementation of Technical Specifications. Ongoing.

2.1.3.D Continue Boss Talks, which involve example discussions with Operations team members and are used to reinforce expectations for conservative decision-making. Ongoing.

2.1.3.E Implement the Gold Card Program, as discussed in 2.1.1.F. 8/1/95.

Zxpected Results: Additional training and coaching will result in improvements in conservative decision-making. Response to precursor problems will become more effective and thereby increase overall Plant reliability through fixing problems early, instead of waiting until they become challenges to current performance.

Page 12

Measurement s ~e: ~l 2.1.3.a Same as standards 2.1.1.a, 2.1.1.b, 2.1.1.d, 2.1.1.e, and 2.1.l.f.

De men Level 2.1.3.c Management Oversight observations should indicate improvement.

2.1.3.d NRC observations should indicate improvement.

2.1.3.e Management observations of the Gold Card Program should indicate that conservative decisions are being discussed and reinforced.

2.1.3.f Peer evaluations of performance will be conducted periodically to evaluate this area.

Page 13

2.2 MANAGEMENTINVOLVEMENT

~ I Obj ective:t 2,2.1 Create an environment in which Operations staff accepts, implements and reinforces management expectations at all times.

Initiatives: 2.2.1.A Hold confirmatory meetings with Operations staff to focus on the acceptance, development, and implementation of management expectations. Beginning in the fourth quarter of 1995.

2.2.1.B Implement the OI-9 Program, as discussed in 2.1.1.A. 8/1/95.

2.2.1.C Continue Boss Talks in Operations, as discussed in 2.1.3.D. Ongoing.

2.2.1.D Implement pilot management training, as discussed in 2.1.2.D. This training will be used in conjunction with the regular performance appraisal program. 9/1/95.

Expected Results: Confirmatory meetings will enhance commitment to management expectations, Completing the balance of the initiatives will further reinforce and validate implementation of the expectations. Overall, the expectations should result in more effective personnel performance and increased reliability in Plant operations.

Measurement R dA: v 2.2.1.a Same as the standards set forth in 2.1.1.a - 2.1.1.g.

2.2.l.b Same as the standards set forth in 2.1.1.h - 2.l.l.m.

2.2.1.c Performance appraisal results will identify, in detail, the implementation of management expectations.

2.2.1.d Same as the standard set forth in 2.1.2.d.

Objective: 2.2.2 Use the Operations quarterly indicators to (1) reinforce management expectations, (2) facilitate identification of areas requiring additional work, and (3) facilitate identification of successes showing improvement from the'perspective of the Operations staff and WNP-2 management.

InNatives: 2.2.2.A Select and analyze key Operations processes (e.g., Clearance Order processing) to identify in-process performance indicators which would assist implementers and staff in evaluating the quality of process implementation. Collect and chart data to allow improved performance Page 14

of a particular process. After certain process level improvements are made and solidified, select another process for similar review and continue until all Operations processes have been analyzed. Ongoing.

2.2.2.B Revise the Operations quarterly indicators to track human performance trends requiring improvement. Assure these indicators have goals or control bands identified to focus management attention when necessary.

Beginning 8/1/95.

2.2.2.C Periodically review equipment trending data from Technical Staff to ensure Maintenance and Technical Staff personnel are focused on equipment trends which Operations believes require attention. Validate equipment trends with operator workarounds and problem areas.

Beginning 10/1/95.

Expected Results: Analyzing processes and tracking in-process performance will allow performers and management to identify process or implementation problems earlier and implement fixes prior to the problem affecting Plant reliability. In addition, establishing performance indicators will reinforce expectations and allow standards to be revised for added efficiencies. At the same time, data gathering will allow a greater degree of management by fact, rather than by assumption. These actions should translate into improved Plant reliability, better problem resolution and clearer expectations.

Measurement S de*: e Level 2.2.2.a Same as the standards set forth in 2.1.1.a - 2.1.1.g.

llgUKLal 2.2.2.b One process per quarter will be tracked, trended and evaluated to ensure demonstrated improvement.

2.2.2.c Feedback from operators and shift crews will be monitored to evaluate responsiveness to problems.

2.2.2.d Human performance PERs for Operations'rrors, related to will be monitored for reduction.

Operations'rocesses, 2.2.2.e Management Oversight observations willbe monitored for indications of improved performance.

Page 15

2.3A PROBLEM IDENTIFICATION Obj ective:t 2.3A.1 Increase the number of PERs generated as a'esult of Operations'involvement in Plant activities.

Initiative: 2.3A.1.A Coaching by the Operations Manager, via the on-going OI-9 reviews and on-going Management Oversight, has provided additional clarification and expectations. As a result, the current threshold for generating PERs is considered adequate. No further action willbe taken regarding this issue at this time.

2.3A.1.B Generate statistical data demonstrating that the current PER level is truly representative of existing problems. 3/96 Objective: 2.3A.2 Develop a common understanding among Operations staff regarding the need to document problems so that they can be properly characterized and fixed.

Initiative: 2.3A.2.A Coaching by the Operations Manager, via the ongoing OI-9 evaluations and in-progress Management Oversight observations, has provided additional clarification and improved consistency. The current threshold for PER generation is consistent between shifts and is meeting management expectations. No further action will be taken, regarding this issue at this time.

Page 16

2.3B PROBLEM RESOLUTION

~

Improve the system for reviewing chronic problems and operator

~

Objective: 2.3B.1 workarounds to ensure it is based on sound technical facts and judgments. Clearly communicate this system to Operations staff so that misunderstandings about station priorities are avoided.

InMatives: 2.3B.l.A Revise OI-14 Chronic Equipment Problems. OI-14 documents the methods to track status and prioritize chronic equipment problems resulting in operator workarounds. The revision will improve identification of issues for resolution. Beginning 9/1/95.

2.3B.1.B Establish goals for reducing the number of workarounds. 9/1/95.

Erpected Result: Improved focus will reduce the total number and duration of Operations workarounds, Measurement S de: ~l e Lev 2.3B.l.a Control Room deficiencies will be monitored for improvement.

2.3B.l.b The number of operator workarounds will be monitored for reduction.

2.3B.l.c The average time a work-around is in place will be monitored for reduction.

2.3B.l.d Observations from Management will be monitored for indications of improved performance.

2.3B.1.e Feedback from the Operations staff will be monitored for indication of an improved ability to operate the Plant as designed.

Page 17

2.4 QUALITYOF OPERATIONS Improve the process and common understanding of issues among

~

Objective:t 2.4.1 Operations staff which leads to preventing recurrence of minor events while they are precursors, rather than addressing them only when they become significant events.

InMatives: 2.4.1.A Reinforce management expectations for dealing with issues through the use of the OI-9 Program, as discussed in 2.1.1.A. 8/1/95.

2.4.1.B Monitor issues raised and resolution of those issues through conducting additional operator log reviews and Quality assessments and by assessing feedback from Management Oversight in the Control Room. Oversight began in 5/95, log reviews began in 4/95 and Quality assessments are routine. Ongoing.

2.4.1.C Use the quarterly human performance 'indicators for Operations (described under 2.2.2.B) to reinforce positive behaviors and correct weak behaviors. This will be done on an individual crew and manager basis. Beginning 8/1/95.

2.4.1.D Use the Gold Card Program to reinforce human performance issue resolution at an early stage. Beginning 8/1/95.

Zrp ected Result: Problems will be addressed before they become challenges to Operations. This should result in improved reliability.

Measurement S dR*: e Leve 2.4.l.a Same as standards: set forth in 2.1.l.a - 2.l.l.g.

e men vl 2.4.1.b Feedback from Oversight personnel will be monitored for indications of improved performance.

2.4.1.c Logs will be monitored for indication that issues are consistently being resolved through an established corrective processes.

2.4.1.d Observations of the Gold Card Program implementation will .be monitored for indications that Operations staff is being more aggressive in fixing human performance problems early.

2.4.1.e The gross number of PERs will be monitored for an increase, followed by a decrease as problems are corrected and do not recur. PERS are also monitored for recurring trends of problem types or areas.

Page 18

2.5 PROGRAMS AND PROCEDURES I

~

Objective:t 2.5.1 I ~ All staff members must strictly follow procedures unless they have reason to believe they should not, at which time they should secure their work area and seek procedural clarification or modification.

Initiatives: 2.5.1.A Implement OI-9 Program, as discussed in 2.1.1.A. 8/I/95.

2.5.1.B Operations staff members express a persistent belief that traps exist in procedures. Survey the staff to determine whether this is an actual concern. If the concern is validated, correct the procedures and revise the training program to ensure that all staff members are made aware of the procedure requirements. This training should be prioritized around the most frequently cited procedures of concern. 8/1/95.

Expected Result: Operations staff will strictly adhere to procedures. Operations will demonstrate recognizable leadership in adherence to this standard.

'Measurement S ~N*: ~l ra e Level 2.5.1.a NOV rate, LERs, and personnel errors will be monitored for reduction.

n Lev 2.5.1.b Procedure compliance PERs will be monitored for reduction.

2.5.1.c Feedback from Management Oversight and the NRC will be monitored for indications of improvement.

Objective: 2.5.2 'nsure Operations management makes decisions regarding the need for procedure deviations in accordance with approved procedures.

Initiatives: 2.5.2.A Review of a sample of Operations'rocedure deviations will be completed by Quality. 8/1/95.

2.5.2.B If a problem exists with inappropriate procedure deviations, develop appropriate corrective actions. To be assessed once analysis is complete.

Expected Result: Operations staff will lead by example in implementing management's expectations regarding the use of procedure deviations.

Measurement Standanf: Procedure deviations processed in accordance with approved procedures.

Page 19

2.6 CORRECTIVE ACTIONS I

Ensure that Operations staff accepts issues brought to them by other

~

Objective:t 2.6.1 I ~

station personnel in a manner that does not intimidate oi in any way demean the messenger. Operations staff should hold personnel accountable for gathering and reporting facts in this same non-threatening manner.

InMatives: 2.6.1.A Perform a site-wide informational survey to determine whether station personnel elect to ignore issues rather than be subject to challenges associated with reporting them to the Control Room. To be initiated 9/15/95.

2.6.1.B If a concern is validated, develop appropriate responses to the issues identified. To be assessed based upon survey results.

Expected Result: A survey of station personnel will identify whether a concern exists in this area and if so, action can be taken to improve Operations staff performance.. This should

'ultimately encourage station personnel to freely identify issues of concern so that they may be properly addressed.

Measurement Standard: Subjective measure based on survey results.

Page 20

PERFORMANCE IMPROVEMENT AREAS ENGINEERING 3.0

~ Ovoralk porfcrmanco less than average ENGI EERBIG 3.1 OBJECTIVE SAFETY FOCUS ~ Problem rosolutlon ls Inoffectlvo 3.1.1

~ Safety focus needs further improvement action plans 4 priorities 3.1.1 are lacking In key areas

~ Rect cause analyses aro Inadequate 3.1.1 OLIECTIVE MA AGEMENT INVOLgEMENT

~ Further Improvemonts are needed to managomont's Invclvoment 32.1 within onglnoorlng organizations

~ Managomongsuporvlscry sldlls neod Imprcvoment 3A.1

~ Inadoquato support given to Involving supervisors In systom 3$ .1 rnanagemont program

~ Need to continuo emphasis on bacldog managoment 3%1 PROBLEM OBJECTIVE IDENTIFICATION

~ Tlmoly resolution of probloms contlnuos to bo weak 38.1

'PROBLEM

'RESOLUTION

~ Nood to further Improve ofloctlvonoss of multl<lsclpllned toams 3.3.1 conducting s atom walkdowns

~ Folhw through on romedhrl offcrts Is brcklng 38.1

~ Problems with rosolvlng long~ndlng lssuos persist 33.1

~ Soveral plant 4 Industry issues not dealt with ofioctively 39.1 3A OB JECTIVE UNDERSTANDING DESIGN

~ Understanding of plant design 4 tho design chango rovtow 3A.t process ls minimal 3.5.1 6A.f

~ Inattention-to4etag errors Alack of appropriate proIect oversight 3A.1 problorns persist

~

Design reviews aro lacking In consbtency 4 quality 3$ .1

~ SlgnNlcant number cf deficiencies In Implomontatlcn of doslgn 3.6.1 changes aro evident %2.1 OB J ECTIVE OUALITYOF ENGINEERING ~ Process controls are weak 3A.1 WORK

~ System managomont program tacks adequate support 3$ .1

~ Design reviews 6 their Implementation aro weak 3A.1

~ Attention to detail lacking 3A.1

~ Poor Intordopartmont coordination 4 cooperation 3$ .1 33.1

~ Poor managomont Invclvomont 6 oversight 3.1.1 T.f.f PROGRAMS KL PROCEDURES ~ Implemontatlon of 10CFR50.65 (aka "tho Maintonanco Rule ) 3.1.1 legs significantly bohlnd most of the Industry

~ Ouarterly team walkdcwns nct always adequately supported 32.1 by other organizations

~ Froquency of quarterly team walkdowns Is Inadequate 3.2.1

~ Prccoduros, Instructions, 4 standards aro cumbersome 3.6.1 4 unwloldy H

I rr KXCKPTlONAL PKRFORMANCK ~

~w AVKRAOK PKRFORMANCK ~ Mwuuu PKRFORMANCK erc4reeae BAY 10, 1005

ENGINEERING 3.1 SAFETY FOCUS Objective: 3.1.1 Maintain Plant Nuclear Safety within the bounds of the Plant's license and the insights provided by the Probabilistic Safety Assessment.

InMatives: 3.1.1.A Develop and communicate, management expectations for conservative decision-making, stressing safe operation, Plant operability, quality, timeliness and thoroughness of work products. Completed. Update training to emphasize conservative decision-making by 6/96.

3.1.1.B Continue to prioritize initiatives, programs and projects through the Plant Review Committee process with a focus on maintaining nuclear safety and Plant support consistent with the Plant-wide prioritization process.

Ongoing.

3.1.1.C Increase and optimize staffing in the System Engineering group to provide better and more timely system support to Operations and Maintenance. 11/30/95.

3.1.1.D Update the Engineering Qualification Guides to provide in-depth qualification training to Engineering staff, which will include the following: 10/31/95.

~ Senior Reactor Operator (SRO) level training to system engineers on their WNP-2 assigned systems. To be completed within. one year for present staff and within one year of hire date for new staff.

~ Integrated systems training based on the SRO systems training program within two years for present staff and one year from hire date for new systems engineers.

~ Design and licensing basis training, including the development of the required design basis documents and training materials. To be completed within two years (10/97) for present staff and within two years of hire date for new staff.

~ Train Engineering staff on Plant Technical Specifications. To be completed within one year for present staff and within one year of hire date for new staff.

~ Provide Engineering staff with annual refresher training on performing operability assessments, specifically addressing GL 91-18.

Page 21

~ Corrective action resolution training on root cause methods and effective corrective actions. To be completed within one year for present staff and within one year of hire date for new staff.

~ Probabilistic Safety Assessment applications and awareness training for appropriate staff personnel, emphasizing safety significance rankings of systems. To be completed within one year for present staff and within one year of hire date for new staff.

~ Continuing training program that focuses on refresher training, lessons learned and special topics (e.g., industry events). Ongoing.

Expected Results: Minimization of errors associated with misunderstanding Plant interactions when implementing Plant design changes or performing post modification or maintenance testing or special test procedures.

Enhanced engineering safety perspective through a better understanding of'how changes in Plant conditions and systems can affect Plant accident response.

Improved quality of operability assessments performed on degraded Plant systems, components and structures.

Improved interface between Engineering and Operations. With broader systems knowledge, the engineer will better understand the effect of degraded equipment on the ability of the operators to control the Plant during normal and off-normal conditions.

Improved quality and timely completion of safety significant issues through better regulatory and risk-based Plant understanding.

Better and more timely support to Plant Operations and Maintenance on those initiatives, programs and projects of greatest impact to reliable and cost effective Plant operations.

Increased system engineering understanding and involvement with Plant systems to allow refocus of system engineering problem resolution performance to become proactive rather than reactive.

Measurement Standanfs: 3.1.1.a Use of Maintenance Rule criteria to monitor safety system availability and reliability.

3.l.l.b Number of LER/NOVs issued against safety systems.

3.1.l.c WO backlog on safety systems.

Page 22

3.1.1.d Timeliness, of closure of corrective actions on significant PERs.

3.1.1.e Monitor schedule effectiveness in focusing work activities on risk significant systems and issues.

Page 23

3.2 MANAGEMENTINVOLVEMENT Objective: 3.2.1 'ocus Engineering on an end product that ensures safe, reliable and cost-effective operation of WNP-2.

IniMatives: 3.2.1.A Define Engineering support in terms of Plant performance indicators related to safe, reliable and cost-effective system operation. Adopt a definition of "success" that meets the following criteria:

~ End result oriented (i.e., fixed problem, enhanced Plant operation, reduced barriers, more effective maintenance).

~ Not based solely on definition of an Engineering product (i.e., do not use a criteria based solely on the engineering quality of the design package). 10/31/95.

3.2.1.B Continue to eliminate low priority discretionary issues from work scope through application of the Project Review Committee processes including PSA/PRA. Items that do not meet the corporate goals of safe Plant Operation improved reliability, cost effectiveness and willbe eliminated.

Ongoing.

3.2.1.C Establish alignment between Engineering, Operations and Maintenance to identify process interfaces and define role, responsibility and accountability of each in the following activities: 12/29/95.

~ System walk-downs

~ Design change implementation and testing,

~ Scope reduction control 3.2.1.D Consolidate all technical resources under a single director. 7/31/95.

Expected Results: Improved quality and thoroughness of all Engineering products with a focus on customer satisfaction-measured in ability to implement, amount of rework and cost-effectiveness.

Enhanced ability to finalize design packages (error free).

Decrease in long-standing/open issues.

Improvement in teamwork, Better alignment between organizations with corporate expectations and goals provides focus for prioritizing work.

Page 24

Engineering focus changes from internally defined measures of. success to measures that are directly measured in improved Plant performance, more effective maintenance and better Operations staff support.

Reduced maintenance costs and reduced operator burden.

Establishment and tracking of performance indicators will enhance directorate knowledge and ability to communicate performance level.

Measurement Standanfs: 3.2.1.a Reduction in work inventory age.

3.2.1.b Timeliness of engineering responses - turnaround time.

3.2.1.c Total design project costs defined in terms of engineering labor, implementation labor and capital costs within estimates.

3.2.1.d Planning and schedule effectiveness (i.e., completing work on schedule).

3;2.1.e Individual system performance - monitor total Plant costs, Plant efficiency, and total megawatts produced.

3.2.l.f Number of operator workarounds.

3.2.1.g Number of Control Room deficiencies.

3.2.1.h Total maintenance manhours expended on system maintenance.

3.2.1.i Total dose received.

Page 25

3.3 PROBLEM IDEN'HFICATION AND RESOLUTION 3.3.1 Identify and resolve operationally significant issues in a timely manner consistent with the corporate goals of continued safe Plant operation, improved reliability; and cost effectiveness.

InitiMves: 3.3.1.A Increase and optimize staffing - See 3.1.1.C.

3.3.1.B Provide in-depth training to Engineering staff - see 3.1.1.D.

3.3.1.C Prioritize work and eliminate low priority discretionary items - see 3.1.1.B and 3.2.1.B.

3.3.1.D Strengthen management expectations for System Engineers to appropriately identify and categorize system weaknesses for resolution.

The following information sources will be used to aid the System Engineers in identifying weaknesses: 9/15/95.

~ PER Generation

~ Operating Event Reports

~ Work Orders utilization

.~ Work History File utilization

~ Risk significant component identification

~ Operations and Maintenance (customer) feedback 3.3.1.E Develop and implement system report card assessing key system reliability characteristics. 12/30/95.

3.3.1.F Reassess process for ensuring industry experience is reflected in system reliability, availability, and operability decisions - See section 1.1.2.

3.3.1.H Establish-management expectations among Operations, Maintenance and Engineering that defines the System Engineer as the focal point for system problem resolution. Include emphasis on immediate notification of System Engineers on any significant issues associated with their systems. 12/31/95.

Erpected.'esults:

Decrease in long-standing/open issues.

Improved quality and timely completion of safety significant issues.

Better and more timely support to Plant operations and maintenance.

Page 26

Improved cost-effectiveness and reliability of systems as measured by objective criteria.

Establishment of a proactive approach to ensure industry experience is factored into maintaining safe, reliable, and cost effective system operations.

Measurement Standards: 3.3.1.a Timeliness of closure of corrective actions on significant PERs.

3.3.1.b Reduce work order inventory age.

3.3.1.c System report card - reflects key indicators on a system by system basis (e.g., Maintenance Rule criteria (risk significant actions), work order inventory age, PERs, overdue PTL items, failed tests, operator work-around, component performance).

3.3.1.d Results obtained from OER selective re-review effort (i.e., assessment of quality of reviews performed).

3;3.1.e System availability.

3.3.1.f Equivalent system availability.

Page,27

3.4 & 3.5 UNDERSTANDING DESIGN AND QUALITYOF ENGINEERING WORK Objective:t 3.4.1 Maintain an Engineering organization that has the appropriate qualifications, education, training and tools to successfully meet the corporate goals of safe, reliable and cost-effective Plant operation.

Initiatives: '3.4.1.A Optimize and staff the System Engineering group with highly qualified engineering personnel - see 3.1.1.C.

3.4.1.B Provide in-depth training to Engineering staff - see 3.1.1.D.

3.4.1.C Re-engineer design change process to simplify procedures, making the cognizant Engineer accountable for a larger scope of the design inter-relationships (i.e., minimize special reviews performed by experts).

2/5/96.

3.4.1.D Improve interorganizational process interfaces by establishing clearly defined roles and responsibilities - see 3.2.1.C.

Expected Results: Minimize errors associated with misunderstanding Plant interactions when implementing Plant design changes or performing post-modification or -maintenance testing or special test procedures.

Enhance engineering safety perspective through a better understanding of how changes in Plant conditions and systems can affect Plant accident response.

Improve the quality of operability assessments performed on degraded Plant systems, components and structures.

Measurement Standard: Number of PER/LER/NOVs issued against system-related design implementation, post-maintenance testing and special test activities.

Page 28

3.6 PROGRAMS AND PROCEDURE Ensure that Engineering programs are closely coupled with the System

~ ~

Objectives: 3.5.1

~ ~

Engineer group such that the System Engineer is provided with the necessary tools and data to properly assess the health of the Plant systems.

Maintain Engineering processes that provide high quality, efficient and responsive design products to maintain system health and support Plant operational needs.

InMatives: 3.5.1.A Review current program charters and realign, ifnecessary, to ensure that direct communication links are established with the System Engineers for data related to their system. 1/31/96.

3.5.1.B Revise and streamline the design change process - see 3.4.1.C.

3.5.1.C Complete development of Maintenance Rule Program - see 7.1.1.F.

Expected Results: .

Better use of programs to support System Engineers in maintaining their systems in a safe, reliable and cost-effective manner.

Improved support and timeliness of Engineering products required to support Plant operations.

Better Engineering versatility in addressing problems.

Measurement Standards: 3.5.1.a Performance indicators as defined on system report cards.

3.5.1.b Timeliness of Engineering designs and implementation in the Plant.

Page 29

PERFORMANCE IMPROVEMENT AREAS MAINTENANCE 4.0

~ Overall: perlormanco ls avorago MAINTENANCE 4.1 OLIECTIVE SAFETY FOCUS ~ Continual personnel errors Indicate safety focus Is weak 41 .1 4.1 .2 82.1 OBJECTIVE MAIJAGEMENT INVOLVEMENT:

~ Increased supervisory field prosonco has been Ineffoctual 42.1 In reducing porsonnol errors

~ Supervisory porfcrmance level noods Improvement 4&t T.t.f

~ Need cantlnuod managomont emphasis on prccodural complhnco 42.1 6 neod to perform error. froo work 62.1 43A OBJECTIVE PROBLEM IDENTIFCATION ~ Prcbleln'Identlflcatlcn Is untimely and weak 4AIL1 4DB OBJECTIVE PROBLEM RESOLUTION' ~ Corroctlvo actions have nct boon offectlve In ellmlnatlng 4DB.1 procedural ncncomplhrnco 8 porsonnol errors 4.4 OBJECTIVE (PLANTI MATERIAL

~ Management'e goals for tho age of work ardors, number of 4.*1 CONDITION backlogged work orders d tknoly ccmplotlon of PM's havo nct been met

~ Post.malntenanco testing ls woak 44.1

~ Procedural norPccm plhrnco has nct been olknlnated 4&t OBJECTIVE QUAUTYOF MAINTENANCE ~ Personnel errors 5 procedural nclPcompllanco continue to occur 42.1 WORK 4$ .1 82.1

~

Foreign matorfal exclusion In both drywoll 6 wotwog Is weak 4.6.1 4.8 OBJECTIVE PROGRAMS ta PROCEDURES ~ Procoduro upgrado effort slow to completo 4.8.1

~ Work orders havo boon rovlsod without O.C. rovlew 4&1

~ Review of backlogged work requests has bosn untimely 4A.f EI CXCCPttCNAL PCRFCRMANCC ~

~w AVCRAaC PCRFORMANCC ~ Msauuu PCRFCRMANCC

MAINTENANCE 4.1 SAFETY FOCUS Objective: 4.1.1 Improve the industrial safety consciousness and industrial safety performance of personnel involved in performing Maintenance activities.

Initiatives: 4.1 1.A

~ Continue monthly trending and evaluation of lost time and recordable accidents for Maintenance personnel by maintenance management.

Ongoing.

4.1.1.B Continue conducting routine safety meetings aimed at dealing with industrial safety issues for Maintenance personnel. Ongoing.

4.1.1.C Continue monthly trending of errors by Maintenance personnel for management evaluation and action. Current trending shows continued improvement in both the number and significance of errors by Maintenance personnel. Ongoing.

4.1.1.D Evaluate the need for additional management actions (such as training, procedure revisions, establishing new management expectations, etc.) and implement them as needed based on performance. 10/15/95.

Erpected Result: A sustained reduction in the number of lost time and recordable accidents.

Measurement Standard: Representation of lost time and recordable accident trends and personnel. error trends for Maintenance personnel.

Objective: 4.1.2 Ensure decisions regarding the prioritization, scheduling, and implementation of maintenance activities (including the removal of Plant systems from service) are conservative from a nuclear safety perspective.

InMatives: 4.1.2.A Continue SRO review and involvement in the assignment of priorities for corrective maintenance activities. Ongoing.

Page 30

4.1.2.B Continue evaluating the removal of safety systems from service using a probabalistic safety assessment and tracking of safety system out-of-service times to ensure conservatism regarding safety system availability.

Ongoing.

Zrp ected Result: Conservatively maintaining safety system availability and reliability consistent with the probabalistic safety assessment.

Measurement Standard: Routine tracking and evaluation of safety system availability and reliability.

Page 31

4.2 MANAGElVHWTINVOLVEMENT 4.2.1 Maintain a low personnel error rate (including cases of procedure non-compliance) by Maintenance personnel.

InMatives: 4.2.1.A Increase the Maintenance management perspective of craft supervisors by including craft supervisors in periodic meetings. This should be. aimed at systematically communicating Maintenance management:expectations and perspective in the areas of procedure compliance and craft supervisor performance expectations. These meetings will begin no later than 9/15/95 and continue for as long as needed to accomplish their purpose.

Ongoing.

4.2.1.B Review current Maintenance management practices (including the Maintenance Observation Program) for evaluating and improving the effectiveness of Maintenance craft supervisors and implement corrective actions as needed. 10/1/95.

4.2.1.C Continue monthly trending of Maintenance personnel error rate and the number of Maintenance personnel errors per month for Maintenance management evaluation and action. Ongoing.

Expected Results: Improved understanding and embracing of Maintenance management expectations I regarding craft supervisor performance expectations by craft supervisors.

A sustained reduction in the number and significance of human performance errors and procedure non-compliances for Maintenance personnel.

Measurement Standard: Monthly trending of human performance errors (inclusive of procedure non-compliance events) for Maintenance personnel.

Page 32

4.3A PROBLEM IDENTIFICATION I

Continued proactive problem identification by personnel involved in

~

Objective:t 4.3A.1 maintenance activities.

Initiative: 4.3A.1.A Review with Maintenance staff and supervisory personnel Maintenance manager's expectations regarding identification and implementation of corrective actions. 9/15/95.

4.3A.1.B Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator. for trending "rework" as a quality measure. 9/15/95.

4.3A.1.C Corrective actions associated with LER 94-019-00, Gasket Missing From Main Control Room Air Handle WMA-AH-51B Preclude Associated Emergency Fan WMA-FN-54B From Sufficiently Pressurizing The Control Room, have been implemented to deal with the issue of inadequate problem identification surrounding the Control Room HVAC system. Completed.

Expected Results: Timely and accurate identification of problems associated with maintenance activities and Plant equipment.

A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.

Measurement Standanf: System reliability, number of operator workarounds, unplanned reactor trips, management observation.

Page 33

4.3B PROBLEM RESOLUTION I

Strengthen Maintenance management's effectiveness in monitoring for

~

Objective:t 4.3B.1 and evaluating opportunities to improve the effectiveness of corrective actions and equipment repairs.

Iriitiative: 4.3B.1.A Continue monthly trending of maintenance performance indicators such as trouble/breakdown work order inventory, work order inventory age, the number of Control Room deficiencies, the number of late preventive maintenance tasks and technical specification surveillance tests, personnel errors, schedule effectiveness, and personnel safety performance for management evaluation and action. Ongoing.

4.3B.1.B Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending "rework" as.a quality measure. 9/15/95.

4.3B.1.C Continue monthly trending and management review of late corrective actions associated with PERs and regulatory commitments. Ongoing.

4.3B.1.D Review Maintenance manager's expectations regarding identification and implementation of corrective actions with Maintenance staff and supervisory personnel. 9/15/95.

4.3B.1.E Continued participation by the Maintenance Manager in the PER Review Meetings. Ongoing.

Expected Result: A sustained decrease in the number of repeat events/recurring problems associated with Plant equipment and performance of the Maintenance organization.

Measurement Standard: Track key word search "hits" that identify newly written PERs as repeat events.

Page 34

4.4 PLANT MATEMALCONDITION Objective: 4.4.1 Sustain a material condition for Plant components and systems which results in high levels of system availability and reliability and a low Plant heat rate.

Initiatives: 4.4.1.A Continue monthly trending of performance indicators associated with Plant material condition relative to established goals such as work order inventory, work order inventory age, the number of Control Room deficiencies, and the number of late preventive maintenance tasks for management evaluation and action. Current trending shows an overall positive improvement for these indicators. Ongoing.

4.4.1.B Institute system engineer reviews of corrective maintenance work orders for safety-related, quality class 1 equipment to verify the adequacy of testing activities intended to ensure the equipment is operable prior to its return to service. 9/30/95.

Expected Result: Sustained high levels of system availability and reliability, a continued low Plant heat rate, and meeting goals associated with Plant material conditions.

Measurement Standanf: Graphical trends of system availability and reliability, Plant heat rate, and material condition performance indicators.

Page 35

4.5 QUALIIYOF MAINTENANCEWORK Objective:t 4.5.1 Sustain a high level of performance regarding the quality of maintenance work performed.-

InMatives: 4.5.1.A Further enhance the monthly maintenance performance indicators by implementing a maintenance performance indicator for trending "rework" as a quality measure. 9/15/95.

4.5.1.B Continue monthly trending of maintenance performance in the areas of preventive maintenance and technical specification surveillance testing for Maintenance management evaluation and action. Ongoing.

Continue monthly trending of errors by Maintenance personnel for management evaluation and action. Current trending shows improvement in both the number and significance of errors by Maintenance personnel.

Ongoing.

4.5.1.D Train appropriate personnel on the requirements and implementation activities associated with foreign material exclusion requirements.

1/15/96.

4.5.1.E Continue scheduled, routine training of Maintenance personnel.

Ongoing.

Erp ected Result: Continued improved performance regarding the quality of maintenance work performed, continued reduction in the error rate by Maintenance personnel, and a minimization in the number of events involving inadequate foreign material controls.

Measurement Standard: Graphical representation of maintenance rework, Maintenance personnel error rate, preventive maintenance, performance, and a reduction in the number of events involving inadequate foreign material exclusion, using a PER measure.

Page 36

4.6 PROGRAMS AND PROCEDURES

<gg Objective: 4.6.1 Provide technically accurate and usable maintenance procedures that can be used, as written, by Maintenance personnel in the field.

InMatives: 4.6.1.A Continue monthly progress trending of the maintenance procedure upgrade effort for management evaluation and action. Ongoing.

4.6.1.B Complete a re-evaluation of the current time table and scope of the maintenance procedure upgrade effort from a value added, cost-effectiveness and regulatory commitment standpoint. 10/15/95.

Expected Result: Based on the re-evaluation, either continue the current or revised maintenance procedures upgrade effort on the existing or revised schedule, or discontinue the maintenance procedure upgrade effort.

Measurement Standard: Graphical, monthly trending of maintenance procedure upgrade completions.

Page 37

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0

~ Overall: porformanco ls average PLANT SUPPORT 6.1 OBJECTIVE SAFETY FOCUS MANAGEMENT

~ Quality assuranco area needs Increased management Involvoment RSA.1 52A2.

INVOLVEMENT OBJECTIVE ROBLEM ~ PER process kr cumbersome 4 Inconsistently used 0~

IDENTIFICATION ~ PER trending program lacks moaning to management BLEM RESO N SPA OBJECTlVE bU)LIIYOF Q ALITY ~ Problem rosolutlcn neods Improvement ASSURANCE

~ Uso of slop work order authority has boon underutlllzod SDA2

~ Need to bo moro crltlcal 5 aggrosslvo w/emphasis on SDA.I prcblom rosclutlon SPA.2 6.38 PREPAREDNESS'BJECTIVE QUALITYOF, EMERGENCY SAC OBJECTIVE, bUALIIYOF FIRE ~ Technical Rro Issues, thormolag and fire barrier soal Installation 7.5.1 PROTECTION exists

~ Fire Extinguisher Ins Factions and untroatod wood In protected Comploto area wore noted as prcblom areas.

OBJECTIVE QUALITYOF SECURITY

~ Porlormanco has boon woak 6.3D.1 6.3OA

~ Noed to ollmlnate sonso cf complacency to stop docllno SAD.1 In porlcrmance 63DA OBJECTIVE 0vALITYOF ~ Radlatlcn exposuro tor both routine 4 outage actlvtgos too high SAE.1 HE Ab PHYSIC

~ Scurco term roductlon efforts lag behind Industry avorago SM.1

~ Personnol vlchtlcns aro oxcosslvo SDE2 SA.I

~ Apparent nogatlvo trond of porscnal contarnlnatlcn events SAR.3 SA OBJECTIVE PR RAMSA SNAB PROCEDURES

~ Procedural adhoronco contlnuos as a slgnltlcant prcblom SABA SAE2 axcaenoNAL eanrorurANca

~w AVEAAOK aanrorarANca E pcarorurANCK 0604704AAO AAY25, 100$

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0

~ Overall: performance ls average PLANT SUPPORT 5.3A OBJECTIVE EQUALITY OF ai7AUTV ~ Problem resolution needs Improvement 6.3A.1 ASSURANCE

~ Use of stop work order authority has been underutlllzed 6.3A.2

~ Need to be more critical %aggressive wl emphasIs on 6.3A.1 problem resolution 6.3A.2 OQH704.0A JUNE 1N$

QUALI1YASSURANCE 5.3A QUALITYASSURANCE Objective: 5.3A.1 Attain a higher level of quality involvement and line management buy-in on issue resolution, human performance, procedural adherence, and the effectiveness of corrective action programs.

Initiatives: 5.3A.1.A On 6/20/95 the Quality Directorate began a 100% review of 'all PERS at the disposition and closure phase. This review focuses on the adequacy and completion of the corrective actions. Inadequate corrective actions are communicated to the appropriate line organization both verbally and in writing. This initiative will continue for a six-month period at which time it will be reevaluated. Ongoing.

5;3A.1.B Quarterly, Functional Area Engineers will meet with line management to determine the needs of the line organization as well as obtain an assessment of the performance of the Quality organization in supporting those needs. Ongoing.

5.3A.l.c Each Quality Directorate Manager will rotate two individuals from the Quality Directorate per fiscal year. This applies to both inter- and intra-organizational rotations. Rotations for Operations personnel into the Quality Directorate to commence by October 1995. Ongoing.

5.3A.1.D The Line organization will participate as Audit Team Members in 50 percent of FY96 Quality audits. Ongoing.

5.3A.1.E Outside utilities'ersonnel will participate as Audit Team Members in 50 percent of FY96 Quality audits. Ongoing.

5.3A.1.F Functional Area Engineers will use Quality Control inspectors in a "Coordinated Approach" to Plant walk-downs. Ongoing.

5.3A.1.G Development and implementation of a training program for the Quality Directorate. The focus of this program will be on auditor performance and licensing basis requirements. Ongoing.

5.3A.1.H Implement a shop-peer inspection program. This willinvolve a reduction in QC hold points and training of craft personnel on how'to perform peer inspections. Ongoing.

Page 38

, Expected Results: Effective communication between the line organization and the Quality staff should improve. An additional benefit is the expected alignment of goals for Quality and the line organizations.

A thorough review of all PERs at disposition and closure should foster a consistent and improved standard on the quality and effectiveness of the corrective action process.

Through rotation of personnel, Quality staff will gain an appreciation for the performance requirements of the line organization and line organizations will gain an increased awareness for the license-based requirements of their activities.

Increased awareness of the Quality staff on the problems, issues, workarounds, and failures in the Plant. The resource of Quality Control has not been fully utilized for its unique perspective. This endeavor should transfer Plant awareness to all organizations.

Improve Craft personnel responsibility for delivering a quality product through involvement and exposure to PEER inspection.

Measurement Standards: 5.3A.l.a The Quality Directorate will track and report on the number and the specifics of returned PERS as a result of the Corrective Action Review Board and Quality Directorate review efforts.

.5.3A.l.b Every quarter, the frequency of the Functional Area Engineer's-meeting with the line organization will be reviewed and reported in the Quality Directorate Quarterly Report.

5.3A.l.c Organizational rotations will be reviewed and in the Directorate Quarterly Report.

5.3A.l.d Line organization participation on audit teams will be reviewed and reported in the Quality Directorate Quarterly Report. on this goal.

5.3A.l.e Report frequency and value achieved using the Quality/QC coordinated approach will be reviewed and the administrative staff will track and generate a quarterly report for the Director's review.

Objective: 5.3A.2 The Quality Organization will focus their resources on, timely and effective intervention dealing with issues having an impact on human performance, station safety and a reduction in repeat problems.

Page 39

Initiatives: 5.3A.2.A Quality Directorate Audits and Surveillances will have reports'generated within seven working days of the exit. Ongoing.

5.3A.2.B Quarterly, Functional Area Engineers will meet with the line management to determine the needs of the organization as, well as the performance of the Quality organization in supporting those needs.

Ongoing.

5.3A.2.C Use the Critical Attribute Database to ensure a thorough and comprehensive coverage of the Functional Areas. Focusing on the fundamental aspects of the department's scope. Ongoing.

5.3A.2.D Track the use of the "Stop Work" order by the Quality Directorate. This applies to both the formal and the consensus "Stop Work" order.

Ongoing.

5.3A.2.E Functional Area Engineers will use Quality Control inspectors in a "Coordinated Approach" to Plant walk-downs. Ongoing.

Expected Results: With Audit and Surveillance Reports in the customer's hands within seven (7) working days of the exit, the value and applicability of the information to line management should be enhanced.

Effective communication between the customer organization and the Quality staff should improve. The additional benefit is providing a clear focus for both organizations on the areas requiring improvement.

.Aggressive and appropriate use of the "Stop Work" tool should increase the effectiveness of the Quality Directorate in raising the standard of human performance and procedural compliance, The focus of the line organizations and Quality Directorate should be on the same issues to identify potential and repetitive problems to management.

Increased awareness of the Quality staff of the problems, issues, workarounds, and failures in the Plant. The resource of Quality Control has not been fully utilized for its unique perspective. This endeavor should transfer the unique perspective Quality Control has on Plant activities to all organizations via Quality Directorate products.

Measurement Standards: 5.3A.2.a The achievement of timely reports will be reviewed. The Quality-Directorate will track this parameter.

5.3A.2.b Information from the Functional Areas Engineers meeting with the respective departments will be reported in the Quarterly Quality Directorate report.

Page 40

5.3A.2.c Every six months, the scheduled due dates for the Critical Attributes Database will be queried to establish the percent completed.

5.3A.2.d The number and value added for the Stop Work Order will be reviewed.

A log will be maintained by the directorate secretary and reported in the Quarterly Quality Directorate Report.

Page 4I

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 5.0 0 Overall: performance Is average PLANT SUPPORT 5.3B PREPAREDNESS,'BJECTIVE

.,QUALITY'OF EMERGENCY 050075.aas JUNE 1005

EMERGENCY PREPAREDNESS 5.3B FMERGENCY PLAN AND IMPLIMENI'INGPROCEDUEU<B Objective: 5.3B.1 Maintain and verify the current level of the Emergency Plan and Implementing Procedures.

Initiatives: 5-.3B.1.A Train Emergency Response Organization to the new plan and procedures.

Completed.

5.3B.1.B Develop training for NUMARC-Emergency Action Levels. Completed.

5.3B.1.C Complete WNP-2 Accountability Drill. Completed.

5.3B.1.D Complete Preparedness Drill for 10/95 Exercise. 9/95.

5.3B.1.E Conduct 10/95 Exercise. 10/95.

5.3B.1.F Develop procedures and training for severe accident management. 1/97.

Expected Result: Successful evaluations during 8/95 NRC Inspection and 10/95 Exercise.

Measurement Standard: No major areas of concern revealed during 8/95 NRC Inspection and 10/95 Exercise.

Objective: 5.3B.2 Maintain Emergency Response Facilities and Equipment.

Initiatives: 5.3B.2.A Develop Emergency Response Facilities and Equipment Checklist.

Completed.

5.3B.2.B Develop Emergency Planning Position Papers. 12/95.

Expected Result: All emergency response centers and equipment maintained in a constant state of readmess.

Page 42

Measurement Standard: No identified areas of concern noted during weekly walkdown of emergency response centers.

Objective: 5.3B.3 Develop Departmental Guidelines and Policies by 12/31/95 that clearly identify functions of Emergency Planning Organization.

Initiatives: 5.3B.3.A Develop instructional manual for drills and exercises. Completed.

5.3B.3.B Develop reference materials for various Emergency Planning roles and responsibilities. 12/95.

5.3B.3.C Develop six-year planning schedule. 8/95.

Expected Result: Enhance the department's ability to maintain a high quality, effective Emergency Response Organization.

Measurement Standard: Reduce the number of findings from Quality audits, NRC Inspections and FEMA Reviews.

Objective: 5.3B.4 Develop a Program Impro'vement Plan with State, Counties, and EFSEC by June 1996 to achieve program efficiencies.

Initiatives: 5.3B.4.A Conduct benchmarking with selected counties, states, and utilities.

Completed.

5.3B.4.B Use information obtained from bench marking to identify work efficiencies. 12/95.

5.3B.4.C Implement work efficiencies to achieve reduction in program costs without affecting quality. 6/96.

Expected Result: Achieve off-site cost savings.

Measurement Standard: Reduced expenditure for off-site emergency preparedness.

Page 43

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0

~ Overall: performance Is average PLANT SUPPORT 6.3C OBJECTIVE bUALITYOF

%RE ~ Technical Fire Issues, thermolag and fire barrier seal 7.6.1 PROTEC I'ION Installation exists

~ Rre Extinguisher Inspections and untreated wood In protected Complete area were noted as problem areas.

0504754.5C JULY 25, 1005

FIRE PROTECTION 5.3C FIRE PROTECTION Objective: 5.3C.1 Complete fire protection projects relating to thermo-lag, fire-rated penetration seals, and safe shutdown (Appendix -R) procedures.

Initiatives: 5.3C.1.A Establish projects to address fire protection issues. Complete.

5.3C.1.B Complete plant modifications necessary to resolve safe shutdown fire barrier issues without reliance on thermo-lag. Spring 1999.

5.3C.1.C Complete walkdown of essential fire penetration seals. 12/97.

5:3C.1.D Revise safe shutdown analysis to incorporate necessary changes.

Completed.

Expected Result: Resolve fire protection deficiencies.

Measurement Standard: Completion of initiatives in accordance with established schedules.

Page 44

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0

~ Overall: performance Is average PLANT SUPPORT 6.3D OBJECTIVE QUALITYOF SECURITY

~ Some examples of poor performance Identified. 6.3D.1 6.3D.4

~ Need to Implement programs to remove complacency and Improve 6.3D.1 performance 5.3D.4 050l746.0 D JVLY 19. 1005

SEC URIZY 5.3D SECUMTY Objective:,5.3D.1 Eliminate complacency and improve human performance.

InMatives: 5.3D.1.A Ensure Security Procedure compliance through the following initiatives:

~ Develop and implement in-house compliance audits using representatives from all Security departments. Development completed 2/95; Implementation Ongoing.

~ Gain Security Officer feedback on procedure reviews, concerns, and suggestions. 12/1/95.

~ Consolidate the number of Security procedures. Ongoing.

~ Continue to communicate management expectations for procedural compliance. Ongoing.

5.3D.1.B Relieve boredom which contributes to complacency by adding duties relating to proper housekeeping and safety focus to ensure officers remain in a higher state of readiness. Ongoing.

Expected Result: Continuation of improvement in performance which has been observed since completion of Mid-Cycle Assessment.

Measurement Standard: Graphical representation of human performance errors against an established goal.

Obj ective: 5.3D.2 Optimize Security performance by using state-of-the-art equipment.

InNatives: 5.3D.2.A Install Hand Geometry at protected area entry turnstiles to allow employees to gain efficiencies. 11/95.

5.3D.2.B Relocate the EOFCC and related equipment to the Alternate Access Point Badge Issue Station as part of the equipment upgrade. 11/95.

Page 45

Expected Result: Reduction in badging errors.

Measurement Standard: Badging error rate.

Objective: 5.3D.3 Increase availability and reliability of Security equipment.

InMatives: 5.3D.3.A Increase assessment of Alarm Station Operator (ASO) performance and increase operator assessment ability of Security equipment.

Implemented 4/5/95.

~ Repair or replace 17" alarm monitors to improve picture resolution.

Completed.

~ Train CAS operators on method to use the camera "template" for assessment purposes and methods for adjusting monitors. 9/1/95.

5.3D.3.B Reduce excessive alarm rates on vital area doors. 12/19/95.

~ Implementation of multiple employee entries through card-reader doors. Ongoing.

~ Issue informational articles to Plant employees stating expectations for door closures. Ongoing.

~ Continue to develop and trend door alarm rates, gathering more detail data for an in-depth analysis to determine ifthere is a maintenance or human error problem. 12/95.

Expected Result: Reduction in Security Systems'quipment failures.

Measurement Standard: Graphical representation of equipment failures against an established goal.

Objective: 5.3D.4 Strengthen the FFD & CBO programs.

InMatives: 5.3D.4.A Maintain existing quality of work, pride, and skill of FFD staff.

'Upgrade equipment, incorporate DOT FFD program. Streamline FFD outage processing. Ongoing.

5.3D.4.B Increase employee awareness and understanding of the Supply System's Continued Behavioral Observation Program. Ongoing.

Page 46

Expected Result: Maintain a drug-free and professional work force.

Measurement Standard: Graphical representation of FFD testing results.

Objective: 5.3D.S Maintain high level of readiness.

InMatives: 5.3D.S.A Benchmark other Security training and Security Force organizations.

Ongoing.

5.3D.5.8 Participate in peer self-assessments of the FFD/CBO and Security Programs. Ongoing.

5.3D.S.C Prepare for Operational Safeguards Response Evaluation {OSRE).

Scheduled by NRC.

Expected Result: An acceptable and working OSRE plan and increased Security Force efficiency.

Measurement Standardt List of on-going/planned activities.

Page 47

PERFORMANCE IMPROVEMENT AREAS PLANT SUPPORT 6.0

~ Overall: performance ls average PLANT SUPPORT 6.3E OB JECTIVE 0 ALITYOF HEAb

~ Radiation exposure for both routine b. outage activities too high 6.3E.1 PHYSIC ~ Source term reduction efforts lag behInd Industry average 6.3E.1

~ Personnel vlolatlons are excessive 6.3E.2 6.4.1

~ Apparent negative trend of personnel contamlnatlon events 62E.3 0504764.$ E JUNE 1&OS

HEALTH PHYSICS 5.3E HEALTH PHYSICS Objective: 5.3E.1 Reduce personnel radiation exposure to a level consistent with comparable Boiling Water Reactors.

InMatives: 5.3E.1.A Implement WNP-2 Business Plan (SOT2) concerning reduction of occupational and collective personnel radiation exposure. Ongoing.

5:3E.1.B Improve and continue the plan for flushing high radiation dose rate components to remove contaminants causing increased dose rates.

Ongoing.

5.3E.l.c Identify high radiation dose rate contributors (e.g., turbine blades),

evaluate for modification or removal and develop plans for implementation of modification in order to achieve lower dose rates.

Identification - by 9/96; Evaluation and Development - Ongoing.

(Piping, which was causing elevated dose rates in the Reactor Water Cleanup Holdup Pump Room, was removed in July 1995.)

5.3E.1.D Continue the plan for shielding components as evaluations deem appropriate. Ongoing.

5.3E.1.E Continue the publication of the status of departmental dose accumulation and dose budget comparisons in the Plant newsletter. Ongoing.

5.3E.1.F Implement an incentive compensation plan based upon an ALARAgoal.

Completed.

Expected Result: Reduction of collective and occupational personnel radiation exposure.

Measurement Standards: 5.3E.l.a Annual dose accumulation and ranking on INPO quartiles.

5.3E.l.b Departments assessed based on monthly, outage and annual dose accumulation.

5.3E.l.c Results from standardized radiation survey points.

t t Objective: 5.3E.2 Continue to foster an environment which encourages adherence to radiological requirements.

Page 48

InMatives: 5.3E.2.A Develop Advance Radiation Worker Training including practical exercise using the maintenance training skid and concurrent training of craft workers and health physics technicians. 1/96.

5.3E.2.B Add industry events to include personnel violations of radiological requirements at WNP-2 to General Employee Training. Ongoing.

5.3E.2.C Develop and communicate management expectations for worker accountability in radiological environments including work group supervisor accountability on all shifts. 10/95.

5.3E.2.D Enhance the RWP/ALARA planning process to improve exposure controls and provide improved information to workers. 9/95.

Expected Result: Reduction in personnel violations of radiological requirements.

Measurement Standard: The measurement standard will be a reduction in personnel violations of, radiological requirements which result in PERs as compared to the total number of PERs written.

Objective: 5.3E.3 Ensure proper emphasis on personnel contamination events.

5.3E.3.A Develop criteria which indicates a significant personnel contamination event. 11/95.

5.3E.3.B Implement trending program using criteria for significant personnel contamination event. 1/96.

5.3E.3.C Use information from trending program to develop baseline and inform management. Ongoing.

Expected Result: Reduction in personnel contamination events trended and investigated.

Measurement Standard: The measurement standard will be determined as part of the development of the personnel contamination event program.

Page 49

PERFORMANCE IMPROVEMENT AREAS TRAINING 6.0 TRAINING 6.1 OBJECTIVE OPERATIONS TRAINING ~ Continue training that Improves and enhances oporator 6.1.1 porforma neo.

~ Enhance knowledge of plant operations and impact on 6.14 operator performance 6.2 OBJECTIVE MAINTENANCE TRAINING ~ Foster training environment emphasizing proper safety focus 6.2.1 6.3 OBJECTIVE ENGINEERING SUPPORT ~ Ensure undorstandlng of Plant Systems and Operations 6.3.1 TRAINING 6.4 CHEMISTRY OBJECTIVE AND HP TECHNICIAN ~ Enhance and improvo chemistry and health technician 6.4.1 TRAINING performs neo.

EXCEPTIONAL PERFORMANCE W AVERAGE PERFORMANCE MINIMUM PERFORMANCE ~

~B ADDED BY SUPPLY SYSTEM 0000704.0.0 JULY 10. 1005

TRAINING 6.1 OPERATIONS TRAINING Objective: 6.1.1 Continue to provide quality training that is specifically .designed to enhance and improve operator performance in the Plant.

Initiatives: 6.1.1.A Continue development and integration of the following performance issues and attributes into licensed and non-licensed operator training materials and simulator scenarios: Ongoing.

~ Attention to detail

~ Conservative decision-making

~ Problem resolution and a questioning attitude

~ Self-checking

~ Component tagging practices

~ Technical specification case studies

~ Pre-evolution or pre-job briefs

~ Understanding design bases

~ Line management expectations

~ Procedural adherence

~ Three-way communication 6.1.1.B Continue implementation of these performance attributes in classroom and simulator training sessions. As an example, in the present training cycle (95-4), Operations Training is re-emphasizing conservative decision-making and problem resolution during simulator scenarios which are based on Abnormal Operations. Self-checking is being evaluated by instructors and Operations Managers/Supervisors using Job Performance Measures (JPM) training in the simulator and the formal communications policy is being reviewed in the classroom as well as in the Plant simulator. Ongoing.

Page'0

6.1.1.C Continuously evaluate ways to further enhance operator training programs, maintaining a "focus" on improved Plant and operator performance. Use Training Advisory Group (TAG) meetings to ensure Training alignment with Operations line management expectations and needs. Ongoing.

Expected Result: Increased emphasis on good performance attributes and management expectations in operator training will result in improved operator performance and reduced error rate.

Measurement Standard: Operations Training will use the Operations line management measurement standards as indicators of success.

Objective: 6.1.2 Enhance knowledge of Supply System managers, supervisors, and key staff to enable them to have a better operational understanding of how the discharge of their responsibilities impact Plant operations and operator perform ailce.

InMatives: 6.1.2.A Continue presentation of the 13-week Management Certification training course into the foreseeable future to ensure that critical managers and supervisors receive this important training. Ongoing.

6.1.2.B Involve Plant personnel from Operations, Maintenance, Technical Services and Engineering into this program as augmentation for the instructional staff in future management certification classes. 9/30/95.

6.1.2.C Evaluate increasing the student population of this class to effectively train and certify more people per unit of time. 10/I/95.

Expected Result: Providing SRO level training to managers, supervisors, and key staff will enable them to have a better operational understanding of the impact of their responsibilities on safe and efficient Plant operations.

Measurement Standard: Operations Training will use the Operations line management measurement standards as indicators of success.

Page 51

6.2

~ MAINTF22fANCETRAINING

~ ~

Objective: 6.2.1

~ ~ Foster a training environment that emphasizes proper safety. focus.

'Initiative: 6.2.1.A Reinforce management expectations when conducting training and evaluating performance by targeting the following attributes: Ongoing.

~ Procedural adherence

~ Stop, Think, Act, Review (STAR)

~ Work practices (e.g., attention to detail and conservative decision-making)

~ Industrial/Radiological safety All Maintenance personnel have been through one cycle of this training.

A second cycle with emphasis on these attributes will be completed by 4/96.

Expected Result: Reduction in performance errors.

Measurement Standard: Maintenance Training will use the Maintenance line management measurement standards as indicators of success.

Page 52

6.3 ENGINEERING SUPPORT TRAINING Objective: 6.3.1 Ensure technical and engineering professionals possess a broad scope understanding of Plant systems and operations.

InMatives: 6.3.1.A Augment the Engineering Support Staff Training (ESST) Program participant population. This initiative is presently in progress and will be completed by 6/96.

6.3.1.B Institute training within the ESST Program to enhance the technical capabilities of the technical and engineering professionals on staff. This program will be in place by 1/97.

Expected Results: Reduction in occurrences attributable to lack of understanding of the potential impact of engineering activities on Plant operations.

Compliance with regulatory and procedural guidance.

Measurement Standards: 6.3.1.a ESST-training will use the Engineering line organization measurement standards as indicators of success.

6.3.1.b Fewer issues surfacing in POC reviews of change documents.

6.3.1.c Reduction in PERs related to engineering activities.

6.3.1.d Fewer inadequate Corrective Actions involving engineering activities.

Page 53

6 .4 CHEMISTRY TECHNICIAN AND HEALTH PHYSICS TECHNICIAN TRAINING Objective: 6.4.1 Continue to provide quality training that is specifically designed to enhance and improve chemistry technician and health physics technician performance in the Plant.

InMatives: 6.4.1.A Continue to provide continuing training based on identified needs such as PERs, LERs, in-house operating events and industry events.

Ongoing.

6.4.1.B Continue to stress self-checking, procedure adherence, communications, questioning attitudes and conservative decision-making in all phases of training. Ongoing.

6.4.1.C Continue to use line management as subject matter experts (SME) during training to reinforce management's expectations for performance.

Ongoing.

Expected Result: Improved job performance.

Measurement Standard: Chemistry and Health Physics Training Group will use the line organizations measurement standards as indicators of success.

'I Page 54

PERFORMANCE IMPROVEMENT AREAS ADDITIONALIMPROVEMENT INITIATIVES 7.0 ADDITIONAL IMPROVEMENT INITIATIVES 7.1 OBJECTIVE MAINTENANCE RULE ~ Implement Maintenance Rule. 7.1.1 7.2 OBJECTIVE FSAR UPGRADE ~ Improve the FSAR.

7.3 OBJECTIVE IMPROVED TECHNICAL ~ Improve the Technical Specifications 7.3.1 SPECIFICATIONS OBJECTIVE'.4.1 PLANNING AND CONTROL ~ Develop business plan Inltlatlves supporting NRC Communlcatlon Document Implementation

~ Develop progress reporting for business plan Initlatlves 7.4.2 7.5 OBJECTIVE INTEGRATED PLANNING AND ~ Improve overall Integrated planning and scheduling of work SCHEDUUNG 7.5.1'XCEPTIONAL PERFORMANCE ~

~w AVERAOE PERFORMANCE ~ MINIMUM PERFORMANCE ~

~B AteED BY SUPPLY SYSTEM 05o0raxo.o JULY 25. 1005

ADDITIONALIMPROVEMENT INITIATIVES INDEX

~a~~e

7. ADDITIONALIMPRO 55-61 7.1 MAINTENANCERULE 56 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE 57 7.3 IMPROVED TECHNICAL SPECIFICATIONS 58 7.4 PLAN5tING AND CONTROL 59-60 7.5 INTEGRATED PLANNING AND SCHEDULING 61 Page 55

MAINTENANCERULE 7.1 MAINIENANCE RULE Objective: 7.1.1 Implement the Maintenance Rule.

Actions: 7.1.1.A Scope SSCs within the Maintenance Rule.. Completed.

7.1.1.B Determine SSC risk significance. Completed.

7.1.1.C Complete data collection. Completed.

7.1.1.D Draft performance criteria. Completed.

7.1.1.E Complete identification of all "a(1)" SSCs. Completed.

7.1.1.F Complete draft Program Plan. Completed.

7.1.1.G Draft goals for "a(l)" SSCs. Completed.

7.1.1.H Performance criteria review by Expert Panel. 8/31/95.

7.1.1.I Begin trial implementation of Maintenance Rule. Ongoing.

7.1.1.J Draft Annual Report-Program Review. 10/95.

Expected Result: Implementation of Maintenance Rule will bring the Supply System in line with industry practices and NRC requirements.

Measurement Standard: Meet milestones on all Action Items.

i Page 56

FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE 7.2 FINAL SAFETY ANALYSIS REPORT (FSAR) UPGRADE Objective: 7.2.1 Rewrite the FSAR to ensure the following:

~ It contains the minimum information required by Regulatory Guide 1.70.

~ It accurately reflects existing design and operating procedures It can be relied upon for 10 CFR 50.59 safety evaluations.

Actions: 7;2.1.A Establish project scope and develop upgrade plan. Completed.

7.2.1.B Present upgrade plan to Project Review Committee (PRC). Completed.

7.2.1.C Prepare bid documents for upgrade project. Completed.

7.2.1.D Receive and evaluate upgrade project bids. 8/20/95.

7.2.1.E Begin upgrade project. 9/15/95.

7.2.1.F Complete upgrade project. '6/97.

7.2.1.G Submit FSAR upgrade to the NRC. 8/97.

Expected Result: An upgraded FSAR will accurately reflect existing WNP-2 design, reflect aH information required by Regulatory Guide 1.70, and consolidate current. redundant data. This upgrade process will also allow for the development of an FSAR change process by which the future integrity of the document will be protected.

Measurement Standard: Meet milestones on all Action Items.

Page 57

' IMPROVED TECHNICAL SPECIFICATIONS

'7.3 INIPROVED TECHNICAL SPECIFICATIONS Objective: 7.3.1 Convert the existing Supply System Technical Specifications to the Improved Technical Specifications in a manner similar to that described in NUREGs 1433 and 1434.

Actions: 7.3.1.A Submit Improved Technical Specifications to NRC. In the 4th quarter of 1995.

7.3.1.B Obtain NRC approval. Scheduled by NRC.

7.3.1.C Implement Improved Technical Specifications. In the 4th quarter of 1996.

Expected Result: Implementation of Improved Technical Specifications will result in improved operational safety, clearer understanding of the Technical Specification requirements, decreased administrative burden, and a six-month reduction in surveillance frequency ff ff R (18 to 24 months).

Measurement Standard: Meet milestones on all Action Items.

Page 58

PLANNING AND CONTROL 7.4 BUSINESS PLAN ALIGNMENTAND MONTHLYPROGRESS REPORTING PLAN ALT NMENT Objective: 7.4.1 Develop business plan initiative(s) to support key issues identified for performance enhancement (Reference Business Plan Initiative Form Attachment A).

Initiatives: 7.4.1.A Develop global business plan initiatives addressing the purpose, objective, expected results and major action items required to successfully develop, implement and monitor activities in support of performance enhancement. 8/15/95.

7;4.1.B Review performance enhancement objectives and identify common issues across organizations which would warrant the development of business plan initiatives (e.g., creating an environment that encourages a proper safety focus). 8/15/95.

7.4.1.C Draft Business Plan Initiatives as identified in Initiative 2 above.

8/31/95.

Expected Result: Alignment of performance enhancement objectives and initiatives and the Business Plan.

Measurement Standard: Complete actions on schedule.

NTHLY PR R REP TIN Objective: 7.4.2 Develop and implement monthly progress reporting for related business plan initiatives and other key actions.

Initiatives: 7.4.2.A All business plan related initiatives'tatus will be reported on a monthly basis (reference Management Initiative Progress Report Attachment B).

~o: Only performance enhancement objectives and related business plan initiatives require monthly status reports. All other initiatives will continue to be reported quarterly. 8/31/95.

Page 59

7.4.2.8 All other key actions identified as performance enhancement objectives will require monthly status reports. 8/31/95.

Expected Result: Provide monthly status reporting for management review of progress and assessment of corrective actions.

Measurement Standard: Complete actions on schedule.

Page 60

INTEGRATED PLANNING AND SCHEDULING 7.5 INTEGRATED PLANNING AND SCHEDULING Objective: 7.5.1 Improve overall integrated planning and scheduling of work (see 0;5. 1).

InMatives: 7.5.1.A Implement a electronic work process. Completed.

7.5.1.B Reorganize Planning and Scheduling organizations to combine similar functions. Completed.

7.5.1.C Implement improved integrated daily scheduling process. Completed.

7;5.1.D Create Fix-It-Now (FIN) process. 9/11/95.

7.5.1.E Create Work Teams. 10/13/95.

7.5.1.F Implement Work Teams. 10/30/95.

Expected Result: Improved daily integrated schedule coordination, adherence, accountability, and efficiency within involved departments..

Measurement Standard: Meet milestone schedule.

Page 61