OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY      E. 2ufelt TELEPHONE      I3131342.-3840 OPERATING STATUS Fit: Patrick                                    Notes
OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY      E. 2ufelt TELEPHONE      I3131342.-3840 OPERATING STATUS
                                                                                                                    '
Fit: Patrick                                    Notes
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:      790601 - 790630
: 2. Reporting Period:      790601 - 790630
Line 34: Line 31:
: 9. Power Level To Which Restricted,if Any (Net MWe):        None
: 9. Power Level To Which Restricted,if Any (Net MWe):        None
: 10. Reasons For Restrictions,1f Any:          Plant in cold shutdown        in acco' 'arje with NRC "Show Cause" order of March 13, 1979.                                          __
: 10. Reasons For Restrictions,1f Any:          Plant in cold shutdown        in acco' 'arje with NRC "Show Cause" order of March 13, 1979.                                          __
                                                                                                                          -
This Month          Yr..to-Date        Cumulative i1. Hours In Reporting Period                              720                  4343                34416
This Month          Yr..to-Date        Cumulative i1. Hours In Reporting Period                              720                  4343                34416
: 12. Numbe: Of Hours Reactor Was Critical                      0                1767.3              23829.5
: 12. Numbe: Of Hours Reactor Was Critical                      0                1767.3              23829.5
Line 54: Line 50:


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY    E. Zufelt TELEPHONE (3151342-3840 SiONTH      June 1979 DAY    AVERAGE DAILY POWER LEVEL            DAY    AVERAGE DAILY POWER LEVEL (51We Net)                                (SIWE-Net i 1                  0                      g7                  0 2                0                        g3                0 3                  0                        39                0 4                  0                        20                0 5                  0                                          0 21 6                  0                      22                  0 7                  0                      D                  0 8                  0                      28                  0 9                0                        25                  0 10                0                        26                0 II                O                        27                0 12                0                                          0 23
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY    E. Zufelt TELEPHONE (3151342-3840 SiONTH      June 1979 DAY    AVERAGE DAILY POWER LEVEL            DAY    AVERAGE DAILY POWER LEVEL (51We Net)                                (SIWE-Net i 1                  0                      g7                  0 2                0                        g3                0 3                  0                        39                0 4                  0                        20                0 5                  0                                          0 21 6                  0                      22                  0 7                  0                      D                  0 8                  0                      28                  0 9                0                        25                  0 10                0                        26                0 II                O                        27                0 12                0                                          0 23
                     '                                          0 13                                          29 14                  0                        30                0 15                  0                        3,
                     '                                          0 13                                          29 14                  0                        30                0 15                  0                        3, 16                  0 SLNMARY:
                                                              -
16                  0 SLNMARY:
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
323 l2;
323 l2;
Line 63: Line 57:
                                                                       =                                  -
                                                                       =                                  -
                                             =_          ri      3w                                        E 2e            E    ,eW              l s.tensee    c,-*          vt              Cause & Couettive
                                             =_          ri      3w                                        E 2e            E    ,eW              l s.tensee    c,-*          vt              Cause & Couettive
           %              lbic
           %              lbic g        3m            j    jgy                1:sent      a?          g?
                                  ,
g        3m            j    jgy                1:sent      a?          g?
ct                      Atison in
ct                      Atison in
                                  *
                                             $E            c2    559              liepin, u    iR G        $'
                                             $E            c2    559              liepin, u    iR G        $'
u Prevent itecuuente e
u Prevent itecuuente e
{
{
Q
Q 5            790315  1:          720          11
                                                                                                                                                                          .
5            790315  1:          720          11
                                                               ,  4            79-014        ZZ        ZZZZZZ    Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
                                                               ,  4            79-014        ZZ        ZZZZZZ    Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
W TN.)
W TN.)
Line 79: Line 68:
_.      S SilicJ ule d        A Iijuipnient I ailuse (! xplain)                            1 -Man ual                        for Pre [ ution of Dat.
_.      S SilicJ ule d        A Iijuipnient I ailuse (! xplain)                            1 -Man ual                        for Pre [ ution of Dat.
  .s                            li-Maintenance or lest                                        2-Manual Scrain.                  1;nti> Sn:ets tor 1.nensee l I ,'
  .s                            li-Maintenance or lest                                        2-Manual Scrain.                  1;nti> Sn:ets tor 1.nensee l I ,'
'' '
C-Refuchng                                                    3. Autonutic Scrain.              1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin                                  4-Otlier (lixplatii)            0161)
C-Refuchng                                                    3. Autonutic Scrain.              1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin                                  4-Otlier (lixplatii)            0161)
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC                                                                        .i G ()perational I o er (I aplain)                                                                I sliibit ! S.nne Souite ll ()the r (1: spiano
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC                                                                        .i G ()perational I o er (I aplain)                                                                I sliibit ! S.nne Souite ll ()the r (1: spiano


_
r        )
r        )
0 i            s        0        0            0      0        0        0            0    0        0              0            0 aer                                                                                        .
0 i            s        0        0            0      0        0        0            0    0        0              0            0 aer                                                                                        .
Line 96: Line 83:
a      ao        l p
a      ao        l p
er                h              a a
er                h              a a
c              sL                    i p            p                  p      ec              t p                  c            c A                a                      w            e        e        e    l            e    e                  i                    h F                      S            d        R        R      C          R    D                  T                    C
c              sL                    i p            p                  p      ec              t p                  c            c A                a                      w            e        e        e    l            e    e                  i                    h F                      S            d        R        R      C          R    D                  T                    C y
* y a              t l                  c n                                      p                a f o                                            s                t                      s      n oi                                          i                  n        n    t m          o t                                    d        m        o        o      na        i sc                    s                              r        c      i        er        t t n              t g                          t      a                  t      t c          a                                    T        3 l u              cn                -          n      l          r  ra          t s          c        A                n          S        8 uf              ei                -    pe          a        e    ec        i -        i          /                u                    0 sl              rd                    i r                    p  pi          mf        d          N                n        d            -
a              t l                  c n                                      p                a f o                                            s                t                      s      n oi                                          i                  n        n    t m          o t                                    d        m        o        o      na        i sc                    s                              r        c      i        er        t t n              t g                          t      a                  t      t c          a                                    T        3 l u              cn                -          n      l          r  ra          t s          c        A                n          S        8 uf              ei                -    pe          a        e    ec        i -        i          /                u                    0 sl              rd                    i r                    p  pi          mf        d          N                n        d            -
ea              ra                      rr          t        o  od          rl          n                        n            e      9 RM                oe                    t u        f          r  rn          ea        i                          a          l        7 cr                          c      i          p  pi          t h                                              i              -
ea              ra                      rr          t        o  od          rl          n                        n            e      9 RM                oe                    t u        f          r  rn          ea        i                          a          l        7 cr                          c      i          p  pi          t h                                              i              -
n                      o            r        m  m            n          o                        o            a      R O
n                      o            r        m  m            n          o                        o            a      R O
Line 114: Line 101:
l E
l E
M A
M A
J
J y        y t
          #
y        y t
s    #
s    #
a        a l        l                            "                      8B e                            0                              p        p                            0              A      25            l t
a        a l        l                            "                      8B e                            0                              p        p                            0              A      25            l t
Line 132: Line 117:
e                                      3 t                                        -
e                                      3 t                                        -
s                3      2              2      3        3          3            7    7        7              0          7          7 y                0      0              0      0        0          0            0    0        0              1          1          2 S
s                3      2              2      3        3          3            7    7        7              0          7          7 y                0      0              0      0        0          0            0    0        0              1          1          2 S
9      9            9      9        9          9                  9        9                          9 e                7      7            7      7        7
9      9            9      9        9          9                  9        9                          9 e                7      7            7      7        7 7            9    7        7              9          7        9 t                /      /            /      /                  /            7    /        /              7          /          7 2      3              0      0                  6                                                                  /
                                                                      '
l u                1      1            2      2 2        2
7            9    7        7              9          7        9 t                /      /            /      /                  /            7    /        /              7          /          7 2      3              0      0                  6                                                                  /
l u                1      1            2      2
                                                                      '
2        2
                                                                                               /
                                                                                               /
6 8
6 8
Line 153: Line 134:
                                 #  N''l"'S'  #
                                 #  N''l"'S'  #
llow Detected          Cause of          Results of    Action taken to  Repair Component #                                  Malfunction        Malfunction        Preclude    Time Recurrence (flours) 1584 b/12/79    27      27-R-101                    OPS            No recording      Broken pen      Replaced pen        4.0 6017                                          Maint. repair    Valve needs 6/18/79    27      27-PC-101A                  OPS                of valve          stroking      Stroked              6.0 6018 6/18/79    27      27-PC-122A                  OPS                    "              "              "
llow Detected          Cause of          Results of    Action taken to  Repair Component #                                  Malfunction        Malfunction        Preclude    Time Recurrence (flours) 1584 b/12/79    27      27-R-101                    OPS            No recording      Broken pen      Replaced pen        4.0 6017                                          Maint. repair    Valve needs 6/18/79    27      27-PC-101A                  OPS                of valve          stroking      Stroked              6.0 6018 6/18/79    27      27-PC-122A                  OPS                    "              "              "
6.0
6.0 1873
                -
(/23/79    27      27-PC-10lli                Itic            Out of cal .      Out of cal . Calibration          4.0 11736 6/23/79    27      27-PCV-122B                OPS            Out of cal.      Improper control Calibration          4.0 34 6/22/79    27    -2 7- A0V- 12711              OPS            Valve rebuilt    Out of cal.      Stroked              8.0 1579 6/12/79    76      76-Pl-103                  OPS              Gaue out of cal .      --        Replaced / cal.      4.0 753 6/18/79    93      93-AM-C                    I f.C          Age              No indicatioc    Replaced / cal.      6.0 (d                    1695 bJ                                                                                                        Replaced
1873
(/23/79    27      27-PC-10lli                Itic            Out of cal .      Out of cal . Calibration          4.0
_
11736 6/23/79    27      27-PCV-122B                OPS            Out of cal.      Improper control Calibration          4.0 34 6/22/79    27    -2 7- A0V- 12711              OPS            Valve rebuilt    Out of cal.      Stroked              8.0 1579 6/12/79    76      76-Pl-103                  OPS              Gaue out of cal .      --        Replaced / cal.      4.0 753 6/18/79    93      93-AM-C                    I f.C          Age              No indicatioc    Replaced / cal.      6.0 (d                    1695 bJ                                                                                                        Replaced
   ' ..q 5/29/79    99      Camera #1                  Sec.            Lightning        No picture      Balanced amp.      40.0 1604
   ' ..q 5/29/79    99      Camera #1                  Sec.            Lightning        No picture      Balanced amp.      40.0 1604
,      6/4/79      99      Camera #1                  Sec.            Unknown          No picture      Adjusted            20.0
,      6/4/79      99      Camera #1                  Sec.            Unknown          No picture      Adjusted            20.0
Line 182: Line 159:
e S
e S
A            w o
A            w o
S
S l
!
l l
l l
l M
M A
A J
J t
        #
s    #          r e                e u    t        d q      n          a e e              e R n              R o
t s    #          r e                e u    t        d q      n          a e e              e R n              R o
p        d r m              r o      8 :a C        4 (
p        d r m              r o      8 :a C        4 (
9 1
9 1
Line 197: Line 172:
                           /
                           /
6
6
                                            -
                                         *g, CrN0 T  ~  -
                                         *g, CrN0 T  ~  -
(
(


POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s                                                                                            REPAIR DNI.E  SYSTEFI                  110W DliTliCTED        CAUSE OF MALFUNCTION COMPONENT #                                                          ACTION TAKEN TO PRECLUDE RECURPENCE  TIME l'0URS 24 Jun      71          71              OPS          Replace two cells of the        Iteplaced  with NCX-2250 cells            48 SB-1,Sil-2                        wrong type. During initial construction two (2) Type                                                b NCX-2550 cells were installt d instead of NCX-2250.
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s                                                                                            REPAIR DNI.E  SYSTEFI                  110W DliTliCTED        CAUSE OF MALFUNCTION COMPONENT #                                                          ACTION TAKEN TO PRECLUDE RECURPENCE  TIME l'0URS 24 Jun      71          71              OPS          Replace two cells of the        Iteplaced  with NCX-2250 cells            48 SB-1,Sil-2                        wrong type. During initial construction two (2) Type                                                b NCX-2550 cells were installt d instead of NCX-2250.
Also replaced cell which        Installed new cell in jumpered had been jumpered. Jumpered    position cell had experienced
Also replaced cell which        Installed new cell in jumpered had been jumpered. Jumpered    position cell had experienced cracked case in 1977.
                              -
cracked case in 1977.
24 Jun      71          1212          PM          N/A                            Disconnected, cleaned, regreased, and
24 Jun      71          1212          PM          N/A                            Disconnected, cleaned, regreased, and
_Sil- 1, S B- 2                                                    retorqued all battery connections.
_Sil- 1, S B- 2                                                    retorqued all battery connections.
Rechecked torque valves following equalize charge.
Rechecked torque valves following equalize charge.
27 Jun      17          1522        Audible        Lower particulate pump          Replaced motor bearings                  10 04-2                        noisy 26 Jun      02          1782          N/A          Requested to clean anchor      Completed retorque                          6
27 Jun      17          1522        Audible        Lower particulate pump          Replaced motor bearings                  10 04-2                        noisy 26 Jun      02          1782          N/A          Requested to clean anchor      Completed retorque                          6 SS- Atill- 14                    bolt threads fi retorque b )
    ,
SS- Atill- 14                    bolt threads fi retorque b )
G 18 Jun    10          It>85          OPS          Check valve noisy              . Replaced disc holder                  300
G 18 Jun    10          It>85          OPS          Check valve noisy              . Replaced disc holder                  300
--                        ItllR- 4 2C p .s s.
--                        ItllR- 4 2C p .s s.
20 Jun    4 t3        167:          N/A          Unable to test anchor bolts      Installed new anchors                    51! 2 11-46-34
20 Jun    4 t3        167:          N/A          Unable to test anchor bolts      Installed new anchors                    51! 2 11-46-34
                                                                                                                              .


PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #                                                                                          REPAIR DATE    SYSTEF1 C0biPONENT #    110W DETECTED        CAUSE OF b!ALFUNCTION        .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun      46          1649          N/A        Unabic to inspect anchor        Installed new fasteners                40 11-46-41                    bolts 21 Jun      46      _1919            N/A        Anchors loose 6 broken          Installed new fasteners              114 11-46-42 21 Jun      71          1457          N/A        N/A                              Performed electrical preventative      80 Bus 1i500                                                      maintenance on llus 11500 23 Jun      46          1674          N/A        NRC-79-02 Inspection            Repaired IAW F1PT-15                  190 11-46-39 19 Jun      93          1654          N/A        Preventive maintenance          Cleaned left G right air bank          8 EDG-A                                                        solenoid valves 19 Jun      93          1655          N/A        Preventive maintenance          Cleaned left 6 right air bank          12 EDG-C                                                        solenoid valves. Replaced right  bank solenoid valve.
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #                                                                                          REPAIR DATE    SYSTEF1 C0biPONENT #    110W DETECTED        CAUSE OF b!ALFUNCTION        .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun      46          1649          N/A        Unabic to inspect anchor        Installed new fasteners                40 11-46-41                    bolts 21 Jun      46      _1919            N/A        Anchors loose 6 broken          Installed new fasteners              114 11-46-42 21 Jun      71          1457          N/A        N/A                              Performed electrical preventative      80 Bus 1i500                                                      maintenance on llus 11500 23 Jun      46          1674          N/A        NRC-79-02 Inspection            Repaired IAW F1PT-15                  190 11-46-39 19 Jun      93          1654          N/A        Preventive maintenance          Cleaned left G right air bank          8 EDG-A                                                        solenoid valves 19 Jun      93          1655          N/A        Preventive maintenance          Cleaned left 6 right air bank          12 EDG-C                                                        solenoid valves. Replaced right  bank solenoid valve.
19 Jun    46          1506          OPS        Strainer cover gasket leak      Tightened cover                        2 VJ                      S-5B b
19 Jun    46          1506          OPS        Strainer cover gasket leak      Tightened cover                        2 VJ                      S-5B b
  .sY ljl Jun    .,s        1640          OPS        llCU Valves - air leaks          Rebuild solenoid valves                24
  .sY ljl Jun    .,s        1640          OPS        llCU Valves - air leaks          Rebuild solenoid valves                24
    ,
_,il('u Valves D
_,il('u Valves D


POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE          WORK REQUEST 8                                                                                      REPAIR SYSTEh!                110W DETECTED        CAUSE OF btALFUNCTION COFIPONENT #                                                    ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun        93        1563          Visual      Air Access fasteners spot        Rewelded door latches                  1 EDG-B                      wolds failed 2'1 Jun      93        1656            N/A      Preventive blaintenance          Cleaned left 6 right air bank          12 EDG-D                                                        solenoid valves 15 Jun      27        930            OPS      blotor will not start            Replaced two drive sub-assemblies      24 RFI,102A                                                    and new cover plate 15 Jun    27        929            OPS        Excessive noise from pump        Replaced pump                          28 RF1-101A 16 Jun    27        693            OPS      Solenoid coil is contin-          Disassembled, cleaned, and rebuild    12 SOV-123B                  ually failing                    valve 16 Jun    71        1120            N/A      N/A                              Performed electrical preventive        45 Bus 12600                                                    maintenance on Bus 12600 Lt  .
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE          WORK REQUEST 8                                                                                      REPAIR SYSTEh!                110W DETECTED        CAUSE OF btALFUNCTION COFIPONENT #                                                    ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun        93        1563          Visual      Air Access fasteners spot        Rewelded door latches                  1 EDG-B                      wolds failed 2'1 Jun      93        1656            N/A      Preventive blaintenance          Cleaned left 6 right air bank          12 EDG-D                                                        solenoid valves 15 Jun      27        930            OPS      blotor will not start            Replaced two drive sub-assemblies      24 RFI,102A                                                    and new cover plate 15 Jun    27        929            OPS        Excessive noise from pump        Replaced pump                          28 RF1-101A 16 Jun    27        693            OPS      Solenoid coil is contin-          Disassembled, cleaned, and rebuild    12 SOV-123B                  ually failing                    valve 16 Jun    71        1120            N/A      N/A                              Performed electrical preventive        45 Bus 12600                                                    maintenance on Bus 12600 Lt  .
''
   - 18 Jun        70        1409            OPS      liigh D/P during operation        Changed filters                        2 F-11B t
   - 18 Jun        70        1409            OPS      liigh D/P during operation        Changed filters                        2 F-11B
-  .
t
         .2 Jun    27      11039            OPS      Valve sticks shut                Freed brass bushing in manual          9 A0V-126B                                                    handwheel assembly 2 Jun      27        34            OPS        Position indicator broken        Replaced broken indicator              40 A0V-127B
         .2 Jun    27      11039            OPS      Valve sticks shut                Freed brass bushing in manual          9 A0V-126B                                                    handwheel assembly 2 Jun      27        34            OPS        Position indicator broken        Replaced broken indicator              40 A0V-127B


POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #                                                                                              REPAIR DNI E  SYSTEM                        liOW DIiTECTED COMPONENT #                                CAUSE OF MALFUNCTION          ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun      71          1458                N/A      N/A                                Electrical PM's of switchgear,        50 Bus 12500                                                              breakers, and motor loads 13 Jun      29          813                Visual      Packing leak                      Ground seat, replaced pilot valve,    600 A0V-80A                                                                and repacked 14 . inn    27        11737                  OPS      Seat leakage                      Remachined seat f plug                12 CNSsl415                                                -
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #                                                                                              REPAIR DNI E  SYSTEM                        liOW DIiTECTED COMPONENT #                                CAUSE OF MALFUNCTION          ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun      71          1458                N/A      N/A                                Electrical PM's of switchgear,        50 Bus 12500                                                              breakers, and motor loads 13 Jun      29          813                Visual      Packing leak                      Ground seat, replaced pilot valve,    600 A0V-80A                                                                and repacked 14 . inn    27        11737                  OPS      Seat leakage                      Remachined seat f plug                12 CNSsl415                                                -
14 Jun    01-125        1175              Visual      Fan belts need replacing          Replaced fan belts                      2 FN-Ill 6 Jun      46          1691                OPS      Requested to clean                Cleaned strainers                        3 S-5ATB                              strainers 6 Jun      02          1130                N/A      N/A                                Preventive maintenance of valve        48 MOV's                                                                motor operators
14 Jun    01-125        1175              Visual      Fan belts need replacing          Replaced fan belts                      2 FN-Ill 6 Jun      46          1691                OPS      Requested to clean                Cleaned strainers                        3 S-5ATB                              strainers 6 Jun      02          1130                N/A      N/A                                Preventive maintenance of valve        48 MOV's                                                                motor operators
     'o J u n    27          1682                  ST        Position switches out of          Adjusted and tested valve position      6 A0V-131A,132A                          adjustment                        swit c he s
     'o J u n    27          1682                  ST        Position switches out of          Adjusted and tested valve position      6 A0V-131A,132A                          adjustment                        swit c he s 8 Jun      46      .,1310                Visual      MPT-15 repair                      Replaced angle                          9 i'                      1146-336 9 Jun      o7          1595                OPS      Dirty filters                      Replaced filters                      4 s 'C - l b A T. ll
<
8 Jun      46      .,1310                Visual      MPT-15 repair                      Replaced angle                          9 i'                      1146-336 9 Jun      o7          1595                OPS      Dirty filters                      Replaced filters                      4 s 'C - l b A T. ll


POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM                  !!OW DETECTED        CAUSE OF MALFUNCTION        ACTION TAKEN TO PRECLUDE RECURRENCE  TIME COMPONENT 110URS
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM                  !!OW DETECTED        CAUSE OF MALFUNCTION        ACTION TAKEN TO PRECLUDE RECURRENCE  TIME COMPONENT 110URS 11 Jun    10        102        DCAR-001-79    Incompleta installatior.        Completed items to clear DCAR            4 ilangers 12 Jun    93      1574              OPS        Air start motors remained        Replace starters, cleaned air start    32 EJG -B                        engaged with diesel running      valves, installed new right bank start magnet valve 1Jun      11      1119            Maint.      Broke squib valve connector      Replaced coth squibs and tested          16 EV-14A,Il                      pin while performing            per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun      11      1628              OPS      Breaker operator misaligned      Realigned operator                    1/3 P-2B                        with breaker switch 5 Jun    23        141          Visual      Weld leak                        Repaired weld                            10 10" SilP 902- 19 5 Jun    14      12889            Visual      Leak on gland leak-off          Replaced bushing f3 pipe nipple          5 tra                    P-1B rG L4    2 Jun    14      1421            Visual      11 14-1 needs minor              Regrouted baseplate                14/1420*
                                                                          .
11 Jun    10        102        DCAR-001-79    Incompleta installatior.        Completed items to clear DCAR            4 ilangers 12 Jun    93      1574              OPS        Air start motors remained        Replace starters, cleaned air start    32 EJG -B                        engaged with diesel running      valves, installed new right bank start magnet valve 1Jun      11      1119            Maint.      Broke squib valve connector      Replaced coth squibs and tested          16 EV-14A,Il                      pin while performing            per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun      11      1628              OPS      Breaker operator misaligned      Realigned operator                    1/3 P-2B                        with breaker switch 5 Jun    23        141          Visual      Weld leak                        Repaired weld                            10 10" SilP 902- 19 5 Jun    14      12889            Visual      Leak on gland leak-off          Replaced bushing f3 pipe nipple          5 tra                    P-1B rG L4    2 Jun    14      1421            Visual      11 14-1 needs minor              Regrouted baseplate                14/1420*
11 41-1                      grouting rework t-i (a
11 41-1                      grouting rework t-i (a
                                                                                     *Previously reported (Fliy 1979)
                                                                                     *Previously reported (Fliy 1979)


POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR DAl,E        WORK REQUEST s SYSTEM                110W DETEC' LED        CAUSE OF MALFUNCTION          ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
                                            .
REPAIR DAl,E        WORK REQUEST s SYSTEM                110W DETEC' LED        CAUSE OF MALFUNCTION          ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 26 Jun    71        1121            N/A          N/A                            Performed electrical preventat ive      72 Ilus llo00                                                      maintenance on Bux 11600 21 Jun    10        1914            N/A          NRC 79-02 Inspection            Modified existing support            299'2 11-10-50 26 Jun    13        1917 _          N/A          Snubber test for NRC 79-02      Removed, tested f. reinstalled          18 PFSK--1051                                                      snubber 26 Jun    13        1915            N/A          Snubber test for NRC 79-02      Removed, tested fa reinstalled          6 PFSK-1050                                                        snubber 28 .lun  10        1851            Si          Valve operator torque          Replaced torque switch and adjusted    10 MOV-258                        switch binding prevented        valve position rotors valve from opening 20 Jun  71      _1019            OPS          Cell #6 had cracked case        Replaced cell                            6 SB-2                          causing leak and resulting U                                              battery ground IV v4
liOURS 26 Jun    71        1121            N/A          N/A                            Performed electrical preventat ive      72 Ilus llo00                                                      maintenance on Bux 11600 21 Jun    10        1914            N/A          NRC 79-02 Inspection            Modified existing support            299'2 11-10-50 26 Jun    13        1917 _          N/A          Snubber test for NRC 79-02      Removed, tested f. reinstalled          18 PFSK--1051                                                      snubber 26 Jun    13        1915            N/A          Snubber test for NRC 79-02      Removed, tested fa reinstalled          6 PFSK-1050                                                        snubber 28 .lun  10        1851            Si          Valve operator torque          Replaced torque switch and adjusted    10 MOV-258                        switch binding prevented        valve position rotors valve from opening 20 Jun  71      _1019            OPS          Cell #6 had cracked case        Replaced cell                            6 SB-2                          causing leak and resulting U                                              battery ground IV v4
___i el
___i el
       ,}}
       ,}}

Latest revision as of 04:03, 2 February 2020

Monthly Operating Rept for June 1979
ML19224D081
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/30/1979
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19224D079 List:
References
MOR-790630, NUDOCS 7907100609
Download: ML19224D081 (12)


Text

'

OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY E. 2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes

1. Unit Name:
2. Reporting Period: 790601 - 790630
3. Licensed Thermal Power (MWt):

2436

4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 821
6. Maximum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe): 800
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,1f Any: Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. __

This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 720 4343 34416

12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5
13. Reactor Rescrve Shutdown Hours 0 0 0
14. Hours Generator On.Line 0 1767.3 23054.4
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590
18. Net E'ectrical Energy Generated (MWH) 0 1.198,435 15,024,420
19. Unit Service Factor 0 40. ' % 67. 0 $
20. Unit Availability Factor 0 40.7 % 67.0 %
21. Unit Capacity Factor (Using MDC Net) 0 34.3 *i 61.1 *;
22. Unit Capacity Factor (Using DER Net) . 0 33.6's 53.2%
23. Unit Forced Outage Rate 100*, 59.3*s 18,2%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Vene Unknown - pending completion of

25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) (SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 0 21 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23

' 0 13 29 14 0 30 0 15 0 3, 16 0 SLNMARY:

Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.

323 l2;

s DOCKET NO. 50-333 UNIT SilUIDOWNS AND POWER REDUCllONS .I A FNPI UNIT N AME DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.

= -

=_ ri 3w E 2e E ,eW l s.tensee c,-* vt Cause & Couettive

% lbic g 3m j jgy 1:sent a? g?

ct Atison in

$E c2 559 liepin, u iR G $'

u Prevent itecuuente e

{

Q 5 790315 1: 720 11

, 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)

W TN.)

vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions

_. S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.

.s li-Maintenance or lest 2-Manual Scrain. 1;nti> Sn:ets tor 1.nensee l I ,'

C-Refuchng 3. Autonutic Scrain. 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)

I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC .i G ()perational I o er (I aplain) I sliibit ! S.nne Souite ll ()the r (1: spiano

r )

0 i s 0 0 0 0 0 0 0 0 0 0 0 aer .

pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio l 9 6 1 1 0 8 RTl (

4 d

o r e e t e n r e p . e n n u n c o n t . i n n d een C r n h s l a o o e kd e / . p o gr a g c i c aur Tl n c i o C t o tl r a oo t t / ep d a r cu dC - ti d d d / c d nm e r p nec e/ - t e e e d e e i a n b e

ore np eo hi c a

c a

r en c m-r e e i c

IPR cs i nn a t l n

t t o t o l l p

a ao l p

er h a a

c sL i p p p ec t p c c A a w e e e l e e i h F S d R R C R D T C y

a t l c n p a f o s t s n oi i n n t m o t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn - n l r ra t s c A n S 8 uf ei - pe a e ec i - i / u 0 sl rd i r p pi mf d N n d -

ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i -

n o r m m n o o a R O

T I N D I I I N N F N

A L

P h r r c r o t o R r o f r E n n t

o r t

c r W o o 8 i

w t t

s o e i

r e O t f i 8 sn c i t nr d P r ot Cn - o e s c ne e a c / o 9 ri n p n e A od r r R m #

f en Ti 7 et n i a n t / cr e u A m I su t - pi o l r w e N o d d F u uf ec R os c c T o d ec r e I S al sa O ro n s e o c Ca os pp or c o C_

U e M o d d d k d r N c 9

7 m a a a n a o e P L I B B B U B L R n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S F e S C S C C S S C P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o

S l

l E

M A

J y y t

s #

a a l l " 8B e 0 p p 0 A 25 l t

u t 5 0 I s s ,

0 55  ?

t c n 6 2 A P i i

'( 0 44 0 e e 1 - 8 R D D , 1 -

1 R n - C 7 "D "A t

- S -

o p

R I 2 5 d d " " "I S. I T k

r m T T - 1 o o 1 R P

- - U 1 - 5 R R M M M - - -

o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m

e 3 t -

s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S

9 9 9 9 9 9 9 9 9 e 7 7 7 7 7 7 9 7 7 9 7 9 t / / / / / 7 / / 7 / 7 2 3 0 0 6 /

l u 1 1 2 2 2 2

/

6 8

1 8

1

/

4 1

1 4

/ / / / / / / / / / / /

6 6 6 6 6 6 6 6 6 6 6 6

, 'C UNu

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary

. lune 1979 IfC Date System

  1. Nl"'S' #

llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS " " "

6.0 1873

(/23/79 27 27-PC-10lli Itic Out of cal . Out of cal . Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal. Improper control Calibration 4.0 34 6/22/79 27 -2 7- A0V- 12711 OPS Valve rebuilt Out of cal. Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . -- Replaced / cal. 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. 6.0 (d 1695 bJ Replaced

' ..q 5/29/79 99 Camera #1 Sec. Lightning No picture Balanced amp. 40.0 1604

, 6/4/79 99 Camera #1 Sec. Unknown No picture Adjusted 20.0

- s 852 6/4/79 99 Security printei Sec. Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0

r )

i s 0 aer .

pmu 6 eio i RTl (

o t

e n c een kd e aur tl r cu d e

nec ore c IPR a l

t c p A e R

n m r

f o a oi l t

sc a t n t l u n uf a sl ea t s

RM n o

T C N

A.

l P

R E n W

y o

O f i P r ot a c R m C en A m E su n E u I uf e L S al k C C a o U e 9 M r N c 7 B n 9 K a 1 6 C n I e e R t n T n u d A i J e P a t Z M c T e I t F e c D

e S

A w o

S l

l l

M A

J t

s # r e e u t d q n a e e e R n R o

p d r m r o 8 :a C 4 (

9 1

m e

t s 9 y 9 S

9 e 7 t /

u 9 l 2

/

6

  • g, CrN0 T ~ -

(

POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURPENCE TIME l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. During initial construction two (2) Type b NCX-2550 cells were installt d instead of NCX-2250.

Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.

24 Jun 71 1212 PM N/A Disconnected, cleaned, regreased, and

_Sil- 1, S B- 2 retorqued all battery connections.

Rechecked torque valves following equalize charge.

27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque b )

G 18 Jun 10 It>85 OPS Check valve noisy . Replaced disc holder 300

-- ItllR- 4 2C p .s s.

20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51! 2 11-46-34

PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # REPAIR DATE SYSTEF1 C0biPONENT # 110W DETECTED CAUSE OF b!ALFUNCTION .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 _1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. Replaced right bank solenoid valve.

19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b

.sY ljl Jun .,s 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24

_,il('u Valves D

POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE WORK REQUEST 8 REPAIR SYSTEh! 110W DETECTED CAUSE OF btALFUNCTION COFIPONENT # ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin- Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt .

- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 F-11B t

.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B

POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # REPAIR DNI E SYSTEM liOW DIiTECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 -

14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators

'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s 8 Jun 46 .,1310 Visual MPT-15 repair Replaced angle 9 i' 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll

POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM  !!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior. Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*

11 41-1 grouting rework t-i (a

  • Previously reported (Fliy 1979)

POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR DAl,E WORK REQUEST s SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 _1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4

___i el

,