ML17305B191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 25: Line 25:
: 3. A loss-of-coolant accident requiring actuation of the engineered safeguards.
: 3. A loss-of-coolant accident requiring actuation of the engineered safeguards.
A main steam    line or feedwater line break.
A main steam    line or feedwater line break.
     >01>200804 S0ii>4 ADOCK 05000528 t'DR P                    PDC PALO VERDE  " UNIT 1                    3/4 4-13
     >01>200804 S0ii>4 ADOCK 05000528 t'DR P                    PDC PALO VERDE  " UNIT 1                    3/4 4-13
                         ~h  X l<W'~sW wW 1 l  i~M R  Xi7
                         ~h  X l<W'~sW wW 1 l  i~M R  Xi7

Latest revision as of 04:57, 4 February 2020

Proposed Tech Specs,Extending Schedule for SG Eddy Current Exam Until Next Refueling Outage or Less than 32 Months
ML17305B191
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/14/1990
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305B190 List:
References
NUDOCS 9011200304
Download: ML17305B191 (2)


Text

REACTOR COOLANT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued) 4.4.4.3 Ins ection Fre uencies - The above required inservice inspections of steam generator tubes shall be performed at the following frequencies:

The first inservice inspection shall be performed after 6 Effective Full Power Months but within 24 calender months of initial crit-icality. Subsequent inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection. If two consecutive inspections following service under AVT conditions, not including the preservice inspection, result in all inspection results falling into the C-1 category or if two consecutive inspections demonstrate that previously observed degradation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months.

b. If the results of the inservice inspection of a steam generator conducted in accordance with Table 4.4-2 at 40 month intervals fall into Category C-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency shall apply until the subsequent inspections satisfy the criteria of Specification 4.4.4.3a.; the interval may then be extended to a maximum of once per 40 months.

C. Additional, unscheduled inservice inspections shall be performed on each steam generator in accordance with the first sample inspection specified in Table 4.4-2 during the shutdown subsequent to any of the following conditions:

Primary-to-secondary tubes leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3. 4. 5. 2.

2. A seismic occurrence greater than the Operating Basis Earthquake.
3. A loss-of-coolant accident requiring actuation of the engineered safeguards.

A main steam line or feedwater line break.

>01>200804 S0ii>4 ADOCK 05000528 t'DR P PDC PALO VERDE " UNIT 1 3/4 4-13

~h X l<W'~sW wW 1 l i~M R Xi7

'E C

~ 0