MONTHYEARML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle Project stage: Request ML15104A8102015-04-14014 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Request for Information Regarding Pressure Boundary Leakage in RCP 2A Pressure Instrumentation Nozzle (MF6083) Project stage: RAI ML15110A4792015-04-15015 April 2015 NRR E-mail Capture - Palo Verde, Unit 3 - Information Regarding Pressure Boundary Leakage in Reactor Coolant Pump 2A Pressure Instrumentation Nozzle for April 15, 2015 Phone Call (MF6083) Project stage: Other ML15113A6362015-04-22022 April 2015 Acceptance of Relief Request 53 Project stage: Acceptance Review ML15113A4972015-04-23023 April 2015 Request for Additional Information Regarding Relief Request 53 Project stage: RAI ML15117A0422015-04-29029 April 2015 Memorandum to File Summarizing 4/24/15 Telephone Conference Granting Verbal Relief for Relief Request 53, Request for Approval of an Alternative to ASME Code, Section XI, Requirements for Flaw Removal Project stage: Other ML15198A2422015-07-15015 July 2015 Transmittal of Updated Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2242015-07-15015 July 2015 Transmittal of Non-Proprietary Documents for Relief Request 53 Project stage: Request ML15198A2262015-07-15015 July 2015 Attachment 3: Calculation CN-PAFM-15-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Transient Stress and Fracture Mechanics Evaluation for One Cycle Operation. Project stage: Request ML15198A2272015-07-15015 July 2015 Attachment 4: Calculation TR-FSE-15-2-NP, Rev. 1, Palo Verde Nuclear Generating Station Unit 3 Evaluation of Potential Loose Part - Reactor Coolant Pump Instrument Nozzle Weld Fragment. Project stage: Request ML15198A2252015-07-15015 July 2015 Attachment 2: Calculation CN-MRCDA-15-13-NP, Qualification of Palo Verde Unit 3 Reactor Coolant Pump Replacement Instrumentation Nozzle. Project stage: Request ML15209A6662015-08-10010 August 2015 Request for Withholding Information from Public Disclosure - 7/10/15 Affidavit Executed by J. Gresham, Westinghouse, Re Five Proprietary Documents in Support of Relief Request 53 - Approval of an Alternative to Flaw Removal (TAC No Project stage: Withholding Request Acceptance ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal Project stage: Other 2015-04-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
10 CFR 50.55a Saps Palo Verde Nuclear Generating Station 102-07077-TNW/DCE P.O. Box 52034 July 15, 2015 Phoenix, AZ 85072 Mail Station 7636 Tel 623 393 5764 A-TN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
References:
- 1. Arizona Public Service Company (APS) letter number 102-07037, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittalof ProprietaryDocuments for Relief Request 53, dated April 17, 2015, Agencywide Documents Access and Management System [ADAMS] Accession Number ML15111A289
- 2. APS letter number 102-07034, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, American Society of Mechanical Engineers (ASME)
Code,Section XI, Request for Approval of an Alternative to Flaw Removal -
Relief Request 53, dated April 17, 2015, ADAMS Accession Number ML15111A429
- 3. APS letter number 102-07085, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, Transmittal of Updated ProprietaryDocuments for Relief Request 53, dated July 15, 2015
Dear Sir:
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Docket No. 50-530 Transmittal of Non-Proprietary Documents for Relief Request 53 On April 17, 2015, pursuant to 10 CFR 50.55a(z)(1), Arizona Public Service Company (APS) submitted References 1 and 2 for Nuclear Regulatory Commission (NRC) approval of Relief Request 53. The letters provided proprietary documents and non-proprietary documents, respectively. Reference 3 provides five updated proprietary versions of the proprietary documents provided in Reference 1.
This letter transmits non-proprietary versions of the documents contained in the Enclosures to References 1 and 3.
There are no commitments made to the NRC by this letter.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Pc Callaway - Di-ablo Canyon - Palo Verde - Wolf Creek
102-07077-TNW/DCE ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Transmittal of Non-Proprietary Documents for Relief Request 53 Page 2 If you have any questions or require additional information, please contact Michael D. Dilorenzo, Nuclear Regulatory Affairs Department Leader, at (623) 393-3495.
Sincerely, Thomas N. Weber Nuclear Regulatory Affairs Department Leader TNW/DCE/akf
Enclosure:
Non-Proprietary Documents for Relief Request 53 cc (w/ enclosure):
M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Senior Resident Inspector for PVNGS
ENCLOSURE Non-Proprietary Documents for Relief Request 53
Enclosure Non-proprietary Documents for Relief Request 53 On April 17, 2015, pursuant to 10 CFR 50.55a(z)(1), Arizona Public Service Company (APS) submitted References 1 and 2 for Nuclear Regulatory Commission (NRC) approval of Relief Request 53. The letters provided proprietary documents and non-proprietary documents, respectively. Reference 3 provides five updated proprietary versions of the proprietary documents provided in Reference 1.
The attachments to this Enclosure provide non-proprietary documents provided in References 1 and 3. The updated proprietary documents in Reference 3 identify the proprietary content portions of the documents that have been removed in Attachments 2 through 6 of this Enclosure. This identification was not provided in the original transmittal of the documents in Reference 1..
The attachment numbers used in this Enclosure correlate to those provided in the enclosures to References 1 and 3. Attachment 1 of this enclosure is a placeholder to preserve the attachment number correlation among the attachments. The original document listed in Attachment 1 was provided in Reference 2 as a non-proprietary version.
Attachment 1 - Westinghouse Document DAR-MRCDA-1 5-6-NP, Rev. 1, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Attachment 2 - Westinghouse Calculation CN-MRCDA-1 5-13-NP, Rev. 0, Qualificationof Palo Verde Unit 3 ReactorCoolant Pump Replacement InstrumentationNozzle Attachment 3- Westinghouse Calculation CN-PAFM-1 5-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair TransientStress and FractureMechanics Evaluation for One Cycle Operation Attachment 4 - Westinghouse Calculation TR-FSE-1 5-2-NP, Rev. 1, Palo Verde Nuclear GeneratingStation Unit 3 Evaluation of PotentialLoose Part- Reactor Coolant Pump Instrument Nozzle Weld Fragment Attachment 5 - Westinghouse Letter, LTR-ME-1 5-30-NP, Rev. 2, ASME Code Section X1 Reconciliation for Arizona Public Service (APS), Palo Verde Nuclear Generating Station (PVNGS) Unit 3 Replacement Instrument Nozzle Attachment 6- Westinghouse Calculation CN-NPE-06-XXXX-03-NP, Rev. 1, PlantX - StructuralEvaluations of the RCP Pressure Tap Nozzles Attachment 7 - Drawings Referenced in Responses to NRC Questions
- C-8000-101-2017- NP, Rev 2, Wall Static PressureSuction
- STD-009-0009-NP, Rev. 2, Coolant Pumps Weld Joint Identification and FabricationRequirements 1
Enclosure Non-proprietary Documents for Relief Request 53
- DWG 339-0054-NP, Rev. 0, Safe End Mach. Of Pressure Tap Holes and Weld Prep. (Suction)
" C-14473-220-002-NP, Rev. 0, Replacement Pressure Tap Nozzle
" E-14473-220-001 -NP, Rev. 0, Pump Casing-A Pressure Tap Nozzle Modification Assembly
" SE-1 4473-220-003-NP, Rev. 0, Pressure Tap Nozzle Replacement Palo Verde Unit 3
References:
- 1. Arizona Public Service Company (APS) letter number 102-07037, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittal of ProprietaryDocuments for Relief Request 53, dated April 17, 2015, Agencywide Documents Access and Management System
[ADAMS] Accession Number ML15111A289
- 2. APS letter number 102-07034, Palo Verde Nuclear Generating Station Unit 3, Docket No. STN 50-530, American Society of Mechanical Engineers (ASME) Code, Section Xl, Request for Approval of an Alternative to Flaw Removal-- Relief Request 53, dated April 17, 2015, ADAMS Accession Number ML15111A429
- 3. APS letter number 102-07085, Palo Verde Nuclear GeneratingStation Unit 3, Docket No. STN 50-530, Transmittalof Updated Documents for Relief Request 53, dated July 15, 2015 2
Enclosure Non-proprietary Documents for Relief Request 53 Attachment 1 Westinghouse Document DAR-MRCDA-15-6-NP, Rev. 1, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Note:
This attachment was inserted for the sake of preserving the correlation between the attachment numbers of this Enclosure and those of the referenced letters. No document is attached.