Line 3: Line 3:
| issue date = 01/14/1981
| issue date = 01/14/1981
| title = Interim Deficiency Rept Re Use of Improperly Grounded Flexible Conduit on safety-related Circuits,Initially Reported on 801210.Caused by Manufacturer Failure to Remove Paint from Termination Module.Next Rept by Apr 1981
| title = Interim Deficiency Rept Re Use of Improperly Grounded Flexible Conduit on safety-related Circuits,Initially Reported on 801210.Caused by Manufacturer Failure to Remove Paint from Termination Module.Next Rept by Apr 1981
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULAT~INFORMATION DISTRIBUTION TEr>>(RIDS)ACCESSION NBR:8101210362 DOC~DATE:81/Oi/14NOTARI7ED:
{{#Wiki_filter:REGULAT~ INFORMATION DISTRIBUTION                           TEr>> (RIDS)
NOFACIL:g-8Susquehanna SteamElectricStation<Unit'1RPennsylva 0-.388Susquehanna SteamElectricStation~Unit2<Pennsylva A~AUTHORAFFILIATION CURTISRN~<sPennsy'Ivania Power8,LightCo.RECIP~NAMERECIPIENT AFFILIATION GRIERR8,H~RegionlsPhiladelphiai OfficeoftheDirector
ACCESSION NBR:8101210362                 DOC   ~ DATE:     81/Oi/14      NOTARI7ED:     NO        00CKET FACIL:g -       8    Susquehanna    Steam      Electric Station< Unit '1R Pennsylva              05000387 0-.388 Susquehanna        Steam      Electric Station~ Unit 2< Pennsylva               05000388 A   ~                     AUTHOR  AFFILIATION CURTISR  N  ~ <s          Pennsy'Ivania       Power    8, Light Co.
RECIP ~ NAME              RECIPIENT AFFILIATION GRIERR 8, H   ~             Region ls Philadelphiai Office of the Director


==SUBJECT:==
==SUBJECT:==
Interimdefic>ency reptreuseofimproperly groundedflexibleconduitonsafety-related cir'cuitsEinitiallv reportedon801210~Causedbymanufacturer failuretoremovepaintfromtermination modulesNextreptbyApril1981'ISTRISUTIONCODE:SOILSCOPIESRECEIVED:LTR
Interim defic>ency rept re use of improperly grounded flexible conduit on safety-related cir'cuitsEinitiallv reported on 801210 Caused by manufacturer failure to remove
/ENCLSIZE:TITLE:ConstructionDeficiency Report(10CFR50,55E)
                                          ~
NOTES:Send IEE3copiesFSARltallamends.SendILE3copiesFSARRallamends.00CKET05000387050003880500038705000388RECIPIENT IoCODE/Nar>>E ACTION;A/0LICENSNG04RUSHBROOKsr>>
paint from termination modules Next rept by April 1981
~06INTERNAL:
                                                                                                'I STRI  SU  TI ON CODE:   SOILS    COPIES RECEIVED:LTR                 /ENCL          SIZE:
AD/RCt/IE 17ASL'BP/J~HARDOIRMDIVOFLICEQUIPQUALRR11IS,E09iMPA20OELO21QABR14RUTHERFORDEAs I(.OPIESLTTREhlCL11111111'111111111111RECIPIENT IDCODE/IYAYiE YOUf<GBLOODEB 05STARKERS07AEOD18D/DIRHUMFAC15EDO8STAFF19HYD/GEOBR22lICQUALBR12NRCPDR02.P--STREV13REGFII01STADS,DEV21COPIESLTTRENCL1111111l1111111111111EXTERNAL:
TITLE: Constr uc t i on Deficiency Repor t (10CFR50,55E)
ACRSNSIC160816161LPDR03gp]9SlggTOTALNUMBEROFCOPIESREQUIRED:
NOTES:Send         IEE  3  copies  FSAR    lt  all    amends.                                    05000387 Send      ILE  3  copies  FSAR    R    all    amends.                                     05000388 RECIPIENT            (.OP  I ES                  RECIPIENT              COPIES Io  CODE/Nar>>E       LTTR EhlCL                ID CODE/IYAYiE          LTTR ENCL ACTION;       A/0    L ICENSNG 04          1          1        YOUf<GBLOODEB 05            1 RUSHBROOKsr>>     ~ 06        1                    STARKERS          07        1      1 INTERNAL: AD/RCt/IE               17        1          1        AEOD              18        1      1 ASL'BP/J ~ HARD              1          1        D/DIR  HUM  FAC15        1      1 OIR MDIV OF LIC              1 EDO 8 STAFF      19        l      1 EQUIP QUAL RR1 1              1          1        HYD/GEO BR        22        1      1 IS,E              09        1          1        lIC QUAL  BR    12        1      1 iMP A              20                              NRC PDR          02 OELO              21 1
LTTR~ENCL TWONORTHNINTHSTREET,ALLENTOWN, PA.18101PHONErt215)770-5151NORMANW.CURTISVicePresident'-Engineering ILConstruction-Nuclear 77D5381January14,1981Mr.BoyceH.GrierDirector, RegionIU.S.NuclearRegulatory Commission 631PakAvenueKingofPrussia,PA19406SUSQUEHANNA STEAMELECTRICSTATIONINTERIMREPORTOFADEFICIENCY RELATINGTOIMPROPERLY GROUNDEDFLEXIBLECONDUITER's100450/100508 FILE840-4PLA-613
1 1
1        .P   -- ST  REV  13 1
1 1
1 QA BR              14        1          1        REG  F II        01        1      1 RUTHERFORDEAs      I        1          1        ST    ADS, DEV 21          1      1 EXTERNAL: ACRS                  16      16          16        LPDR              03 NSIC              08        1 g p ]9Sl TOTAL NUMBER OF COPIES            REQUIRED: LTTR             ~     ENCL gg


==DearMr.Grier:==
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101      PHONEr t215) 770-5151 NORMAN W. CURTIS Vice President'-Engineering IL Construction-Nuclear 77D5381 January 14, 1981 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Pa k Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY RELATING TO IMPROPERLY GROUNDED FLEXIBLE CONDUIT ER's 100450/100508                            FILE 840-4 PLA-613
Thisletterservestoconfirminformation providedbytelephone toNRCInspector, Mr.J.Mattia,byMr.A.R.SabolofPP&LonDecember10,1980.Duringthatconversations Mr.Mattiawasadvisedthatthesubjectcondition wasunderevaluation forreportability undertheprovisions of10CFR50.55(e).
 
Thedeficiency involvestheuseofimproperly groundedflexibleconduitinvarioussafetyrelatedcircuitsasreportedtotheNRCbyGeneralElectricundertheprovisions of10CFR21onDecember8,1980(LetterNo.MFN212-80)
==Dear Mr.         Grier:==
.PPaLhasevaluated thecondition anddetermined thatitisreportable under10CFR50.55(e).
 
Acompletedescription ofthecondition along-with itssafetyimplications andcorrective actionplannedisattachedtothisletter.Sincethedetailsofthisreportprovideinformation relevanttothereporting requirements of10CFR21,this.correspondence isconsidered toalsodischarge anyformalresponsibility PPaLmayhaveforreporting incompliance thereto.WeexpecttoprovideafinalreportpriortoApril,1981.8102220'3llt7tPENNSYLVANIA POWERILLIGHTCOMPANY Mr.BoyceH-.GriexJanuary14,1981Verytrulyyours,N.W.'CurtisVicePresident-Engineering 6Construction-Nucleax'LW:sab Attachment cc:Mr.VictorStello(15)Director-Office ofEnspection aEnforcement U.S.NuclearRegulatory Commission Washington, D.C.20555mcsghgmeOfficeofManagement Information aProgramControlU.S.NuclearRegulatory Commission Washington, D.C.20555Mr.RobertM.GalloU.S.NuclearRegulatory Commission P.'O.Box52Shickshinny, PA18655 INTERIMREPORT~sub'ec0:Improperly GroundedFlexibleConduitonSafety-Related FailSafeCirciMetallicflexibleconduitisutilizedtoencloseelectrical conductors invariousfail-safe (deenergize toperformthe'safetyfunction) safetyrelatedcircuits.
This      letter      serves to confirm information provided by telephone to NRC Inspector, Mr. J. Mattia, by Mr. A. R. Sabol of PP&L on December 10, 1980.
Thesefail-safe ci.rcuits, arepartoftheReactor.Protection System(RPS),NuclearSteamSupplyShut-Off'System (NSSS)andNeutronMonitoring System(NMS)logics.The'ail-safe designrequiresthat.theflexibleconduitprovidealowresistance pathtoground.topreventexternalvoltagesources,thatcouldoccurfromcertainshortcircuits, fromdefeating (deenergizing tooperate)fail-safe modeofthesesafetyrelatedcircuits.
During that conversations Mr. Mattia was advised that the subject condition was under evaluation for reportability under the provisions of 10CFR50.55(e).
Thepositivegroundpathassuresthattheupstreamprotective deviceswillsenseandinterrupt ashortcircuit,therebyeliminating thepossibility ofanexternalvoltagesourcedefeating thesafetyfunction.
The    deficiency involves the use of improperly grounded flexible conduit in    various      safety related circuits as reported to the NRC by General Electric under the provisions of 10CFR 21 on December 8, 1980 (Letter No.
Flexibleconduiti:sutilizedforfail-safe circuitswithintheGE-supplied PowerGeneration ControlComplex(PGCC).Typically theflexibleconduitisroutedthroughthePGCCfloorsectionsfromthetermination cabinetstopanelsorfrompaneltopanel.Thedefectbeingreportedisthelackofpositivemetallicgrounding fortheflexibleconduiteitherattheterminati.on cabinetoratthepanel.Inatypicalterm@nation cabinetinstallation; theconduitisattachedwithalockingringtoatermination module.Thisisanacceptable groundconnecti.on; however,thetermination moduleisultimately mountedonapainted(highelectrical resistance) surface.Duringmanufacturing, therewasnoprocedure toassurepaintwasremovedpriortomountingthetermination module.Hence,apositivegroundpathwasnotprovided.
MFN212-80) . PPaL has evaluated the condition and determined that                      it is reportable under 10CFR50.55(e). A complete description of the condition along-with its safety implications and corrective action planned is attached to this letter.
GEhasreportedthisdefecttotheNRCunder10CFR,Part21.AnalsisofSafetImlications Thedesignbasis,forsafety-related fail-safe circuitsoftheRPS,NSSSandNMSsystemsrequiresprotection againstthepossibility oflossofprotective functions fromexternalvoltagesources.Installation ofthesecircuitsin'positively groundedmetallicconduitisrequiredtomeetthisdesignbasis.'.Engineering considers theomissionofapositivegroundontheGEsuppliedflexiblemetal'lic conduittobeasignificant deficien'cy indesignandconstruction ofthePGCCsuchthatifitweretohaveremaineduncorrected, couldhaveadversely affectedthesafetyofoperation oftheplant.Therefore, thelackofgrounding onflexiblemetallicconduitcontaining safety-related fail-safe circuitswithinthePGCCisconsidered reportable under10CFR5e.55(e).Page1of2 Corrective Action:GEwi;11issueinstructions.
Since the details of this report provide information relevant to the reporting requirements of 10CFR 21, this. correspondence is considered to also discharge any formal responsibility PPaL may have for reporting in compliance thereto.
tofieldinvestigate installations offail-safe circuitsinflexibleconduit~foradequategrounding.
We    expect to provide a              final report prior to April,   1981.
Where'hegrounding is.foundtobeunacceptable, positivegrounding willbeinstalled.
PENNSYLVANIA POWER    IL LIGHT COMPANY 8 1 02 2 2 0 '3 llt7t
IBechtelhasbeeninstructed toreview'nstallations ofsafety-relatedfail-safe circuitswithin.theirdesignscopetoassurethatpositiveracewaygrounding hasbeenapplied.Afinalreportidentifying thetotalscopeoftheproblemandcorrective actionswillbeprovidedbyMarch31,1981.SBK/kesPage2of2}}
 
Mr. Boyce  H-. Griex                                                              January 14, 1981 Very  truly yours, N. W. 'Curtis Vice President-Engineering     6  Construction-Nucleax'LW:sab Attachment cc:   Mr. Victor Stello (15)
Director-Office of Enspection                          a Enforcement U. S. Nuclear  Regulatory Commission Washington, D.C. 20555 mcsghgme Office of  Management  Information                         a Program Control U. S. Nuclear  Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.'O. Box 52 Shickshinny, PA 18655
 
INTERIM REPORT
~sub 'ec0:   Improperly Grounded Flexible Conduit    on Safety-Related Fail Safe Circi Metallic flexible conduit is utilized to enclose electrical conductors in various fail-safe (deenergize to perform the 'safety function) safety related circuits. These fail-safe ci.rcuits, are part of the Reactor        .
Protection System (RPS), Nuclear Steam Supply Shut-Off'System (NSSS) and Neutron Monitoring System (NMS) logics. The'ail-safe design requires that
.the flexible conduit provide a low resistance path to ground .to prevent external voltage sources, that could occur from certain short circuits, from defeating (deenergizing to operate) fail-safe mode of these safety related circuits. The positive ground path assures that the upstream protective devices will sense and interrupt a short circuit, thereby eliminating the possibility of      an external voltage source defeating the safety function.
Flexible conduit i:s utilized for fail-safe circuits within the GE-supplied Power Generation Control Complex (PGCC). Typically the flexible conduit is routed through the PGCC floor sections from the termination cabinets to panels or from panel to panel.
The defect being reported is the lack of positive metallic grounding for the flexible conduit either at the terminati.on cabinet or at the panel. In a typical term@nation cabinet installation; the conduit is attached with a locking ring to a termination module. This is an acceptable ground connecti.on; however, the termination module is ultimately mounted on a painted (high electrical resistance) surface.         During manufacturing, there was no procedure to assure paint was removed prior to mounting the termination module. Hence, a positive ground path was not provided.
GE  has reported  this defect to the  NRC under  10 CFR, Part 21.
Anal sis of Safet      Im  lications The design basis, for safety-related     fail-safe circuits of the RPS, NSSS  and NMS systems requires protection    against the possibility of loss of protective functions from external voltage sources. Installation of these circuits in 'positively grounded metallic conduit is required to meet  this design basis.'.
Engineering considers the omission of a positive ground on the GE supplied flexible metal'lic conduit to be a significant deficien'cy in design and construction of the PGCC such that      if it were to have remained uncorrected, could have adversely affected the safety of operation of the plant. Therefore, the lack of grounding on flexible metallic conduit containing safety-related fail-safe circuits within the PGCC is considered reportable under 10 CFR 5e.55 (e).
Page 1 of 2
 
Corrective Action:
GE wi;11 issue instructions. to field investigate installations of fail-safe circuits in flexible conduit    ~for adequate grounding.
is. found to                                        will be Where'he grounding              be unacceptable, positive grounding installed.
I Bechtel has been instructed to review'nstallations of safety-related fail-safe circuits within. their design scope to assure that positive raceway grounding has been applied.
A final report identifying the total scope of the problem      and corrective actions will be provided by March 31, 1981.
SBK/kes Page 2      of 2}}

Latest revision as of 17:25, 3 February 2020

Interim Deficiency Rept Re Use of Improperly Grounded Flexible Conduit on safety-related Circuits,Initially Reported on 801210.Caused by Manufacturer Failure to Remove Paint from Termination Module.Next Rept by Apr 1981
ML18030A192
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/14/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, ER-100450, ER-100508, PLA-613, NUDOCS 8101210362
Download: ML18030A192 (5)


Text

REGULAT~ INFORMATION DISTRIBUTION TEr>> (RIDS)

ACCESSION NBR:8101210362 DOC ~ DATE: 81/Oi/14 NOTARI7ED: NO 00CKET FACIL:g - 8 Susquehanna Steam Electric Station< Unit '1R Pennsylva 05000387 0-.388 Susquehanna Steam Electric Station~ Unit 2< Pennsylva 05000388 A ~ AUTHOR AFFILIATION CURTISR N ~ ency rept re use of improperly grounded flexible conduit on safety-related cir'cuitsEinitiallv reported on 801210 Caused by manufacturer failure to remove

~

paint from termination modules Next rept by April 1981

'I STRI SU TI ON CODE: SOILS COPIES RECEIVED:LTR /ENCL SIZE:

TITLE: Constr uc t i on Deficiency Repor t (10CFR50,55E)

NOTES:Send IEE 3 copies FSAR lt all amends. 05000387 Send ILE 3 copies FSAR R all amends. 05000388 RECIPIENT (.OP I ES RECIPIENT COPIES Io CODE/Nar>>E LTTR EhlCL ID CODE/IYAYiE LTTR ENCL ACTION; A/0 L ICENSNG 04 1 1 YOUf<GBLOODEB 05 1 RUSHBROOKsr>> ~ 06 1 STARKERS 07 1 1 INTERNAL: AD/RCt/IE 17 1 1 AEOD 18 1 1 ASL'BP/J ~ HARD 1 1 D/DIR HUM FAC15 1 1 OIR MDIV OF LIC 1 EDO 8 STAFF 19 l 1 EQUIP QUAL RR1 1 1 1 HYD/GEO BR 22 1 1 IS,E 09 1 1 lIC QUAL BR 12 1 1 iMP A 20 NRC PDR 02 OELO 21 1

1 1

1 .P -- ST REV 13 1

1 1

1 QA BR 14 1 1 REG F II 01 1 1 RUTHERFORDEAs I 1 1 ST ADS, DEV 21 1 1 EXTERNAL: ACRS 16 16 16 LPDR 03 NSIC 08 1 g p ]9Sl TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL gg

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr t215) 770-5151 NORMAN W. CURTIS Vice President'-Engineering IL Construction-Nuclear 77D5381 January 14, 1981 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Pa k Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION INTERIM REPORT OF A DEFICIENCY RELATING TO IMPROPERLY GROUNDED FLEXIBLE CONDUIT ER's 100450/100508 FILE 840-4 PLA-613

Dear Mr. Grier:

This letter serves to confirm information provided by telephone to NRC Inspector, Mr. J. Mattia, by Mr. A. R. Sabol of PP&L on December 10, 1980.

During that conversations Mr. Mattia was advised that the subject condition was under evaluation for reportability under the provisions of 10CFR50.55(e).

The deficiency involves the use of improperly grounded flexible conduit in various safety related circuits as reported to the NRC by General Electric under the provisions of 10CFR 21 on December 8, 1980 (Letter No.

MFN212-80) . PPaL has evaluated the condition and determined that it is reportable under 10CFR50.55(e). A complete description of the condition along-with its safety implications and corrective action planned is attached to this letter.

Since the details of this report provide information relevant to the reporting requirements of 10CFR 21, this. correspondence is considered to also discharge any formal responsibility PPaL may have for reporting in compliance thereto.

We expect to provide a final report prior to April, 1981.

PENNSYLVANIA POWER IL LIGHT COMPANY 8 1 02 2 2 0 '3 llt7t

Mr. Boyce H-. Griex January 14, 1981 Very truly yours, N. W. 'Curtis Vice President-Engineering 6 Construction-Nucleax'LW:sab Attachment cc: Mr. Victor Stello (15)

Director-Office of Enspection a Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 mcsghgme Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.'O. Box 52 Shickshinny, PA 18655

INTERIM REPORT

~sub 'ec0: Improperly Grounded Flexible Conduit on Safety-Related Fail Safe Circi Metallic flexible conduit is utilized to enclose electrical conductors in various fail-safe (deenergize to perform the 'safety function) safety related circuits. These fail-safe ci.rcuits, are part of the Reactor .

Protection System (RPS), Nuclear Steam Supply Shut-Off'System (NSSS) and Neutron Monitoring System (NMS) logics. The'ail-safe design requires that

.the flexible conduit provide a low resistance path to ground .to prevent external voltage sources, that could occur from certain short circuits, from defeating (deenergizing to operate) fail-safe mode of these safety related circuits. The positive ground path assures that the upstream protective devices will sense and interrupt a short circuit, thereby eliminating the possibility of an external voltage source defeating the safety function.

Flexible conduit i:s utilized for fail-safe circuits within the GE-supplied Power Generation Control Complex (PGCC). Typically the flexible conduit is routed through the PGCC floor sections from the termination cabinets to panels or from panel to panel.

The defect being reported is the lack of positive metallic grounding for the flexible conduit either at the terminati.on cabinet or at the panel. In a typical term@nation cabinet installation; the conduit is attached with a locking ring to a termination module. This is an acceptable ground connecti.on; however, the termination module is ultimately mounted on a painted (high electrical resistance) surface. During manufacturing, there was no procedure to assure paint was removed prior to mounting the termination module. Hence, a positive ground path was not provided.

GE has reported this defect to the NRC under 10 CFR, Part 21.

Anal sis of Safet Im lications The design basis, for safety-related fail-safe circuits of the RPS, NSSS and NMS systems requires protection against the possibility of loss of protective functions from external voltage sources. Installation of these circuits in 'positively grounded metallic conduit is required to meet this design basis.'.

Engineering considers the omission of a positive ground on the GE supplied flexible metal'lic conduit to be a significant deficien'cy in design and construction of the PGCC such that if it were to have remained uncorrected, could have adversely affected the safety of operation of the plant. Therefore, the lack of grounding on flexible metallic conduit containing safety-related fail-safe circuits within the PGCC is considered reportable under 10 CFR 5e.55 (e).

Page 1 of 2

Corrective Action:

GE wi;11 issue instructions. to field investigate installations of fail-safe circuits in flexible conduit ~for adequate grounding.

is. found to will be Where'he grounding be unacceptable, positive grounding installed.

I Bechtel has been instructed to review'nstallations of safety-related fail-safe circuits within. their design scope to assure that positive raceway grounding has been applied.

A final report identifying the total scope of the problem and corrective actions will be provided by March 31, 1981.

SBK/kes Page 2 of 2