1 NRR-PMDAPEm Resource From:
Miller, Ed Sent:
Tuesday, May 20, 2014 7:38 AM To:
'lawrence.rudy@duke-energy.com'
Subject:
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Attachments:
Draft RHMB RAI_Catawba.docx
- Larry, The NRC staffs draft RAI for the subject activity is attached to this e-mail. The draft RAI is not an official NRC staff request and is being provided to you to facilitate a subsequent conference call to determine: 1) If the questions clearly convey the NRC staff information needs; 2) Whether the regulatory basis for the questions is understood; and 3) Whether the information is already available in existing, docketed, correspondence. After youve had a chance to review the draft information request, please contact me to schedule the conference call. Thanks.
Ed Miller (301) 415-2481
Hearing Identifier:
NRR_PMDA Email Number:
1299 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAFCB2BB35FF)
Subject:
Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report Sent Date:
5/20/2014 7:37:41 AM Received Date:
5/20/2014 7:37:00 AM From:
Miller, Ed Created By:
Ed.Miller@nrc.gov Recipients:
"'lawrence.rudy@duke-energy.com'" <lawrence.rudy@duke-energy.com>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 623 5/20/2014 7:37:00 AM Draft RHMB RAI_Catawba.docx 27432 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION, UNITS 1 AND 2 FLOODING HAZARD REEVALUATION REPORT DOCKET NOS. 50-413 AND 50-414 By letter dated March 12, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14077A054), Duke Energy Carolinas (Duke) submitted a Flooding Hazard Reevaluation Report (FHRR) in response to Enclosure 2 of the March 12, 2012, Fukushima Lessons Learned 50.54(f) letter. In order for the NRC staff to complete its review of the LAR, the following additional information is requested.
- 1. Please submit provide electronic versions of input and output files for the following activities:
- a. Calculations of Locally Intense Precipitation (LIP), Probable Maximum Precipitation, Probable Maximum Flood, dam breach, storm surge, and combined effects flooding.
- c. The HEC-RAS model used for reservoir PMF routing and dam break analysis.
- d. The Coastal Engineering Design and Analysis (CEDAS) for wind-driven wave heights.
- e. The COULWAVE model for evaluating overtopping.