| author name = | | author name = | ||
| author affiliation = PPL Susquehanna, LLC | | author affiliation = PPL Susquehanna, LLC | ||
| addressee name = Gerlach R | | addressee name = Gerlach R | ||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | | addressee affiliation = NRC/Document Control Desk, NRC/NRR | ||
| docket = 05000388 | | docket = 05000388 | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Mar. 11, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-9803 USER INFORMATION: | {{#Wiki_filter:Mar. 11, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-9803 USER INFORMATION: | ||
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION: | GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION: | ||
TO: GERLACH*ROSE M 03/11/2010 LOCATION: | TO: GERLACH*ROSE M 03/11/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | ||
USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. | THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | ||
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/08/2010 ADD MANUAL TABLE OF CONTENTS DATE: 03/10/2010 CATEGORY: | ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | ||
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/08/2010 ADD MANUAL TABLE OF CONTENTS DATE: 03/10/2010 CATEGORY: DOCUMENTS TYPE: TRM2 | |||
Mar. 11, 2010 Page 2 of 2 ID: TEXT B3.8.1 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:56 ADD: REV: 57 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGESAND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. | |||
SSES MANUAL Manual Name: TRM2 Manual | |||
==Title:== | |||
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Dat e : 0)3/10/2010 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 57 03/10/2010 | |||
==Title:== | |||
LIST OF EFFECTIVE SECTIONS TEXT TOC 16 09/16/2009 | |||
==Title:== | |||
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002 | |||
==Title:== | |||
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005\ / | |||
==Title:== | |||
PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS I ý \" \ -\/ | |||
TEXT 2.2 9 02/12/2010 | |||
==Title:== | |||
PLANT PROGRAMS AND SETPOINTS/INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 -'4 05/23/2008 | |||
==Title:== | |||
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION>,(ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 'N 0 11/19/2002 | |||
==Title:== | |||
REACTIVITY/ CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS .CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009 | |||
==Title:== | |||
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR) | |||
LDCN 4712 Report Date: 03/10/10 Page .1. | |||
1 of of 15 15 Report Date: 03/10/10 | |||
SSES MANUAL Manual Name: TRM2 Manual | |||
==Title:== | |||
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002 | |||
==Title:== | |||
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007 | |||
==Title:== | |||
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007 | |||
==Title:== | |||
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5 05/23/2008 | |||
==Title:== | |||
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002 | |||
==Title:== | |||
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005 | |||
==Title:== | |||
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007 | |||
==Title:== | |||
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003 | |||
==Title |
Latest revision as of 20:27, 6 December 2019
ML100810092 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 03/11/2010 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
028401, 2010-9803 | |
Download: ML100810092 (29) | |
Text
Mar. 11, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-9803 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 03/11/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/08/2010 ADD MANUAL TABLE OF CONTENTS DATE: 03/10/2010 CATEGORY: DOCUMENTS TYPE: TRM2
Mar. 11, 2010 Page 2 of 2 ID: TEXT B3.8.1 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:56 ADD: REV: 57 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGESAND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Dat e : 0)3/10/2010 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 57 03/10/2010
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 16 09/16/2009
Title:
TABLE OF CONTENTS TEXT 1.1 0 11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005\ /
Title:
PLANT PROGRAMS AND SETPOINTS PLANT-PROGRAMS I ý \" \ -\/
TEXT 2.2 9 02/12/2010
Title:
PLANT PROGRAMS AND SETPOINTS/INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 -'4 05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION>,(ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 'N 0 11/19/2002
Title:
REACTIVITY/ CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS .CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Report Date: 03/10/10 Page .1.
1 of of 15 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5 05/23/2008
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/19/2005
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Report Date: 03/10/10 Page Z2 of of 15 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)
TEXT 3.4.4 2 05/14/2009
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page3 of .15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 8 01/20/2010
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Report Date: 03/10/10 Page 4 Page A of of 15 15 Report Date: 03/10/10
SSES MANUAL
- Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 1 10/02/2009
Title:
PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT 3,8.3 0 11/19/2002
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES Report Date: 03/10/10 5
Page .~ of of 15 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4 1 02/04/2005
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0 11/19/2002
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2 10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1 04/26/2006
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Page 6 of 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM
- TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS Report Date: 03/10/10 Page 17.
7 of of 15
.155 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3 .12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4. 1 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4. 2 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION.
TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27/2003
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4 05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY Page 8 of 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING I IMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 0 11/19/2002
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 2 11/09/2007
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 3 11/09/2007
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM Report Date: 03/10/10 Page ~9 Page of of 15
.15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009
Title:
INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 1 12/18/2008
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 .11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION Page 10 of 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS Report Date: 03/10/10 Page ii 11 of of 15
.15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 0 TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 2 06/27/2008
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3 06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS Report Date: 03/10/10 Pageli Page 12 of of 15
.15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.11 1 10/02/2009
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/i7/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS
. TEXT B3.9.3
Title:
0 .11/19/2002 REFUELING OPERATIONS BASES REFUELING PLATFORM Report Date: 03/10/10 Page ia Page 13 of of 15 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATIO1 TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002'
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM Report Date: 03/10/10 Page 14 Page 14 of of 15 15 Report Date: 03/10/10
SSES MANUAL Manual Name: TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.5 4 11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 03/10/10 Page ~15 Page of of 15
.15 Report Date: 03/10/10
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 09/08/2009 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 04/15/2009 Page TRM / 2.0-9 11/15/2004 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/17/2009 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 TRM/LOES-1 EFFECTIVE DATE 03/01/2010 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 04/14/2008 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 -10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM /3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 10/05/2006 Page TRM / 3.7-48 06/07/2007 Page TRM I 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009
-Page TRM I 3.7-56 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 / 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004
- Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-29 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 03/31/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM /3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM /3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 'ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 TRM/LOES-5 EFFECTIVE DATE 03/01/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TRM / LOES-5 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/.13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM [B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Page TRM / B 3.3-20 12/11/2008 Page TRM / B 3.3-21 05/16/2003 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 TRM I LOES-6 EFFECTIVE DATE 03/01/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TRM / LOES-6 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-10a through TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM/ B 3.7-24 through TRM / B 3.7-29 10/05/2006 Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 TRM / LOES-7 EFFECTIVE DATE 03/01/2010 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Pages TRM I B 3.7-39 and TRM / B 3.7-40 04/01/2009 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/0212002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009
-B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.1 -1l a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 TRM/LOES-8 EFFECTIVE DATE 03/01/2010 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 ' TRM / LOES-8 EFFECTIVE DATE 03/01/2010
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02112/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM /B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 3/2/2010 SUSQUEHANNA - UNIT 2 TRM I LOEIS-9 EFFECTIVE DATE 03/01/2010
Primary Containment Penetration Conductor Overcurrent Protective Devices PPL Rev. 2 B 3.8.1 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices BASES TRO TRO 3.8.1 requires that all primary containment penetration conductor overcurrent protective devices are OPERABLE. This assures that the design limits of the containment electrical penetrations will not be challenged as a result of electrical faults on the penetration conductors. Primary containment electrical penetrations and penetration conductors are protected by either de-energizing circuits not required during reactor operation or demonstrating the OPERABILITY of primary and backup overcurrent protection circuit breakers by periodic surveillance.
ACTIONS The ACTIONS are defined to ensure proper corrective measures are taken in response to the inoperable components.
The ACTIONS have been modified by a Note to clarify the application of Completion Time rules. The Conditions of this TRO may be entered independently for each affected protective device. The Completion Time(s) of the inoperable primary containment penetration conductor overcurrent protective device will be tracked separately for each affected device starting from the time the Condition was entered for that device as a result of discovery of an inoperable device.
A.1 and A.2 With one or more required primary containment penetration conductor overcurrent protective devices inoperable, the circuit(s) associated with the inoperable protection device(s) must be placed in a condition that would preclude the possibility of a fault that could overload the circuit(s). To accomplish this, the circuit is deenergized. Since syitems or components supplied by the affected circuit will no longer have power, they must be declared inoperable. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account the design of the electrical penetration for maximum fault current, the availability of backup circuit protection on the distribution system and the low probability of a design basis accident occurring during this period. This Completion Time is also considered reasonable to perform the necessary repairs or circuit alterations to restore or otherwise deenergize the affected circuit.
In order to assure that any electrical penetration which is not protected by an overcurrent device remains deenergized, it is necessary to periodically verify that its alternate circuit breaker is opened, or that the inoperable circuit breaker is opened. A Completion Time of once per 7 days is considered sufficient due to the infrequency of plant operations that could result in reenergizing a circuit that has been deenergized in this manner.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.8-1 EFFECTIVE DATE 04/02/2002
-.4,.
Primary Containment Penetration Conductor Overcurrent Protective Devices PPL Rev. 2 B 3.8.1 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices BASES ACTIONS B.1 (continued)
In the event that the Required Actions and associated Completion Times of Condition A are not met, the plant must be placed in a MODE or other specified condition in which the TRO does not apply. This is done by placing the plant in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
The Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
TRS The TRSs are performed at the specified Frequency to ensure that the required overcurrent protective devices are maintained OPERABLE.
TRS 3.8.1.1 This surveillance requires the performance of a functional test on a representative sample of >_10% of each type of lower voltage circuit breaker used as penetration protection. This sample size is sufficiently large to represent the actual failure distribution within the whole population of circuit breakers of a given type used in the plant. Circuit breakers selected for functional testing should be selected on a rotating basis.
A representative sample is determined based upon each manufacturer's brand of circuit breaker. Each manufacturer's molded case and metal case circuit breakers are grouped into representative samples, which are then tested on a rotating basis to ensure that all breakers are tested. If a wide variety exists within any manufacturer's brand of circuit breakers, it is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of breaker for surveillance purposes.
This surveillance has been modified by a Note, stating that for each circuit breaker found inoperable during these functional tests, an additional representative sample of at least 10% of all circuit breakers of the inoperable type shall be functionally tested until no more failures are found or all circuit breakers of that type have been tested. The expansion of the test population ensures that a failure discovered in the representative sample was not caused by a failure mechanism that could systematically affect other breakers in the overall population of breakers of the same type.
The functional tests required by TRS 3.8.1.1 consist of injecting a current with a value equal to 300% of the pickup of the thermal (long term time delay) element of Types 150A Frame and 250A Frame (thermal magnetic) circuit breakers, and (continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.8-2 EFFECTIVE DATE 01/28/2005
Primary Containment Penetration Conductor Overcurrent Protective Devices PPL Rev. 2 B 3.8.1 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices BASES TRS verifying that the circuit breaker operates within the time delay band-width (continued) specified by the manufacturer for the test current. The magnetic (instantaneous) element is tested by injecting a current in excess of 120%
of the pickup value of the magnetic (instantaneous) element and verifying that the circuit breaker trips instantaneously with no intentional time delay.
Type 150A Frame (magnetic only) circuit breaker testing also follows this procedure except that no thermal trip elements are involved. Circuit breakers found inoperable during functional testing should be restored to OPERABLE status prior to resuming operation.
If there are any failure mechanisms that could affect the OPERABILITY of the circuit breaker(s), they are likely to have occurred in the sample tested.
The 24 month Frequency takes into consideration the infrequent operation of the breakers and their correspondingly low failure rate.
TRS 3.8.1.2 This surveillance requires the performance of a functional test on each required overcurrent relay. The functional test consists of injecting a -
current sufficient to actuate the relay, verify that the pickup current is less than 120% of the nominal relay pickup current, and that the measured response time is within +/-10% of the specified value. The 24 month Frequency takes into consideration the infrequent operation of the breakers and their correspondingly low failure rate.
TRS 3.8.1.3 This surveillance requires the inspection of each circuit breaker and the performance of procedures prepared in conjunction with the manufacturer's recommendations. By performance of recommended maintenance, the likelihood for the circuit breakers to become inoperable can be minimized.
The 120 month Frequency takes into consideration the low frequency of operation of the circuit breakers and the low likelihood that operation and maintenance activities could adversely affect the OPERABILITY of the circuit breakers. Provisions of TRS 3.0.2 are not applicable.
REFERENCES None SUSQUEHANNA - UNIT 2 TRM / B 3.8-2a EFFECTIVE DATE 03/01/2010