ML15133A366: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:~Dominioin Dominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com Safeguards Information May 8, 2015 Re: 10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission Attention:
{{#Wiki_filter:Dominion Energy Kewaunee, Inc.
Document Control Desk Washington, D.C. 20555-0001 Serial No.: 15-137 NL&OS/MAE:
5000 Dominion Boulevard, Glen Allen, VA 23060                                             ~Dominioin Web Address: www.dom.com Safeguards Information May 8, 2015 Re:         10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission                                                     Serial No.:            15-137 Attention: Document Control Desk                                                       NL&OS/MAE: R2 Washington, D.C. 20555-0001                                                           Docket Nos.: 50-305 72-64 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.
R2 Docket Nos.: 50-305 72-64 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION (KPS) AND ASSOCIATED ISFSI RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (TAC MF5779)Dominion Energy Kewaunee, Inc. (DEK) submitted Revisions 1 through 4 to Kewaunee Power Station's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (the Plan) on June 11, 2013, October 2, 2013, November 5, 2013 and September 17, 2014, respectively.
KEWAUNEE POWER STATION (KPS) AND ASSOCIATED ISFSI RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (TAC MF5779)
On March 12, 2015, DEK received a request for additional information (RAI) regarding the Plan. As discussed in a March 10, 2015 clarification call, the NRC staff considered a response date of May 11, 2015 acceptable.
Dominion Energy Kewaunee, Inc. (DEK) submitted Revisions 1 through 4 to Kewaunee Power Station's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (the Plan) on June 11, 2013, October 2, 2013, November 5, 2013 and September 17, 2014, respectively. On March 12, 2015, DEK received a request for additional information (RAI) regarding the Plan. As discussed in a March 10, 2015 clarification call, the NRC staff considered a response date of May 11, 2015 acceptable. DEK's response to the RAI, as it relates to Revisions 1 through 4 of the Plan, is provided as Enclosures 1 through 3 to this letter.
DEK's response to the RAI, as it relates to Revisions 1 through 4 of the Plan, is provided as Enclosures 1 through 3 to this letter.The combination of material in Enclosures 2 and 3 to this letter is considered Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.
The combination of material in Enclosures 2 and 3 to this letter is considered Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Sincerely, Classified By: Name: Jonathan R. Barbier Title: SECURITY COMPLIANCE COORD Organization:
If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.
Nuc. Protection Services/
Classified By:
DEK Effective Date: April 21. 2015 I Unauthorized Disclosure Of Safeguards Information Will Be Riihie.c.t To Civil And Criminal Sanctions jI Gianna C. Clark Vice President  
Name: Jonathan R. Barbier Sincerely,
-Nuclear Support Services Dominion Energy Kewaunee, Inc.Subiect To Civil And Criminal Sanctions NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.
 
UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED." Safeguards Information 7s-ts-D ýP tA S SVP Serial No. 15-137 Docket Nos.: 50-305/72-64 Sec. Plan RAI Page 2 of 2 Safeguards Information
==Title:==
SECURITY COMPLIANCE COORD Organization: Nuc. Protection Services/ DEK Effective Date: April 21. 2015 Gianna C. Clark I Unauthorized Disclosure Of Safeguards Information Will Be Riihie.c.t To Civil And Criminal Sanctions Subiect To Civil And Criminal Sanctions jI Vice President - Nuclear Support Services Dominion Energy Kewaunee, Inc.
NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED."
Safeguards Information                                                         7s-ts-D ý P tA S SVP
 
Serial No. 15-137 Docket Nos.: 50-305/72-64 Sec. Plan RAI Page 2 of 2 Safeguards Information


==Enclosures:==
==Enclosures:==
Line 33: Line 38:
: 2. Response to RAI 1(Safeguards Information)
: 2. Response to RAI 1(Safeguards Information)
: 3. Response to RAI 2 (Safeguards Information)
: 3. Response to RAI 2 (Safeguards Information)
Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region III Attn.: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. P. Longmire (without Enclosures)
Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region III Attn.: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. P. Longmire (without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Ted Carter (without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Ted Carter (without Enclosures)
NRC Senior Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.
NRC Senior Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED."
UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED." Safeguards Information}}
Safeguards Information}}

Latest revision as of 00:33, 5 December 2019

ISFSI - Response to Request for Additional Information on the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program (the Plan)
ML15133A366
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 05/08/2015
From: Clark G
Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
15-137, TAC MF5779
Download: ML15133A366 (2)


Text

Dominion Energy Kewaunee, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 ~Dominioin Web Address: www.dom.com Safeguards Information May 8, 2015 Re: 10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission Serial No.: 15-137 Attention: Document Control Desk NL&OS/MAE: R2 Washington, D.C. 20555-0001 Docket Nos.: 50-305 72-64 License Nos.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION (KPS) AND ASSOCIATED ISFSI RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION (TAC MF5779)

Dominion Energy Kewaunee, Inc. (DEK) submitted Revisions 1 through 4 to Kewaunee Power Station's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (the Plan) on June 11, 2013, October 2, 2013, November 5, 2013 and September 17, 2014, respectively. On March 12, 2015, DEK received a request for additional information (RAI) regarding the Plan. As discussed in a March 10, 2015 clarification call, the NRC staff considered a response date of May 11, 2015 acceptable. DEK's response to the RAI, as it relates to Revisions 1 through 4 of the Plan, is provided as Enclosures 1 through 3 to this letter.

The combination of material in Enclosures 2 and 3 to this letter is considered Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Classified By:

Name: Jonathan R. Barbier Sincerely,

Title:

SECURITY COMPLIANCE COORD Organization: Nuc. Protection Services/ DEK Effective Date: April 21. 2015 Gianna C. Clark I Unauthorized Disclosure Of Safeguards Information Will Be Riihie.c.t To Civil And Criminal Sanctions Subiect To Civil And Criminal Sanctions jI Vice President - Nuclear Support Services Dominion Energy Kewaunee, Inc.

NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED."

Safeguards Information 7s-ts-D ý P tA S SVP

Serial No.15-137 Docket Nos.: 50-305/72-64 Sec. Plan RAI Page 2 of 2 Safeguards Information

Enclosures:

1. Response to Request for Additional Information
2. Response to RAI 1(Safeguards Information)
3. Response to RAI 2 (Safeguards Information)

Commitments made by this letter: None cc: U. S. Nuclear Regulatory Commission, Region III Attn.: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. P. Longmire (without Enclosures)

NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Ted Carter (without Enclosures)

NRC Senior Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 NOTE: ENCLOSURES 2 AND 3 TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ENCLOSURES 2 AND 3, THIS LETTER IS "DECONTROLLED."

Safeguards Information