ML13016A502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13016A502
| number = ML13016A502
| issue date = 12/20/2012
| issue date = 12/20/2012
| title = 2012/12/20 Davis-Besse Lr - FW: DB High Strength Bolt Inspection Deferrals
| title = Lr - FW: DB High Strength Bolt Inspection Deferrals
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 13: Line 13:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:Davis-BesseNPEm Resource From:                      CuadradoDeJesus, Samuel Sent:                      Thursday, December 20, 2012 11:04 AM To:                        Larry S. Hinkle Cc:                        Davis-BesseHearingFile Resource; Doutt, Clifford; dorts@firstenergycorp.com
==Subject:==
FW: DB High Strength Bolt Inspection Deferrals
: Larry, Below is the staffs position.
From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel
==Subject:==
DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.
1
Hearing Identifier:        Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:              3995 Mail Envelope Properties        (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A338)
==Subject:==
FW: DB High Strength Bolt Inspection Deferrals Sent Date:                12/20/2012 11:04:14 AM Received Date:            12/20/2012 11:04:16 AM From:                      CuadradoDeJesus, Samuel Created By:                Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "Doutt, Clifford" <Clifford.Doutt@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "Larry S. Hinkle" <larry.hinkle@embarqmail.com>
Tracking Status: None Post Office:              HQCLSTR01.nrc.gov Files                            Size                      Date & Time MESSAGE                          641                      12/20/2012 11:04:16 AM Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:}}

Latest revision as of 16:13, 5 December 2019

Lr - FW: DB High Strength Bolt Inspection Deferrals
ML13016A502
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML13016A502 (2)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:04 AM To: Larry S. Hinkle Cc: Davis-BesseHearingFile Resource; Doutt, Clifford; dorts@firstenergycorp.com

Subject:

FW: DB High Strength Bolt Inspection Deferrals

Larry, Below is the staffs position.

From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel

Subject:

DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.

1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3995 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A338)

Subject:

FW: DB High Strength Bolt Inspection Deferrals Sent Date: 12/20/2012 11:04:14 AM Received Date: 12/20/2012 11:04:16 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "Doutt, Clifford" <Clifford.Doutt@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "Larry S. Hinkle" <larry.hinkle@embarqmail.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 641 12/20/2012 11:04:16 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: