(2 intermediate revisions by the same user not shown) |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:CATEGORY j.REGULA'1 Y INFORMATION'IGTRIBUTIO | | {{#Wiki_filter:CATEGORY j. |
| >>SYSTEM, (RIDS)i~1 ACCESSION NBR:9904300149 DOC.DATE: 99/04/22 NOTARIZED: | | REGULA'1 Y INFORMATION'IGTRIBUTIO >> SYSTEM, (RIDS) i ~1 ACCESSION NBR:9904300149 DOC.DATE: 99/04/22 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.N2Q)E AUTHOR AFFILIATION POWERS;k'.4!. Indiana Michigan Power Co. |
| NO DOCKET¹FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.N2Q)E AUTHOR AFFILIATION POWERS;k'.4!. | | RE(IP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk) |
| Indiana Michigan Power Co.RE(IP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk) | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Forwards results of independent chemical evaluations performed from Sept 1997 through Feb 1999,re resolution of issues related to license amend 227.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR | | Forwards results of independent chemical evaluations performed from Sept 1997 through Feb 1999,re resolution of issues related to license amend 227. |
| )ENCL'i SIZE: 5+2 TITLE: OR Submittal: | | A DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ) ENCL 'i SIZE: 5 +2 TITLE: OR Submittal: General Distribution T NOTES: E RECIPIENT COPIES RECIPIENT COPIES G |
| General Distribution NOTES: A T E RECIPIENT ,ID CODE/NAME LPD3-1 LA STANG,J INTERNA FILE CENTER 1 NRR/DSSA/SRXB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1'1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LPD3-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,I OGC/HDS3 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 G D N NOTE TO ALL"RZDS" RECIPIENTS: | | ,ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 LA 1 1 LPD3-1 PD 1 1 STANG,J 1 INTERNA FILE CENTER 1 1 NRR/DE/EMCB 1 1 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NRR/SPSB JUNG,I 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D |
| PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071373 IN91ANA&If CHl6AN PQWM April 22, 1999 Docket No.50-315 AEP:NRC:1295B U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: 0-Pl-17 Washington, DC 20555-0001 Reference 1: Letter AEP:NRC:1295D from R.P.Powers to the Nuclear Regulatory Commission Dated February 20, 1999.Reference 2: Letter J.F.Stang to R.P.Powers, Donald C.Cook Nuclear Plant, Unit 1-Issuance of Amendment RE: Steam Generator Surveillance Extension (TAC NO.MA3562)Dated December 30, 1998.Donald C.Cook Nuclear Plant Unit 1 RESOLUTION OF ISSUES RELATED TO LICENSE AMENDMENT 227 On February 20, 1999, Indiana Michigan Power Company (1&M)informed the NRC (Reference 1)of our action placing the implementation of License Amendment 227, Deferral of Steam Generator. | | N WASTETH NOTE TO ALL "RZDS" RECIPIENTS: |
| Eddy Current Testing, on hold.The implementation of the amendment, was delayed to resolve concerns related to adherence to Electric Power Research Institute (EPRI)chemistry guidelines while the steam generators were in wet lay-up.An independent review of the chemistry conditions during the current unit 1 shutdown period found that while minor fluctuations in steam generator water chemistry occurred, adequate corrosion protection was maintained. | | PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12 |
| When fluctuations were detected, chemistry parameters were restored to goal values in accordance with plant procedures and the EPRI guidelines. | | |
| This conclusion was discussed with NRC management and staff on March 25, 1999 at D.C.Cook Nuclear Plant (CNP).Attachments 1 and 2 contain the results of the independent chemistry evaluations performed from September 1997 through February 1999.Additionally, attachment 1 contains recommendations by the independent evaluator. | | Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071373 IN91ANA |
| These recommendations have been entered into our corrective action program and will be dispositioned as part of the CNP restart.As a result of the investigation of the original concern under the corrective action program, we have identified weaknesses in our submittal preparation and validation process as well as our own license amendment implementation process.Revision of the procedures that support the above processes is a priority.In the interim, we have instituted stringent controls on submittals | | &IfCHl6AN PQWM April 22, 1999 AEP:NRC:1295B Docket No. 50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: 0-Pl-17 Washington, DC 20555-0001 Reference 1: Letter AEP:NRC:1295D from R. P. Powers to the Nuclear Regulatory Commission Dated February 20, 1999. |
| :d4 9904300%4'P 9'70422 PDR ADQCK 0500031.5 P PDR U.S.Nuclear Regulatory Commission Page 2 AEP:NRC:1295B of all types while we revise our procedures and retrain personnel. | | Reference 2: Letter J. F. Stang to R.P. Powers, Donald C. Cook Nuclear Plant, Unit 1 Issuance of Amendment RE: |
| License Amendment 227 was implemented on April 5, 1999.If you have any further questions regarding this issue, please contact David F.Kunsemiller, Director Regulatory Affairs at 616-466-2405.Sincerely, R.P.Powers Vice President Attachments A.C.Bakken III J.E.Dyer MDEQ-DW&RPD NRC Resident Inspector M.W.Rencheck R.Whale ATTACHMENT 1 TO AEP:NRC:1295B UNIT 1 STEAM GENERATOR LAYUP CHEMISTRY OUT OF SPECIFICATION DURING SEPTEMBER 24, 1997 TO DECEMBER 31, 1997}} | | Steam Generator Surveillance Extension (TAC NO. |
| | MA3562) Dated December 30, 1998. |
| | Donald C. Cook Nuclear Plant Unit 1 RESOLUTION OF ISSUES RELATED TO LICENSE AMENDMENT 227 On February 20, 1999, Indiana Michigan Power Company (1&M) informed the NRC (Reference 1) of our action placing the implementation of License Amendment 227, Deferral of Steam Generator. Eddy Current Testing, on hold. The implementation of the amendment, was delayed to resolve concerns related to adherence to Electric Power Research Institute (EPRI) chemistry guidelines while the steam generators were in wet lay-up. |
| | An independent review of the chemistry conditions during the current unit 1 shutdown period found that while minor fluctuations in steam generator water chemistry occurred, adequate corrosion protection was maintained. When fluctuations were detected, chemistry parameters were restored to goal values in accordance with plant procedures and the EPRI guidelines. This conclusion was discussed with NRC management and staff on March 25, 1999 at D. C. Cook Nuclear Plant (CNP). Attachments 1 and 2 contain the results of the independent chemistry evaluations performed from September 1997 through February 1999. |
| | Additionally, attachment 1 contains recommendations by the independent evaluator. These recommendations have been entered into our corrective action program and will be dispositioned as part of the CNP restart. |
| | As a result of the investigation of the original concern under the corrective action program, we have identified weaknesses in our submittal preparation and validation process as well as our own license amendment implementation process. Revision of the procedures that support the above processes is a priority. In the interim, we have instituted stringent controls on submittals 9'70422 |
| | :d4 9904300%4'P PDR ADQCK 0500031.5 P PDR |
| | |
| | U. S. Nuclear Regulatory Commission AEP:NRC:1295B Page 2 of all types while we revise our procedures and retrain personnel. |
| | License Amendment 227 was implemented on April 5, 1999. |
| | If you have any further questions regarding this issue, please contact David F. Kunsemiller, Director Regulatory Affairs at 616-466-2405. |
| | Sincerely, R. P. Powers Vice President Attachments A. C. Bakken III J. E. Dyer MDEQ DW & RPD NRC Resident Inspector M. W. Rencheck R. Whale |
| | |
| | ATTACHMENT 1 TO AEP:NRC:1295B UNIT 1 STEAM GENERATOR LAYUP CHEMISTRY OUT OF SPECIFICATION DURING SEPTEMBER 24, 1997 TO DECEMBER 31, 1997}} |
Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
CATEGORY j.
REGULA'1 Y INFORMATION'IGTRIBUTIO >> SYSTEM, (RIDS) i ~1 ACCESSION NBR:9904300149 DOC.DATE: 99/04/22 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.N2Q)E AUTHOR AFFILIATION POWERS;k'.4!. Indiana Michigan Power Co.
RE(IP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards results of independent chemical evaluations performed from Sept 1997 through Feb 1999,re resolution of issues related to license amend 227.
A DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ) ENCL 'i SIZE: 5 +2 TITLE: OR Submittal: General Distribution T NOTES: E RECIPIENT COPIES RECIPIENT COPIES G
,ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 LA 1 1 LPD3-1 PD 1 1 STANG,J 1 INTERNA FILE CENTER 1 1 NRR/DE/EMCB 1 1 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NRR/SPSB JUNG,I 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
N WASTETH NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12
Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071373 IN91ANA
&IfCHl6AN PQWM April 22, 1999 AEP:NRC:1295B Docket No. 50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: 0-Pl-17 Washington, DC 20555-0001 Reference 1: Letter AEP:NRC:1295D from R. P. Powers to the Nuclear Regulatory Commission Dated February 20, 1999.
Reference 2: Letter J. F. Stang to R.P. Powers, Donald C. Cook Nuclear Plant, Unit 1 Issuance of Amendment RE:
Steam Generator Surveillance Extension (TAC NO.
MA3562) Dated December 30, 1998.
Donald C. Cook Nuclear Plant Unit 1 RESOLUTION OF ISSUES RELATED TO LICENSE AMENDMENT 227 On February 20, 1999, Indiana Michigan Power Company (1&M) informed the NRC (Reference 1) of our action placing the implementation of License Amendment 227, Deferral of Steam Generator. Eddy Current Testing, on hold. The implementation of the amendment, was delayed to resolve concerns related to adherence to Electric Power Research Institute (EPRI) chemistry guidelines while the steam generators were in wet lay-up.
An independent review of the chemistry conditions during the current unit 1 shutdown period found that while minor fluctuations in steam generator water chemistry occurred, adequate corrosion protection was maintained. When fluctuations were detected, chemistry parameters were restored to goal values in accordance with plant procedures and the EPRI guidelines. This conclusion was discussed with NRC management and staff on March 25, 1999 at D. C. Cook Nuclear Plant (CNP). Attachments 1 and 2 contain the results of the independent chemistry evaluations performed from September 1997 through February 1999.
Additionally, attachment 1 contains recommendations by the independent evaluator. These recommendations have been entered into our corrective action program and will be dispositioned as part of the CNP restart.
As a result of the investigation of the original concern under the corrective action program, we have identified weaknesses in our submittal preparation and validation process as well as our own license amendment implementation process. Revision of the procedures that support the above processes is a priority. In the interim, we have instituted stringent controls on submittals 9'70422
- d4 9904300%4'P PDR ADQCK 0500031.5 P PDR
U. S. Nuclear Regulatory Commission AEP:NRC:1295B Page 2 of all types while we revise our procedures and retrain personnel.
License Amendment 227 was implemented on April 5, 1999.
If you have any further questions regarding this issue, please contact David F. Kunsemiller, Director Regulatory Affairs at 616-466-2405.
Sincerely, R. P. Powers Vice President Attachments A. C. Bakken III J. E. Dyer MDEQ DW & RPD NRC Resident Inspector M. W. Rencheck R. Whale
ATTACHMENT 1 TO AEP:NRC:1295B UNIT 1 STEAM GENERATOR LAYUP CHEMISTRY OUT OF SPECIFICATION DURING SEPTEMBER 24, 1997 TO DECEMBER 31, 1997