ML12318A396: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12318A396
| number = ML12318A396
| issue date = 11/13/2012
| issue date = 11/13/2012
| title = Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (Tac. ME9892)
| title = NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (Tac. ME9892)
| author name = Billoch-Colon A T
| author name = Billoch-Colon A
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Caves J
| addressee name = Caves J
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Billoch, Araceli Sent: Tuesday, November 13, 2012 9:43 AM To:Caves, John
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Billoch, Araceli Sent:                       Tuesday, November 13, 2012 9:43 AM To:                         Caves, John


==Subject:==
==Subject:==
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservic e Inspection Program - Third Interval (TAC.
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (TAC.
ME9892)
ME9892)


==Dear Mr. Caves,==
==Dear Mr. Caves,==
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 8, 2012 (Agencywide Documents Access and Management System Accession No. ML12313A442), Carolina Power and Light Company (the licensee), submitted a relief request for Shearon Harris Nuclear Power Plant, Unit No. 1. The licensee requested relief from the American Society of Mechanical Engineers Code, Section XI, requirements to perform a repair of the a through-wall leakage in the interfaces between a 12-inch stainless steel pipe and two elbows in the "B" spent fuel pool cooling system return.
The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical re view. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.


By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 8, 2012 (Agencywide Documents Access and Management System Accession No. ML12313A442), Carolina Power and Light Company (the licensee), submitted a relief request for Shearon Harris Nuclear Power Plant, Unit No. 1. The licensee requested relief from the American Society of Mechanical Engineers Code, Section XI, requirements to perform a repair of the a through-wall leakage in the interfaces between a 12-inch stainless steel pipe and two elbows in the B spent fuel pool cooling system return.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3302.
If you have any questions, please contact me at (301) 415-3302.
Araceli T. Billoch Colón         Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302          
Araceli T. Billoch Colón Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302 1


Hearing Identifier: NRR_PMDA Email Number: 529   Mail Envelope Properties   (Araceli.Billoch@nrc.gov20121113094200)
Hearing Identifier:   NRR_PMDA Email Number:         529 Mail Envelope Properties     (Araceli.Billoch@nrc.gov20121113094200)


==Subject:==
==Subject:==
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (TAC. ME9892)
Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (TAC.
Sent Date:   11/13/2012 9:42:47 AM Received Date: 11/13/2012 9:42:00 AM From:   Billoch, Araceli Created By:   Araceli.Billoch@nrc.gov  
ME9892)
 
Sent Date:             11/13/2012 9:42:47 AM Received Date:         11/13/2012 9:42:00 AM From:                 Billoch, Araceli Created By:           Araceli.Billoch@nrc.gov Recipients:
Recipients:     "Caves, John" <john.caves@pgnmail.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2138     11/13/2012 9:42:00 AM
"Caves, John" <john.caves@pgnmail.com>
 
Tracking Status: None Post Office:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   Yes   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Files                           Size                     Date & Time MESSAGE                         2138                     11/13/2012 9:42:00 AM Options Priority:                       Standard Return Notification:           No Reply Requested:               Yes Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 17:06, 5 December 2019

NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (Tac. ME9892)
ML12318A396
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/13/2012
From: Billoch-Colon A
Division of Operating Reactor Licensing
To: Caves J
Progress Energy Co
References
TAC ME9892
Download: ML12318A396 (2)


Text

NRR-PMDAPEm Resource From: Billoch, Araceli Sent: Tuesday, November 13, 2012 9:43 AM To: Caves, John

Subject:

Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (TAC.

ME9892)

Dear Mr. Caves,

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated November 8, 2012 (Agencywide Documents Access and Management System Accession No. ML12313A442), Carolina Power and Light Company (the licensee), submitted a relief request for Shearon Harris Nuclear Power Plant, Unit No. 1. The licensee requested relief from the American Society of Mechanical Engineers Code,Section XI, requirements to perform a repair of the a through-wall leakage in the interfaces between a 12-inch stainless steel pipe and two elbows in the B spent fuel pool cooling system return.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-3302.

Araceli T. Billoch Colón Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Tel. 301-415-3302 1

Hearing Identifier: NRR_PMDA Email Number: 529 Mail Envelope Properties (Araceli.Billoch@nrc.gov20121113094200)

Subject:

Shearon Harris Nuclear Power Plant, Unit No. 1 - Acceptance Review or Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (TAC.

ME9892)

Sent Date: 11/13/2012 9:42:47 AM Received Date: 11/13/2012 9:42:00 AM From: Billoch, Araceli Created By: Araceli.Billoch@nrc.gov Recipients:

"Caves, John" <john.caves@pgnmail.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2138 11/13/2012 9:42:00 AM Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received: