OPERATING DATA REPORT DOCKET NO. 50-333 DATE Julv 1979 COMPLETED BY E. 2ufelt TELEPHONE I3131342.-3840 OPERATING STATUS Fit: Patrick Notes

1. Unit Name:
2. Reporting Period: 790601 - 790630
3. Licensed Thermal Power (MWt):

2436

4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 821
6. Maximum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe): 800
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,1f Any: Plant in cold shutdown in acco' 'arje with NRC "Show Cause" order of March 13, 1979. __

This Month Yr..to-Date Cumulative i1. Hours In Reporting Period 720 4343 34416

12. Numbe: Of Hours Reactor Was Critical 0 1767.3 23829.5
13. Reactor Rescrve Shutdown Hours 0 0 0
14. Hours Generator On.Line 0 1767.3 23054.4
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3,626,1rg 45,840,308
17. Gross Electrical Energy Generated (MWH) 0 1.235,720 15,530,590
18. Net E'ectrical Energy Generated (MWH) 0 1.198,435 15,024,420
19. Unit Service Factor 0 40. ' % 67. 0 $
20. Unit Availability Factor 0 40.7 % 67.0 %
21. Unit Capacity Factor (Using MDC Net) 0 34.3 *i 61.1 *;
22. Unit Capacity Factor (Using DER Net) . 0 33.6's 53.2%
23. Unit Forced Outage Rate 100*, 59.3*s 18,2%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Vene Unknown - pending completion of

25. If Shut Down At End Of Report Period. Estimated Date of Startup: pipe stress reanalysis
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 790710060'i 323 123

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP DATE July 1979 CONfPLETED BY E. Zufelt TELEPHONE (3151342-3840 SiONTH June 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net) (SIWE-Net i 1 0 g7 0 2 0 g3 0 3 0 39 0 4 0 20 0 5 0 0 21 6 0 22 0 7 0 D 0 8 0 28 0 9 0 25 0 10 0 26 0 II O 27 0 12 0 0 23

' 0 13 29 14 0 30 0 15 0 3, 16 0 SLNMARY:

Unit continues to remain in cold shutdown condition in accordance with the NRC "Show Cause" order of Sfarch 13, 1979.

323 l2;

s DOCKET NO. 50-333 UNIT SilUIDOWNS AND POWER REDUCllONS .I A FNPI UNIT N AME DATE IulY 1979 COMPLETED fly li Zu fel t HLPORT MON 111 ,Iu l y 1979 1ELEP ONE (315)342-3840 n.

= -

=_ ri 3w E 2e E ,eW l s.tensee c,-* vt Cause & Couettive

% lbic g 3m j jgy 1:sent a? g?

ct Atison in

$E c2 559 liepin, u iR G $'

u Prevent itecuuente e

{

Q 5 790315 1: 720 11

, 4 79-014 ZZ ZZZZZZ Continuing re-evaluation of stress calculation and to make modifica-tions if required (cumulative hours to date - 2575.7)

W TN.)

vs i 2 3 4 I l 'oi s c J Reason Method: lixinbit G - Inst r uctions

_. S SilicJ ule d A Iijuipnient I ailuse (! xplain) 1 -Man ual for Pre [ ution of Dat.

.s li-Maintenance or lest 2-Manual Scrain. 1;nti> Sn:ets tor 1.nensee l I ,'

C-Refuchng 3. Autonutic Scrain. 1.sent Itepor t (l I It) I ile (Ntilti G-I) Regulatory itesisitisoin 4-Otlier (lixplatii) 0161)

I ()pelaltel If Jllililg A I accilse I:xalnlilJIitnl 1 AdinliliallJlikC .i G ()perational I o er (I aplain) I sliibit ! S.nne Souite ll ()the r (1: spiano

r )

0 i s 0 0 0 0 0 0 0 0 0 0 0 aer .

pmu 8 1 1 4 2 6 4 0 0 8 3 3 eio l 9 6 1 1 0 8 RTl (

4 d

o r e e t e n r e p . e n n u n c o n t . i n n d een C r n h s l a o o e kd e / . p o gr a g c i c aur Tl n c i o C t o tl r a oo t t / ep d a r cu dC - ti d d d / c d nm e r p nec e/ - t e e e d e e i a n b e

ore np eo hi c a

c a

r en c m-r e e i c

IPR cs i nn a t l n

t t o t o l l p

a ao l p

er h a a

c sL i p p p ec t p c c A a w e e e l e e i h F S d R R C R D T C y

a t l c n p a f o s t s n oi i n n t m o t d m o o na i sc s r c i er t t n t g t a t t c a T 3 l u cn - n l r ra t s c A n S 8 uf ei - pe a e ec i - i / u 0 sl rd i r p pi mf d N n d -

ea ra rr t o od rl n n e 9 RM oe t u f r rn ea i a l 7 cr c i p pi t h i -

n o r m m n o o a R O

T I N D I I I N N F N

A L

P h r r c r o t o R r o f r E n n t

o r t

c r W o o 8 i

w t t

s o e i

r e O t f i 8 sn c i t nr d P r ot Cn - o e s c ne e a c / o 9 ri n p n e A od r r R m #

f en Ti 7 et n i a n t / cr e u A m I su t - pi o l r w e N o d d F u uf ec R os c c T o d ec r e I S al sa O ro n s e o c Ca os pp or c o C_

U e M o d d d k d r N c 9

7 m a a a n a o e P L I B B B U B L R n 9 K a 1 C n 1 I e e R t n T n u d A i l e P a t Z M c T e I t S C C S F e S C S C C S S C P G G P P G P 6 S P P i D O I I O O I O I I O O H A w o

S l

l E

M A

J y y t

s #

a a l l " 8B e 0 p p 0 A 25 l t

u t 5 0 I s s ,

0 55  ?

t c n 6 2 A P i i

'( 0 44 0 e e 1 - 8 R D D , 1 -

1 R n - C 7 "D "A t

- S -

o p

R I 2 5 d d " " "I S. I T k

r m T T - 1 o o 1 R P

- - U 1 - 5 R R M M M - - -

o 2 6 2 2 T 8 4 8 1 3 R R 8 R 7 0 4 7 9 7 L 5 0 6 0 2 A 2 3 2 4 7 4 0 I 8 S 6 S 3 1 2 1 3 7 1 6 6 2 1 8 7 2 5 6 6 6 4 1 1 1 1 1 1 7 1 1 1 1 m

e 3 t -

s 3 2 2 3 3 3 7 7 7 0 7 7 y 0 0 0 0 0 0 0 0 0 1 1 2 S

9 9 9 9 9 9 9 9 9 e 7 7 7 7 7 7 9 7 7 9 7 9 t / / / / / 7 / / 7 / 7 2 3 0 0 6 /

l u 1 1 2 2 2 2

/

6 8

1 8

1

/

4 1

1 4

/ / / / / / / / / / / /

6 6 6 6 6 6 6 6 6 6 6 6

, 'C UNu

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary

. lune 1979 IfC Date System

  1. Nl"'S' #

llow Detected Cause of Results of Action taken to Repair Component # Malfunction Malfunction Preclude Time Recurrence (flours) 1584 b/12/79 27 27-R-101 OPS No recording Broken pen Replaced pen 4.0 6017 Maint. repair Valve needs 6/18/79 27 27-PC-101A OPS of valve stroking Stroked 6.0 6018 6/18/79 27 27-PC-122A OPS " " "

6.0 1873

(/23/79 27 27-PC-10lli Itic Out of cal . Out of cal . Calibration 4.0 11736 6/23/79 27 27-PCV-122B OPS Out of cal. Improper control Calibration 4.0 34 6/22/79 27 -2 7- A0V- 12711 OPS Valve rebuilt Out of cal. Stroked 8.0 1579 6/12/79 76 76-Pl-103 OPS Gaue out of cal . -- Replaced / cal. 4.0 753 6/18/79 93 93-AM-C I f.C Age No indicatioc Replaced / cal. 6.0 (d 1695 bJ Replaced

' ..q 5/29/79 99 Camera #1 Sec. Lightning No picture Balanced amp. 40.0 1604

, 6/4/79 99 Camera #1 Sec. Unknown No picture Adjusted 20.0

- s 852 6/4/79 99 Security printei Sec. Bad Diodes Will not print Repaired 40.0 860 6/9/79 99 55cu r i t y tei _ er 9ec Brol en Will not type G . li repair 1.0

r )

i s 0 aer .

pmu 6 eio i RTl (

o t

e n c een kd e aur tl r cu d e

nec ore c IPR a l

t c p A e R

n m r

f o a oi l t

sc a t n t l u n uf a sl ea t s

RM n o

T C N

A.

l P

R E n W

y o

O f i P r ot a c R m C en A m E su n E u I uf e L S al k C C a o U e 9 M r N c 7 B n 9 K a 1 6 C n I e e R t n T n u d A i J e P a t Z M c T e I t F e c D

e S

A w o

S l

l l

M A

J t

s # r e e u t d q n a e e e R n R o

p d r m r o 8 :a C 4 (

9 1

m e

t s 9 y 9 S

9 e 7 t /

u 9 l 2

/

6

  • g, CrN0 T ~ -

(

POWER AUTl!ORITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical F. Mechanical Maintenance Summary W0ltK REQUEST s REPAIR DNI.E SYSTEFI 110W DliTliCTED CAUSE OF MALFUNCTION COMPONENT # ACTION TAKEN TO PRECLUDE RECURPENCE TIME l'0URS 24 Jun 71 71 OPS Replace two cells of the Iteplaced with NCX-2250 cells 48 SB-1,Sil-2 wrong type. During initial construction two (2) Type b NCX-2550 cells were installt d instead of NCX-2250.

Also replaced cell which Installed new cell in jumpered had been jumpered. Jumpered position cell had experienced cracked case in 1977.

24 Jun 71 1212 PM N/A Disconnected, cleaned, regreased, and

_Sil- 1, S B- 2 retorqued all battery connections.

Rechecked torque valves following equalize charge.

27 Jun 17 1522 Audible Lower particulate pump Replaced motor bearings 10 04-2 noisy 26 Jun 02 1782 N/A Requested to clean anchor Completed retorque 6 SS- Atill- 14 bolt threads fi retorque b )

G 18 Jun 10 It>85 OPS Check valve noisy . Replaced disc holder 300

-- ItllR- 4 2C p .s s.

20 Jun 4 t3 167: N/A Unable to test anchor bolts Installed new anchors 51! 2 11-46-34

PONER Alril10RITY OF TifE STATE OF NEW YORK JAbtES A. FITZPATRICK NUCL. EAR POWER PLANT Safety Related Electrical 6 F:echanical Flaintenance Summary WORK REQUEST # REPAIR DATE SYSTEF1 C0biPONENT # 110W DETECTED CAUSE OF b!ALFUNCTION .\CTION TAKEN TO PkECLUDE RECURRENCE TIbiE 110URS 20 Jun 46 1649 N/A Unabic to inspect anchor Installed new fasteners 40 11-46-41 bolts 21 Jun 46 _1919 N/A Anchors loose 6 broken Installed new fasteners 114 11-46-42 21 Jun 71 1457 N/A N/A Performed electrical preventative 80 Bus 1i500 maintenance on llus 11500 23 Jun 46 1674 N/A NRC-79-02 Inspection Repaired IAW F1PT-15 190 11-46-39 19 Jun 93 1654 N/A Preventive maintenance Cleaned left G right air bank 8 EDG-A solenoid valves 19 Jun 93 1655 N/A Preventive maintenance Cleaned left 6 right air bank 12 EDG-C solenoid valves. Replaced right bank solenoid valve.

19 Jun 46 1506 OPS Strainer cover gasket leak Tightened cover 2 VJ S-5B b

.sY ljl Jun .,s 1640 OPS llCU Valves - air leaks Rebuild solenoid valves 24

_,il('u Valves D

POWER AIRil0RITY OF Ti!E STATE OF NEW YORK JAF1ES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical G Flechanical Flaintenance Summary DATE WORK REQUEST 8 REPAIR SYSTEh! 110W DETECTED CAUSE OF btALFUNCTION COFIPONENT # ACTION TAKEN TO PRECLUDE RECURIWNCE TIbtE Il0URS 20 Jun 93 1563 Visual Air Access fasteners spot Rewelded door latches 1 EDG-B wolds failed 2'1 Jun 93 1656 N/A Preventive blaintenance Cleaned left 6 right air bank 12 EDG-D solenoid valves 15 Jun 27 930 OPS blotor will not start Replaced two drive sub-assemblies 24 RFI,102A and new cover plate 15 Jun 27 929 OPS Excessive noise from pump Replaced pump 28 RF1-101A 16 Jun 27 693 OPS Solenoid coil is contin- Disassembled, cleaned, and rebuild 12 SOV-123B ually failing valve 16 Jun 71 1120 N/A N/A Performed electrical preventive 45 Bus 12600 maintenance on Bus 12600 Lt .

- 18 Jun 70 1409 OPS liigh D/P during operation Changed filters 2 F-11B t

.2 Jun 27 11039 OPS Valve sticks shut Freed brass bushing in manual 9 A0V-126B handwheel assembly 2 Jun 27 34 OPS Position indicator broken Replaced broken indicator 40 A0V-127B

POWEll AUTil0RITY OF TiiE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f Mechanical Maintenance Summary WORK REQll;iST # REPAIR DNI E SYSTEM liOW DIiTECTED COMPONENT # CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 12 Jun 71 1458 N/A N/A Electrical PM's of switchgear, 50 Bus 12500 breakers, and motor loads 13 Jun 29 813 Visual Packing leak Ground seat, replaced pilot valve, 600 A0V-80A and repacked 14 . inn 27 11737 OPS Seat leakage Remachined seat f plug 12 CNSsl415 -

14 Jun 01-125 1175 Visual Fan belts need replacing Replaced fan belts 2 FN-Ill 6 Jun 46 1691 OPS Requested to clean Cleaned strainers 3 S-5ATB strainers 6 Jun 02 1130 N/A N/A Preventive maintenance of valve 48 MOV's motor operators

'o J u n 27 1682 ST Position switches out of Adjusted and tested valve position 6 A0V-131A,132A adjustment swit c he s 8 Jun 46 .,1310 Visual MPT-15 repair Replaced angle 9 i' 1146-336 9 Jun o7 1595 OPS Dirty filters Replaced filters 4 s 'C - l b A T. ll

POWER AUT110RITY OF Ti!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical f, Machanical Maintenance Summary WORK REQUEST 4 REPAIR DNI.E SYSTEM  !!OW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT 110URS 11 Jun 10 102 DCAR-001-79 Incompleta installatior. Completed items to clear DCAR 4 ilangers 12 Jun 93 1574 OPS Air start motors remained Replace starters, cleaned air start 32 EJG -B engaged with diesel running valves, installed new right bank start magnet valve 1Jun 11 1119 Maint. Broke squib valve connector Replaced coth squibs and tested 16 EV-14A,Il pin while performing per ST-6E, MP 11.2 Modification FI-78-02 (ref. WR #11/1125) 1Jun 11 1628 OPS Breaker operator misaligned Realigned operator 1/3 P-2B with breaker switch 5 Jun 23 141 Visual Weld leak Repaired weld 10 10" SilP 902- 19 5 Jun 14 12889 Visual Leak on gland leak-off Replaced bushing f3 pipe nipple 5 tra P-1B rG L4 2 Jun 14 1421 Visual 11 14-1 needs minor Regrouted baseplate 14/1420*

11 41-1 grouting rework t-i (a

  • Previously reported (Fliy 1979)

POWER AllTii0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical f. Mechanical Maintenance Summary REPAIR DAl,E WORK REQUEST s SYSTEM 110W DETEC' LED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT #

liOURS 26 Jun 71 1121 N/A N/A Performed electrical preventat ive 72 Ilus llo00 maintenance on Bux 11600 21 Jun 10 1914 N/A NRC 79-02 Inspection Modified existing support 299'2 11-10-50 26 Jun 13 1917 _ N/A Snubber test for NRC 79-02 Removed, tested f. reinstalled 18 PFSK--1051 snubber 26 Jun 13 1915 N/A Snubber test for NRC 79-02 Removed, tested fa reinstalled 6 PFSK-1050 snubber 28 .lun 10 1851 Si Valve operator torque Replaced torque switch and adjusted 10 MOV-258 switch binding prevented valve position rotors valve from opening 20 Jun 71 _1019 OPS Cell #6 had cracked case Replaced cell 6 SB-2 causing leak and resulting U battery ground IV v4

___i el

,