Monthly Operating Rept for June 1979
ML19224D081
Person / Time
Site: FitzPatrick 
Issue date: 06/30/1979
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19224D079 List:
References
MOR-790630, NUDOCS 7907100609
Download: ML19224D081 (12)


Text

'

OPERATING DATA REPORT DOCKET NO.

50-333 DATE Julv 1979 COMPLETED BY E.

2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes

1. Unit Name:

790601 - 790630

2. Reporting Period:

2436

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

883 821

5. Design Electrical Rating (Net MWe):

830

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

800

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,1f Any:

Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979.

This Month Yr..to-Date Cumulative 720 4343 34416 i1. Hours In Reporting Period

12. Numbe: Of Hours Reactor Was Critical 0

1767.3 23829.5

13. Reactor Rescrve Shutdown Hours 0

0 0

14. Hours Generator On.Line 0

1767.3 23054.4

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590 0

1.198,435 15,024,420

18. Net E'ectrical Energy Generated (MWH)
19. Unit Service Factor 0
40. ' %
67. 0 $
20. Unit Availability Factor 0

40.7 %

67.0 %

0 34.3 *i 61.1 *;

21. Unit Capacity Factor (Using MDC Net) 0 33.6's 53.2%
22. Unit Capacity Factor (Using DER Net).
23. Unit Forced Outage Rate 100*,

59.3*s 18,2%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Vene Unknown - pending completion of

25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)

(SIWE-Net i 1

0 g7 0

2 0

g3 0

3 0

39 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

D 0

8 0

28 0

9 0

25 0

10 0

26 0

II O

27 0

12 0

0 23 0

13 29 14 0

30 0

15 0

3, 16 0

SLNMARY:

Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.

323 l2;

s DOCKET NO.

50-333 UNIT SilUIDOWNS AND POWER REDUCllONS UNIT N AME

.I A FNPI DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111

,Iu l y 1979 1ELEP ONE (315)342-3840 n.=

3w E

=_

ri 2e E

,eW l s.tensee vt Cause & Couettive c,

g?

lbic g

3m j

jgy 1:sent a?

ct Atison in

$E c2 559 liepin, u iR G Prevent itecuuente

{

u e

Q 5

790315 1:

720 11 4

79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)

W TN.)

vs i

2 3

4 I l 'oi s c J Reason Method:

lixinbit G - Inst r uctions S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.

li-Maintenance or lest 2-Manual Scrain.

1;nti> Sn:ets tor 1.nensee

.s l I,'

C-Refuchng

3. Autonutic Scrain.

1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)

I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC

.i G ()perational I o er (I aplain)

I sliibit ! S.nne Souite ll ()the r (1: spiano

r

)

0 0

0 0

0 i

s 0

0 0

0 0

0 0

aer pmu 8

1 1

4 2

6 4

0 0

8 3

3 eio 9

6 1

1 0

8 RTl 4

l

(

d o

r e

er t

e n

e p

e n

n u

n c

o n

t i

n n

d een C

r n

h s l

a o

o e

p o

gr a

g c

i c

kd e

/

aur Tl n

c i o C

t or tl r a

oo t t

/

ep d

a cu dC ti d

d d

/ c d

nm e

r p

nec e/

t e

e e

d e e

i a n

b e

ore np hi c

c r

en c

m-e i

IPR eo cs a

a i

nn a

r e t

l c

t t o t o l

l a

ao l

er h

a n

c sL i p p

p p

ec p

t p c

c a

h A

a w

e e

e l

e e

i F

S d

R R

C R

D T

C ya t

l c

n p

a f o s

t s

n i

n n

t m o

oi t

d m

o o

na i

sc s

r c

i er t

t n t g t

a t

t c a

T 3

l u cn n

l r

ra t s c

A n

S 8

uf ei pe a

e ec i -

i

/

u 0

sl rd i r p

pi mf d

N n

d ea ra rr t

o od rl n

n e

9 RM oe t u f

r rn ea i

a l

7 cr c

i p

pi t h i

n o

r m

m n

o o

a R

I N

D I

I I

N N

F O

TNA L

P r

h r

o c

r o

t R

t r

o t

f r

E n

r n

i o

t r

c i

W o

o 8

w t

s o

e r

e O

t f i 8

sn c

i t

nr d

P r

ot Cn o

e s

c ne e

a c

r

/ o 9

ri n

p n

e A

od r

R m

en f

Ti 7

et n

i a

n t

/

cr e

u A

m su I

t pi o

l r

w e

N o

d d

F u

uf ec R

os c

c T

o d

ec r

e S

al sa O

ro n

s e o

c I

C_

Ca os pp d

d d

k d

or c

o U

e 9

M r

o m

a a

a n

a o

e N

c 7

L I

B B

B U

B L

R P

n 9

K a

1 C

n 1

I e

e R

t n

T n

u d

A i

l e

P a

t Z

M c

T e

I t

S C

C S

S C

S C

C S

S C

F e

P G

G P

P G

P 6

S P

P i

D O

I I

O O

I O

I I

O O

H A

wo l

S l

EM A

J y

y t

a a

s l

l 8B t

e 0

p p

0 A

25 l

u t

5 0

I s

s 0

55

?

tc n

6 2

A P

i i

'(

0 44 0

e e

1 8

R D

D "D

"A 1

1 R

n C

7 S

t I

2 5

d d

"I S.

o R

T I

k p

T T

1 o

o 1

R P

r m

U 1

5 R

R M

M M

o 2

6 2

2 T

8 4

8 1

3 R

R 8

R 7

0 4

7 9

7 L

5 0

6 0

2 A

2 3

2 4

7 4

0 I

8 S

6 S

3 1

2 1

3 7

1 6

6 2

1 8

7 2

5 6

6 6

4 1

1 1

1 1

1 7

1 1

1 1

me 3

t s

3 2

2 3

3 3

7 7

7 0

7 7

y 0

0 0

0 0

0 0

0 0

1 1

2 S

9 9

9 9

9 9

9 9

9 e

7 7

7 7

7 7

9 7

7 9

7 9

t

/

/

/

/

/

7

/

/

7

/

7 2

3 0

0 6

/

8 8

/

1

/

u 1

1 2

2 2

2 6

1 1

4 1

4 l

/

/

/

/

/

/

/

/

/

/

/

/

6 6

6 6

6 6

6 6

6 6

6 6

UNu

, 'C

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary

. lune 1979 IfC Nl"'S' Cause of Results of Action taken to Repair Date System llow Detected Component #

Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS 6.0 1873

(/23/79 27 27-PC-10lli Itic Out of cal.

Out of cal.

Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal.

Improper control Calibration 4.0 34 6/22/79 27

-2 7-A0V-12711 OPS Valve rebuilt Out of cal.

Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal.

Replaced / cal.

4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal.

6.0 (d

1695 bJ Replaced 5/29/79 99 Camera #1 Sec.

Lightning No picture Balanced amp.

40.0

..q 1604 6/4/79 99 Camera #1 Sec.

Unknown No picture Adjusted 20.0

- s 852 6/4/79 99 Security printei Sec.

Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G. li repair 1.0

r

)

i s

0 aer pmu 6

eio RTl i

(

o t

e n

c een kd e aur tl rcu d

nec e

ore c

IPR a

t l

c p

A e

R n

mr f o oi a

l t

sc a

t n t

l u uf na sl t

ea s

RM no T

C N

A.

l P

R E

n W

o O

y f i P

r ot a

c R

m C

en A

m E

su n

E u

uf I

e L

S al k

C C a o

U e

9 M

r N

c 7

B n

9 K

a 6

1 C

n I

e e

R t

n T

n u

d A

i J

e P

a t

Z M

c T

e I

t c

F e

e D

S A

wo l

S l

lM A

J ts r

e e

u t

d q

n a

e e

e R

n R

op d

r m

r o

8 C

4

a

(

9 1

me ts 9

y 9

S 9

e 7

t

/

u 9

2 l

/

6 CrN0

~

  • g, T

-(

POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURPENCE TIME COMPONENT #

l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type.

During initial b

construction two (2) Type NCX-2550 cells were installt d instead of NCX-2250.

Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.

1212 PM N/A Disconnected, cleaned, regreased, and 24 Jun 71

_Sil-1, S B-2 retorqued all battery connections.

Rechecked torque valves following equalize charge.

27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6

SS-Atill-14 bolt threads fi retorque b

)

G 18 Jun 10 It>85 OPS Check valve noisy

. Replaced disc holder 300 ItllR-4 2C p.s s.

20 Jun 4 t3 167:

N/A Unable to test anchor bolts Installed new anchors 51!2 11-46-34

PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST #

REPAIR DATE SYSTEF1 C0biPONENT #

110W DETECTED CAUSE OF b!ALFUNCTION

.\\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46

_1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8

EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves.

Replaced right bank solenoid valve.

19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2

VJ S-5B b

.sY ljl Jun 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24

.,s

_,il('u Valves D

POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary WORK REQUEST 8 REPAIR DATE SYSTEh!

COFIPONENT #

110W DETECTED CAUSE OF btALFUNCTION ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1

EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin-Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt

- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2

F-11B t

.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9

A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B

POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A.

FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST #

REPAIR DNI E SYSTEM liOW DIiTECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14. inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2

FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3

S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators

'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6

A0V-131A,132A adjustment swit c he s i'

.,1310 Visual MPT-15 repair Replaced angle 9

8 Jun 46 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4

s 'C - l b A T. ll

POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary REPAIR WORK REQUEST 4 DNI.E SYSTEM

!!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior.

Completed items to clear DCAR 4

ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint.

Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902-19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5

tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*

11 41-1 grouting rework t-i (a

  • Previously reported (Fliy 1979)

POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR WORK REQUEST s DAl,E SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _

N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6

PFSK-1050 snubber 28.lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71

_1019 OPS Cell #6 had cracked case Replaced cell 6

SB-2 causing leak and resulting U

battery ground IV v4

___i el

,