Letter Sequence RAI |
---|
|
|
MONTHYEARML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle Project stage: Request ML15104A8102015-04-14014 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083) Project stage: RAI ML15110A4792015-04-15015 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083) Project stage: Other ML15113A6362015-04-22022 April 2015 Acceptance of Relief Request 53 Project stage: Acceptance Review ML15113A4972015-04-23023 April 2015 Request for Additional Information Regarding Relief Request 53 Project stage: RAI ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal Project stage: Other ML15198A2422015-07-15015 July 2015 Transmittal of Updated Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2242015-07-15015 July 2015 Transmittal of Non-Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2262015-07-15015 July 2015 Attachment 3: Calculation CN-PAFM-15-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Transient Stress and Fracture Mechanics Evaluation for One Cycle Operation. Project stage: Request ML15198A2272015-07-15015 July 2015 Attachment 4: Calculation TR-FSE-15-2-NP, Rev. 1, Palo Verde Nuclear Generating Station Unit 3 Evaluation of Potential Loose Part - Reactor Coolant Pump Instrument Nozzle Weld Fragment. Project stage: Request ML15198A2252015-07-15015 July 2015 Attachment 2: Calculation CN-MRCDA-15-13-NP, Qualification of Palo Verde Unit 3 Reactor Coolant Pump Replacement Instrumentation Nozzle. Project stage: Request ML15209A6662015-08-10010 August 2015 Request for Withholding Information from Public Disclosure - 7/10/15 Affidavit Executed by J. Gresham, Westinghouse, Re Five Proprietary Documents in Support of Relief Request 53 - Approval of an Alternative to Flaw Removal (TAC No Project stage: Withholding Request Acceptance ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal Project stage: Other 2015-04-29
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23243B0082023-08-31031 August 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23233A0132023-08-18018 August 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23220A0512023-08-0303 August 2023 NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 ML23202A0162023-07-20020 July 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23143A1332023-05-23023 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23130A0132023-05-10010 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705 ML23017A0932023-01-17017 January 2023 NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181) ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22167A1872022-06-16016 June 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22136A0922022-05-16016 May 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR ML22075A1902022-03-16016 March 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22034A0132022-02-0202 February 2022 NRR E-mail Capture - Palo Verde, Unit 2 - Verbal Approval of RR-69 to Extend Containment Tendon Inspection from 2/8/22 to 6/8/22 ML22032A0312022-01-31031 January 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for an Exemption Regarding Elimination of Dafas Using RIPE Process ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21333A1982021-11-19019 November 2021 NRC Review of PVNGS Training Needs Analysis and Training Required by Condition I of the Confirmatory Order EA-20-054 ML21306A1882021-10-18018 October 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Second Pre-submittal Meeting for the Proposed Exemption to Eliminate Dafas Using RIPE Process ML21272A0592021-09-28028 September 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 21 ML21264A1352021-09-17017 September 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21237A0762021-08-25025 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML21228A0082021-08-16016 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of an LAR for Administrative Changes to Technical Specifications ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21237A5172021-08-10010 August 2021 Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request Fo ML21160A1442021-06-0909 June 2021 NRR E-mail Capture - Palo Verde 1 and, 2 - Acceptance Review for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21146A3342021-05-14014 May 2021 ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21132A2372021-05-12012 May 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21103A3632021-04-13013 April 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50 ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21053A0262021-02-22022 February 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML20366A1682020-12-31031 December 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Acceptance Review of an Order Associated with Indirect Transfers of Control of Licenses ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML20325A0392020-11-19019 November 2020 NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 66 to Extend Containment Tendon Inspection by One Year Based on 10 CFR 50.55a(Z)(2) ML20316A0162020-11-0909 November 2020 NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 66, Request Containment Post-Tensioning System Inspection One-Time by One Year Due to COVID-19 Pandemic ML20295A4912020-10-21021 October 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20265A0982020-09-21021 September 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications ML20108E9462020-04-16016 April 2020 NRR E-mail Capture - (External_Sender) Clarification to PVNGS Part 26 Exemption Request (ML20105A481) ML20091K0752020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay Examination ML20091M1992020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay ISI Examinations ML20050C9742020-02-19019 February 2020 NRR E-mail Capture - Palo Verde 1,2, and 3 - Framatome Htp Fuel LAR and Exemption Third Audit Summary (EPIDs L-2018-LLA-0194 and L-2018-LLE-0010) 2024-01-10
[Table view] |
Text
NRR-PMDAPEm Resource From: Watford, Margaret Sent: Tuesday, April 14, 2015 9:41 AM To: Thomas.N.Weber@aps.com
Subject:
Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083)
Attachments: Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083).pdf
- Tom, On April 7, 2015, Arizona Public Service Company discovered boron deposits on the differential pressure instrumentation nozzle on the suction side of the 2A reactor coolant pump, while performing planned routine visual examinations of Palo Verde Nuclear Generating Station, Unit 3 components. A call was held between Palo Verde and NRC staff on April 9, 2015 to discuss the emergent situation and the potential for the licensee to request relief from the ASME Code,Section XI, requirements. The licensee provided presentation slides, which are available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML15103A288.
Based on the licensees slides, the NRC staff has questions regarding the licensees proposed repair. Please see the attached document for the questions.
Due to the emergent nature of the situation, a clarification call will be held on April 15, 2015 to discuss the questions and repair schedule in detail.
Thank you, Maggie Watford Project Manager, Palo Verde NRR/DORL/LPL4-1 Phone: 301-415-1233 Email: Margaret.Watford@nrc.gov Cube: O-7-H16 Mailstop: O-8-H4A 1
Hearing Identifier: NRR_PMDA Email Number: 1998 Mail Envelope Properties (Margaret.Watford@nrc.gov20150414094000)
Subject:
Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083)
Sent Date: 4/14/2015 9:40:37 AM Received Date: 4/14/2015 9:40:00 AM From: Watford, Margaret Created By: Margaret.Watford@nrc.gov Recipients:
"Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1235 4/14/2015 9:40:00 AM Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083).pdf 82325 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION REGARDING PRESSURE BOUNDARY LEAKAGE FOUND ON REACTOR COOLANT PUMP 2A PRESSURE INSTRUMENTATION NOZZLE PALO VERDE NUCLEAR GENERATING STATION, UNIT 3 (TAC NO. MF6083)
On April 7, 2015, Arizona Public Service Company discovered boron deposits on the differential pressure instrumentation nozzle on the suction side of the 2A reactor coolant pump, while performing planned routine visual examinations of Palo Verde Nuclear Generating Station, Unit 3 components. A call was held between Palo Verde and NRC staff on April 9, 2015 to discuss the emergent situation and the potential for the licensee to request relief from the ASME Code,Section XI, requirements. The licensee provided presentation slides, which are available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML15103A288.
Based on the licensees slides, the NRC staff has the following questions regarding the licensees proposed repair.
- 1. Provide drawings of the original pressure instrument nozzle penetration that identify the following:
(a) The essential components and parts of the nozzle penetration.
(b) The bore of the reactor coolant pump (RCP) casing where the instrument nozzle is attached.
(c) The nozzle itself (with drilled hole).
(d) The J-groove weld.
The drawings should identify the dimensions of all major components and parts of the original pressure instrument nozzles, such as the diameter of the bore, orifice, RCP base metal thickness, and cladding. If these drawings were submitted as part of a previous licensing action, please provide references.
- 2. Provide the following information on the half nozzle repair:
(a) Describe the detailed steps of the half nozzle repair.
(b) Provide drawings of the half nozzle repair with the dimensions of all major components and parts of the repaired pressure instrument nozzles, such as the diameter and the length of the bore and cladding. Identify the demarcation of ASME Code Classification for components (i.e., ASME Class 1 vs. Class 2) and the primary system pressure boundary on the drawings after the repair is completed.
(c) Provide a detailed drawing which shows the intersection between the new nozzle and old nozzle (i.e., the location of the 0.6 inch gap).
- 3. Provide the following information on the new weld:
(a) Discuss how the partial penetration weld will be made at the exterior RCP wall where the new nozzle is attached, including the welding process/method and the pre- and
post-welding examination (method and areas of examination). Provide information on any pre- or post-heat treatment and the relevant ASME Code Section and subarticle to which the welding will be complied.
(b) Provide the welding design drawing.
(c) Discuss the inservice inspection of the new attachment weld, including how often the weld will be examined and the inspection method that will be used.
- 4. Provide the applicability of the relief request, either by the month and year or the designated number (e.g., No. 11) of the next refueling outage.
- 5. Discuss the impact of the high speed flow of coolant inside the RCP impinging on the degraded J-groove weld of the instrument nozzle. Discuss whether such impact would cause fragments of the J-groove weld to fall into the flow stream. Address if the potential loose parts of the J-groove would cause damage to the RCP internals.
- 6. Discuss the condition (i.e., any degradation or leakage) of previously repaired Alloy 600 small bore instrumentation lines attached to hot leg.
- 7. By letter dated August 16, 2005, the licensee submitted Relief Request 31, Revision 1 (ADAMS Accession No. ML052550368). Based on the review of Relief Request No. 31, it appears that the licensee may need to calculate the metal loss of the bore in the RCP casing due to potential crevice corrosion as a result of the 0.6 inch gap existing between (1) the new nozzle and remnant nozzle in the flaw evaluation, (2) crack growth of existing flaw in the weld by thermal fatigue, and (3) growth of existing flaw in the weld into the RCP casing. Confirm that all flaw evaluations and crack growth calculations consider the period of extended operation.
- 8. In Relief Request 31, the licensee committed to track the time at cold shutdown conditions for each unit against the assumptions made in the corrosion analysis so that the overall general/crevice corrosion rate does not exceed the rate presented in WCAP-15973-P, Revision 1, Low-Alloy Steel Component Corrosion Analysis Supporting Small Diameter Alloy 600/690 Nozzle Repair/Replacement Programs dated May 2004 (ADAMS Accession No. ML041540232). The licensee made the commitment to ensure the allowable bore diameter is not exceeded over the life of the plant.
(a) Discuss whether this commitment has been carried out since 2005. If yes, discuss how the cold shutdown conditions have been tracked and how the bore diameter is monitored to ensure that it does not exceed the allowable diameter.
(b) Discuss how often the required action in the commitment is performed.
(c) If the commitment has not been carried out, provide justification.