ML13016A502
| ML13016A502 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/20/2012 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Division of License Renewal |
| References | |
| Download: ML13016A502 (2) | |
Text
1 Davis-BesseNPEm Resource From:
CuadradoDeJesus, Samuel Sent:
Thursday, December 20, 2012 11:04 AM To:
Larry S. Hinkle Cc:
Davis-BesseHearingFile Resource; Doutt, Clifford; dorts@firstenergycorp.com
Subject:
FW: DB High Strength Bolt Inspection Deferrals
- Larry, Below is the staffs position.
From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel
Subject:
DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.
Hearing Identifier:
Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:
3995 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A338)
Subject:
FW: DB High Strength Bolt Inspection Deferrals Sent Date:
12/20/2012 11:04:14 AM Received Date:
12/20/2012 11:04:16 AM From:
CuadradoDeJesus, Samuel Created By:
Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "Doutt, Clifford" <Clifford.Doutt@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "Larry S. Hinkle" <larry.hinkle@embarqmail.com>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 641 12/20/2012 11:04:16 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: