MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
'
OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY E. 2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes
- 1. Unit Name:
- 2. Reporting Period: 790601 - 790630
- 3. Licensed Thermal Power (MWt):
2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net MWe): 821
- 6. Maximum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe): 800
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions,1f Any: Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. __
This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 720 4343 34416
- 12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5
- 13. Reactor Rescrve Shutdown Hours 0 0 0
- 14. Hours Generator On.Line 0 1767.3 23054.4
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
- 17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590
- 18. Net E'ectrical Energy Generated (MWH) 0 1.198,435 15,024,420
- 19. Unit Service Factor 0 40. ' % 67. 0 $
- 20. Unit Availability Factor 0 40.7 % 67.0 %
- 21. Unit Capacity Factor (Using MDC Net) 0 34.3 *i 61.1 *;
- 22. Unit Capacity Factor (Using DER Net) . 0 33.6's 53.2%
- 23. Unit Forced Outage Rate 100*, 59.3*s 18,2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Vene Unknown - pending completion of
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) (SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 0 21 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23
' 0 13 29 14 0 30 0 15 0 3, 16 0 SLNMARY:
Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.
323 l2;
s DOCKET NO. 50-333 UNIT SilUIDOWNS AND POWER REDUCllONS .I A FNPI UNIT N AME DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.
= -
=_ ri 3w E 2e E ,eW l s.tensee c,-* vt Cause & Couettive
% lbic g 3m j jgy 1:sent a? g?
ct Atison in
$E c2 559 liepin, u iR G $'
u Prevent itecuuente e
{
Q 5 790315 1: 720 11
, 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)
W TN.)
vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions
_. S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.
.s li-Maintenance or lest 2-Manual Scrain. 1;nti> Sn:ets tor 1.nensee l I ,'
C-Refuchng 3. Autonutic Scrain. 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)
I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC .i G ()perational I o er (I aplain) I sliibit ! S.nne Souite ll ()the r (1: spiano
r )
0 i s 0 0 0 0 0 0 0 0 0 0 0 aer .
pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio l 9 6 1 1 0 8 RTl (
4 d
o r e e t e n r e p . e n n u n c o n t . i n n d een C r n h s l a o o e kd e / . p o gr a g c i c aur Tl n c i o C t o tl r a oo t t / ep d a r cu dC - ti d d d / c d nm e r p nec e/ - t e e e d e e i a n b e
ore np eo hi c a
c a
r en c m-r e e i c
IPR cs i nn a t l n
t t o t o l l p
a ao l p
er h a a
c sL i p p p ec t p c c A a w e e e l e e i h F S d R R C R D T C y
a t l c n p a f o s t s n oi i n n t m o t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn - n l r ra t s c A n S 8 uf ei - pe a e ec i - i / u 0 sl rd i r p pi mf d N n d -
ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i -
n o r m m n o o a R O
T I N D I I I N N F N
A L
P h r r c r o t o R r o f r E n n t
o r t
c r W o o 8 i
w t t
s o e i
r e O t f i 8 sn c i t nr d P r ot Cn - o e s c ne e a c / o 9 ri n p n e A od r r R m #
f en Ti 7 et n i a n t / cr e u A m I su t - pi o l r w e N o d d F u uf ec R os c c T o d ec r e I S al sa O ro n s e o c Ca os pp or c o C_
U e M o d d d k d r N c 9
7 m a a a n a o e P L I B B B U B L R n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S F e S C S C C S S C P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o
S l
l E
M A
J y y t
s #
a a l l " 8B e 0 p p 0 A 25 l t
u t 5 0 I s s ,
0 55 ?
t c n 6 2 A P i i
'( 0 44 0 e e 1 - 8 R D D , 1 -
1 R n - C 7 "D "A t
- S -
o p
R I 2 5 d d " " "I S. I T k
r m T T - 1 o o 1 R P
- - U 1 - 5 R R M M M - - -
o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m
e 3 t -
s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S
9 9 9 9 9 9 9 9 9 e 7 7 7 7 7 7 9 7 7 9 7 9 t / / / / / 7 / / 7 / 7 2 3 0 0 6 /
l u 1 1 2 2 2 2
/
6 8
1 8
1
/
4 1
1 4
/ / / / / / / / / / / /
6 6 6 6 6 6 6 6 6 6 6 6
, 'C UNu
JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary
. lune 1979 IfC Date System
- Nl"'S' #
llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS " " "
6.0 1873
(/23/79 27 27-PC-10lli Itic Out of cal . Out of cal . Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal. Improper control Calibration 4.0 34 6/22/79 27 -2 7- A0V- 12711 OPS Valve rebuilt Out of cal. Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . -- Replaced / cal. 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. 6.0 (d 1695 bJ Replaced
' ..q 5/29/79 99 Camera #1 Sec. Lightning No picture Balanced amp. 40.0 1604
, 6/4/79 99 Camera #1 Sec. Unknown No picture Adjusted 20.0
- s 852 6/4/79 99 Security printei Sec. Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0
r )
i s 0 aer .
pmu 6 eio i RTl (
o t
e n c een kd e aur tl r cu d e
nec ore c IPR a l
t c p A e R
n m r
f o a oi l t
sc a t n t l u n uf a sl ea t s
RM n o
T C N
A.
l P
R E n W
y o
O f i P r ot a c R m C en A m E su n E u I uf e L S al k C C a o U e 9 M r N c 7 B n 9 K a 1 6 C n I e e R t n T n u d A i J e P a t Z M c T e I t F e c D
e S
A w o
S l
l l
M A
J t
s # r e e u t d q n a e e e R n R o
p d r m r o 8 :a C 4 (
9 1
m e
t s 9 y 9 S
9 e 7 t /
u 9 l 2
/
6
(
POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURPENCE TIME l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. During initial construction two (2) Type b NCX-2550 cells were installt d instead of NCX-2250.
Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.
24 Jun 71 1212 PM N/A Disconnected, cleaned, regreased, and
_Sil- 1, S B- 2 retorqued all battery connections.
Rechecked torque valves following equalize charge.
27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque b )
G 18 Jun 10 It>85 OPS Check valve noisy . Replaced disc holder 300
-- ItllR- 4 2C p .s s.
20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51! 2 11-46-34
PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # REPAIR DATE SYSTEF1 C0biPONENT # 110W DETECTED CAUSE OF b!ALFUNCTION .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 _1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. Replaced right bank solenoid valve.
19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b
.sY ljl Jun .,s 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24
_,il('u Valves D
POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE WORK REQUEST 8 REPAIR SYSTEh! 110W DETECTED CAUSE OF btALFUNCTION COFIPONENT # ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin- Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt .
- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 F-11B t
.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B
POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # REPAIR DNI E SYSTEM liOW DIiTECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 -
14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators
'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s 8 Jun 46 .,1310 Visual MPT-15 repair Replaced angle 9 i' 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll
POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM !!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior. Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*
11 41-1 grouting rework t-i (a
- Previously reported (Fliy 1979)
POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR DAl,E WORK REQUEST s SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #
liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 _1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4