ML18177A303: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18177A303
| number = ML18177A303
| issue date = 06/26/2018
| issue date = 06/26/2018
| title = Fuel Services, Inc., Inspection Schedule (Non-Safeguards)
| title = 2019 Nuclear Fuel Services, Inc., Inspection Schedule (Non-Safeguards)
| author name = Williams R E
| author name = Williams R
| author affiliation = NRC/RGN-II/DFFI
| author affiliation = NRC/RGN-II/DFFI
| addressee name = Freudenberger R
| addressee name = Freudenberger R
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:/RA/}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 26, 2018 Richard Freudenberger Quality, Safety and Safeguards Nuclear Fuel Services, Inc.
P. O. Box 337, MS 123 Erwin, TN 37650
 
==SUBJECT:==
NUCLEAR FUEL SERVICES, INC- CALENDAR YEAR 2019 INSPECTION SCHEDULE
 
==Dear Mr. Freudenberger:==
 
Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at Nuclear Fuel Services (NFS) for calendar year 2019. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.
Please note that inspections related to Safeguards are not included in this schedule. In addition, any regional initiative or other reactive inspection is not included. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Carmen Rivera at (404) 997-4515 with any questions or concerns you may have regarding this letter or the inspection schedule.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                /RA/
Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 70-143 License No. SNM-124
 
==Enclosure:==
 
2019 NFS Inspection Schedule cc: (See page 2)
 
R. Freudenberger                              2 cc:
Joel Duling President Nuclear Fuel Services, Inc.
P. O. Box 337, MS 123 Erwin, TN 37650 John Hagemann Director, Operations Nuclear Fuel Services, Inc.
Electronic Mail Distribution Debra G. Shults Director, TN Dept. of Environment & Conservation Electronic Mail Distribution Doris D. Hensley Mayor, Town of Erwin 211 N. Main Avenue P.O. Box 59 Erwin, TN 37650 Gregg Lynch Mayor, Unicoi County P.O. Box 169 Erwin, TN 37650 Johnny Lynch Mayor, Town of Unicoi P.O. Box 39 Unicoi, TN 37692 David W. Deming Manager, Program Field Office - NFS BMPC - core Manufacturing 1205 Banner Hill Rd Erwin, TN 37650
 
ML18177A303            SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE            RII:DFFI      RII:DFFI SIGNATURE          /RA/          /RA/
NAME              CRivera      LPitts DATE                  6/25/2018    6/25/2018    6/ /2018      6/  /2018      6/  /2018      6/ /2018  6/ /2018 E-MAIL COPY?        YES    NO  YES      NO  YES    NO    YES    NO    YES    NO    YES    NO  YES    NO NUCLEAR FUEL SERVICES 2019 INSPECTION/ACTIVITY PLAN CALENDAR NRC Inspection 1 Dates                        March 11-15 Number of Inspectors        3 IP 88015 Nuclear Criticality Safety Inspection Procedures (IPs)
IP 88050 Emergency Preparedness NRC Inspection 2 Dates                        May 20- 24 Number of Inspectors        3 IP 88070 Permanent Plant Modifications Inspection Procedures (IPs)
IP 88015 Nuclear Criticality Safety NRC Inspection 3 Dates                        August 12-16 Number of Inspectors        3 IP 88030 Radiation Protection Inspection Procedures (IPs)  IP 86740 Inspection of Transportation Activities IP 88045 Effluent Control and Environmental Protection NRC Inspection 4 Dates                        November 4-8 Number of Inspectors        5 IP 88015 Nuclear Criticality Safety Inspection Procedure (IP)
IP 88055 Fire Protection Triennial Enclosure}}

Latest revision as of 20:51, 2 February 2020

2019 Nuclear Fuel Services, Inc., Inspection Schedule (Non-Safeguards)
ML18177A303
Person / Time
Site: Erwin
Issue date: 06/26/2018
From: Robert Williams
NRC/RGN-II/DFFI
To: Freudenberger R
Nuclear Fuel Services
References
Download: ML18177A303 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 26, 2018 Richard Freudenberger Quality, Safety and Safeguards Nuclear Fuel Services, Inc.

P. O. Box 337, MS 123 Erwin, TN 37650

SUBJECT:

NUCLEAR FUEL SERVICES, INC- CALENDAR YEAR 2019 INSPECTION SCHEDULE

Dear Mr. Freudenberger:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at Nuclear Fuel Services (NFS) for calendar year 2019. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that inspections related to Safeguards are not included in this schedule. In addition, any regional initiative or other reactive inspection is not included. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Carmen Rivera at (404) 997-4515 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No.70-143 License No. SNM-124

Enclosure:

2019 NFS Inspection Schedule cc: (See page 2)

R. Freudenberger 2 cc:

Joel Duling President Nuclear Fuel Services, Inc.

P. O. Box 337, MS 123 Erwin, TN 37650 John Hagemann Director, Operations Nuclear Fuel Services, Inc.

Electronic Mail Distribution Debra G. Shults Director, TN Dept. of Environment & Conservation Electronic Mail Distribution Doris D. Hensley Mayor, Town of Erwin 211 N. Main Avenue P.O. Box 59 Erwin, TN 37650 Gregg Lynch Mayor, Unicoi County P.O. Box 169 Erwin, TN 37650 Johnny Lynch Mayor, Town of Unicoi P.O. Box 39 Unicoi, TN 37692 David W. Deming Manager, Program Field Office - NFS BMPC - core Manufacturing 1205 Banner Hill Rd Erwin, TN 37650

ML18177A303 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DFFI RII:DFFI SIGNATURE /RA/ /RA/

NAME CRivera LPitts DATE 6/25/2018 6/25/2018 6/ /2018 6/ /2018 6/ /2018 6/ /2018 6/ /2018 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO NUCLEAR FUEL SERVICES 2019 INSPECTION/ACTIVITY PLAN CALENDAR NRC Inspection 1 Dates March 11-15 Number of Inspectors 3 IP 88015 Nuclear Criticality Safety Inspection Procedures (IPs)

IP 88050 Emergency Preparedness NRC Inspection 2 Dates May 20- 24 Number of Inspectors 3 IP 88070 Permanent Plant Modifications Inspection Procedures (IPs)

IP 88015 Nuclear Criticality Safety NRC Inspection 3 Dates August 12-16 Number of Inspectors 3 IP 88030 Radiation Protection Inspection Procedures (IPs) IP 86740 Inspection of Transportation Activities IP 88045 Effluent Control and Environmental Protection NRC Inspection 4 Dates November 4-8 Number of Inspectors 5 IP 88015 Nuclear Criticality Safety Inspection Procedure (IP)

IP 88055 Fire Protection Triennial Enclosure