ML13078A251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13078A251
| number = ML13078A251
| issue date = 03/19/2013
| issue date = 03/19/2013
| title = 03/19/2013-03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19)
| title = 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19)
| author name = Westberry C
| author name = Westberry C
| author affiliation = Southern Co, Southern Nuclear Operating Co, Inc
| author affiliation = Southern Co, Southern Nuclear Operating Co, Inc
Line 13: Line 13:
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 7
| page count = 7
| project =
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:FNP LAR AUDIT PRESENTATION March19, 2013Session5-Monitoring Session 5 Monitoring Chip Westberry Monitoring Overview*Provides means to ensure Assumptions remain Valid Valid-Process Defined in FAQ 10-059 Scoping*Scoping*ScreeningBiM-Bi g M-Little m*Target Value Determination*Monitoring Implementation Slide 2 Monitoring ScopingPer FAQ 59, we are scoping 6 categories of SSCs:
{{#Wiki_filter:FNP LAR AUDIT PRESENTATION March 19, 2013 Session 5 - Monitoring Chip Westberry
NSCA-NSCA-FPRA-NPO-Rad. Release-FP Systems and features-Programmatic Elements Slide 3 Monitoring Screening*Risk CriteriaRAW>20-RAW > 2.0 AND-CDF>1E-6 ORLERF>1E-7 CDF> 1E 6 OR LERF > 1E 7*Screened in gets Big M treatment using a monitoring p ro g ram meetin g the re quirements of section 2.6 of pggq NFPA 805.*Screened out gets Little m treatment using existing system and program health processes.*Corrective Action Program is used to document issues andissueresolution and issue resolution
 
.Slide 4 Monitoring Targets
Monitoring Overview
*UsesIPEandFPRAreliabilityandavailability
* Provides means to ensure Assumptions remain Valid
*Uses IPE and FPRA reliability and availability data*EPRI TR 1006756 report for baseline data*Surveillance Optimization is being committed to in Attachment S as implementation item 1.
    - Process Defined in FAQ 10-059
Slide 5 Monitoring Commitments*Attachment S commitments for Monitoring:Themonitoringprogramwillbeimplementedafterthe
* Scoping
-The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.
* Screening
Slide 6 QUESTIONS?
    - Big Bi M
QUESTIONS ?Slide 7}}
    - Little m
* Target Value Determination
* Monitoring Implementation Slide 2
 
Monitoring Scoping Per FAQ 59, we are scoping 6 categories of SSCs:
    - NSCA
    - FPRA
    - NPO
    - Rad. Release
    - FP Systems and features
    - Programmatic Elements Slide 3
 
Monitoring Screening
* Risk Criteria
    - RAW > 2.0 20 AND
    - CDF> 1E-6 1E 6 OR LERF > 1E 1E-7 7
* Screened in gets Big M treatment using a monitoring program p   g   meeting g the requirements q          of section 2.6 of NFPA 805.
* Screened out gets Little m treatment using existing system and program health processes.
* Corrective Action Program is used to document issues and issue resolution.
resolution Slide 4
 
Monitoring Targets
* Uses IPE and FPRA reliability and availability data
* EPRI TR 1006756 report for baseline data
* Surveillance Optimization is being committed to in Attachment S as implementation item 1.
Slide 5
 
Monitoring Commitments
* Attachment S commitments for Monitoring:
    - The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.
Slide 6
 
QUESTIONS ?
Slide 7}}

Latest revision as of 14:56, 5 December 2019

03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19)
ML13078A251
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/19/2013
From: Westberry C
Southern Co, Southern Nuclear Operating Co
To:
Division of Operating Reactor Licensing
Brown E
Shared Package
ML13078A284 List:
References
Download: ML13078A251 (7)


Text

FNP LAR AUDIT PRESENTATION March 19, 2013 Session 5 - Monitoring Chip Westberry

Monitoring Overview

  • Provides means to ensure Assumptions remain Valid

- Process Defined in FAQ 10-059

  • Scoping
  • Screening

- Big Bi M

- Little m

  • Target Value Determination
  • Monitoring Implementation Slide 2

Monitoring Scoping Per FAQ 59, we are scoping 6 categories of SSCs:

- NSCA

- FPRA

- NPO

- Rad. Release

- FP Systems and features

- Programmatic Elements Slide 3

Monitoring Screening

  • Risk Criteria

- RAW > 2.0 20 AND

- CDF> 1E-6 1E 6 OR LERF > 1E 1E-7 7

  • Screened in gets Big M treatment using a monitoring program p g meeting g the requirements q of section 2.6 of NFPA 805.
  • Screened out gets Little m treatment using existing system and program health processes.
  • Corrective Action Program is used to document issues and issue resolution.

resolution Slide 4

Monitoring Targets

  • Uses IPE and FPRA reliability and availability data
  • EPRI TR 1006756 report for baseline data
  • Surveillance Optimization is being committed to in Attachment S as implementation item 1.

Slide 5

Monitoring Commitments

  • Attachment S commitments for Monitoring:

- The monitoring program will be implemented after the safety evaluation issuance as part of the fire protection program transition to NFPA 805. A Monitoring Program Engineering Evaluation will be developed during implementation.

Slide 6

QUESTIONS ?

Slide 7