| number = ML14141A439
| number = ML14141A439
| issue date = 05/20/2014
| issue date = 05/20/2014
| title = Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report
| title = NRR E-mail Capture - Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report
| author name = Miller E
| author name = Miller E
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name = Rudy L J
| addressee name = Rudy L
| addressee affiliation = Duke Energy Corp
| addressee affiliation = Duke Energy Corp
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Miller, Ed Sent: Tuesday, May 20, 2014 7:38 AM To: 'lawrence.rudy@duke-energy.com'
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Miller, Ed Sent:                     Tuesday, May 20, 2014 7:38 AM To:                       'lawrence.rudy@duke-energy.com'


==Subject:==
==Subject:==
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Attachments:
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Attachments:               Draft RHMB RAI_Catawba.docx
Draft RHMB RAI_Catawba.docxLarry, The NRC staff's draft RAI for the subject activity is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; and 3) Whether the information is already available in existing, docketed, correspondence. After you've had a chance to review the draft information request, please contact me to schedule the conference call. Thanks.  
: Larry, The NRC staffs draft RAI for the subject activity is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; and 3) Whether the information is already available in existing, docketed, correspondence. After youve had a chance to review the draft information request, please contact me to schedule the conference call. Thanks.
Ed Miller (301) 415-2481 1


Ed Miller
Hearing Identifier:   NRR_PMDA Email Number:         1299 Mail Envelope Properties   (9C2386A0C0BC584684916F7A0482B6CAFCB2BB35FF)
 
(301) 415-2481
 
Hearing Identifier: NRR_PMDA Email Number: 1299   Mail Envelope Properties   (9C2386A0C0BC584684916F7A0482B6CAFCB2BB35FF)


==Subject:==
==Subject:==
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Sent Date:   5/20/2014 7:37:41 AM Received Date: 5/20/2014 7:37:00 AM From:   Miller, Ed Created By:   Ed.Miller@nrc.gov Recipients:     "'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com> Tracking Status: None  
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Sent Date:           5/20/2014 7:37:41 AM Received Date:       5/20/2014 7:37:00 AM From:                 Miller, Ed Created By:           Ed.Miller@nrc.gov Recipients:
 
"'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   623     5/20/2014 7:37:00 AM Draft RHMB RAI_Catawba.docx   27432 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None Post Office:         HQCLSTR02.nrc.gov Files                         Size                     Date & Time MESSAGE                       623                     5/20/2014 7:37:00 AM Draft RHMB RAI_Catawba.docx                           27432 Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
DRAFT REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION, UNITS 1 AND 2 FLOODING HAZARD REEVALUATION REPORT DOCKET NOS. 50-413 AND 50-414
Recipients Received:
 
By letter dated March 12, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14077A054), Duke Energy Carolinas (Duke) submitted a Flooding Hazard Reevaluation Report (FHRR) in response to Enclosure 2 of


the March 12, 2012, Fukushima Lessons Learned 50.54(f) letter. In order for the NRC staff to complete its review of the LAR, the following additional information is requested.
DRAFT REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION, UNITS 1 AND 2 FLOODING HAZARD REEVALUATION REPORT DOCKET NOS. 50-413 AND 50-414 By letter dated March 12, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14077A054), Duke Energy Carolinas (Duke) submitted a Flooding Hazard Reevaluation Report (FHRR) in response to Enclosure 2 of the March 12, 2012, Fukushima Lessons Learned 50.54(f) letter. In order for the NRC staff to complete its review of the LAR, the following additional information is requested.
: 1. Please submit provide electronic versions of input and output files for the following activities: a. Calculations of Locally Intense Precipitation (LIP), Probable Maximum Precipitation, Probable Maximum Flood, dam breach, storm surge, and combined effects flooding. b. The Info Works CS (IWCS) model used for LIP site surface depth analysis. c. The HEC-RAS model used for reservoir PMF routing and dam break analysis. d. The Coastal Engineering Design and Analysis (CEDAS) for wind-driven wave heights. e. The COULWAVE model for evaluating overtopping.}}
: 1. Please submit provide electronic versions of input and output files for the following activities:
: a. Calculations of Locally Intense Precipitation (LIP), Probable Maximum Precipitation, Probable Maximum Flood, dam breach, storm surge, and combined effects flooding.
: b. The Info Works CS (IWCS) model used for LIP site surface depth analysis.
: c. The HEC-RAS model used for reservoir PMF routing and dam break analysis.
: d. The Coastal Engineering Design and Analysis (CEDAS) for wind-driven wave heights.
: e. The COULWAVE model for evaluating overtopping.}}

Latest revision as of 06:59, 5 December 2019

NRR E-mail Capture - Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report
ML14141A439
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/20/2014
From: Ed Miller
Division of Operating Reactor Licensing
To: Rudy L
Duke Energy Corp
References
Download: ML14141A439 (3)


Text

NRR-PMDAPEm Resource From: Miller, Ed Sent: Tuesday, May 20, 2014 7:38 AM To: 'lawrence.rudy@duke-energy.com'

Subject:

Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Attachments: Draft RHMB RAI_Catawba.docx

Larry, The NRC staffs draft RAI for the subject activity is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; and 3) Whether the information is already available in existing, docketed, correspondence. After youve had a chance to review the draft information request, please contact me to schedule the conference call. Thanks.

Ed Miller (301) 415-2481 1

Hearing Identifier: NRR_PMDA Email Number: 1299 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAFCB2BB35FF)

Subject:

Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Sent Date: 5/20/2014 7:37:41 AM Received Date: 5/20/2014 7:37:00 AM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 623 5/20/2014 7:37:00 AM Draft RHMB RAI_Catawba.docx 27432 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION, UNITS 1 AND 2 FLOODING HAZARD REEVALUATION REPORT DOCKET NOS. 50-413 AND 50-414 By letter dated March 12, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14077A054), Duke Energy Carolinas (Duke) submitted a Flooding Hazard Reevaluation Report (FHRR) in response to Enclosure 2 of the March 12, 2012, Fukushima Lessons Learned 50.54(f) letter. In order for the NRC staff to complete its review of the LAR, the following additional information is requested.

1. Please submit provide electronic versions of input and output files for the following activities:
a. Calculations of Locally Intense Precipitation (LIP), Probable Maximum Precipitation, Probable Maximum Flood, dam breach, storm surge, and combined effects flooding.
b. The Info Works CS (IWCS) model used for LIP site surface depth analysis.
c. The HEC-RAS model used for reservoir PMF routing and dam break analysis.
d. The Coastal Engineering Design and Analysis (CEDAS) for wind-driven wave heights.
e. The COULWAVE model for evaluating overtopping.