ML18053A535: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:*/
ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATIONS PAGE CHANGE August 24, 1988 8809010116 880824            1!,(I PDR ADOCK 05000255                          1 Page i  p                  PDC        I\'
\_                            - l TSP0888-0101-NL04
* TABLE 4.1. 3 Minimum Frequencies for Checks, Calibrations and Testing of Miscellaneous Instrumentati9n and Controls-Channel Desc'ription Surveillance Func.tion          Frequency                    Surveillance Method
: 1. Start-Up Range        a. Check                  s        a. Comparison of both channel count rate Neutron Monitors                                                indications when in service.
: b. Test                    p        b. Internal test signals.
: 2. Primary Rod            a. Check                  s        a. Comparison of output data with secondary RPSI.
Position                                                        RPIS.
Indication            b. Check                  M        b. Check of power dependent insertion limits 3.
System Secondary Rod Position Indication c.
a.
b.
Calibrate (1)
Check Check R
s M
c.
a.
b.
monitoring system.
Physically measured rod drive position used to verify system accuracy. Check rod position interlocks.
Comparison of output data with primary RPIS.
Same as 2(b) above.
System                c. Calibrate ( 1 )        R        c. .Same as 2(c) above, including out-of-sequence alarm function.
: 4. Area Monitors          a. Check                  D        a. Normal readings observed and internal.
Note: Process                                                    test signals used to verify instrument Monitor Surveil-                                                operation.
lance Requirements    b *. Calibrate              R        b. Exposure to known external radiation are located in                                                  *source.
Tables 4.24-1 and      c. Test                    M        c. Detector exposed to remote operated 4.24-2                                                          radiation check source or integral electronic check source.
: 5. Emergency Plan Radia-  a. Calibrate              A        a. Exposure to known radiation source.
tion Instruments      b. Test                    M        b. Battery check.
: 6. Environmental          a. Check                  M        a. Operational check.
Monitors              b. Calibrate              A        b. Verify airflow indicator.
: 7. Pressurizer Level      a. , Check                  s        a. Comparison of six independent level Instruments                                                      readings.
: b. Calibrate              R        b. Known differential pressure applied to sensor.
: c. Test                    M        c. Signal to meter relay adjusted with test device.
4-10                              Amendment No. tt, is, S$,
TS~0888-0101-NL04}}

Latest revision as of 13:00, 3 February 2020

Proposed Tech Spec Table 4.1.3, Min Frequencies for Checks, Calibrs & Testing of Miscellaneous Instrumentation & Controls.
ML18053A535
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/24/1988
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18053A534 List:
References
NUDOCS 8809010116
Download: ML18053A535 (2)


Text

  • /

ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATIONS PAGE CHANGE August 24, 1988 8809010116 880824 1!,(I PDR ADOCK 05000255 1 Page i p PDC I\'

\_ - l TSP0888-0101-NL04

  • TABLE 4.1. 3 Minimum Frequencies for Checks, Calibrations and Testing of Miscellaneous Instrumentati9n and Controls-Channel Desc'ription Surveillance Func.tion Frequency Surveillance Method
1. Start-Up Range a. Check s a. Comparison of both channel count rate Neutron Monitors indications when in service.
b. Test p b. Internal test signals.
2. Primary Rod a. Check s a. Comparison of output data with secondary RPSI.

Position RPIS.

Indication b. Check M b. Check of power dependent insertion limits 3.

System Secondary Rod Position Indication c.

a.

b.

Calibrate (1)

Check Check R

s M

c.

a.

b.

monitoring system.

Physically measured rod drive position used to verify system accuracy. Check rod position interlocks.

Comparison of output data with primary RPIS.

Same as 2(b) above.

System c. Calibrate ( 1 ) R c. .Same as 2(c) above, including out-of-sequence alarm function.

4. Area Monitors a. Check D a. Normal readings observed and internal.

Note: Process test signals used to verify instrument Monitor Surveil- operation.

lance Requirements b *. Calibrate R b. Exposure to known external radiation are located in *source.

Tables 4.24-1 and c. Test M c. Detector exposed to remote operated 4.24-2 radiation check source or integral electronic check source.

5. Emergency Plan Radia- a. Calibrate A a. Exposure to known radiation source.

tion Instruments b. Test M b. Battery check.

6. Environmental a. Check M a. Operational check.

Monitors b. Calibrate A b. Verify airflow indicator.

7. Pressurizer Level a. , Check s a. Comparison of six independent level Instruments readings.
b. Calibrate R b. Known differential pressure applied to sensor.
c. Test M c. Signal to meter relay adjusted with test device.

4-10 Amendment No. tt, is, S$,

TS~0888-0101-NL04