ML15110A479: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15110A479
| number = ML15110A479
| issue date = 04/15/2015
| issue date = 04/15/2015
| title = 2015/04/15 NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083)
| title = NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083)
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co, (Formerly Arizona Nuclear)
| author affiliation = Arizona Public Service Co, (Formerly Arizona Nuclear)
| addressee name = Watford M
| addressee name = Watford M
Line 14: Line 14:
| page count = 5
| page count = 5
| project = TAC:MF6083
| project = TAC:MF6083
| stage =  
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Thomas.N.Weber@aps.comSent:Wednesday, April 15, 2015 12:14 PMTo:Watford, MargaretCc:Delbert.Elkinton@aps.com; George.Andrews@aps.com; Carl.Stephenson@aps.com; Ken.House@aps.comSubject:File for NRC Phone Call Attachments:Agenda for Phone Call 4-15-15.pdfMaggie, Attached please find the agenda and two figures that we plan to use today on the phone call. Can you distribute to the participants on the call.
{{#Wiki_filter:NRR-PMDAPEm Resource From:                     Thomas.N.Weber@aps.com Sent:                     Wednesday, April 15, 2015 12:14 PM To:                       Watford, Margaret Cc:                       Delbert.Elkinton@aps.com; George.Andrews@aps.com; Carl.Stephenson@aps.com; Ken.House@aps.com


Thanks, TN Weber-Department Leader Regulatory Affairs PVNGS Hearing Identifier: NRR_PMDA Email Number: 2010   Mail Envelope Properties   (EB0C94E90ED2EF409E17260ECE38B14E0692FCFB)  
==Subject:==
File for NRC Phone Call Attachments:              Agenda for Phone Call 4-15-15.pdf
: Maggie, Attached please find the agenda and two figures that we plan to use today on the phone call. Can you distribute to the participants on the call.
: Thanks, TN Weber Department Leader Regulatory Affairs PVNGS 1
 
Hearing Identifier:   NRR_PMDA Email Number:         2010 Mail Envelope Properties     (EB0C94E90ED2EF409E17260ECE38B14E0692FCFB)


==Subject:==
==Subject:==
File for NRC Phone Call   Sent Date:   4/15/2015 12:13:55 PM Received Date: 4/15/2015 12:14:11 PM From:   Thomas.N.Weber@aps.com Created By:   Thomas.N.Weber@aps.com Recipients:     "Delbert.Elkinton@aps.com" <Delbert.Elkinton@aps.com>
File for NRC Phone Call Sent Date:             4/15/2015 12:13:55 PM Received Date:         4/15/2015 12:14:11 PM From:                 Thomas.N.Weber@aps.com Created By:           Thomas.N.Weber@aps.com Recipients:
Tracking Status: None "George.Andrews@aps.com" <George.Andrews@aps.com> Tracking Status: None "Carl.Stephenson@aps.com" <Carl.Stephenson@aps.com> Tracking Status: None "Ken.House@aps.com" <Ken.House@aps.com> Tracking Status: None "Watford, Margaret" <Margaret.Watford@nrc.gov> Tracking Status: None Post Office:   ntm211.apsc.com Files     Size     Date & Time MESSAGE   251     4/15/2015 12:14:11 PM Agenda for Phone Call 4-15-15.pdf   2120674   Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
"Delbert.Elkinton@aps.com" <Delbert.Elkinton@aps.com>
Agenda for NRC Phone Call  April 15, 2015  RCP 2A Nozzle Relief Request 1. Introductions 2. Original Design of RCP 2A Nozzle  3. Recap of Discovery of Condition  a. Results of visual inspection of RCP 2A nozzle  b. Visual inspection of remaining nozzles (EOC) c. Results of dye penetrant supplemental inspection  d. Results of straight beam UT supplemental inspection of original nozzle 4. Half-Nozzle Design of RCP 2A Nozzle 5. Actions Completed 6. Relief Request a. Summary Description  b. Supporting Analysis c. Timeframe 7. Summary/Overview of RAI received Tuesday (4-14-15) 8. Questions/Comments RCP 2A Original Nozzle Arrangement 
Tracking Status: None "George.Andrews@aps.com" <George.Andrews@aps.com>
Tracking Status: None "Carl.Stephenson@aps.com" <Carl.Stephenson@aps.com>
Tracking Status: None "Ken.House@aps.com" <Ken.House@aps.com>
Tracking Status: None "Watford, Margaret" <Margaret.Watford@nrc.gov>
Tracking Status: None Post Office:           ntm211.apsc.com Files                           Size                 Date & Time MESSAGE                         251                   4/15/2015 12:14:11 PM Agenda for Phone Call 4-15-15.pdf                   2120674 Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:


==Enclosure==
Agenda for NRC Phone Call April 15, 2015 RCP 2A Nozzle Relief Request
    *NPS -nominal pipe size      Item Description Dimensions (inches) Material Note A Safe-end Clad and Butter 309 Stainless, 82 or 182 inconel   B Remnant Nozzle Orifice 1 NPS* x 0.190 diameter Outlet end (removed) was former Class 1 code break C Remnant J-groove Weld 82 or 182 inconel Former RCS pressure boundary D Safe-end Pipe Wall 3 thick Carbon Steel  E Remnant Nozzle-half 1 NPS x 1.5 Alloy 600  F Replacement Nozzle 1 NPS Alloy 690  G Replacement Nozzle Orifice 0.190 diameter Outlet end is new Class 1 code break H Replacement J-groove Weld 0.5 ERNiCrFe-7A (filler) New RCS pressure boundary A B C D EFG HFigure 1 RCP 2A Suction Safe-end Repaired Instrument Nozzle 
: 1. Introductions
}}
: 2. Original Design of RCP 2A Nozzle
: 3. Recap of Discovery of Condition
: a. Results of visual inspection of RCP 2A nozzle
: b. Visual inspection of remaining nozzles (EOC)
: c. Results of dye penetrant supplemental inspection
: d. Results of straight beam UT supplemental inspection of original nozzle
: 4. Half-Nozzle Design of RCP 2A Nozzle
: 5. Actions Completed
: 6. Relief Request
: a. Summary Description
: b. Supporting Analysis
: c. Timeframe
: 7. Summary/Overview of RAI received Tuesday (4-14-15)
: 8. Questions/Comments
 
RCP 2A Original Nozzle Arrangement
 
Enclosure Figure 1 RCP 2A Suction Safe-end Repaired Instrument Nozzle H                G A
B C
D                  E                  F Item         Description         Dimensions (inches)             Material                             Note A Safe-end Clad and Butter                             309 Stainless, 82 or 182 inconel B Remnant Nozzle Orifice     1 NPS* x 0.190 diameter                           Outlet end (removed) was former Class 1 code break C Remnant J-groove Weld                                   82 or 182 inconel     Former RCS pressure boundary D Safe-end Pipe Wall                 3 thick               Carbon Steel E Remnant Nozzle-half             1 NPS x 1.5                 Alloy 600 F Replacement Nozzle                 1 NPS                   Alloy 690 G Replacement Nozzle Orifice     0.190 diameter                                 Outlet end is new Class 1 code break H Replacement J-groove Weld           0.5               ERNiCrFe-7A (filler)   New RCS pressure boundary
*NPS -nominal pipe size}}

Latest revision as of 01:20, 5 December 2019

NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083)
ML15110A479
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/15/2015
From: Weber T
Arizona Public Service Co, (Formerly Arizona Nuclear)
To: Watford M
Plant Licensing Branch IV
References
TAC MF6083
Download: ML15110A479 (5)


Text

NRR-PMDAPEm Resource From: Thomas.N.Weber@aps.com Sent: Wednesday, April 15, 2015 12:14 PM To: Watford, Margaret Cc: Delbert.Elkinton@aps.com; George.Andrews@aps.com; Carl.Stephenson@aps.com; Ken.House@aps.com

Subject:

File for NRC Phone Call Attachments: Agenda for Phone Call 4-15-15.pdf

Maggie, Attached please find the agenda and two figures that we plan to use today on the phone call. Can you distribute to the participants on the call.
Thanks, TN Weber Department Leader Regulatory Affairs PVNGS 1

Hearing Identifier: NRR_PMDA Email Number: 2010 Mail Envelope Properties (EB0C94E90ED2EF409E17260ECE38B14E0692FCFB)

Subject:

File for NRC Phone Call Sent Date: 4/15/2015 12:13:55 PM Received Date: 4/15/2015 12:14:11 PM From: Thomas.N.Weber@aps.com Created By: Thomas.N.Weber@aps.com Recipients:

"Delbert.Elkinton@aps.com" <Delbert.Elkinton@aps.com>

Tracking Status: None "George.Andrews@aps.com" <George.Andrews@aps.com>

Tracking Status: None "Carl.Stephenson@aps.com" <Carl.Stephenson@aps.com>

Tracking Status: None "Ken.House@aps.com" <Ken.House@aps.com>

Tracking Status: None "Watford, Margaret" <Margaret.Watford@nrc.gov>

Tracking Status: None Post Office: ntm211.apsc.com Files Size Date & Time MESSAGE 251 4/15/2015 12:14:11 PM Agenda for Phone Call 4-15-15.pdf 2120674 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for NRC Phone Call April 15, 2015 RCP 2A Nozzle Relief Request

1. Introductions
2. Original Design of RCP 2A Nozzle
3. Recap of Discovery of Condition
a. Results of visual inspection of RCP 2A nozzle
b. Visual inspection of remaining nozzles (EOC)
c. Results of dye penetrant supplemental inspection
d. Results of straight beam UT supplemental inspection of original nozzle
4. Half-Nozzle Design of RCP 2A Nozzle
5. Actions Completed
6. Relief Request
a. Summary Description
b. Supporting Analysis
c. Timeframe
7. Summary/Overview of RAI received Tuesday (4-14-15)
8. Questions/Comments

RCP 2A Original Nozzle Arrangement

Enclosure Figure 1 RCP 2A Suction Safe-end Repaired Instrument Nozzle H G A

B C

D E F Item Description Dimensions (inches) Material Note A Safe-end Clad and Butter 309 Stainless, 82 or 182 inconel B Remnant Nozzle Orifice 1 NPS* x 0.190 diameter Outlet end (removed) was former Class 1 code break C Remnant J-groove Weld 82 or 182 inconel Former RCS pressure boundary D Safe-end Pipe Wall 3 thick Carbon Steel E Remnant Nozzle-half 1 NPS x 1.5 Alloy 600 F Replacement Nozzle 1 NPS Alloy 690 G Replacement Nozzle Orifice 0.190 diameter Outlet end is new Class 1 code break H Replacement J-groove Weld 0.5 ERNiCrFe-7A (filler) New RCS pressure boundary

  • NPS -nominal pipe size