2-1 2.1      Type A Test                                          2-1 2.2      Local Leak Rate Tests (Types Band C)                2-1 3        TYPE A TEST                                          3-1 3.1      Edited Log of Events                                3-1 3.2      General Test Description                            3-2 3.2.1    Prerequisites                                        3-2 3.2.2    Equipment and Instrumentation                        3-2 3.2.3    Data Acquisition System                              3-3 3.2.4    Data Resolution System                              3-3
2-1 2.1      Type A Test                                          2-1 2.2      Local Leak Rate Tests (Types Band C)                2-1 3        TYPE A TEST                                          3-1 3.1      Edited Log of Events                                3-1 3.2      General Test Description                            3-2 3.2.1    Prerequisites                                        3-2 3.2.2    Equipment and Instrumentation                        3-2 3.2.3    Data Acquisition System                              3-3 3.2.4    Data Resolution System                              3-3 3.3      Test Analysis                                        3-6 3.4      Test Results                                        3-d 3.4~1    CILRT Results - Total Time Method                    3-8 3 .. 4.2 CILRT Results - Mass Point Method                    3-8 3.4.3    Superimposed Leakage Rate Test Results              3-8 3.ij.4  Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage              3-9--
* 3.3      Test Analysis                                        3-6 3.4      Test Results                                        3-d 3.4~1    CILRT Results - Total Time Method                    3-8 3 .. 4.2 CILRT Results - Mass Point Method                    3-8 3.4.3    Superimposed Leakage Rate Test Results              3-8 3.ij.4  Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage              3-9--
4        LOCAL LEAK RATE TESTS (TYPES BAND C)                ~-1 Appendices 3A      SITE METEOROLOGY PRIOR TO CILRT                      3A-1 3B      SITE METEOROLOGY DURING THE CILRT                    3B-1 3C      INSTRUMENTATION TABLE                                3C-1 3D      INSTRUMENTATION LOCATION (PROFILE VIEW)              30-1 3E      INSTRUMENTATION LOCATION (PLAN VIEW)                3E-1 3F      CONTAINMENT INPUT VARIABLES                          3F-1
4        LOCAL LEAK RATE TESTS (TYPES BAND C)                ~-1 Appendices 3A      SITE METEOROLOGY PRIOR TO CILRT                      3A-1 3B      SITE METEOROLOGY DURING THE CILRT                    3B-1 3C      INSTRUMENTATION TABLE                                3C-1 3D      INSTRUMENTATION LOCATION (PROFILE VIEW)              30-1 3E      INSTRUMENTATION LOCATION (PLAN VIEW)                3E-1 3F      CONTAINMENT INPUT VARIABLES                          3F-1
* 3G      LEAK RATE DATA - ABSOLUTE T.E.ST METHOD - MASS POINT ANALYSIS i
* 3G      LEAK RATE DATA - ABSOLUTE T.E.ST METHOD - MASS POINT ANALYSIS i
Line 40: Line 39:
==SUMMARY==
==SUMMARY==
4B-1
4B-1
*
* ii
* ii
* REFERENCES
 
REFERENCES
: 1. 10CFR50  Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors. April 19. 1976
: 1. 10CFR50  Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors. April 19. 1976
: 2. Bechtel Topical Report BN-TOP-1. Rev. 1. Testing Criteria tor Integrated Leak Rate    Testing  of    Primary  Containment Structures for Nuclear Power Plants. Novem.oer 1. 1972
: 2. Bechtel Topical Report BN-TOP-1. Rev. 1. Testing Criteria tor Integrated Leak Rate    Testing  of    Primary  Containment Structures for Nuclear Power Plants. Novem.oer 1. 1972
Line 51: Line 50:
* SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear          Power Stat1on, Unit No. 2~~--
* SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear          Power Stat1on, Unit No. 2~~--
This report is submitted as        required by 10CFR50 Appendix- J, paragraph V.B ,Reference 1) *
This report is submitted as        required by 10CFR50 Appendix- J, paragraph V.B ,Reference 1) *
*
* 1-1
* 1-1
* SECTION 2
 
SECTION 2


==SUMMARY==
==SUMMARY==
Line 68: Line 67:
2.2  LOCAL LEAK RATE TESTS ('l'YPES BAND C)
2.2  LOCAL LEAK RATE TESTS ('l'YPES BAND C)
The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.
The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.
* The leakage past electrical penetration A-18 initiated a review
* The leakage past electrical penetration A-18 initiated a review of the Type B test procedures upon          completion  or    the 2-1
* of the Type B test procedures upon          completion  or    the 2-1
* Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations *
* Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations *
*
* 2-2
* 2-2
* SECTION 3 TYPE A TEST 3,.1 EDITED LOG OF EVENTS December 15, 1981 2350 - Initiated containment pressurization December 16 1 1981 033q - Secured containment pressurization and cycled MOV-VS-200B 0336 - Restarted pressurization 1102 - Identified    leakage  path  at  electrical penetration A-18 1111    Secured containment pressurization 1720 - Completed stabilization December 17; 1981
 
SECTION 3 TYPE A TEST 3,.1 EDITED LOG OF EVENTS December 15, 1981 2350 - Initiated containment pressurization December 16 1 1981 033q - Secured containment pressurization and cycled MOV-VS-200B 0336 - Restarted pressurization 1102 - Identified    leakage  path  at  electrical penetration A-18 1111    Secured containment pressurization 1720 - Completed stabilization December 17; 1981
* 1700 - Quantified be a minimum December 18, 1981 leakage at electrical penetration A-18 to of 3.75 scfm 0800 - Only  major leakage    path  identified    electrical penetration A-18 0950 - Tightened collar bushing nut on A-18 *B 11 Phase wire -
* 1700 - Quantified be a minimum December 18, 1981 leakage at electrical penetration A-18 to of 3.75 scfm 0800 - Only  major leakage    path  identified    electrical penetration A-18 0950 - Tightened collar bushing nut on A-18 *B 11 Phase wire -
leakage stopped 1030 - Started taking data for ILkT December 19 1 1981 0215    Completed ILRT oq35 - Started superimposed verification test 0835    Completed superimposed verification test 1150 - C0Dm1enced contairunent depressurization 2138    Completed contairunent depressurization 3-1
leakage stopped 1030 - Started taking data for ILkT December 19 1 1981 0215    Completed ILRT oq35 - Started superimposed verification test 0835    Completed superimposed verification test 1150 - C0Dm1enced contairunent depressurization 2138    Completed contairunent depressurization 3-1
* 3.2  GENERAL TEST DESCRIPTION 3.2.1      Prerequisites In  accordance    with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a      partial listing of the prerequisites      that were completed and docwnented prior to containment pressurization *.
 
3.2  GENERAL TEST DESCRIPTION 3.2.1      Prerequisites In  accordance    with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a      partial listing of the prerequisites      that were completed and docwnented prior to containment pressurization *.
: 1. General inspection of the accessible interior          and exterior surfaces of the containment structure          was performed.
: 1. General inspection of the accessible interior          and exterior surfaces of the containment structure          was performed.
: 2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.
: 2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.
Line 90: Line 89:
During the test, the necessary variables used to determine containment    leakage    were    continually    monitored    using instrumentation      which  consisted    of  multiple    resistance temperature detectors      (RTDs),    chilled  mirror    dew  po.int indicators, and two absolute pressure quartz manometers (see Appendix 3D) *
During the test, the necessary variables used to determine containment    leakage    were    continually    monitored    using instrumentation      which  consisted    of  multiple    resistance temperature detectors      (RTDs),    chilled  mirror    dew  po.int indicators, and two absolute pressure quartz manometers (see Appendix 3D) *
* 3-2
* 3-2
* A mass flowmeter in the service air systems was used during the superimposed verification test.        All  test    instrumentation readings are input into the piant computer for data acquisition and averaging.
 
A mass flowmeter in the service air systems was used during the superimposed verification test.        All  test    instrumentation readings are input into the piant computer for data acquisition and averaging.
3.2.3      Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan.,
3.2.3      Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan.,
log, average, and analyze data received from the containment instrumentation.
log, average, and analyze data received from the containment instrumentation.
Line 100: Line 100:
3.2.4.1    Absolute Method Mass Point Analysis The  Absolute    Method  of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period    of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:
3.2.4.1    Absolute Method Mass Point Analysis The  Absolute    Method  of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period    of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:
* 3-3
* 3-3
* M  =  CP-Pv) V (144)                            *lEq 1)
 
M  =  CP-Pv) V (144)                            *lEq 1)
RT where:
RT where:
M  =airmass, lb P  = total pressure, psia Pv  = average vapor pressure, psia R  = 53.35 ft lbf/1bm 0 R ,for air)
M  =airmass, lb P  = total pressure, psia Pv  = average vapor pressure, psia R  = 53.35 ft lbf/1bm 0 R ,for air)
Line 115: Line 116:
The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is
The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is
* 3-4
* 3-4
* expressed as a percentage of containment mass lost in 24 hours o~
 
expressed as a percentage of containment mass lost in 24 hours o~
symbo1ica1ly :
symbo1ica1ly :
MEA  Leak Rate = Mi - Mt      (2400)
MEA  Leak Rate = Mi - Mt      (2400)
Line 124: Line 126:
The 95 percent  confidence    interval    is  determined  with the T distribution.
The 95 percent  confidence    interval    is  determined  with the T distribution.
This  analysis  method    was  used    in  conjunction with procedure 2-PT-16.3 (Reference 3) *
This  analysis  method    was  used    in  conjunction with procedure 2-PT-16.3 (Reference 3) *
*
* 3-5
* 3-5


--------*-  ~ - - -
--------*-  ~ - - -
* 3.3  TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J.
3.3  TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J.
The graph is divided into the following zones:
The graph is divided into the following zones:
zone A - depicts temperature stabilization period from 1140 hours to 1710 hours on December 16, 1981.
zone A - depicts temperature stabilization period from 1140 hours to 1710 hours on December 16, 1981.
Line 135: Line 136:
Zone D  depicts superimposed verification test        from 0440 hours to 0840 hours on December 19, 1981 *.
Zone D  depicts superimposed verification test        from 0440 hours to 0840 hours on December 19, 1981 *.
An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.
An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.
The unacceptable mass trend shown in Zone B was a result of
The unacceptable mass trend shown in Zone B was a result of excessive leakage past electrical penetration A18
* excessive leakage past electrical penetration A18
* The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C.
* The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C.
The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4).      The input data tor the V~PCO-CILRT program are shown in Appendix 3F.
The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4).      The input data tor the V~PCO-CILRT program are shown in Appendix 3F.
Line 143: Line 143:
The following  appendices      contain  the plots  provided by this report:
The following  appendices      contain  the plots  provided by this report:
3-6
3-6
* Appendix                          Description 3J              Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours on 12/19/81) 3K              Containment leak rate and UCL vs time, mass point ana1ysis    (1030  hours  on 12/18/81 to 0210 hours on 12/19/81) 3L              Containment leak rate vs time, tota1 time analysis~(1030 hours on 12/18/81 to 0210 hours on 12/19/81)
 
Appendix                          Description 3J              Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours on 12/19/81) 3K              Containment leak rate and UCL vs time, mass point ana1ysis    (1030  hours  on 12/18/81 to 0210 hours on 12/19/81) 3L              Containment leak rate vs time, tota1 time analysis~(1030 hours on 12/18/81 to 0210 hours on 12/19/81)
The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours to 0840 hours on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures *
The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours to 0840 hours on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures *
*
* 3-1
* 3-1
* 3.4  TEST RESULTS 3.4.1      CILRT Results - Total Time Method 1 .. Leakage rate calculated, Lam                  0.043258 percent/day
 
3.4  TEST RESULTS 3.4.1      CILRT Results - Total Time Method 1 .. Leakage rate calculated, Lam                  0.043258 percent/day
: 2. 95 percent upper confidence interval          0 .0289.;t7 percent/day
: 2. 95 percent upper confidence interval          0 .0289.;t7 percent/day
: 3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2)                  0.072185 percent/day CILRT Results-Mass Point Method
: 3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2)                  0.072185 percent/day CILRT Results-Mass Point Method
Line 160: Line 161:
(Lo+ Lam - o.~5 La) s  Le$    (Lo+ Lam+  0.2s    La) where:  Le = Containment leakage rate calculated during      the verification test              0.122645 percent/day Lo = Leakage rate imposed on containment using  flow measuring device                0.109090 percent/day
(Lo+ Lam - o.~5 La) s  Le$    (Lo+ Lam+  0.2s    La) where:  Le = Containment leakage rate calculated during      the verification test              0.122645 percent/day Lo = Leakage rate imposed on containment using  flow measuring device                0.109090 percent/day
* 3-8
* 3-8
* La  = Maxinnnn  a11owab1e 1eakage rate                            0.1 percent/day Lam= tota1 measured containment leakage rate                    0"'03713b pei:cent/day 0.109090 + 0.037136 - 0.025 S 0.122645    s 0.109090 + Ou037136 + 0.025 0.121226  s  0.122645  s 0.171226 3.4.4      Types C and B Penetration Leakage          to be  Added  to Containment Calcu1ated Leakage*
 
La  = Maxinnnn  a11owab1e 1eakage rate                            0.1 percent/day Lam= tota1 measured containment leakage rate                    0"'03713b pei:cent/day 0.109090 + 0.037136 - 0.025 S 0.122645    s 0.109090 + Ou037136 + 0.025 0.121226  s  0.122645  s 0.171226 3.4.4      Types C and B Penetration Leakage          to be  Added  to Containment Calcu1ated Leakage*
Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added                    3.88 SCFH Total Type B leakage to be added                            0 Total Types Band C leakage to be added                                0.00129 percent/day
Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added                    3.88 SCFH Total Type B leakage to be added                            0 Total Types Band C leakage to be added                                0.00129 percent/day
* NOTB:  The above penetrations were in a nonvented valve lineup configuration for this test. with respective leak rates taken from 2-PT-16.4
* NOTB:  The above penetrations were in a nonvented valve lineup configuration for this test. with respective leak rates taken from 2-PT-16.4
* their
* their
* 3-9
* 3-9
* APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure
 
APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure
   ~        ~      (in Hg)      Dew Point (OF)    Dry Bu1b (OF) 12/8/81  0000    29.70            35                q.s 0400    29.57            31                4&
   ~        ~      (in Hg)      Dew Point (OF)    Dry Bu1b (OF) 12/8/81  0000    29.70            35                q.s 0400    29.57            31                4&
0800    29.&1            39                4{,
0800    29.&1            39                4{,
Line 172: Line 175:
(
(
* 3A-1
* 3A-1
* APPENDIX 3A (CONT*D)
 
APPENDIX 3A (CONT*D)
Barometric Pressure
Barometric Pressure
   ~        ~      (in Hg)    Dew Point  ,on Dry Bulb (OF) 12/11/81 0000    29.82          12            31 0400    29.83          15            31 0800    29.88          14            29 1200    29.91          16            3~
   ~        ~      (in Hg)    Dew Point  ,on Dry Bulb (OF) 12/11/81 0000    29.82          12            31 0400    29.83          15            31 0800    29.88          14            29 1200    29.91          16            3~
Line 180: Line 184:
0400    30.31          17            23 0800    30~33          18            22 1200    30.34          21            40 1600    30.31          22            41 2000    30~31          21            26
0400    30.31          17            23 0800    30~33          18            22 1200    30.34          21            40 1600    30.31          22            41 2000    30~31          21            26
**                          3A-2
**                          3A-2
* APPENDIX 3A (CONT*D)
 
APPENDIX 3A (CONT*D)
Barometric Pressure
Barometric Pressure
   ~        ~      Cin Hg)    Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000    30.30          19            23 0400    30.27          21            23 0800    30.23          24            21 1200    30.12          39            44 1600    30.02          43            4q 2000    29~91          49            50 12/15/81 0000    29.87          45            q.5 0400    29.89          37            37 0800    29 .. 87        36            36 1200    29.75          31            37
   ~        ~      Cin Hg)    Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000    30.30          19            23 0400    30.27          21            23 0800    30.23          24            21 1200    30.12          39            44 1600    30.02          43            4q 2000    29~91          49            50 12/15/81 0000    29.87          45            q.5 0400    29.89          37            37 0800    29 .. 87        36            36 1200    29.75          31            37
Line 192: Line 197:
33 q.5 45 44 1300      30.16            21              50 1400      30.16            29              4b 1500      30.16            30              47 1600      30.16            27              48 1700      30.10            28              47 1800      30~70            31              31 1900      30.80            30              36 2000      30.70            35              41 2100      30.80            28              31
33 q.5 45 44 1300      30.16            21              50 1400      30.16            29              4b 1500      30.16            30              47 1600      30.16            27              48 1700      30.10            28              47 1800      30~70            31              31 1900      30.80            30              36 2000      30.70            35              41 2100      30.80            28              31
* 3B-1
* 3B-1
* APPENDIX 3B (CONT*D)
 
APPENDIX 3B (CONT*D)
Barometric Pressure
Barometric Pressure
     ~      ~      (in Hg)    Dew Point (OF) Dry Bulb (OF) 2200    30.8            28            33 2300    30.38          27            27 12/17/81 0000    30.38          26            34 0100    30.;38          29            3~
     ~      ~      (in Hg)    Dew Point (OF) Dry Bulb (OF) 2200    30.8            28            33 2300    30.38          27            27 12/17/81 0000    30.38          26            34 0100    30.;38          29            3~
Line 198: Line 204:
* 0800 0900 1000 30.;.38 30.37 30.38 29 30 31 38 42 44 1100    30 .. 38        2~            4b 1200    30*.40          31            47 1300    30.37          32            55 1400    30.38          30            52 1500    30.32          32            52 1600    30.37          38            50 1700    29.38          43            43 1800    30.38          42            IJ2 1900    30.34          41            43
* 0800 0900 1000 30.;.38 30.37 30.38 29 30 31 38 42 44 1100    30 .. 38        2~            4b 1200    30*.40          31            47 1300    30.37          32            55 1400    30.38          30            52 1500    30.32          32            52 1600    30.37          38            50 1700    29.38          43            43 1800    30.38          42            IJ2 1900    30.34          41            43
**                          3B-2
**                          3B-2
* APPENDIX 3B (CONT'D)
 
APPENDIX 3B (CONT'D)
Barometric Pressure
Barometric Pressure
     ~      Time*  {in Hg)    Dew Point &OF) Dry Bul.b IOF) 2000    30.35          37            50 2100    30.34          39.5          46 2200    30.37          39.5          4b 2300
     ~      Time*  {in Hg)    Dew Point &OF) Dry Bul.b IOF) 2000    30.35          37            50 2100    30.34          39.5          46 2200    30.37          39.5          4b 2300 12/18/81 0000 0100    30.36          35            49 0200    30.36          35            4~
                    **              **            **
0300 0400    30.31          39            50 0500    30.33          40            48
12/18/81 0000
                    **            **            **
0100    30.36          35            49 0200    30.36          35            4~
0300
                    **            **            **
0400    30.31          39            50 0500    30.33          40            48
* 0600 0700 0800 30.36 30.38 30.37 41 41 37 46 Q.t, 44 0900    30.37          35            37 1000    30~37          33            44 1100    30.37          32            41 1200    30.38          35            39 1300    30.38          33            38 1400    30~37          29            41 1500    30.37          32            41 1600    30.37          34            39 1700    30.37          28            33
* 0600 0700 0800 30.36 30.38 30.37 41 41 37 46 Q.t, 44 0900    30.37          35            37 1000    30~37          33            44 1100    30.37          32            41 1200    30.38          35            39 1300    30.38          33            38 1400    30~37          29            41 1500    30.37          32            41 1600    30.37          34            39 1700    30.37          28            33
* 3B-3
* 3B-3
* APPENDIX 3B ,coNT 1 D)
 
APPENDIX 3B ,coNT 1 D)
Barometric Pressure
Barometric Pressure
     ~      Time  (in Hg)    Dew Point (OF) Dry Bu1b (OF) 1800    30.37          28            33 1900    30.37          28            38 2000    30~37          28            34 2100    30.37          28            34 2200    30.37          28            32 2300    30.37          28            31 12/19/81 0000    30.37          28            31 0100                    **            **
     ~      Time  (in Hg)    Dew Point (OF) Dry Bu1b (OF) 1800    30.37          28            33 1900    30.37          28            38 2000    30~37          28            34 2100    30.37          28            34 2200    30.37          28            32 2300    30.37          28            31 12/19/81 0000    30.37          28            31 0100                    **            **
                    **
0200    30.38          21            3At 0300
0200    30.38          21            3At 0300
                    **            ...            **
* 0400 0500 0600 30.38 30~37 21 24 34 33 0700    30.37          18            22 0800    30~37          18            32 0900    30.38          18
* 0400 0500 0600
                    **
30.38 30~37
                                  **
21 24
                                                  **
34 33 0700    30.37          18            22 0800    30~37          18            32 0900    30.38          18
* 3B-4
* 3B-4


*
APPENDIX 3C INSTRUMENTATION TAbLE The  following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.
* APPENDIX 3C
* INSTRUMENTATION TAbLE The  following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.
Weight      Computer Instrument        Factor        ~                    Range      ~          Accuracy  Sensitivity Rl'D-LM-200-1    0.02683      T1000A        55-1050F          F-1        +/-0 .1oF-  +/-0.090F Rl'D-LM-200-2    0.02322      T1001A        55-1050F          F-2        +/-0.1oF*    +/-0.09°F Rl'D-LM-200-3    0.02427      T1002A        55-105DF          F-3        +/-0 .. 1DF  +/-0.090F Rl'D-LM-200-4    0.01820      T1003A        55-1050F          E-3        +/-0.10F    +/-0 .. 09°F Rl'D-LM-200-5    0.08884      T100qA        55-105DF          B-1        +/-0.10F    +/-0.09°F Rl'D-LM-200-6    0.08884      T1005A        55-105DF          B-2        +/-0.1°F    +/-0 *.09°F Rl'D-LM-200-7    0.08884      T1006A        55-1050F          c-1        +/-0 .10F    +/-0.09°F Rl'D-LM-200-8    0.08881J    T1007A        55-1050F            c-2        +/-0.1DF    +/-0.09°F Rl'D-LM-200-9    0.04975      T1008A        55-105DF          A-1        +/-0 .. 10F  +/-0.09°F Rl'D-LM-200-10    O.OIJ975    T1009A        55"'.'"1050F      A-2        +/-0.1°F    +/-0.09°F RTD-LM-200-11    0.04975      T1010A        55-1050F
Weight      Computer Instrument        Factor        ~                    Range      ~          Accuracy  Sensitivity Rl'D-LM-200-1    0.02683      T1000A        55-1050F          F-1        +/-0 .1oF-  +/-0.090F Rl'D-LM-200-2    0.02322      T1001A        55-1050F          F-2        +/-0.1oF*    +/-0.09°F Rl'D-LM-200-3    0.02427      T1002A        55-105DF          F-3        +/-0 .. 1DF  +/-0.090F Rl'D-LM-200-4    0.01820      T1003A        55-1050F          E-3        +/-0.10F    +/-0 .. 09°F Rl'D-LM-200-5    0.08884      T100qA        55-105DF          B-1        +/-0.10F    +/-0.09°F Rl'D-LM-200-6    0.08884      T1005A        55-105DF          B-2        +/-0.1°F    +/-0 *.09°F Rl'D-LM-200-7    0.08884      T1006A        55-1050F          c-1        +/-0 .10F    +/-0.09°F Rl'D-LM-200-8    0.08881J    T1007A        55-1050F            c-2        +/-0.1DF    +/-0.09°F Rl'D-LM-200-9    0.04975      T1008A        55-105DF          A-1        +/-0 .. 10F  +/-0.09°F Rl'D-LM-200-10    O.OIJ975    T1009A        55"'.'"1050F      A-2        +/-0.1°F    +/-0.09°F RTD-LM-200-11    0.04975      T1010A        55-1050F
* A-3        +/-0.1°F    +/-0.09°F Rl'D-LM-200-12    0.02460      T1011A        55-1050F          D-1        +/-0.10F    +/-0.09°F Rl'D-LM-200-13    0.021J60    T1012A        55-105DF          D-2        +/-0.1°F    +/-0.09°F Rl'D-LM-200-14    0.02460      T1013A        55-1050F          E-1        +/-0.1DF    +/-0.09°F Rl'D-LM-200-15    0.02LJ60    TIJ02LJA      55-105DF          B-2        +/-0.1DF    +/-0 ..09°F Rl'D-LM-200-16    O.OLJ76t>    T4025A        55-1050.l?        I-1        +/-0.1DF    +/-0.090?
* A-3        +/-0.1°F    +/-0.09°F Rl'D-LM-200-12    0.02460      T1011A        55-1050F          D-1        +/-0.10F    +/-0.09°F Rl'D-LM-200-13    0.021J60    T1012A        55-105DF          D-2        +/-0.1°F    +/-0.09°F Rl'D-LM-200-14    0.02460      T1013A        55-1050F          E-1        +/-0.1DF    +/-0.09°F Rl'D-LM-200-15    0.02LJ60    TIJ02LJA      55-105DF          B-2        +/-0.1DF    +/-0 ..09°F Rl'D-LM-200-16    O.OLJ76t>    T4025A        55-1050.l?        I-1        +/-0.1DF    +/-0.090?
RTD-LM-200-17    0.04706      T4026A        55-1050F          I-2        +/-0.10F    +/-0.090F Rl'D-LM-:W0-18    O.OIJ766    T4027A        55-1050F          I-3        +/-0.1DF    +/-0.090F 3C-1
RTD-LM-200-17    0.04706      T4026A        55-1050F          I-2        +/-0.10F    +/-0.090F Rl'D-LM-:W0-18    O.OIJ766    T4027A        55-1050F          I-3        +/-0.1DF    +/-0.090F 3C-1


*
APPENDIX 3C (CONT 1 D)
* APPENDIX 3C (CONT 1 D)
Weight    Computer Instrwnent    Factor    Point            Range        ~  Accuracy    Sensitivity Rl'D-LM-200-21 0.03608  T4009A      55-105°F          H-1 +/-0.1°F      +/-0 .090F Rl'D-LM-200-22 0.03961  T4020A      55-1050F          H-2 +/-0.1°.F      +/-0.090F RTD-LM-200-23  0 .o 1782 T4021A      55-1050F          G-1 +/-0.1°F      +/-0.090F Rl'D-LM-200-24 0.06800  T4022A      55-1050F          G-2 +/-0.10F      +/-0,.09°F Ml'-LM-200-o  0.14064  T4039A      -40 to +200°F      J-1 +/-0.40F      +/-O.OS°F MT-LM-200-7    0.14064  T4040A      -40 to +-2Q00F    J-2 +/-0.4°F      +/-0.05°F Ml'-LM-200-8  0.23959  T4041A      -40 to +2000F      K-1 +/-0.4°F      +/-0.05°F Ml'-LM-200-9  0.23959  T4042A      -1rn to +2Q00F    K-2 +/-0.4°F      +/-0.05°F Ml'-LM-200-10  0.23959  T4043A      -40 to +2000F      K-3 +/-Om4°F      +/-0.05°F PI-LM-206      0.5      00960        0-100 psia            +/-0.0&8 psia  o.oon,  ops PI-LM-207      o.s      00961        0-100 psia            +/-0 .068 psia 0.001, °FS 3C-2
* Weight    Computer Instrwnent    Factor    Point            Range        ~  Accuracy    Sensitivity Rl'D-LM-200-21 0.03608  T4009A      55-105°F          H-1 +/-0.1°F      +/-0 .090F Rl'D-LM-200-22 0.03961  T4020A      55-1050F          H-2 +/-0.1°.F      +/-0.090F RTD-LM-200-23  0 .o 1782 T4021A      55-1050F          G-1 +/-0.1°F      +/-0.090F Rl'D-LM-200-24 0.06800  T4022A      55-1050F          G-2 +/-0.10F      +/-0,.09°F Ml'-LM-200-o  0.14064  T4039A      -40 to +200°F      J-1 +/-0.40F      +/-O.OS°F MT-LM-200-7    0.14064  T4040A      -40 to +-2Q00F    J-2 +/-0.4°F      +/-0.05°F Ml'-LM-200-8  0.23959  T4041A      -40 to +2000F      K-1 +/-0.4°F      +/-0.05°F Ml'-LM-200-9  0.23959  T4042A      -1rn to +2Q00F    K-2 +/-0.4°F      +/-0.05°F Ml'-LM-200-10  0.23959  T4043A      -40 to +2000F      K-3 +/-Om4°F      +/-0.05°F PI-LM-206      0.5      00960        0-100 psia            +/-0.0&8 psia  o.oon,  ops PI-LM-207      o.s      00961        0-100 psia            +/-0 .068 psia 0.001, °FS 3C-2
* MT-7 ZONE J ZONEK MT-8      MT-IO        MT-9 PROFILE VIEW NOTE:
* MT-7 ZONE J ZONEK
* MT-8      MT-IO        MT-9 PROFILE VIEW NOTE:
MT-G MT-LM-200-G(TYP)
MT-G MT-LM-200-G(TYP)
' *.                        APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1
' *.                        APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1


,,.
el 132' RTD-12 RT0-5 RTO-G RTD-7              1 el 95 RTD-13                                            RTD-15 RT0-14 el 11 4i4 RTD-4                                              RTD-22
el 132' RTD-12 RT0-5 RTO-G RTD-7              1 el 95 RTD-13                                            RTD-15 RT0-14 el 11 4i4 RTD-4                                              RTD-22
* RTD-3 RTD-21 RT0-2 RTD-1 el 18'-4" el
* RTD-3 RTD-21 RT0-2 RTD-1 el 18'-4" el
Line 252: Line 241:
* RT0-17 IRTD-lj PLAN VIEW NOTES:
* RT0-17 IRTD-lj PLAN VIEW NOTES:
I. RTD-l=RTD-LM-200-1 (TYP)
I. RTD-l=RTD-LM-200-1 (TYP)
: 2. RT D-19,20 NOT USED APPENDIX 3 E
: 2. RT D-19,20 NOT USED APPENDIX 3 E 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD)
* 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD)
SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1
SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1


*
MT-7 NOTE:
* MT-7 NOTE:
PLAN VIEW MT-6 MT-LM-200-6 (TYP)
PLAN VIEW MT-6 MT-LM-200-6 (TYP)
* APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2
* APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2
Line 264: Line 251:
CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time  ABS Pressure    DEWPT    Vap Pressure    Dry Bu1b mours)      CPsia)        COF)        (Psia)    Temperature IOR) o.o      60.949        66.42        0.3209        534.33 o.~33    60.950        66.43        0.3210        534.34 0.667    60.950        66.45        0.3212        534.33
CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time  ABS Pressure    DEWPT    Vap Pressure    Dry Bu1b mours)      CPsia)        COF)        (Psia)    Temperature IOR) o.o      60.949        66.42        0.3209        534.33 o.~33    60.950        66.43        0.3210        534.34 0.667    60.950        66.45        0.3212        534.33
* 1.000    60.949        66.46        0.3213        534.32 1.333    60.950        66.47        0.3215        534.34 1.667    &0.951        66.50        0.3218        534.34 2.000      60 .951      6f>.50      0.3218        534.35 2.333    60.951        66.52        0.3220        534.36
* 1.000    60.949        66.46        0.3213        534.32 1.333    60.950        66.47        0.3215        534.34 1.667    &0.951        66.50        0.3218        534.34 2.000      60 .951      6f>.50      0.3218        534.35 2.333    60.951        66.52        0.3220        534.36
* 2.667 3.000 3.333 60.951 60.950 60.950 66.52 66.53 66.56 0.3220 0.3221 0.3225 534.35 534.34 534.35 3.667    60.951        66.56        0.3225        534.36 4.000    60 .951      f,f,.57      0.3226        534.37 4.333    60.951        66.58        0.3227        534.37 4.667    60.952        66.57        0.3226        53,._39 5.000    .60 .952      66.60        0.3229        534.38 5.333    60.952        66.60        0.3229.        534.38 5.667    60.952        66.60        0.3229,        534.38 6.000    60.952        66.61        0.3230        534.38 6.333    60.952        66.62        0.3231        534.39
* 2.667 3.000 3.333 60.951 60.950 60.950 66.52 66.53 66.56 0.3220 0.3221 0.3225 534.35 534.34 534.35 3.667    60.951        66.56        0.3225        534.36 4.000    60 .951      f,f,.57      0.3226        534.37 4.333    60.951        66.58        0.3227        534.37 4.667    60.952        66.57        0.3226        53,._39 5.000    .60 .952      66.60        0.3229        534.38 5.333    60.952        66.60        0.3229.        534.38 5.667    60.952        66.60        0.3229,        534.38 6.000    60.952        66.61        0.3230        534.38 6.333    60.952        66.62        0.3231        534.39 6.667    60.952        66.62        0.3231        534.40 3F-1
* 6.667    60.952        66.62        0.3231        534.40 3F-1
* Time (Hours)
* Time (Hours)
ABS Pressure (Psia)
ABS Pressure (Psia)
Line 271: Line 257:
DEWPT (OF)
DEWPT (OF)
Vap Pressure IPsia)
Vap Pressure IPsia)
Dry Bulb Temperature  (OR) 7.000    60.952      66.62        0.3231        534~3' 7.333    60.951      66 .63        0.3232        534.39 7.667    60.951      66.6LJ        0.3234        534.39 8.000    60.951      66.63        0.3232        534.39 8.333    60.951      6&.64        0.3234        534.39 8.&67    60.951      66.&3        0.3232        534.40 9.000    60.951      M,.64        0.3234        534.40 9.333    60.951      66 .. 65      0.3235        534.40 9.667    60.951      66.64        0.32.34      534.40 10 .ooo                                            534.40
Dry Bulb Temperature  (OR) 7.000    60.952      66.62        0.3231        534~3' 7.333    60.951      66 .63        0.3232        534.39 7.667    60.951      66.6LJ        0.3234        534.39 8.000    60.951      66.63        0.3232        534.39 8.333    60.951      6&.64        0.3234        534.39 8.&67    60.951      66.&3        0.3232        534.40 9.000    60.951      M,.64        0.3234        534.40 9.333    60.951      66 .. 65      0.3235        534.40 9.667    60.951      66.64        0.32.34      534.40 10 .ooo                                            534.40 b0.~50      66.62        0.3231 10.333    60.950      66.65        0.3235        534.40 10.&67    60.950      66.64        0.3234        534.40 11.000    60.950      66.64        0.3234        534.a+O 11.333    60.949      66.65        0.3235        534.40 11.667    60.94~      66.67        0 .. 3237    534.40 12.000    60 .. ~49  66.65        0.3235        5.34.41 12.333    60.949      66.64        0.3.l34      534 .. 41 12.667    60.948      66.64        0.3234        53AJ.40 13.000    60.948      66.65        0.3235        534.40 13 .333    60.948      66.64        0.3234        534.ll1 13.667    60~948      t,6.64        0.3234        534.41 14.000    60.9£J8    66.b4        0.3234        53Q..40 14.333    60.947      66.63        0.3232        534.41 3F-2 jl
* b0.~50      66.62        0.3231 10.333    60.950      66.65        0.3235        534.40 10.&67    60.950      66.64        0.3234        534.40 11.000    60.950      66.64        0.3234        534.a+O 11.333    60.949      66.65        0.3235        534.40 11.667    60.94~      66.67        0 .. 3237    534.40 12.000    60 .. ~49  66.65        0.3235        5.34.41 12.333    60.949      66.64        0.3.l34      534 .. 41 12.667    60.948      66.64        0.3234        53AJ.40 13.000    60.948      66.65        0.3235        534.40 13 .333    60.948      66.64        0.3234        534.ll1 13.667    60~948      t,6.64        0.3234        534.41 14.000    60.9£J8    66.b4        0.3234        53Q..40
* 14.333    60.947      66.63        0.3232        534.41 3F-2 jl
* Time C.l:lours)
* Time C.l:lours)
ABS Pressure
ABS Pressure
Line 282: Line 266:
Dry Bu1b Temperature C0 R}
Dry Bu1b Temperature C0 R}
14.667        60.947      66.63      0.3232          5.34.40 15.000        60.947      bb.62      0 .. 3231      534.41 15.333        60~9lH,    66.63      0.3232          534.40 1'5.667      60.~45      66.63      0.3232          534.40
14.667        60.947      66.63      0.3232          5.34.40 15.000        60.947      bb.62      0 .. 3231      534.41 15.333        60~9lH,    66.63      0.3232          534.40 1'5.667      60.~45      66.63      0.3232          534.40
*
* 3F-3
* 3F-3
* Time (Hours)
* Time (Hours)
Line 289: Line 272:
Leakage (I/day)
Leakage (I/day)
Conf (I/day)
Conf (I/day)
UCL (I/day) 6.333  551221.60      0.041207      0.005040  o.046.itn 6.067  551211.28      0.042827      0 .0011825 0.047651 7.000  551221.t,O      0.041938      0.004463  0.04&401 7.333  551211.49      0.042241      0.004076  0.04&317 7.667  551210.47      0.0~2185      0.003728  0.045913 a.ooo  551211.a&9    -0.041&29      0.003461  O.Oa.50~6 8.333  551210.47      0.040950      0.003264  0.044214
UCL (I/day) 6.333  551221.60      0.041207      0.005040  o.046.itn 6.067  551211.28      0.042827      0 .0011825 0.047651 7.000  551221.t,O      0.041938      0.004463  0.04&401 7.333  551211.49      0.042241      0.004076  0.04&317 7.667  551210.47      0.0~2185      0.003728  0.045913 a.ooo  551211.a&9    -0.041&29      0.003461  O.Oa.50~6 8.333  551210.47      0.040950      0.003264  0.044214 8.667  551201.17      0.041049      0.003018  0.01+4008 9.000  551200.1&      0.040924      0.002801  0.043725 9.333  551199.14      0.040&33      0.002&20  0 .04325:.t 9.&&7  551200.16      0.040047      0.002509  0.042556 10 .ooo 551193.10      0.,039884    0.0023'+9  0.04.l233  I 10.333  551190.05      0 .039749    0.002204  0.041953 10.667  551191.0b      0.039353      0.002104  0.041457 11.000  551191.06      0.038825      0.002045  0.040870 1).333  551180.9&      0 .03882&    0.001~26  0.040752 11.6b7  551178.92      0.038772      0.001818  0.040590 12.000  551170.64      0.039022      0.001736  0.040758 12.333  551171.bf,      0 .039023    0.001&43  0.040066 12.667  551172.88      0.038812      0.001571  0.0403ts3 13.000  551171.86      0.038538      0.001515  0.0-.0053 13.333  551162.57      0.038591      0.001441  0.040033 13.667  551102.57      0.038509      0.001374  0.03~883 3G-2
                                '
8.667  551201.17      0.041049      0.003018  0.01+4008 9.000  551200.1&      0.040924      0.002801  0.043725
* 9.333  551199.14      0.040&33      0.002&20  0 .04325:.t 9.&&7  551200.16      0.040047      0.002509  0.042556 10 .ooo 551193.10      0.,039884    0.0023'+9  0.04.l233  I 10.333  551190.05      0 .039749    0.002204  0.041953 10.667  551191.0b      0.039353      0.002104  0.041457 11.000  551191.06      0.038825      0.002045  0.040870 1).333  551180.9&      0 .03882&    0.001~26  0.040752 11.6b7  551178.92      0.038772      0.001818  0.040590 12.000  551170.64      0.039022      0.001736  0.040758 12.333  551171.bf,      0 .039023    0.001&43  0.040066 12.667  551172.88      0.038812      0.001571  0.0403ts3 13.000  551171.86      0.038538      0.001515  0.0-.0053 13.333  551162.57      0.038591      0.001441  0.040033
* 13.667  551102.57      0.038509      0.001374  0.03~883 3G-2
* Time
* Time
   <<Hours)
   <<Hours)
Line 300: Line 279:
Con&#xa3; (I/day)
Con&#xa3; (I/day)
UCL Cl/day) 14.000  551172.88      0.037888        0.001442 0.039330 14.333  551154.49      0.037961        0.001377 0.039338 14.667  551164.d1      0.037524        0.001382 0.038906 15 .ooo 551155.51      0.037375        0.001329 0.038704 15.333  551155.72      0.037131        0.001292 0.038430 15 .667 551146.62      0.037136        0.001238 0.038374
UCL Cl/day) 14.000  551172.88      0.037888        0.001442 0.039330 14.333  551154.49      0.037961        0.001377 0.039338 14.667  551164.d1      0.037524        0.001382 0.038906 15 .ooo 551155.51      0.037375        0.001329 0.038704 15.333  551155.72      0.037131        0.001292 0.038430 15 .667 551146.62      0.037136        0.001238 0.038374
*
* 3G-3
* 3G-3
* APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - MASS POINT ..ANAL~S1S
* APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - MASS POINT ..ANAL~S1S
                                                        !
:Time        Mass            Leakage        Conf          UCL (Hours)      (LBM)            (I/day)      (~/day}      (1/dan o.o        55127&.49          o.o          o.o          o.o 0.333      551274.26          o.o          o.o          o.o 0.667      551282.55      -0 .039582    0.339245      0.299663 1.000      551282.76      -0 .035414    0.052661      0.017247 1.333      551.270.21      0.005280      0.060467      0.0&5747
:Time        Mass            Leakage        Conf          UCL (Hours)      (LBM)            (I/day)      (~/day}      (1/dan o.o        55127&.49          o.o          o.o          o.o 0.333      551274.26          o.o          o.o          o.o 0.667      551282.55      -0 .039582    0.339245      0.299663 1.000      551282.76      -0 .035414    0.052661      0.017247 1.333      551.270.21      0.005280      0.060467      0.0&5747
* 1.6&7 2.000 2.333 55127&.2&
* 1.6&7 2.000 2.333 55127&.2&
Line 323: Line 300:
Cont (I/day)
Cont (I/day)
UCL
UCL
                                                                     ,~/day) 6.000    551232.93    0.031609        0.045422    0.042849    0.088271 6.333    551221.60    0.037737        o .. 046083 0.011-1530  0.087f>13 6 .. 66.7 551211.28    0.042582        0.047488    0.040147    0.087t>35 7.000    551221.60    0.034141        0.047117    0.039504  .0.0~6622 7.333    551211.49    0.038592        0.047516    0.038570    0.08&085 8.000    551211 .. 49  0.035375        0.047378    0.037258    0.084&36 8.333    551210.47    0.034493        0.04b984    0.036793    0.08377ts 8'.667    551201.17    0.037833        0.047102    0.036135    0.083.2.37 9.000    551200.16    0.036926        0.047047    0.03557'1  0.082t>24
                                                                     ,~/day) 6.000    551232.93    0.031609        0.045422    0.042849    0.088271 6.333    551221.60    0.037737        o .. 046083 0.011-1530  0.087f>13 6 .. 66.7 551211.28    0.042582        0.047488    0.040147    0.087t>35 7.000    551221.60    0.034141        0.047117    0.039504  .0.0~6622 7.333    551211.49    0.038592        0.047516    0.038570    0.08&085 8.000    551211 .. 49  0.035375        0.047378    0.037258    0.084&36 8.333    551210.47    0.034493        0.04b984    0.036793    0.08377ts 8'.667    551201.17    0.037833        0.047102    0.036135    0.083.2.37 9.000    551200.16    0.036926        0.047047    0.03557'1  0.082t>24 9.333    55119.14      0.036083        0.04&861    0.035101    0.081~&2 9.667    551200.lt,    0.03'l378        0.046454    0.034745    0.081199 10.000    551193.10    0.036306        O.Otl6314  0.034283    0.080597 10.333    551190.05    0.03&421        o.o4&18o    0.033837    0.080023 10.667    551191.06    0 .. 034866      0.045871    o.0334ss    0.079359 11.000    551191 .. 06  0.033810        0.045449    0.033195    0.07~&44 11 .. 333  551180.96    0.036700        0.045380    0.032771    0.078150 11.667    551178.92    0.036409        0.045275    0.03231a    0.077653 12.000    551170.64    0.038~02        0.045378    0.031936    0.077314 12 .333    551171~&6    0.037006        0.045316    0.031563    0.070878 12.667    551172.88    0.035610        0.045109    0.0312St,  0.07&366 13.000    551171.86'    0.035039        0.044852. 0.03097S    0.075831 13.661    551162.57    *0.036290        0.044692    0 .03032li  0~075020
* 9.333    55119.14      0.036083        0.04&861    0.035101    0.081~&2 9.667    551200.lt,    0.03'l378        0.046454    0.034745    0.081199 10.000    551193.10    0.036306        O.Otl6314  0.034283    0.080597 10.333    551190.05    0.03&421        o.o4&18o    0.033837    0.080023 10.667    551191.06    0 .. 034866      0.045871    o.0334ss    0.079359 11.000    551191 .. 06  0.033810        0.045449    0.033195    0.07~&44 11 .. 333  551180.96    0.036700        0.045380    0.032771    0.078150 11.667    551178.92    0.036409        0.045275    0.03231a    0.077653 12.000    551170.64    0.038~02        0.045378    0.031936    0.077314 12 .333    551171~&6    0.037006        0.045316    0.031563    0.070878 12.667    551172.88    0.035610        0.045109    0.0312St,  0.07&366 13.000    551171.86'    0.035039        0.044852. 0.03097S    0.075831 13.661    551162.57    *0.036290        0.044692    0 .03032li  0~075020
* 14.000    551172.88    0.032219 3H-2 0.044193    0.0301tU,  0.07~379
* 14.000    551172.88    0.032219 3H-2 0.044193    0.0301tU,  0.07~379
* Time    Mass APPENDIX 3H (CONT 9 D)
* Time    Mass APPENDIX 3H (CONT 9 D)
Meas Leakage Est Leakage  Cont      UCL
Meas Leakage Est Leakage  Cont      UCL
   &Hours)  (LBM)      <<I/day)      ,1/day)  ,1/day)  (~/day) 14.;333 5511S4.;49 0.037056    0.044161  0.029866 0.074027 14.667  551164.81  0~033151    0.043783  0.029681 0.0734t>4 15.000  551155.51  0.035113    a.*043595  O.Ol942o 0.073021 15.333  551155.72  0~034292    0.043345  0.029200 0.072545 15.667  551146.62  0.036088    0.043258  0.028927 0.07.2185
   &Hours)  (LBM)      <<I/day)      ,1/day)  ,1/day)  (~/day) 14.;333 5511S4.;49 0.037056    0.044161  0.029866 0.074027 14.667  551164.81  0~033151    0.043783  0.029681 0.0734t>4 15.000  551155.51  0.035113    a.*043595  O.Ol942o 0.073021 15.333  551155.72  0~034292    0.043345  0.029200 0.072545 15.667  551146.62  0.036088    0.043258  0.028927 0.07.2185
*
* 3H-3
* 3H-3


    *                              *
AIR MASS (LBM) 01          01                            01 01 01          01                            01 01 I',)                        OJ -I>
* AIR MASS (LBM) 01          01                            01 01 01          01                            01 01 I',)                        OJ -I>
0          0                            0  0 0          0                            0  0 0          0                            0  0 1130 1230 1330 ZONE A 1430                    TEMPERATURE STABILIZATION 1530 I\)
0          0                            0  0 0          0                            0  0 0          0                            0  0 1130 1230 1330 ZONE A 1430                    TEMPERATURE STABILIZATION 1530
          '
I\)
0) 1630 1730 1830
0) 1630 1730 1830
                            ------------------- ----
           '(X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 REMOVED RTD FROM SCAN 0930 I\)    1030
           '(X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 REMOVED RTD FROM SCAN 0930 I\)    1030
           '-.J I 130 1230
           '-.J I 130 1230 (X)      1330 1430                            ZONE B 1530                    LEAKAGE INVESTIGATION 1630 1730 1830
          .......
(X)      1330 1430                            ZONE B 1530                    LEAKAGE INVESTIGATION 1630 1730 1830
       -I            1930 3::          2030 IT'I I          2130
       -I            1930 3::          2030 IT'I I          2130
:t:          2230 0
:t:          2230 0
Line 348: Line 317:
::0 0030 z            0130
::0 0030 z            0130
       -I IT'I          0230
       -I IT'I          0230
::0
::0 l>
      <
l>
0330 r            0430 en 0530 0630 0730 0830 0930 I\)
0330 r            0430 en 0530 0630 0730 0830 0930 I\)
          '-
(X)
(X)
I 030 I 130 1230
I 030 I 130 1230
                                -------------
           '(X) 1330 1430 1530 1630 1730                        ZONE C 1830                  ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 0230 0330 PREPARATION FOR SUPERIMPOSED VERIFICATION TEST I\)
           '(X) 1330 1430 1530 1630 1730                        ZONE C 1830                  ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 0230 0330
                              ----------------
PREPARATION FOR SUPERIMPOSED VERIFICATION TEST
          '
I\)
0430 0530
0430 0530
                               -------------        ZONED U)      0630
                               -------------        ZONED U)      0630
           '(X)    0730 SUPERIMPOSED VERIFICATION TEST 0830 0930
           '(X)    0730 SUPERIMPOSED VERIFICATION TEST 0830 0930 1030 1130 1230
                            --------------
1030 1130 1230
                   )>
                   )>
(>J
(>J
Line 374: Line 333:
:::0 rn j
:::0 rn j


*                                                              *                                                                *
         .07 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - - - - - - - ,
         .07 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - - - - - - - ,
         .06          1A II        I\
         .06          1A II        I\
Line 387: Line 345:
1 ,,                                -      '-~~
1 ,,                                -      '-~~
::;;
::;;
  >-
   <t Cl
   <t Cl
   'I-z
   'I-z
         .04
         .04 1
                    '
I  11
1 I  11
                          '
                           ;,
                           ;,
                                                                            ---
                                                                                  ------
LEAK RATE            -------
LEAK RATE            -------
LI.I t.)              1 a:
LI.I t.)              1 a:
Line 402: Line 355:
LI.I  .03        I
LI.I  .03        I
   ~                I a:
   ~                I a:
:,,:
   <t              I LI.I
   <t              I LI.I
   ..I              I cJ
   ..I              I cJ
Line 411: Line 363:
                                                                                                                 + UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I
                                                                                                                 + UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I


*                                                  *                                                              *
           . 06 w
           . 06 w
::!:
j::
j::
   ...J
   ...J
           .05
           .05
   ~
   ~
0 I-
0 I-i3 I-      .04 z
  >-
i3
  ......
I-      .04 z
w u
w u
a:
a:
Line 428: Line 374:
w
w
   !i0::    .03
   !i0::    .03
:.:
   <(
   <(
w
w
Line 446: Line 391:
Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.
Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.
The total Types Band C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage *
The total Types Band C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage *
*
* 4-1
* 4-1


*
APPENDIX 4A 1980-1981 TYPE B DATA  
* APPENDIX 4A
* 1980-1981 TYPE B DATA  


==SUMMARY==
==SUMMARY==
Line 461: Line 403:
4A-1
4A-1


        *
APP.E.NDI..t. 4B 1980-1981 TYPE C DATA SUMMAR~
* APP.E.NDI..t. 4B
* 1980-1981 TYPE C DATA SUMMAR~
Post Repair Penetration system          Valve(s) Tested    Leakdge(scid)/Date        Mr No/Date/Repair                          Leax.age/Date 1      Comp Coo.l.      *rv-cc-209.b        >1770/11-21-81            2111211000/11-24-81/Cl.eaned va.Lve (CC) comp Cool.      2-CC-177            >3240/11-20-81            2111200700/11-22-81                        0/11--&#xa3;l-81 (CC)                                                        Lapped and cleaned valve Comp Cool        2-CC-176                                      S2111181531/11-22-81                      0/11-2~-81 (CC)                                                        Lapped and cleaned valve 5      Comp Cool.      '.l'\7-CC-209A      >3240/11-20-81            2109050700/11-21-81/Replaced ru.ober      0/11-2.2-81 (CC)                                                                                seat 7      Safety Injection 2-.SI-150          0/11-0~-81                N/A                                        0/1.t-1:.t.-sl (SI)          MOV'-2b67C&D        360/11-08-81              211108~345/11-21-81/New gasket            0/1:.t-1:l-81 and pack.ing 8      Comp Cool.      TV-CC-2.07          19 * .:.t./11-11-81      N/A                                        N/A (CC) 9      Comp Cool.                          204/11-13-81              .t:111131801/1..!-05-61/Macru.ned disc i:; .,!4/1"--05-81 (CC)                                                                                Lapped va.t.ve 10    Comp Cool.      .:t-CC-242          43.2/11-13-81            2111130738/11-19-bl/Lapped val.ve          2:6.4/11-b-sl (CC) 11    Comp Cool.      2-CC-233            6. 72/11-13-81            N/A (CC) 12    Comp Cool.      TV-CC-~10B          0/11-13-81                N/A                                        N/A (CC) 13    Comp Cool.      TV-CC-210C          .>.l400/11-06-81          2111131b03/11-13-81/Repl.acea ru.ober (CC)                                                                                seat 14    Comp Cool        TV-CC-210A          0/11-13-Bl                1'11/A                                    N/A (CC) 15    cnarging          2-~H-309          0/11-1!:1-til            N/A                                        N/A (Ch)          ,"1.0V-22B9A 1b    Comp Cool        2-CC-59            >432/11-11-81            2111110330/11-1~-81/Lapped va~ve          0/11-.t:0-81 (CC)
Post Repair Penetration system          Valve(s) Tested    Leakdge(scid)/Date        Mr No/Date/Repair                          Leax.age/Date 1      Comp Coo.l.      *rv-cc-209.b        >1770/11-21-81            2111211000/11-24-81/Cl.eaned va.Lve (CC) comp Cool.      2-CC-177            >3240/11-20-81            2111200700/11-22-81                        0/11--&#xa3;l-81 (CC)                                                        Lapped and cleaned valve Comp Cool        2-CC-176                                      S2111181531/11-22-81                      0/11-2~-81 (CC)                                                        Lapped and cleaned valve 5      Comp Cool.      '.l'\7-CC-209A      >3240/11-20-81            2109050700/11-21-81/Replaced ru.ober      0/11-2.2-81 (CC)                                                                                seat 7      Safety Injection 2-.SI-150          0/11-0~-81                N/A                                        0/1.t-1:.t.-sl (SI)          MOV'-2b67C&D        360/11-08-81              211108~345/11-21-81/New gasket            0/1:.t-1:l-81 and pack.ing 8      Comp Cool.      TV-CC-2.07          19 * .:.t./11-11-81      N/A                                        N/A (CC) 9      Comp Cool.                          204/11-13-81              .t:111131801/1..!-05-61/Macru.ned disc i:; .,!4/1"--05-81 (CC)                                                                                Lapped va.t.ve 10    Comp Cool.      .:t-CC-242          43.2/11-13-81            2111130738/11-19-bl/Lapped val.ve          2:6.4/11-b-sl (CC) 11    Comp Cool.      2-CC-233            6. 72/11-13-81            N/A (CC) 12    Comp Cool.      TV-CC-~10B          0/11-13-81                N/A                                        N/A (CC) 13    Comp Cool.      TV-CC-210C          .>.l400/11-06-81          2111131b03/11-13-81/Repl.acea ru.ober (CC)                                                                                seat 14    Comp Cool        TV-CC-210A          0/11-13-Bl                1'11/A                                    N/A (CC) 15    cnarging          2-~H-309          0/11-1!:1-til            N/A                                        N/A (Ch)          ,"1.0V-22B9A 1b    Comp Cool        2-CC-59            >432/11-11-81            2111110330/11-1~-81/Lapped va~ve          0/11-.t:0-81 (CC)
                                                               ,rn-1
                                                               ,rn-1


      *
APP~NDIX 4B (CONT 1 u) 1980-1981 TYP~ C DATA  
* APP~NDIX 4B (CONT 1 u)
* 1980-1981 TYP~ C DATA  


==SUMMARY==
==SUMMARY==
Line 475: Line 413:
Post Repair Penetration sistem              Valve ,s) Tested    Leakage,scfd)LDate    Mr NoLDateLRepair                      Leax.ageL!2ate 17    Comp Cool          2-CC-58              0/11-11/81            N/A                                    N/A (CC) 18    Comp Cool          2-CC-1              52 .8/11-11-81        211111030~/11-13-81/Lapped vaive      4.8/11-20-81 (CC) 19    Charging            MOV-.2381            0/11-li.-til          N/A                                    N/A (Ch) 20    ~afety Injection    2-SI-32              0/11-09-81            N/A                                    N/a (SI) 21    SaJ:ety Injection  MOV-2842            21.6/11-08-d1          N/A                                    N/A (SI) 23    ::,afety Injection  .MOV-.l869B          0/11-09-81            N/A                                    N/A (SI) 24    Residual Heat      MOV-RH-WO            0/11-.ll-81            N/A                                    N/A Removal (RH) 25    Comp Cool.          TV-CC-205A          0/11-13-81            N/.~                                    N/A (CC) 26    Comp Cool          .TV-CC-205C          0/11-11-81            N/A                                    N/A (CC) 27    Comp Cool            TV-CC-20~.8        0/11-11-81            N/A                                    N/A (CC) 28    Chem and Vo.lume    HCV-2.200 A, B, C  0/11-22-tU            N/A                                    N/A (CV)            TV-2204            0/11-:'2-81            N/A                                    N/A 32    Gaseous Was-c.e      TV-GW-202          0/12.-3-81            N/A                                    N/A (GW)            TV-GW-.i03          0/12-03-81            N/A                                    N/A 33    Gaseous Drains      TV-DG-208A          228/11-B-81            .n 11132 311/12-05-81/0Verhau.lea      0/1.i-11-81 (G.S)          TV-DG-208:d          b.2/11-15-81          N/A                                    N/A 38    Aerated Drains      TV-DA-200A          >3240/12-!t-81        521120~2201/1~-1~-81/Lappect vaive      456/l~-1.t-ts 1 (DA)            *rv-DA200B          t+tW/1.i-09-81        5.l11L0~2.241/12-12-81/Ground valve seat 0/12.-12-tsl
Post Repair Penetration sistem              Valve ,s) Tested    Leakage,scfd)LDate    Mr NoLDateLRepair                      Leax.ageL!2ate 17    Comp Cool          2-CC-58              0/11-11/81            N/A                                    N/A (CC) 18    Comp Cool          2-CC-1              52 .8/11-11-81        211111030~/11-13-81/Lapped vaive      4.8/11-20-81 (CC) 19    Charging            MOV-.2381            0/11-li.-til          N/A                                    N/A (Ch) 20    ~afety Injection    2-SI-32              0/11-09-81            N/A                                    N/a (SI) 21    SaJ:ety Injection  MOV-2842            21.6/11-08-d1          N/A                                    N/A (SI) 23    ::,afety Injection  .MOV-.l869B          0/11-09-81            N/A                                    N/A (SI) 24    Residual Heat      MOV-RH-WO            0/11-.ll-81            N/A                                    N/A Removal (RH) 25    Comp Cool.          TV-CC-205A          0/11-13-81            N/.~                                    N/A (CC) 26    Comp Cool          .TV-CC-205C          0/11-11-81            N/A                                    N/A (CC) 27    Comp Cool            TV-CC-20~.8        0/11-11-81            N/A                                    N/A (CC) 28    Chem and Vo.lume    HCV-2.200 A, B, C  0/11-22-tU            N/A                                    N/A (CV)            TV-2204            0/11-:'2-81            N/A                                    N/A 32    Gaseous Was-c.e      TV-GW-202          0/12.-3-81            N/A                                    N/A (GW)            TV-GW-.i03          0/12-03-81            N/A                                    N/A 33    Gaseous Drains      TV-DG-208A          228/11-B-81            .n 11132 311/12-05-81/0Verhau.lea      0/1.i-11-81 (G.S)          TV-DG-208:d          b.2/11-15-81          N/A                                    N/A 38    Aerated Drains      TV-DA-200A          >3240/12-!t-81        521120~2201/1~-1~-81/Lappect vaive      456/l~-1.t-ts 1 (DA)            *rv-DA200B          t+tW/1.i-09-81        5.l11L0~2.241/12-12-81/Ground valve seat 0/12.-12-tsl


    *
APPENDIX ~B (CONT 1 D) b80-'U81 *.rtPE. C DATA Su.MMAR:i Post .Repair Penetration System          Valve (s) *.rested    Leakage(sctd)/Date        Mr No/Dater~epair                  le a.icage/Date 42      Service Air      2-SA-81                0/11-21-1:11            N/A                                N/A (SA)          2-SA-82              0/11-..tl-til            N/A                                l'ii/A 43    Air Monitoring  2-Rl~-3A, 3B          360/11-0o-cs1            62111201&31/12-1~-81/Cleaned seat  36/12-14-b 1 (RM)          *l'V-RM-200A          0/11-~0-81              N/A                      .        N/A 44    Al.r Monitoring  TV-RM-200B            2.4/11-20-81            N/A                                N/A
* APPENDIX ~B (CONT 1 D)
* b80-'U81 *.rtPE. C DATA Su.MMAR:i Post .Repair Penetration System          Valve (s) *.rested    Leakage(sctd)/Date        Mr No/Dater~epair                  le a.icage/Date 42      Service Air      2-SA-81                0/11-21-1:11            N/A                                N/A (SA)          2-SA-82              0/11-..tl-til            N/A                                l'ii/A 43    Air Monitoring  2-Rl~-3A, 3B          360/11-0o-cs1            62111201&31/12-1~-81/Cleaned seat  36/12-14-b 1 (RM)          *l'V-RM-200A          0/11-~0-81              N/A                      .        N/A 44    Al.r Monitoring  TV-RM-200B            2.4/11-20-81            N/A                                N/A
(.Rl'l)      TV-RM-200C            0 /11-20-1:>1            N/A                                N/A 45    PrJ.mary Grade  2-.RC-1&0              7. 2/ 11-0~-tU          N/A                                N/A Water System    TV-2519A              0 /11-9-81              N/A                                N/A (PG) 46    Charging        FC"~-2160              192/11-12-bl            2A11~10~1/11-17-81/New plug        0/12-13-131 (Ch)                                                                            and cage 47    Instrument Air  2-IA-8b4              ~3.2/11-15-81            2111150407/11-1&-81/Cleaned valve  0/11-15-Bl (IA)          TV-IA-200.            0/11-15-81              N/A                                N/A 2-IA-704              528/11-15-81            2111/50408/11-15-81/Lappeci val.ve N/A 48    Vent & Drain    TV-VG-209A            0/11-14-81              N/A                                N/A System          TV-VG-209B            0/1.1-14-81              N/A                                N/A (DA) 50    ~atety Injection TV-SI-l01A            81.6/11-10'-81          2111102038/11-19-81 Lapped valve    7.2/12-11-dl (SI)          TV-SI-201.B            84 /11-10-iil            2111102101/11-21-81 Replaced Dody seat 51    3erv1.ce Water  2-sw-200              >432/11-10-81            2111101508/11-24-81/0verhauled      0/1.l-Od/81 valve (SW)          2-SW-:.t08            0/11-24-bl              N/A                                ~/A 53    Safety Injection TV-.-:;I-,WO          52 .8/11-13-81          2111101200/11-1&-81 OVernaul.ea    0/ll-08-81 (SI)          2-SI-234              2b .4/11-13-81                                val.ve        N/A Primary Vent    2-VA-1                0/11-12-dl              N/A                                N/A (VA)          2-\/A-9                9.6/11-1.l-bl            N/A                                N/A
(.Rl'l)      TV-RM-200C            0 /11-20-1:>1            N/A                                N/A 45    PrJ.mary Grade  2-.RC-1&0              7. 2/ 11-0~-tU          N/A                                N/A Water System    TV-2519A              0 /11-9-81              N/A                                N/A (PG) 46    Charging        FC"~-2160              192/11-12-bl            2A11~10~1/11-17-81/New plug        0/12-13-131 (Ch)                                                                            and cage 47    Instrument Air  2-IA-8b4              ~3.2/11-15-81            2111150407/11-1&-81/Cleaned valve  0/11-15-Bl (IA)          TV-IA-200.            0/11-15-81              N/A                                N/A 2-IA-704              528/11-15-81            2111/50408/11-15-81/Lappeci val.ve N/A 48    Vent & Drain    TV-VG-209A            0/11-14-81              N/A                                N/A System          TV-VG-209B            0/1.1-14-81              N/A                                N/A (DA) 50    ~atety Injection TV-SI-l01A            81.6/11-10'-81          2111102038/11-19-81 Lapped valve    7.2/12-11-dl (SI)          TV-SI-201.B            84 /11-10-iil            2111102101/11-21-81 Replaced Dody seat 51    3erv1.ce Water  2-sw-200              >432/11-10-81            2111101508/11-24-81/0verhauled      0/1.l-Od/81 valve (SW)          2-SW-:.t08            0/11-24-bl              N/A                                ~/A 53    Safety Injection TV-.-:;I-,WO          52 .8/11-13-81          2111101200/11-1&-81 OVernaul.ea    0/ll-08-81 (SI)          2-SI-234              2b .4/11-13-81                                val.ve        N/A Primary Vent    2-VA-1                0/11-12-dl              N/A                                N/A (VA)          2-\/A-9                9.6/11-1.l-bl            N/A                                N/A


        *
APPENDIX 4B (CONT 1 D)                        '
* APPENDIX 4B (CONT 1 D)                        '
1~80-1~81 TYPE C DATA  
1~80-1~81 TYPE C DATA  


Line 488: Line 423:
Post ae:pair l'enetr ation S)!Stem            Valve ,s} 'Iested    Leakage:,sctd)/Date    Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105  Leakage Monitoring T\7-LM-200E.          0/11-14-81              N/A                  N/A (LM)            TV-LM-200G            0/11-H-81              N/A                  N/A TV-LM-200A            0/11-H-81              N/A                  N/A TV-LM-200C            0/11-14-81              N/A                  N/A TV-Ll'1-200F          0/11-14-81              N/A                  N/A TV-LM.-200H          0,111-14-ttl            N/A                  N/A TV-LM-.200.B          0/11-14-81            'N/A                  N/A TV-LM-200D            0/11-14-dl              N/A                  N/A 56      Sample System      TV-SS-206A            1.b/U-06-1:11          N/A                  N/A (SS)            TV-SS-206B            0/12-0b-81              N/A                  N/A 56      Sample System      TV-SS-200A            0/12-09-81              N/A                  N/A (SS)            TV-SS"'.'"200B        0/l~-09-81              N/A                  N/A Sb      Sample System      TV-SS-202A            1. ~2/l.l-Oo-81        N/A                  N/A (S.5)          l'V-SS-20.lB          .48/12-06-dl          N/A                  0/1~-09-81 57      Sample System      TV-SS-.201A          0/12-03-81              N/A                  N/A (SS)            TV-SS-201B            0/12-03-81              N/A                  N/A 57      Sampl.e System    TV-SS-204A            0/12-10-1:11            N/A                  N/A (SS)            TV-SS-.204B          0/12-10-1:11            N/A                  N/A 57      Aerated Drains    TV-DA-203A            0/11-27-81              N/A                  N/A (DA)            TV-DA-203B            0/11-27-81              N/A                  N/A 58      Instrument Air    2-IA-868              0/11-14-1'$1            N/A                  N/A (IA)            1-IA-704              0/11-14-81              N/A                  N/A bO      Satety Injection  MOV-213~0A            12/11-08-81            N/A                  N/A (SI) 61      Safety Injection  MOV-2890C            0/11-01:1-bl            N/A                  N/A (SI) 62      6a1et:y Injection  MOV-.28~0B            0/11-d-81              N/A                  N/A (SI) 63      Containment Spray  ~-CS-~I+              0/11-~2-!>1            N/A                  N/A/11-23-1:i 1 (CS)            11ov-cs-~01c. D      50 .4/ 11-:d~d 1        N/A                  N/A
Post ae:pair l'enetr ation S)!Stem            Valve ,s} 'Iested    Leakage:,sctd)/Date    Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105  Leakage Monitoring T\7-LM-200E.          0/11-14-81              N/A                  N/A (LM)            TV-LM-200G            0/11-H-81              N/A                  N/A TV-LM-200A            0/11-H-81              N/A                  N/A TV-LM-200C            0/11-14-81              N/A                  N/A TV-Ll'1-200F          0/11-14-81              N/A                  N/A TV-LM.-200H          0,111-14-ttl            N/A                  N/A TV-LM-.200.B          0/11-14-81            'N/A                  N/A TV-LM-200D            0/11-14-dl              N/A                  N/A 56      Sample System      TV-SS-206A            1.b/U-06-1:11          N/A                  N/A (SS)            TV-SS-206B            0/12-0b-81              N/A                  N/A 56      Sample System      TV-SS-200A            0/12-09-81              N/A                  N/A (SS)            TV-SS"'.'"200B        0/l~-09-81              N/A                  N/A Sb      Sample System      TV-SS-202A            1. ~2/l.l-Oo-81        N/A                  N/A (S.5)          l'V-SS-20.lB          .48/12-06-dl          N/A                  0/1~-09-81 57      Sample System      TV-SS-.201A          0/12-03-81              N/A                  N/A (SS)            TV-SS-201B            0/12-03-81              N/A                  N/A 57      Sampl.e System    TV-SS-204A            0/12-10-1:11            N/A                  N/A (SS)            TV-SS-.204B          0/12-10-1:11            N/A                  N/A 57      Aerated Drains    TV-DA-203A            0/11-27-81              N/A                  N/A (DA)            TV-DA-203B            0/11-27-81              N/A                  N/A 58      Instrument Air    2-IA-868              0/11-14-1'$1            N/A                  N/A (IA)            1-IA-704              0/11-14-81              N/A                  N/A bO      Satety Injection  MOV-213~0A            12/11-08-81            N/A                  N/A (SI) 61      Safety Injection  MOV-2890C            0/11-01:1-bl            N/A                  N/A (SI) 62      6a1et:y Injection  MOV-.28~0B            0/11-d-81              N/A                  N/A (SI) 63      Containment Spray  ~-CS-~I+              0/11-~2-!>1            N/A                  N/A/11-23-1:i 1 (CS)            11ov-cs-~01c. D      50 .4/ 11-:d~d 1        N/A                  N/A
* APPENDIX
* APPENDIX
* 1m  (CONT 1 IJ)
* 1m  (CONT 1 IJ) 1980-1981 TYPE C DATA  
* 1980-1981 TYPE C DATA  


==SUMMARY==
==SUMMARY==
Line 500: Line 434:
             & Gaseous Waste    TV-\iW-201              0/12-03-Hl                                                          NA/11-i. .. -dl (CV)    (GW)    T\7-CV-.lSOA            >432/11-14-81                  ~111140832/11-1~-61/La~i:,)ed val.ve 0/11-24-tsl
             & Gaseous Waste    TV-\iW-201              0/12-03-Hl                                                          NA/11-i. .. -dl (CV)    (GW)    T\7-CV-.lSOA            >432/11-14-81                  ~111140832/11-1~-61/La~i:,)ed val.ve 0/11-24-tsl
                                 *rV-CV-.l50B            >4 3')./ 11-14-81              .ll 11140833/11-20-81/Lapped valve    lb.ts/11-24-bl Containment Vac      2-C:11-2              0/11-11/81                    N/A                                  N/A (CV)            J:iC\1-CV-.:00          0/11-11-81                    N/A                                  N/A 4.b-S
                                 *rV-CV-.l50B            >4 3')./ 11-14-81              .ll 11140833/11-20-81/Lapped valve    lb.ts/11-24-bl Containment Vac      2-C:11-2              0/11-11/81                    N/A                                  N/A (CV)            J:iC\1-CV-.:00          0/11-11-81                    N/A                                  N/A 4.b-S
* APPhNDIX ~B (CUNT 1 D)
 
* Penetra"t.ion ::.)!stem          ~ j &sect; ) Tes"t.ed                                                            Post Repair LeaJca9e1scidlLDa't.e  Mr No,lDate,lRe12air              Leaka9eLQa't.e 97      SampJ.e System    TV-SS-..:0.lh    O/li.-10-81            N/A                                N/A (SS)          TV-SS-203B      0/12-10-81            N/A                                'N/A 100    (;;aseous Waste    TV-GW-.lOt,      0/1:l-03-81            N/A                                N/A (GW)          TV-GW-207        0/12-03-81            N/A                                N/A 101    Fire Protection    2-Fi>-151        0/12-02-81            N/A                                N/A (Ff')          l-.FP-15.l      0/12-02-131            N/A                                N/A 103      RedC't.Or Le1:down i-RL-3          0/11-12-81            N/A.                              N/A (RL)          2-RL-5          0/11-12-81            N/A                                N/A 1014    Reactor Letdown    2-RL-13          0/11-1.l-81            N/h                                N/A (RL)          2-RL-15          0/11-12-81            N/A                                N/A 106      Safe1:y Injection  .2-SI-73        0/11-10-bl            N/A                                N/A (SI) 112      Instrument Air    TV-IA-201A      0/11-1d-d1            N/A                                NA (IA)          TV-ll-201B      52.8/11-18-81          S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113      Satety Injection  l-SI-174        9.o/11-0&-81          N/A                                N/A (SI)          MOiJ-2bo9A      ~. o/11-0tJ-o 1        N/A                                N/A}}
APPhNDIX ~B (CUNT 1 D)
Penetra"t.ion ::.)!stem          ~ j &sect; ) Tes"t.ed                                                            Post Repair LeaJca9e1scidlLDa't.e  Mr No,lDate,lRe12air              Leaka9eLQa't.e 97      SampJ.e System    TV-SS-..:0.lh    O/li.-10-81            N/A                                N/A (SS)          TV-SS-203B      0/12-10-81            N/A                                'N/A 100    (;;aseous Waste    TV-GW-.lOt,      0/1:l-03-81            N/A                                N/A (GW)          TV-GW-207        0/12-03-81            N/A                                N/A 101    Fire Protection    2-Fi>-151        0/12-02-81            N/A                                N/A (Ff')          l-.FP-15.l      0/12-02-131            N/A                                N/A 103      RedC't.Or Le1:down i-RL-3          0/11-12-81            N/A.                              N/A (RL)          2-RL-5          0/11-12-81            N/A                                N/A 1014    Reactor Letdown    2-RL-13          0/11-1.l-81            N/h                                N/A (RL)          2-RL-15          0/11-12-81            N/A                                N/A 106      Safe1:y Injection  .2-SI-73        0/11-10-bl            N/A                                N/A (SI) 112      Instrument Air    TV-IA-201A      0/11-1d-d1            N/A                                NA (IA)          TV-ll-201B      52.8/11-18-81          S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113      Satety Injection  l-SI-174        9.o/11-0&-81          N/A                                N/A (SI)          MOiJ-2bo9A      ~. o/11-0tJ-o 1        N/A                                N/A}}

Revision as of 23:58, 2 February 2020

Reactor Containment Bldg Integrated Leak Rate Test Types A,B & C. One Oversize Figure Encl.Aperture Card Is Available in PDR
ML18139B808
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/31/1981
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B807 List:
References
NUDOCS 8203240369
Download: ML18139B808 (49)


Text

REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPES A. B. AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POW.E.R STATION UNIT NO. 2

  • DECEMBER 1981 (8203240369 820319

. PDR ADOCK 05000281

.p PDR

TABLE OF CONTENTS Section Title REFERENCES iii 1 PURPOSE 1-1 2

SUMMARY

2-1 2.1 Type A Test 2-1 2.2 Local Leak Rate Tests (Types Band C) 2-1 3 TYPE A TEST 3-1 3.1 Edited Log of Events 3-1 3.2 General Test Description 3-2 3.2.1 Prerequisites 3-2 3.2.2 Equipment and Instrumentation 3-2 3.2.3 Data Acquisition System 3-3 3.2.4 Data Resolution System 3-3 3.3 Test Analysis 3-6 3.4 Test Results 3-d 3.4~1 CILRT Results - Total Time Method 3-8 3 .. 4.2 CILRT Results - Mass Point Method 3-8 3.4.3 Superimposed Leakage Rate Test Results 3-8 3.ij.4 Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage 3-9--

4 LOCAL LEAK RATE TESTS (TYPES BAND C) ~-1 Appendices 3A SITE METEOROLOGY PRIOR TO CILRT 3A-1 3B SITE METEOROLOGY DURING THE CILRT 3B-1 3C INSTRUMENTATION TABLE 3C-1 3D INSTRUMENTATION LOCATION (PROFILE VIEW) 30-1 3E INSTRUMENTATION LOCATION (PLAN VIEW) 3E-1 3F CONTAINMENT INPUT VARIABLES 3F-1

  • 3G LEAK RATE DATA - ABSOLUTE T.E.ST METHOD - MASS POINT ANALYSIS i

3G-1

  • TABLE OF CDNTENTS (CONT*D)

Section Title Page 3H LEAK RATE DATA - ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS 3H-1 3J STABILIZATION, CILRT, AND VERIFICATION CONTAINMENT AIR MASS VS TIME 3J-1 3K CONTAINMENT LEAK RATE (MASS POINT) + UCL VS TIME 3K-1 3L CALCULATED CONTAINMENT LEAK RATE (TOTAL TIME) VS TIME 3L-1

~A 1~80-1981 TYPE B DATA

SUMMARY

Q.A-1 4B 1980-1981 TYPE C DATA

SUMMARY

4B-1

  • ii

REFERENCES

1. 10CFR50 Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors. April 19. 1976
2. Bechtel Topical Report BN-TOP-1. Rev. 1. Testing Criteria tor Integrated Leak Rate Testing of Primary Containment Structures for Nuclear Power Plants. Novem.oer 1. 1972
3. 2-PT-16.3. Reactor Containment Building Integrated Leak Rate Test. May lij* 1980
4. ANSI 56.B. Containment System Leak.age Testing Requirements.

February 19. 1981

  • iii
  • SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear Power Stat1on, Unit No. 2~~--

This report is submitted as required by 10CFR50 Appendix- J, paragraph V.B ,Reference 1) *

  • 1-1

SECTION 2

SUMMARY

2.1 TYPE A TEST Pressurization for the CILRT was initiated at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br /> on December 15, 1981. At approximately 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> on December 1o.

1981. it was noted that the pz:essur).z~tion_ was approximatel.y 3_., 2 psi/hr~- The anticipated pressurization rate. with the combined compressor capacity rated at 9.900 sctm. had been 4.8 to 5 psi/hr. Leakage investigation revealed that MOV-VS-200B was leaking. At 0334 hours0.00387 days <br />0.0928 hours <br />5.522487e-4 weeks <br />1.27087e-4 months <br />, pressurization was secured and MOV-VS-200B was cycled. Pressurization resumed at 0336 hours.

Subsequently. the pressurization rate was 4.8 psi/hr. The leakage past MOV-VS-200B was calculated to be 3.ooo scfm and it was determined the valve had been partially open.

Test pressure was reached at approximately 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> and pressurization was secured. The containment temperature stabilization criteria were met at approximately 17~0 hours.

From 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> on December 1&. 1981 to 0950 hours on December 18. 1981. the mass trends indicated an unacceptable leakage rate of approximately 1.5 La. During this period. an extensive leakage investigation was conducted.. The only major

  • leakage path was identified at electrical penetration A-18.

leakage rate was quantified to be a minimum ot 3.5 scfm. At approximately 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on December 18, 1981. the collar bushing nut on *B* phas*e wire in penetration A-18 was found to be l.oose and was tightened. Fran 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18. 1981 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on December 19, 1981, the calculated leak rate was The acceptable and the requirements of the procedure were satisfied.

At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> on December 19. 1981, the superimposed leak rate test commenced. At 08~0 hours. the calculated containment ieak rate satisfied the requirements of the procedure.

Depressurization of the containment started at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> on December 19. 1981. At 2138 hours0.0247 days <br />0.594 hours <br />0.00354 weeks <br />8.13509e-4 months <br />. on December 19. 1981, the containment was at atmospheric pressure.

2.2 LOCAL LEAK RATE TESTS ('l'YPES BAND C)

The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.

  • The leakage past electrical penetration A-18 initiated a review of the Type B test procedures upon completion or the 2-1
  • Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations *
  • 2-2

SECTION 3 TYPE A TEST 3,.1 EDITED LOG OF EVENTS December 15, 1981 2350 - Initiated containment pressurization December 16 1 1981 033q - Secured containment pressurization and cycled MOV-VS-200B 0336 - Restarted pressurization 1102 - Identified leakage path at electrical penetration A-18 1111 Secured containment pressurization 1720 - Completed stabilization December 17; 1981

  • 1700 - Quantified be a minimum December 18, 1981 leakage at electrical penetration A-18 to of 3.75 scfm 0800 - Only major leakage path identified electrical penetration A-18 0950 - Tightened collar bushing nut on A-18 *B 11 Phase wire -

leakage stopped 1030 - Started taking data for ILkT December 19 1 1981 0215 Completed ILRT oq35 - Started superimposed verification test 0835 Completed superimposed verification test 1150 - C0Dm1enced contairunent depressurization 2138 Completed contairunent depressurization 3-1

3.2 GENERAL TEST DESCRIPTION 3.2.1 Prerequisites In accordance with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a partial listing of the prerequisites that were completed and docwnented prior to containment pressurization *.

1. General inspection of the accessible interior and exterior surfaces of the containment structure was performed.
2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.

3*. All instrumentation used for test was calibrated within

& months of the test.

4. Valve line-ups, as required, were completed, including closure of the containment isolation valves.
s. Component cooling and chilled water systems were operable.
6. Plant computers were operational and programmed tor the
  • CILRT *
7. The Official Log of Events book was established and available prior to commencement of the test.
8. Site meteorology data was taken for 7 days prior to and throughout the performance of the CILRT.

3.~.2 Equipment and Instrumentation Pressurization of the containment was achieved .by utilization of nine air compressors. Air was piped tr.&1:ough two aftercoolers in parallel and* a refrigerated air dryer. Instrumentation and valving were installed to maintain proper monitoring and control during pressurization. The total capacity of the pressurization system, as installed, was rated at 9,990 sctm.

During the test, the necessary variables used to determine containment leakage were continually monitored using instrumentation which consisted of multiple resistance temperature detectors (RTDs), chilled mirror dew po.int indicators, and two absolute pressure quartz manometers (see Appendix 3D) *

  • 3-2

A mass flowmeter in the service air systems was used during the superimposed verification test. All test instrumentation readings are input into the piant computer for data acquisition and averaging.

3.2.3 Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan.,

log, average, and analyze data received from the containment instrumentation.

The P250 analog scan package reads all the analog inputs in a preestaDlished manner, converts these readings into engineering units, and then stores these values for use by the plant operators and by the plant application programs. For the CILRT, the P250 plant computer monitored the following instrumentation:

Scan Rate (Sec) 2.2 RTDs 20 5 chilled mirrors 20 2 quartz manometers 2 Instantaneous values of the CILRT instruments weze recorded every 5 minutes during the test period, using the P250 digital trend function on the operator*s console *

  • A 10-minute time average of the readings, calculated by the P250 Average and Integrate (A6I) package, was used as input in the plant computer CILRT programs.

The plant computer CILRT program consists of ILRTDA'l'A, which runs every 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average containment temperature, and containment air mass.

Data Resolution System After the appropriate data have been acquired and averaged utilizing the plant computer system 6 the results are manually input to a remote computer system for leak rate calculations.

3.2.4.1 Absolute Method Mass Point Analysis The Absolute Method of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:

  • 3-3

M = CP-Pv) V (144) *lEq 1)

RT where:

M =airmass, lb P = total pressure, psia Pv = average vapor pressure, psia R = 53.35 ft lbf/1bm 0 R ,for air)

T = average containment temperature, 0 R V = containment free volume, 1.8 x 106 tt~

The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A - dM/dt. The leak rate is expressed as a percentage of air mass lost in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or symbolically:

Leak rate= A/B (-2400) fEq 2) where A is the slope of the least-squares curve and Bis they-intercept. The sign convention is such that an outward leak is positive and the wiits are in percent/day. The air mass is computed separately, and the result is correlated as a function of time by means ot a least-squares fit of the form:

m =At+ B 'Bq 3)

  • The slope A and they-intercept Bare then used in .l!.quation 2 to determine the leak rate.

A 95 percent distribution.

confidence interval is calculated using a T The sum of the leakage rate and the 95 percent confidence interval is the Upper Confidence Level (UCL).

The leak rate is less than the UCL with the probability of 95 percent.

3.2.4.2 Absolute Method Total Time Analysis The absol.ute method of total time analysis consists of calculating air lost from the containment pressure, temperature, and dew point observations during the CILRT.

The containment air mass is computed using Equation 1 (Section 3.2.4.1).

The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is

  • 3-4

expressed as a percentage of containment mass lost in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> o~

symbo1ica1ly :

MEA Leak Rate = Mi - Mt (2400)

Mi (.:1t)

The sign convention is such that an outward leak is positive and the units are in percent/day.

The estimated leakage rate is then determined by plotting the measured leak rate as a function of time and then performing a least-squares tit of the measured leak rate values as follows:

BST Leak Rate= At+ B where A is the slope and Bis they intercept of the least-squares curve.

The 95 percent confidence interval is determined with the T distribution.

This analysis method was used in conjunction with procedure 2-PT-16.3 (Reference 3) *

  • 3-5

*- ~ - - -

3.3 TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J.

The graph is divided into the following zones:

zone A - depicts temperature stabilization period from 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br /> to 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> on December 16, 1981.

zone B - depicts unacceptable mass trend trom 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> on December 16, 1981 to 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18, 1981 and also depicts the removal of an RTD from scan.*

Zone C - depicts acceptable mass trend from 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18 , .. 1981 to 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on December 19, 1981.

Zone D depicts superimposed verification test from 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> to 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br /> on December 19, 1981 *.

An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.

The unacceptable mass trend shown in Zone B was a result of excessive leakage past electrical penetration A18

  • The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C.

The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4). The input data tor the V~PCO-CILRT program are shown in Appendix 3F.

The Absolute Method Mass Point Analysis (Section 3.4.2) represents the result of the containment leakage rate. The results given in Appendix JG show that the UCL is 0.03837 percent/day which is within the acceptable limit of 0.013701 percent/day (0.075 less the Type C penalty :tor valves on systems not rented to the containment).

The Absolute Method Total Time Analysis (Section 3.4.1) is used to determine the acceptability of the CILRT it the test duration is less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The results of the total tirne analysis are shown in Appendix 3H. The results show the UCL to be 0.072185 percent/day, which is within the acceptable linut of 0.075 percent/day (La).

The following appendices contain the plots provided by this report:

3-6

Appendix Description 3J Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br /> on 12/19/81) 3K Containment leak rate and UCL vs time, mass point ana1ysis (1030 hours on 12/18/81 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on 12/19/81) 3L Containment leak rate vs time, tota1 time analysis~(1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on 12/18/81 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on 12/19/81)

The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> to 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br /> on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures *

  • 3-1

3.4 TEST RESULTS 3.4.1 CILRT Results - Total Time Method 1 .. Leakage rate calculated, Lam 0.043258 percent/day

2. 95 percent upper confidence interval 0 .0289.;t7 percent/day
3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) 0.072185 percent/day CILRT Results-Mass Point Method
1. Leakage rate calculated, Lam 0.03713b percent/day
2. 95 percent upper confidence interval 0.001238 percent/day
3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) 0.03837-.

pe rcent/day

  • 4.

5.

Type C leakage penalty Total reportable Type A leak rate (3 + 4) 0.001299 percent/day 0.039673 percent/day 3.4.3 superimposed Leakage Rate Test Results

1. The Super.imposed Leak Rate Test is acceptable if Le falls within the following range:

(Lo+ Lam - o.~5 La) s Le$ (Lo+ Lam+ 0.2s La) where: Le = Containment leakage rate calculated during the verification test 0.122645 percent/day Lo = Leakage rate imposed on containment using flow measuring device 0.109090 percent/day

  • 3-8

La = Maxinnnn a11owab1e 1eakage rate 0.1 percent/day Lam= tota1 measured containment leakage rate 0"'03713b pei:cent/day 0.109090 + 0.037136 - 0.025 S 0.122645 s 0.109090 + Ou037136 + 0.025 0.121226 s 0.122645 s 0.171226 3.4.4 Types C and B Penetration Leakage to be Added to Containment Calcu1ated Leakage*

Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added 3.88 SCFH Total Type B leakage to be added 0 Total Types Band C leakage to be added 0.00129 percent/day

  • NOTB: The above penetrations were in a nonvented valve lineup configuration for this test. with respective leak rates taken from 2-PT-16.4
  • their
  • 3-9

APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure

~ ~ (in Hg) Dew Point (OF) Dry Bu1b (OF) 12/8/81 0000 29.70 35 q.s 0400 29.57 31 4&

0800 29.&1 39 4{,

1200 29.63 32 58 1600 29.64 25 54 2000 29.12 22 45 12/9/81 0000 29.75 21 '1-0 0400 29.75 22 35 0800 29.82 19 36

  • 1200 1600 2000 29.80 29.80 29.86 17 12 10 39 38 3L 12/10/81 0000 29.86 10 29 0400 29.81 10 21 0800 29.79 11 .27 1200 29.14 13 35 1600 29. 72 11 37 2000 29.80 11 30

(

APPENDIX 3A (CONT*D)

Barometric Pressure

~ ~ (in Hg) Dew Point ,on Dry Bulb (OF) 12/11/81 0000 29.82 12 31 0400 29.83 15 31 0800 29.88 14 29 1200 29.91 16 3~

1600 29.93 18 36 2000 29.98 19 2&

12/12/81 0000 30.03 20 31 0400 30.36 20 31 0800 30.12 20 29 1200 30.16 2 ... ttO

  • 12/13/81 1600 2000 0000 30.18 30.24 30~26 20 18 19 41 28 2 ...

0400 30.31 17 23 0800 30~33 18 22 1200 30.34 21 40 1600 30.31 22 41 2000 30~31 21 26

APPENDIX 3A (CONT*D)

Barometric Pressure

~ ~ Cin Hg) Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000 30.30 19 23 0400 30.27 21 23 0800 30.23 24 21 1200 30.12 39 44 1600 30.02 43 4q 2000 29~91 49 50 12/15/81 0000 29.87 45 q.5 0400 29.89 37 37 0800 29 .. 87 36 36 1200 29.75 31 37

  • 12/16/81 1600 2000 0000 29~53 29.55 29.67 31 36 31 37 31 31

., APPENDIX 3B SITE METEOROLOGY DURING THB CILRT Barometric Pressure

~ ~* Cin Hg) Dew Point (OF) Dry Bu1b (OF) 12/16/81 0100 29.87 37 38 0200 29.87 31 38 0300 29.87 37 38 0400 29.89 37 38 0500 29.89 37 3ts 0600 30.03 35 39 0700 30.03 36 40 0800 30.03 36 40 0900 30.11 3& 48

  • 1000 1100 1200 30.17 30~ 17 30.17 33*

32:

33 q.5 45 44 1300 30.16 21 50 1400 30.16 29 4b 1500 30.16 30 47 1600 30.16 27 48 1700 30.10 28 47 1800 30~70 31 31 1900 30.80 30 36 2000 30.70 35 41 2100 30.80 28 31

APPENDIX 3B (CONT*D)

Barometric Pressure

~ ~ (in Hg) Dew Point (OF) Dry Bulb (OF) 2200 30.8 28 33 2300 30.38 27 27 12/17/81 0000 30.38 26 34 0100 30.;38 29 3~

0200 30.36 32 34 1300 30.;.35 31 34 1400 30.39 3.2 33 0500 30.39 32 33 0600 30.39 32 34 0700 30.38 32 35

  • 0800 0900 1000 30.;.38 30.37 30.38 29 30 31 38 42 44 1100 30 .. 38 2~ 4b 1200 30*.40 31 47 1300 30.37 32 55 1400 30.38 30 52 1500 30.32 32 52 1600 30.37 38 50 1700 29.38 43 43 1800 30.38 42 IJ2 1900 30.34 41 43

APPENDIX 3B (CONT'D)

Barometric Pressure

~ Time* {in Hg) Dew Point &OF) Dry Bul.b IOF) 2000 30.35 37 50 2100 30.34 39.5 46 2200 30.37 39.5 4b 2300 12/18/81 0000 0100 30.36 35 49 0200 30.36 35 4~

0300 0400 30.31 39 50 0500 30.33 40 48

  • 0600 0700 0800 30.36 30.38 30.37 41 41 37 46 Q.t, 44 0900 30.37 35 37 1000 30~37 33 44 1100 30.37 32 41 1200 30.38 35 39 1300 30.38 33 38 1400 30~37 29 41 1500 30.37 32 41 1600 30.37 34 39 1700 30.37 28 33

APPENDIX 3B ,coNT 1 D)

Barometric Pressure

~ Time (in Hg) Dew Point (OF) Dry Bu1b (OF) 1800 30.37 28 33 1900 30.37 28 38 2000 30~37 28 34 2100 30.37 28 34 2200 30.37 28 32 2300 30.37 28 31 12/19/81 0000 30.37 28 31 0100 ** **

0200 30.38 21 3At 0300

  • 0400 0500 0600 30.38 30~37 21 24 34 33 0700 30.37 18 22 0800 30~37 18 32 0900 30.38 18

APPENDIX 3C INSTRUMENTATION TAbLE The following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.

Weight Computer Instrument Factor ~ Range ~ Accuracy Sensitivity Rl'D-LM-200-1 0.02683 T1000A 55-1050F F-1 +/-0 .1oF- +/-0.090F Rl'D-LM-200-2 0.02322 T1001A 55-1050F F-2 +/-0.1oF* +/-0.09°F Rl'D-LM-200-3 0.02427 T1002A 55-105DF F-3 +/-0 .. 1DF +/-0.090F Rl'D-LM-200-4 0.01820 T1003A 55-1050F E-3 +/-0.10F +/-0 .. 09°F Rl'D-LM-200-5 0.08884 T100qA 55-105DF B-1 +/-0.10F +/-0.09°F Rl'D-LM-200-6 0.08884 T1005A 55-105DF B-2 +/-0.1°F +/-0 *.09°F Rl'D-LM-200-7 0.08884 T1006A 55-1050F c-1 +/-0 .10F +/-0.09°F Rl'D-LM-200-8 0.08881J T1007A 55-1050F c-2 +/-0.1DF +/-0.09°F Rl'D-LM-200-9 0.04975 T1008A 55-105DF A-1 +/-0 .. 10F +/-0.09°F Rl'D-LM-200-10 O.OIJ975 T1009A 55"'.'"1050F A-2 +/-0.1°F +/-0.09°F RTD-LM-200-11 0.04975 T1010A 55-1050F

  • A-3 +/-0.1°F +/-0.09°F Rl'D-LM-200-12 0.02460 T1011A 55-1050F D-1 +/-0.10F +/-0.09°F Rl'D-LM-200-13 0.021J60 T1012A 55-105DF D-2 +/-0.1°F +/-0.09°F Rl'D-LM-200-14 0.02460 T1013A 55-1050F E-1 +/-0.1DF +/-0.09°F Rl'D-LM-200-15 0.02LJ60 TIJ02LJA 55-105DF B-2 +/-0.1DF +/-0 ..09°F Rl'D-LM-200-16 O.OLJ76t> T4025A 55-1050.l? I-1 +/-0.1DF +/-0.090?

RTD-LM-200-17 0.04706 T4026A 55-1050F I-2 +/-0.10F +/-0.090F Rl'D-LM-:W0-18 O.OIJ766 T4027A 55-1050F I-3 +/-0.1DF +/-0.090F 3C-1

APPENDIX 3C (CONT 1 D)

Weight Computer Instrwnent Factor Point Range ~ Accuracy Sensitivity Rl'D-LM-200-21 0.03608 T4009A 55-105°F H-1 +/-0.1°F +/-0 .090F Rl'D-LM-200-22 0.03961 T4020A 55-1050F H-2 +/-0.1°.F +/-0.090F RTD-LM-200-23 0 .o 1782 T4021A 55-1050F G-1 +/-0.1°F +/-0.090F Rl'D-LM-200-24 0.06800 T4022A 55-1050F G-2 +/-0.10F +/-0,.09°F Ml'-LM-200-o 0.14064 T4039A -40 to +200°F J-1 +/-0.40F +/-O.OS°F MT-LM-200-7 0.14064 T4040A -40 to +-2Q00F J-2 +/-0.4°F +/-0.05°F Ml'-LM-200-8 0.23959 T4041A -40 to +2000F K-1 +/-0.4°F +/-0.05°F Ml'-LM-200-9 0.23959 T4042A -1rn to +2Q00F K-2 +/-0.4°F +/-0.05°F Ml'-LM-200-10 0.23959 T4043A -40 to +2000F K-3 +/-Om4°F +/-0.05°F PI-LM-206 0.5 00960 0-100 psia +/-0.0&8 psia o.oon, ops PI-LM-207 o.s 00961 0-100 psia +/-0 .068 psia 0.001, °FS 3C-2

  • MT-7 ZONE J ZONEK MT-8 MT-IO MT-9 PROFILE VIEW NOTE:

MT-G MT-LM-200-G(TYP)

' *. APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1

el 132' RTD-12 RT0-5 RTO-G RTD-7 1 el 95 RTD-13 RTD-15 RT0-14 el 11 4i4 RTD-4 RTD-22

  • RTD-3 RTD-21 RT0-2 RTD-1 el 18'-4" el

-3'-6" I II

~-1-27-7 RTD-24 RTD-17 RTD-18 PROFILE VIEW NOTES:

I. RTO-l=RTD-LM-200-1 (TYP)

2. RTD-19, 20 NOT USED APPENDIX 3D JNSTRUMENTATION LOCATION
  • R ESIS TA NC E TEMPER AT URE DETECTORS (RTD)

SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TE 5 T 3 D-2

  • RTD-18 I
  • RT0-17 IRTD-lj PLAN VIEW NOTES:

I. RTD-l=RTD-LM-200-1 (TYP)

2. RT D-19,20 NOT USED APPENDIX 3 E 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD)

SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1

MT-7 NOTE:

PLAN VIEW MT-6 MT-LM-200-6 (TYP)

  • APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2

,f NT EGRAT E D L EA K RAT E T EST 3E-2

  • APPENDIX 3F VEPCO SURRY POWER STATION UNIT NO. 2.

CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time ABS Pressure DEWPT Vap Pressure Dry Bu1b mours) CPsia) COF) (Psia) Temperature IOR) o.o 60.949 66.42 0.3209 534.33 o.~33 60.950 66.43 0.3210 534.34 0.667 60.950 66.45 0.3212 534.33

  • 1.000 60.949 66.46 0.3213 534.32 1.333 60.950 66.47 0.3215 534.34 1.667 &0.951 66.50 0.3218 534.34 2.000 60 .951 6f>.50 0.3218 534.35 2.333 60.951 66.52 0.3220 534.36
  • 2.667 3.000 3.333 60.951 60.950 60.950 66.52 66.53 66.56 0.3220 0.3221 0.3225 534.35 534.34 534.35 3.667 60.951 66.56 0.3225 534.36 4.000 60 .951 f,f,.57 0.3226 534.37 4.333 60.951 66.58 0.3227 534.37 4.667 60.952 66.57 0.3226 53,._39 5.000 .60 .952 66.60 0.3229 534.38 5.333 60.952 66.60 0.3229. 534.38 5.667 60.952 66.60 0.3229, 534.38 6.000 60.952 66.61 0.3230 534.38 6.333 60.952 66.62 0.3231 534.39 6.667 60.952 66.62 0.3231 534.40 3F-1
  • Time (Hours)

ABS Pressure (Psia)

APPENDIX 3F (CONT*O)

DEWPT (OF)

Vap Pressure IPsia)

Dry Bulb Temperature (OR) 7.000 60.952 66.62 0.3231 534~3' 7.333 60.951 66 .63 0.3232 534.39 7.667 60.951 66.6LJ 0.3234 534.39 8.000 60.951 66.63 0.3232 534.39 8.333 60.951 6&.64 0.3234 534.39 8.&67 60.951 66.&3 0.3232 534.40 9.000 60.951 M,.64 0.3234 534.40 9.333 60.951 66 .. 65 0.3235 534.40 9.667 60.951 66.64 0.32.34 534.40 10 .ooo 534.40 b0.~50 66.62 0.3231 10.333 60.950 66.65 0.3235 534.40 10.&67 60.950 66.64 0.3234 534.40 11.000 60.950 66.64 0.3234 534.a+O 11.333 60.949 66.65 0.3235 534.40 11.667 60.94~ 66.67 0 .. 3237 534.40 12.000 60 .. ~49 66.65 0.3235 5.34.41 12.333 60.949 66.64 0.3.l34 534 .. 41 12.667 60.948 66.64 0.3234 53AJ.40 13.000 60.948 66.65 0.3235 534.40 13 .333 60.948 66.64 0.3234 534.ll1 13.667 60~948 t,6.64 0.3234 534.41 14.000 60.9£J8 66.b4 0.3234 53Q..40 14.333 60.947 66.63 0.3232 534.41 3F-2 jl

  • Time C.l:lours)

ABS Pressure

,Psia)

APPENDIX 3F (CONT ..D)

DEWPT (OF)

Vap '.Pressure CPsia)

Dry Bu1b Temperature C0 R}

14.667 60.947 66.63 0.3232 5.34.40 15.000 60.947 bb.62 0 .. 3231 534.41 15.333 60~9lH, 66.63 0.3232 534.40 1'5.667 60.~45 66.63 0.3232 534.40

  • Time (Hours)

Mass CLBM)

APPENDIX 3G (CONT*D)

Leakage (I/day)

Conf (I/day)

UCL (I/day) 6.333 551221.60 0.041207 0.005040 o.046.itn 6.067 551211.28 0.042827 0 .0011825 0.047651 7.000 551221.t,O 0.041938 0.004463 0.04&401 7.333 551211.49 0.042241 0.004076 0.04&317 7.667 551210.47 0.0~2185 0.003728 0.045913 a.ooo 551211.a&9 -0.041&29 0.003461 O.Oa.50~6 8.333 551210.47 0.040950 0.003264 0.044214 8.667 551201.17 0.041049 0.003018 0.01+4008 9.000 551200.1& 0.040924 0.002801 0.043725 9.333 551199.14 0.040&33 0.002&20 0 .04325:.t 9.&&7 551200.16 0.040047 0.002509 0.042556 10 .ooo 551193.10 0.,039884 0.0023'+9 0.04.l233 I 10.333 551190.05 0 .039749 0.002204 0.041953 10.667 551191.0b 0.039353 0.002104 0.041457 11.000 551191.06 0.038825 0.002045 0.040870 1).333 551180.9& 0 .03882& 0.001~26 0.040752 11.6b7 551178.92 0.038772 0.001818 0.040590 12.000 551170.64 0.039022 0.001736 0.040758 12.333 551171.bf, 0 .039023 0.001&43 0.040066 12.667 551172.88 0.038812 0.001571 0.0403ts3 13.000 551171.86 0.038538 0.001515 0.0-.0053 13.333 551162.57 0.038591 0.001441 0.040033 13.667 551102.57 0.038509 0.001374 0.03~883 3G-2

  • Time

<<Hours)

Mass (LfilO APPENDIX 3G (CONT 1 D)

Leakage Ci/day)

Con£ (I/day)

UCL Cl/day) 14.000 551172.88 0.037888 0.001442 0.039330 14.333 551154.49 0.037961 0.001377 0.039338 14.667 551164.d1 0.037524 0.001382 0.038906 15 .ooo 551155.51 0.037375 0.001329 0.038704 15.333 551155.72 0.037131 0.001292 0.038430 15 .667 551146.62 0.037136 0.001238 0.038374

  • APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - MASS POINT ..ANAL~S1S
Time Mass Leakage Conf UCL (Hours) (LBM) (I/day) (~/day} (1/dan o.o 55127&.49 o.o o.o o.o 0.333 551274.26 o.o o.o o.o 0.667 551282.55 -0 .039582 0.339245 0.299663 1.000 551282.76 -0 .035414 0.052661 0.017247 1.333 551.270.21 0.005280 0.060467 0.0&5747
  • 1.6&7 2.000 2.333 55127&.2&

551265.95 551253 .. 60 0.004864 0.018629 0.036246 0.035836 0.0288111 0.028634 0.040700 0.047443 0.064881 2.6&7 551263.92 0.033067 0.021901 0.054968 3.000 551264.13 0.029497 0.017572 0.0470&9 3.333 551250.77 0.034141 0.014974 0.049115 3.667 551249.55 0 .036121 0.012491 0.04tJb12 4.000 551238.22 0.041005 0.011622 0.052628 4.333 551237.20 0.043284 0 .010152 0.05343&

4 .6(,J 551236.99 0.043750 0 .087,..9 0.052498 5.000 551233.94 0.043975 0.007612 0.051587 5.333 551233.94 0.043268 0.006720 0.049988 5.667 551233.94 0.042011 0.006080 0.04l80~1

  • 6.000 551232.93 0.040659 3G-1 0.005586 0.04b245
  • APPENDIX 3H VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEG.RAT.ED LEAK RATE T.EST FROM 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS Meas Est Time Mass Leakage Leakage Conf UCL (Hours) &LBM) Cl/day) CS/day) (I/day) (i/day) o.o 551276.49 o.o o.o o.o o.o 0.333 551274.2& 0.029223 o.o o.o o.o 0.6b7 551282.55 -0.039548 o.o o.o o.o 1.000 551282.7& -0.027304 -0.040813 0.320027 0.279214
  • 1.333 1.667 2.000 551270.21 551276.26 551265.95 0.020517 0.000595 0.022953

-0.00&387

-0.002760 0.010836 O* .l10105 0.1329&1 0 .104361 0.203719 0.130201 0.115196 2.333 551253.60 0.042710 0.027720 0.089938 0.117658

~ .66"/ 551263.92 0.020521 0.028753 0.07tl20~ 0.10b9b2 3.000 5512&4.13 0.017938 0.028227 0.070~67 0.051St>94 3.333 551250.77 0.033597 0.033105 0.063S95 0.09&700 3.667 551249.55 0.031990 0.035936 0.058~08 O.O!f ..3~5 4.000 551238.22 0.041659 0.040724 0.054122 0.0~4847 4.333 551237.20 0.039478 0.043608 0.050721 0.0943.29 4.667 551.236.99 0.036847 0.045043 0.048.220 0.0~3263 5.000 551233.94 0.037046 0.04&102 0.046182 0.092285 5.333 551233.94 0.034133 0.046327 0.044732 0.091059

  • 5.667 551233.94 0.032686 3H-1 0.;045993 0.043698 0.0S!fb91
  • Time CHours)

Mass (LBM)

APPENDIX 3H ,coNT*D)

Meas leakage Cl/day>

Bst Leakage

&I/day)

Cont (I/day)

UCL

,~/day) 6.000 551232.93 0.031609 0.045422 0.042849 0.088271 6.333 551221.60 0.037737 o .. 046083 0.011-1530 0.087f>13 6 .. 66.7 551211.28 0.042582 0.047488 0.040147 0.087t>35 7.000 551221.60 0.034141 0.047117 0.039504 .0.0~6622 7.333 551211.49 0.038592 0.047516 0.038570 0.08&085 8.000 551211 .. 49 0.035375 0.047378 0.037258 0.084&36 8.333 551210.47 0.034493 0.04b984 0.036793 0.08377ts 8'.667 551201.17 0.037833 0.047102 0.036135 0.083.2.37 9.000 551200.16 0.036926 0.047047 0.03557'1 0.082t>24 9.333 55119.14 0.036083 0.04&861 0.035101 0.081~&2 9.667 551200.lt, 0.03'l378 0.046454 0.034745 0.081199 10.000 551193.10 0.036306 O.Otl6314 0.034283 0.080597 10.333 551190.05 0.03&421 o.o4&18o 0.033837 0.080023 10.667 551191.06 0 .. 034866 0.045871 o.0334ss 0.079359 11.000 551191 .. 06 0.033810 0.045449 0.033195 0.07~&44 11 .. 333 551180.96 0.036700 0.045380 0.032771 0.078150 11.667 551178.92 0.036409 0.045275 0.03231a 0.077653 12.000 551170.64 0.038~02 0.045378 0.031936 0.077314 12 .333 551171~&6 0.037006 0.045316 0.031563 0.070878 12.667 551172.88 0.035610 0.045109 0.0312St, 0.07&366 13.000 551171.86' 0.035039 0.044852. 0.03097S 0.075831 13.661 551162.57 *0.036290 0.044692 0 .03032li 0~075020

  • 14.000 551172.88 0.032219 3H-2 0.044193 0.0301tU, 0.07~379
  • Time Mass APPENDIX 3H (CONT 9 D)

Meas Leakage Est Leakage Cont UCL

&Hours) (LBM) <4 15.000 551155.51 0.035113 a.*043595 O.Ol942o 0.073021 15.333 551155.72 0~034292 0.043345 0.029200 0.072545 15.667 551146.62 0.036088 0.043258 0.028927 0.07.2185

AIR MASS (LBM) 01 01 01 01 01 01 01 01 I',) OJ -I>

0 0 0 0 0 0 0 0 0 0 0 0 1130 1230 1330 ZONE A 1430 TEMPERATURE STABILIZATION 1530 I\)

0) 1630 1730 1830

'(X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 REMOVED RTD FROM SCAN 0930 I\) 1030

'-.J I 130 1230 (X) 1330 1430 ZONE B 1530 LEAKAGE INVESTIGATION 1630 1730 1830

-I 1930 3:: 2030 IT'I I 2130

t: 2230 0

C 2330

0 0030 z 0130

-I IT'I 0230

0 l>

0330 r 0430 en 0530 0630 0730 0830 0930 I\)

(X)

I 030 I 130 1230

'(X) 1330 1430 1530 1630 1730 ZONE C 1830 ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 0230 0330 PREPARATION FOR SUPERIMPOSED VERIFICATION TEST I\)

0430 0530


ZONED U) 0630

'(X) 0730 SUPERIMPOSED VERIFICATION TEST 0830 0930 1030 1130 1230

)>

(>J

-0 c..

.L orn-u

)> :::0  :::0

0 --t oc:o
0 rn j

.07 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - - - - - - - ,

.06 1A II I\

II I \

I-z II II I \\

I ,,-....,

0 I I I

.05 IL \ ~..., ',

U)

U)

<t I I \,' ', - -

1 ,, - '-~~

<t Cl

'I-z

.04 1

I 11

,

LEAK RATE -------

LI.I t.) 1 a:

LI.I IL I

LI.I .03 I

~ I a:

<t I LI.I

..I I cJ

..I

.02 I t.)

, I

.or 1030 1130 1230 1330 1430 1530 1630 17'.30 1830 1930 2030 2130 2230 2330 0030 0130 12/18/81 TIME- 20 MINUTE INTERVALS 12/19/81 APPENDIX 3K CONTAINMENT LEAK RATE

+ UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I

. 06 w

j::

...J

.05

~

0 I-i3 I- .04 z

w u

a:

w a.

w

!i0:: .03

<(

w

...J a

w I-

<(

.02

...J

=>

u

...J

<(

u

.01 1030 1130 1230 1330 1430 1530 1630 1730 1830 1930 2030 2130 2230 2330 0030 0130 12/ 18/81 TIME-20 MINUTE INTERVALS 12/19/81 APPENDIX 3L CALCULATED CONTAINMENT LEAK RATE VS. TIME SURRY POWER STATION-UN IT 2

- INTEGRATED LEAK RATE TEST 3L-I

  • SECTION 4 LOCAL LEAK RATE TESTS CTYPES BAND C)

Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.

The total Types Band C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage *

  • 4-1

APPENDIX 4A 1980-1981 TYPE B DATA

SUMMARY

Prerepair Post Repair Penetration Eguiement Tested Leakage iscfd} LQate:. Leakage fscfdl!;!ate Remarks Personnel Air LOCK 0-Ring 33.6/8-3-80 N/A N/A Personnel Air Lock 0-Ring 3.2 .4/2-9-81 N/A N/A Personnel Air Lock 0-Ring 32.4/4-26-81 N/A N/A Personnel Air Lock 0-Ring 27.48/9-7-81 N/A N/A Personnel Air Lock 0-Ring 57 .. &/1.l-13-81 N/A N/A Fuel Transfer Tube 0-Ring 1.92/12-7-81 N/A N/A Equipment Hatch 0-Ring 0/12-12-81 N/A N/A Emergency Escape Air Lock 0-Ring 0/12-12-81 N/A N/A All electrical penetration 0-Rings were tested with no excessive leakage noted or repairs required.

All electrical penetration cannisters were tested subsequent to this Type A test with no excessive leakage roted or repairs required, with two exceptions.

  • Electrical Penetration A-18 was found leaking 4,320 scfd and the collar bushing nut was tightened with 1'0 11 leakage noted.

Electrical Penetration A-17 was round to be leaking 912. scfd and the collar bushing nut was tightened with "0" leakage noted.

4A-1

APP.E.NDI..t. 4B 1980-1981 TYPE C DATA SUMMAR~

Post Repair Penetration system Valve(s) Tested Leakdge(scid)/Date Mr No/Date/Repair Leax.age/Date 1 Comp Coo.l. *rv-cc-209.b >1770/11-21-81 2111211000/11-24-81/Cl.eaned va.Lve (CC) comp Cool. 2-CC-177 >3240/11-20-81 2111200700/11-22-81 0/11--£l-81 (CC) Lapped and cleaned valve Comp Cool 2-CC-176 S2111181531/11-22-81 0/11-2~-81 (CC) Lapped and cleaned valve 5 Comp Cool. '.l'\7-CC-209A >3240/11-20-81 2109050700/11-21-81/Replaced ru.ober 0/11-2.2-81 (CC) seat 7 Safety Injection 2-.SI-150 0/11-0~-81 N/A 0/1.t-1:.t.-sl (SI) MOV'-2b67C&D 360/11-08-81 211108~345/11-21-81/New gasket 0/1:.t-1:l-81 and pack.ing 8 Comp Cool. TV-CC-2.07 19 * .:.t./11-11-81 N/A N/A (CC) 9 Comp Cool. 204/11-13-81 .t:111131801/1..!-05-61/Macru.ned disc i:; .,!4/1"--05-81 (CC) Lapped va.t.ve 10 Comp Cool. .:t-CC-242 43.2/11-13-81 2111130738/11-19-bl/Lapped val.ve 2:6.4/11-b-sl (CC) 11 Comp Cool. 2-CC-233 6. 72/11-13-81 N/A (CC) 12 Comp Cool. TV-CC-~10B 0/11-13-81 N/A N/A (CC) 13 Comp Cool. TV-CC-210C .>.l400/11-06-81 2111131b03/11-13-81/Repl.acea ru.ober (CC) seat 14 Comp Cool TV-CC-210A 0/11-13-Bl 1'11/A N/A (CC) 15 cnarging 2-~H-309 0/11-1!:1-til N/A N/A (Ch) ,"1.0V-22B9A 1b Comp Cool 2-CC-59 >432/11-11-81 2111110330/11-1~-81/Lapped va~ve 0/11-.t:0-81 (CC)

,rn-1

APP~NDIX 4B (CONT 1 u) 1980-1981 TYP~ C DATA

SUMMARY

Post Repair Penetration sistem Valve ,s) Tested Leakage,scfd)LDate Mr NoLDateLRepair Leax.ageL!2ate 17 Comp Cool 2-CC-58 0/11-11/81 N/A N/A (CC) 18 Comp Cool 2-CC-1 52 .8/11-11-81 211111030~/11-13-81/Lapped vaive 4.8/11-20-81 (CC) 19 Charging MOV-.2381 0/11-li.-til N/A N/A (Ch) 20 ~afety Injection 2-SI-32 0/11-09-81 N/A N/a (SI) 21 SaJ:ety Injection MOV-2842 21.6/11-08-d1 N/A N/A (SI) 23  ::,afety Injection .MOV-.l869B 0/11-09-81 N/A N/A (SI) 24 Residual Heat MOV-RH-WO 0/11-.ll-81 N/A N/A Removal (RH) 25 Comp Cool. TV-CC-205A 0/11-13-81 N/.~ N/A (CC) 26 Comp Cool .TV-CC-205C 0/11-11-81 N/A N/A (CC) 27 Comp Cool TV-CC-20~.8 0/11-11-81 N/A N/A (CC) 28 Chem and Vo.lume HCV-2.200 A, B, C 0/11-22-tU N/A N/A (CV) TV-2204 0/11-:'2-81 N/A N/A 32 Gaseous Was-c.e TV-GW-202 0/12.-3-81 N/A N/A (GW) TV-GW-.i03 0/12-03-81 N/A N/A 33 Gaseous Drains TV-DG-208A 228/11-B-81 .n 11132 311/12-05-81/0Verhau.lea 0/1.i-11-81 (G.S) TV-DG-208:d b.2/11-15-81 N/A N/A 38 Aerated Drains TV-DA-200A >3240/12-!t-81 521120~2201/1~-1~-81/Lappect vaive 456/l~-1.t-ts 1 (DA) *rv-DA200B t+tW/1.i-09-81 5.l11L0~2.241/12-12-81/Ground valve seat 0/12.-12-tsl

APPENDIX ~B (CONT 1 D) b80-'U81 *.rtPE. C DATA Su.MMAR:i Post .Repair Penetration System Valve (s) *.rested Leakage(sctd)/Date Mr No/Dater~epair le a.icage/Date 42 Service Air 2-SA-81 0/11-21-1:11 N/A N/A (SA) 2-SA-82 0/11-..tl-til N/A l'ii/A 43 Air Monitoring 2-Rl~-3A, 3B 360/11-0o-cs1 62111201&31/12-1~-81/Cleaned seat 36/12-14-b 1 (RM) *l'V-RM-200A 0/11-~0-81 N/A . N/A 44 Al.r Monitoring TV-RM-200B 2.4/11-20-81 N/A N/A

(.Rl'l) TV-RM-200C 0 /11-20-1:>1 N/A N/A 45 PrJ.mary Grade 2-.RC-1&0 7. 2/ 11-0~-tU N/A N/A Water System TV-2519A 0 /11-9-81 N/A N/A (PG) 46 Charging FC"~-2160 192/11-12-bl 2A11~10~1/11-17-81/New plug 0/12-13-131 (Ch) and cage 47 Instrument Air 2-IA-8b4 ~3.2/11-15-81 2111150407/11-1&-81/Cleaned valve 0/11-15-Bl (IA) TV-IA-200. 0/11-15-81 N/A N/A 2-IA-704 528/11-15-81 2111/50408/11-15-81/Lappeci val.ve N/A 48 Vent & Drain TV-VG-209A 0/11-14-81 N/A N/A System TV-VG-209B 0/1.1-14-81 N/A N/A (DA) 50 ~atety Injection TV-SI-l01A 81.6/11-10'-81 2111102038/11-19-81 Lapped valve 7.2/12-11-dl (SI) TV-SI-201.B 84 /11-10-iil 2111102101/11-21-81 Replaced Dody seat 51 3erv1.ce Water 2-sw-200 >432/11-10-81 2111101508/11-24-81/0verhauled 0/1.l-Od/81 valve (SW) 2-SW-:.t08 0/11-24-bl N/A ~/A 53 Safety Injection TV-.-:;I-,WO 52 .8/11-13-81 2111101200/11-1&-81 OVernaul.ea 0/ll-08-81 (SI) 2-SI-234 2b .4/11-13-81 val.ve N/A Primary Vent 2-VA-1 0/11-12-dl N/A N/A (VA) 2-\/A-9 9.6/11-1.l-bl N/A N/A

APPENDIX 4B (CONT 1 D) '

1~80-1~81 TYPE C DATA

SUMMARY

Post ae:pair l'enetr ation S)!Stem Valve ,s} 'Iested Leakage:,sctd)/Date Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105 Leakage Monitoring T\7-LM-200E. 0/11-14-81 N/A N/A (LM) TV-LM-200G 0/11-H-81 N/A N/A TV-LM-200A 0/11-H-81 N/A N/A TV-LM-200C 0/11-14-81 N/A N/A TV-Ll'1-200F 0/11-14-81 N/A N/A TV-LM.-200H 0,111-14-ttl N/A N/A TV-LM-.200.B 0/11-14-81 'N/A N/A TV-LM-200D 0/11-14-dl N/A N/A 56 Sample System TV-SS-206A 1.b/U-06-1:11 N/A N/A (SS) TV-SS-206B 0/12-0b-81 N/A N/A 56 Sample System TV-SS-200A 0/12-09-81 N/A N/A (SS) TV-SS"'.'"200B 0/l~-09-81 N/A N/A Sb Sample System TV-SS-202A 1. ~2/l.l-Oo-81 N/A N/A (S.5) l'V-SS-20.lB .48/12-06-dl N/A 0/1~-09-81 57 Sample System TV-SS-.201A 0/12-03-81 N/A N/A (SS) TV-SS-201B 0/12-03-81 N/A N/A 57 Sampl.e System TV-SS-204A 0/12-10-1:11 N/A N/A (SS) TV-SS-.204B 0/12-10-1:11 N/A N/A 57 Aerated Drains TV-DA-203A 0/11-27-81 N/A N/A (DA) TV-DA-203B 0/11-27-81 N/A N/A 58 Instrument Air 2-IA-868 0/11-14-1'$1 N/A N/A (IA) 1-IA-704 0/11-14-81 N/A N/A bO Satety Injection MOV-213~0A 12/11-08-81 N/A N/A (SI) 61 Safety Injection MOV-2890C 0/11-01:1-bl N/A N/A (SI) 62 6a1et:y Injection MOV-.28~0B 0/11-d-81 N/A N/A (SI) 63 Containment Spray ~-CS-~I+ 0/11-~2-!>1 N/A N/A/11-23-1:i 1 (CS) 11ov-cs-~01c. D 50 .4/ 11-:d~d 1 N/A N/A

  • APPENDIX
  • 1m (CONT 1 IJ) 1980-1981 TYPE C DATA

SUMMARY

Post Repair Penetration System Valve (s) .* Tested Leakaq~fscfd)/Date Mr No/Date/Repair Leaicage/Date 64 Contain.~ent Spray 2-CS-13 720/11-26-81 ~111250731/11-28-Bl/Turned 0/11/.t.9/81

(~S) MOII-CS-201A, B 12/11-29-81 N/A rUbber disc N/A insert Recfrculation Spray MOV-RS-~55A,B 0/1.l-01-is 1 l.\1/A N/A (RS)

Safety Injection MO\J-2860A 0/11-24-81 N/A N/A (SI) M(i'J-28b0B 0/11-24-&1 N/A N/A 70 Recirc Spray 2-RS-11 216/11-26-81 21112b0b30/11-2B-81jTUrned rubber 0/11-29-81 (RS) MOV-RS-25bB 0/11-25-81 N/A disc insert NA 71 Recirc Spray 2-RS-17 0/11-~5-81 N/.A N/A (RS) MOV-RS-25t>A 0/11-25-81 N/A NA 89 Air .Ejector 2-VP-12 21b/11-18-H 1 S2111180955/11-24-81/ Lapped valve 9. o/ 11-io-1:1 1 Discharge TV-SV-202A 0/11-18-tU N/A NA

(\7P) 90 Ventilation MO\J-\IS-200C 38.4/U-1...:-81 N/A N/A (VS) MOV-VS-2000 & 201 >1776/U-1~-81 2112130738/12-13-81/Cleaned seat 16 .8/12-15-81 and disc 2112140308/12-l'J-81/Replaced. seat 91 Ventilation i.*lOV-VS-200A !H~/12-08-81 2112:081800/12-1:l-81 Lapped val.ve 12/ll-~-81 (VS) MOV-VS-200B&202  !}1.2/12-08-81 2112081801/12-11-81/Repaired valve 24/ll-11-in seat Cont Vacuum & TV-GW-204 0/12-03-81 N/A NA Gaseous Waste l'V-GW-205 0/12-03-81 N/A NA (CV) &GW) TV-CV-250C "'40/ 11-14-81 21111~0732/11-23-81/0Verhauled 0/11-2&+-81 Val.ve

'F\1-CV-2500 0/11-14-81 N/A NA 93 Contal..IlIUent Vac TV-GW-200 0/12-03-81 N/A NA/11-..t4-H1

& Gaseous Waste TV-\iW-201 0/12-03-Hl NA/11-i. .. -dl (CV) (GW) T\7-CV-.lSOA >432/11-14-81 ~111140832/11-1~-61/La~i:,)ed val.ve 0/11-24-tsl

  • rV-CV-.l50B >4 3')./ 11-14-81 .ll 11140833/11-20-81/Lapped valve lb.ts/11-24-bl Containment Vac 2-C:11-2 0/11-11/81 N/A N/A (CV) J:iC\1-CV-.:00 0/11-11-81 N/A N/A 4.b-S

APPhNDIX ~B (CUNT 1 D)

Penetra"t.ion ::.)!stem ~ j § ) Tes"t.ed Post Repair LeaJca9e1scidlLDa't.e Mr No,lDate,lRe12air Leaka9eLQa't.e 97 SampJ.e System TV-SS-..:0.lh O/li.-10-81 N/A N/A (SS) TV-SS-203B 0/12-10-81 N/A 'N/A 100 (;;aseous Waste TV-GW-.lOt, 0/1:l-03-81 N/A N/A (GW) TV-GW-207 0/12-03-81 N/A N/A 101 Fire Protection 2-Fi>-151 0/12-02-81 N/A N/A (Ff') l-.FP-15.l 0/12-02-131 N/A N/A 103 RedC't.Or Le1:down i-RL-3 0/11-12-81 N/A. N/A (RL) 2-RL-5 0/11-12-81 N/A N/A 1014 Reactor Letdown 2-RL-13 0/11-1.l-81 N/h N/A (RL) 2-RL-15 0/11-12-81 N/A N/A 106 Safe1:y Injection .2-SI-73 0/11-10-bl N/A N/A (SI) 112 Instrument Air TV-IA-201A 0/11-1d-d1 N/A NA (IA) TV-ll-201B 52.8/11-18-81 S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113 Satety Injection l-SI-174 9.o/11-0&-81 N/A N/A (SI) MOiJ-2bo9A ~. o/11-0tJ-o 1 N/A N/A