IR 05000354/2013301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13282A476
| number = ML13282A476
| issue date = 10/08/2013
| issue date = 10/08/2013
| title = ER 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1, Initial Operator Licensing Examination Report
| title = Er 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1, Initial Operator Licensing Examination Report
| author name = Jackson D E
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Joyce T P
| addressee name = Joyce T
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000354
| docket = 05000354
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ber 8, 2013
[[Issue date::October 8, 2013]]


Mr. Thomas President and Chief Nuclear Officer PSEG Nuclear LLC P. O. Box 236 Hancocks Bridge, NJ 08038
==SUBJECT:==
 
HOPE CREEK GENERATING STATION, UNIT 1 - INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2013301
SUBJECT: HOPE CREEK GENERATING STATION, UNIT 1 - INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2013301


==Dear Mr. Joyce:==
==Dear Mr. Joyce:==
On August 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek. The enclosed report documents the examination findings, which were discussed on September 18, 2013, with Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of your staff.
On August 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek. The enclosed report documents the examination findings, which were discussed on September 18, 2013, with Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of your staff.


The examination included the evaluation of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on September 18, 2013.
The examination included the evaluation of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license. The NRC developed the written and operating examinations using NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
 
The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on September 18, 2013.


No findings were identified during this examination.
No findings were identified during this examination.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Enclosure:
NRC Initial Operator Licensing Examination Report 05000354/2013301 w/Attachment
 
ML13282A476 Publicly Non-Sensitive SUNSI Review    Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CB TFish/TF DJackson/
DATE 10/07/2013 10/07/2013 10/08/2013


Sincerely,/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION


===Enclosure:===
==REGION I==
NRC Initial Operator Licensing Examination Report 05000354/2013301 w/Attachment
Docket: 50-354 License: NPF-57 Report : 05000354/2013301 Licensee: PSEG Nuclear LLC Facility: Hope Creek Generating Station, Unit 1 Location: P. O. Box 236 Hancocks Bridge, NJ 08038 Dates: August 19-23, 2013 (Operating Test Administration)
August 27, 2013 (Written Examination Administration)
September 3, 2013 (Facility Submitted Post Exam Package)
August 23 - September 9, 2013 (NRC Examination Grading)
September 16, 2013 (Licenses Issued)
Examiners: T. Fish, Chief Examiner, Operations Branch T. Hedigan, Operations Engineer C. Newport, Operations Engineer C. Lally, Operations Engineer Approved By: Donald E. Jackson, Chief Operations Branch Division of Reactor Safety i
Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
ER 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1, Initial Operator Licensing Examination Report.
ER 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1,


NRC examiners evaluated the competency of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license at the Hope Creek facility. The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on August 27, 2013. NRC examiners administered the operating tests August 19-23, 2013. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. Reactor Safety No findings were identified.
Initial Operator Licensing Examination Report.
 
NRC examiners evaluated the competency of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license at the Hope Creek facility. The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9,
Supplement 1. The written examination was administered by the facility on August 27, 2013.
 
NRC examiners administered the operating tests August 19-23, 2013. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
 
Reactor Safety No findings were identified.
 
ii


=REPORT DETAILS=
=REPORT DETAILS=
Line 54: Line 78:


====a. Examination Scope====
====a. Examination Scope====
The chief examiner reviewed all seven license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee.The chief examiner also audited four of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on each applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
The chief examiner reviewed all seven license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The chief examiner also audited four of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on each applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.


====b. Findings====
====b. Findings====
Line 62: Line 86:


====a. Examination Scope====
====a. Examination Scope====
On August 27, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 3, 2013. The NRC examination team administered the various portions of the operating examination to all applicants August 19-23, 2013. The applicants for reactor operator licenses participated in three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The applicant for an upgrade senior operator license participated in one dynamic simulator scenario, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
On August 27, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 3, 2013.
 
The NRC examination team administered the various portions of the operating examination to all applicants August 19-23, 2013. The applicants for reactor operator licenses participated in three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The applicant for an upgrade senior operator license participated in one dynamic simulator scenario, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.


====b. Findings====
====b. Findings====
All applicants passed all parts of the examination. For the written examinations, the reactor operator applicants' average score was 90.08 percent and ranged from 83.78 to 93.24 percent; the senior operator applicants' average score was 88.00 percent and ranged from 81.63 to 91.83 percent. The written exam questions may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years. Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis and submitted it to the chief examiner. The licensee also submitted post-examination comments related to four questions. The post-exam comments and NRC resolution of the comments may be accessed in the ADAMS system under the accession number noted in Attachment 1.
All applicants passed all parts of the examination. For the written examinations, the reactor operator applicants average score was 90.08 percent and ranged from 83.78 to 93.24 percent; the senior operator applicants average score was 88.00 percent and ranged from 81.63 to 91.83 percent. The written exam questions may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.
 
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis and submitted it to the chief examiner. The licensee also submitted post-examination comments related to four questions. The post-exam comments and NRC resolution of the comments may be accessed in the ADAMS system under the accession number noted in Attachment 1.


===.3 Initial Licensing Examination Development===
===.3 Initial Licensing Examination Development===
Line 73: Line 101:


====b. Findings====
====b. Findings====
The NRC examiners incorporated revisions to the written and operating exams based on technical recommendations from facility operations and training staff. No findings were identified.
The NRC examiners incorporated revisions to the written and operating exams based on technical recommendations from facility operations and training staff.
 
No findings were identified.


===.4 Simulation Facility Performance===
===.4 Simulation Facility Performance===


====a. Examination Scope====
====a. Examination Scope====
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
The examiners observed simulator performance with regard to plant fidelity during the     examination validation and administration.


====b. Findings====
====b. Findings====
Line 86: Line 116:


====a. Examination Scope====
====a. Examination Scope====
The examiners reviewed examination security during the onsite preparation weeks and examination administration week for compliance with NUREG-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
The examiners reviewed examination security during the onsite preparation weeks and examination administration week for compliance with NUREG-1021 requirements.
 
Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.


====b. Findings====
====b. Findings====
No findings were identified.  
No findings were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, including Exit==
==4OA6 Meetings, including Exit==
The NRC provided examination results to Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of the licensee's management staff on September 18, 2013. The licensee acknowledged the findings presented.
 
The NRC provided examination results to Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of the licensees management staff on September 18, 2013. The licensee acknowledged the findings presented.


The licensee did not identify any information or materials used during the examination as proprietary.
The licensee did not identify any information or materials used during the examination as proprietary.


ATTACHMENT:
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=
Line 103: Line 136:


===Licensee Personnel===
===Licensee Personnel===
: [[contact::T. Fowler]], Operations Training Manager  
: [[contact::T. Fowler]], Operations Training Manager
: [[contact::S. Dennis]], Exam Support  
: [[contact::S. Dennis]], Exam Support
: [[contact::D. Rein]], Exam Support
: [[contact::D. Rein]], Exam Support
===NRC Personnel===
===NRC Personnel===
: [[contact::D. Jackson]], Chief, Operator Licensing Branch  
: [[contact::D. Jackson]], Chief, Operator Licensing Branch
 
==ITEMS OPENED, CLOSED, AND DISCUSSED==
==ITEMS OPENED, CLOSED, AND DISCUSSED==
NONE  
 
NONE
 
==ADAMS DOCUMENTS REFERENCED==
==ADAMS DOCUMENTS REFERENCED==
Accession No. ML13267A389
 
: FINAL-Written Exam (Note: In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.) Accession No. ML13267A422
: FINAL-Operating Exam Accession No. ML13280A341 HC Post-Exam Comments and NRC Resolution of Post- Exam Comments
}}
}}

Latest revision as of 14:44, 20 December 2019

Er 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1, Initial Operator Licensing Examination Report
ML13282A476
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/08/2013
From: Diane Jackson
Operations Branch I
To: Joyce T
Public Service Enterprise Group
Jackson D
Shared Package
ML13077A118 List:
References
IR-13-301
Download: ML13282A476 (8)


Text

UNITED STATES ber 8, 2013

SUBJECT:

HOPE CREEK GENERATING STATION, UNIT 1 - INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2013301

Dear Mr. Joyce:

On August 27, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek. The enclosed report documents the examination findings, which were discussed on September 18, 2013, with Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of your staff.

The examination included the evaluation of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license. The NRC developed the written and operating examinations using NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on September 18, 2013.

No findings were identified during this examination.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Enclosure:

NRC Initial Operator Licensing Examination Report 05000354/2013301 w/Attachment

ML13282A476 Publicly Non-Sensitive SUNSI Review Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CBixler/CB TFish/TF DJackson/

DATE 10/07/2013 10/07/2013 10/08/2013

EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Docket: 50-354 License: NPF-57 Report : 05000354/2013301 Licensee: PSEG Nuclear LLC Facility: Hope Creek Generating Station, Unit 1 Location: P. O. Box 236 Hancocks Bridge, NJ 08038 Dates: August 19-23, 2013 (Operating Test Administration)

August 27, 2013 (Written Examination Administration)

September 3, 2013 (Facility Submitted Post Exam Package)

August 23 - September 9, 2013 (NRC Examination Grading)

September 16, 2013 (Licenses Issued)

Examiners: T. Fish, Chief Examiner, Operations Branch T. Hedigan, Operations Engineer C. Newport, Operations Engineer C. Lally, Operations Engineer Approved By: Donald E. Jackson, Chief Operations Branch Division of Reactor Safety i

Enclosure

SUMMARY OF FINDINGS

ER 05000354/2013301; August 19-27, 2013; Hope Creek Generating Station, Unit 1,

Initial Operator Licensing Examination Report.

NRC examiners evaluated the competency of three applicants for reactor operator licenses, three applicants for instant senior operator licenses, and one applicant for an upgrade senior operator license at the Hope Creek facility. The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9,

Supplement 1. The written examination was administered by the facility on August 27, 2013.

NRC examiners administered the operating tests August 19-23, 2013. The license examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.

Reactor Safety No findings were identified.

ii

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA5 Other Activities (Initial Operator License Examination)

.1 License Applications

a. Examination Scope

The chief examiner reviewed all seven license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The chief examiner also audited four of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on each applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.

b. Findings

No findings were identified.

.2 Operator Knowledge and Performance

a. Examination Scope

On August 27, 2013, the licensee proctored the administration of the written examinations to all seven applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 3, 2013.

The NRC examination team administered the various portions of the operating examination to all applicants August 19-23, 2013. The applicants for reactor operator licenses participated in three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The applicant for an upgrade senior operator license participated in one dynamic simulator scenario, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.

b. Findings

All applicants passed all parts of the examination. For the written examinations, the reactor operator applicants average score was 90.08 percent and ranged from 83.78 to 93.24 percent; the senior operator applicants average score was 88.00 percent and ranged from 81.63 to 91.83 percent. The written exam questions may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.

Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis and submitted it to the chief examiner. The licensee also submitted post-examination comments related to four questions. The post-exam comments and NRC resolution of the comments may be accessed in the ADAMS system under the accession number noted in Attachment 1.

.3 Initial Licensing Examination Development

a. Examination Scope

The NRC developed the examinations in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations personnel involved in examination validation were listed on a security agreement. The NRC conducted validation visits to the site the weeks of May 20, June 24, and July 22, 2013.

b. Findings

The NRC examiners incorporated revisions to the written and operating exams based on technical recommendations from facility operations and training staff.

No findings were identified.

.4 Simulation Facility Performance

a. Examination Scope

The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.

b. Findings

No findings were identified.

.5 Examination Security

a. Examination Scope

The examiners reviewed examination security during the onsite preparation weeks and examination administration week for compliance with NUREG-1021 requirements.

Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.

b. Findings

No findings were identified.

4OA6 Meetings, including Exit

The NRC provided examination results to Mr. Thomas Fowler, Hope Creek Operations Training Manager, and other members of the licensees management staff on September 18, 2013. The licensee acknowledged the findings presented.

The licensee did not identify any information or materials used during the examination as proprietary.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

T. Fowler, Operations Training Manager
S. Dennis, Exam Support
D. Rein, Exam Support

NRC Personnel

D. Jackson, Chief, Operator Licensing Branch

ITEMS OPENED, CLOSED, AND DISCUSSED

NONE

ADAMS DOCUMENTS REFERENCED