ML19325C786: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:W
          ~
            }
                                                                                                                  }
X                                          v                                                                        1 r
l ' : ;;; l r ...
::                                          Departmeat of Nuclear Engineering fi '        N                              L Ward Hall E-          g                                  Manhattan, Kansas 66506 -2503 p                                    '913-532 5624
(        ''
l b                ,
9 Oct 1989
                        .U.S. Nuclear-Regulatory Commission N                        Attn:- Document Control Desk Washington, D.C. 20555 Ji                                                                                  Re:  Docket 50-188            d License R-88
{''
Gentlemen:                                                                              (
l
[                          Pursuant to 10CFR50.59(b            the following items are submitted for the Kansas    J State    University TRIGA ),Mk          II Nuclear Reactor Facility for the period      ;
                        'l Oct 88 through 30 Sep 89.                                                                ,
i                                                                                                                    l A.      Changes in the Facility: NONE                                                    )
B.    ' Changes to Procedures:                                                            !
Revisions to the following procedures were issued on 29 Mar 89 - and-            I approved by ballot of the Reactor Safeguards Committee:                          1 Procedure No.1 - Biennial Control Rod Inspection.            The revision    ,
requires        1  inspection and replacement, as necessary, of all        '
electrical (an)d racchanical components within the control rod d            l
                                      ~ examination of insulation for - deterioration, and examination of          4 movable parts for corrosion, dirt, or deterioration,. and              (2) examination and replacement, as necessary, of control-rod drive            ,
switches at the reactor console.
Procedure No. 9 - Entrance to the Reactor Bay - Visitor Contr.ol.
The revision establishes a new mechanism of accountability for J.y Reactor-Ft,cility keys.
C.  . Changes to Tests and Experiments: NONE Sincerely, b
Richard E. Faw, Director KSU Nuclear Reactor Facility cc:      U.S. N.R.C. (Region IV)
KSU Reactor Safeguards Committee 8910170272 FDR              891009 ADOCK 0500018e                                                      ,
                    $, ,                        PDC                                            /
                      .}}

Latest revision as of 01:49, 1 February 2020

Operating Rept for Oct 1988 - Sept 1989
ML19325C786
Person / Time
Site: Kansas State University
Issue date: 10/09/1989
From: Faw R
KANSAS STATE UNIV., MANHATTAN, KS
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910170272
Download: ML19325C786 (1)


Text

W

~

}

}

X v 1 r

l ' : ;;; l r ...

Departmeat of Nuclear Engineering fi ' N L Ward Hall E- g Manhattan, Kansas 66506 -2503 p '913-532 5624

(

l b ,

9 Oct 1989

.U.S. Nuclear-Regulatory Commission N Attn:- Document Control Desk Washington, D.C. 20555 Ji Re: Docket 50-188 d License R-88

{

Gentlemen: (

l

[ Pursuant to 10CFR50.59(b the following items are submitted for the Kansas J State University TRIGA ),Mk II Nuclear Reactor Facility for the period  ;

'l Oct 88 through 30 Sep 89. ,

i l A. Changes in the Facility: NONE )

B. ' Changes to Procedures:  !

Revisions to the following procedures were issued on 29 Mar 89 - and- I approved by ballot of the Reactor Safeguards Committee: 1 Procedure No.1 - Biennial Control Rod Inspection. The revision ,

requires 1 inspection and replacement, as necessary, of all '

electrical (an)d racchanical components within the control rod d l

~ examination of insulation for - deterioration, and examination of 4 movable parts for corrosion, dirt, or deterioration,. and (2) examination and replacement, as necessary, of control-rod drive ,

switches at the reactor console.

Procedure No. 9 - Entrance to the Reactor Bay - Visitor Contr.ol.

The revision establishes a new mechanism of accountability for J.y Reactor-Ft,cility keys.

C. . Changes to Tests and Experiments: NONE Sincerely, b

Richard E. Faw, Director KSU Nuclear Reactor Facility cc: U.S. N.R.C. (Region IV)

KSU Reactor Safeguards Committee 8910170272 FDR 891009 ADOCK 0500018e ,

$, , PDC /

.