ML20265A098

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications
ML20265A098
Person / Time
Site: Palo Verde  
Issue date: 09/21/2020
From: Siva Lingam
NRC/NRR/DORL/LPL4
To: Cox M
Arizona Public Service Co
References
L-2020-LLA-0189
Download: ML20265A098 (4)


Text

From:

Lingam, Siva Sent:

Monday, September 21, 2020 8:09 AM To:

Matthew.Cox@aps.com Cc:

Dixon-Herrity, Jennifer; Wengert, Thomas; Cusumano, Victor; Tilton, Caroline; Hsueh, Kevin; Anderson, Joseph; Ashley, Clinton; Stutzcage, Edward; Garmon-Candelaria, David; Arce, Jeannette; norris, michael; Michael.Dilorenzo@aps.com; Carl.Stephenson@aps.com

Subject:

Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications (EPID L-2020-LLA-0189)

By letter dated August 21, 2020 (Agencywide Documents Access and Management System Accession No. ML20234A737), Arizona Public Service Company submitted a license amendment request (LAR) associated with making necessary administrative changes to Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Technical Specifications.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review for the above LAR The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review approximately by August 21, 2021, or earlier. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, or unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1564.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Grand Gulf Nuclear Station

Entergy Fleet Location: O-9E22; Mail Stop: O-9E03 Telephone: 301-415-1564 E-mail address: Siva.Lingam@nrc.gov

Hearing Identifier:

NRR_DRMA Email Number:

797 Mail Envelope Properties (BL0PR0901MB421089626904C4CB1E096895F63A0)

Subject:

Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications (EPID L-2020-LLA-0189)

Sent Date:

9/21/2020 8:09:18 AM Received Date:

9/21/2020 8:09:18 AM From:

Lingam, Siva Created By:

Siva.Lingam@nrc.gov Recipients:

"Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Wengert, Thomas" <Thomas.Wengert@nrc.gov>

Tracking Status: None "Cusumano, Victor" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Tilton, Caroline" <Caroline.Tilton@nrc.gov>

Tracking Status: None "Hsueh, Kevin" <Kevin.Hsueh@nrc.gov>

Tracking Status: None "Anderson, Joseph" <Joseph.Anderson@nrc.gov>

Tracking Status: None "Ashley, Clinton" <Clinton.Ashley@nrc.gov>

Tracking Status: None "Stutzcage, Edward" <Edward.Stutzcage@nrc.gov>

Tracking Status: None "Garmon-Candelaria, David" <David.Garmon-Candelaria@nrc.gov>

Tracking Status: None "Arce, Jeannette" <Jeannette.Arce@nrc.gov>

Tracking Status: None "norris, michael" <Michael.Norris@nrc.gov>

Tracking Status: None "Michael.Dilorenzo@aps.com" <Michael.Dilorenzo@aps.com>

Tracking Status: None "Carl.Stephenson@aps.com" <Carl.Stephenson@aps.com>

Tracking Status: None "Matthew.Cox@aps.com" <Matthew.Cox@aps.com>

Tracking Status: None Post Office:

BL0PR0901MB4210.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2861 9/21/2020 8:09:18 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: