ML15251A435: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML15251A435 | |||
| issue date = 09/03/2015 | |||
| title = Notification of Licensed Operator Initial Examination 05000261/2016301 | |||
| author name = Guthrie E | |||
| author affiliation = NRC/RGN-II/DRS | |||
| addressee name = Glover R | |||
| addressee affiliation = Duke Energy Carolinas, LLC | |||
| docket = 05000261 | |||
| license number = DPR-023 | |||
| contact person = | |||
| case reference number = 50-261/16-301 | |||
| document type = Letter, License-Operator, Part 55 Historical Related Material | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000261/2016301]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | |||
ATLANTA, GEORGIA 30303-1257 | |||
September 3, 2015 | |||
Richard Michael Glover | |||
Site Vice President | |||
H.B. Robinson Steam Electric Plant | |||
Duke Energy Corporation | |||
3581 West Entrance, RNPA01 | |||
Hartsville, SC 29550 | |||
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED | |||
OPERATOR INITIAL EXAMINATION 05000261/2016301 | |||
Dear R. Glover: | |||
In a meeting on August 18, 2015, between Mr. Frank Giannone, Training Manager, and | |||
Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration | |||
of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is | |||
scheduled to be administered during the weeks of February 1 and 8, 2016. The written | |||
examination is scheduled to be administered the week of February 15, 2016. The on-site | |||
preparatory week is scheduled for the week of January 4, 2016. | |||
As agreed during the telephone conversation, your staff will prepare the examinations based on | |||
the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for | |||
Power Reactors. The NRCs regional office will discuss with your staff any changes that might | |||
be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | |||
outline by November 8, 2015. Mr. Bacon provided the written examination outline to your staff | |||
in July, 2015. The written examinations, operating tests, and supporting reference materials | |||
identified in Attachment 3 to ES-201 will be due by December 3, 2015. Pursuant to Title 10, | |||
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | |||
representative of the facility licensee shall approve the examinations, and tests before they are | |||
submitted to the Commission for review and approval. All materials shall be complete and | |||
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards | |||
information in your response be contained in a separate enclosure and appropriately marked. | |||
Any delay in receiving the required examination and reference materials, or the submittal of | |||
inadequate or incomplete materials, may cause the examinations to be rescheduled. | |||
To conduct the requested written examinations and operating tests, it will be necessary for your | |||
staff to provide adequate space and accommodations in accordance with ES-402, and to make | |||
the simulation facility available on the dates noted above. In accordance with ES-302, your staff | |||
should retain the original simulator performance data (e.g., system pressures, temperatures, | |||
and levels) generated during the dynamic operating tests until the examination results are final. | |||
R. Glover 2 | |||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | |||
operator and senior reactor operator license applications (Office of Management and Budget | |||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | |||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | |||
this collection of information is estimated to average 2500 hours per response, including the | |||
time for reviewing instructions, gathering and maintaining the data needed, writing the | |||
examinations, and completing and reviewing the collection of information. Send comments on | |||
any aspect of this collection of information, including suggestions for reducing the burden, to the | |||
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, | |||
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov; | |||
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | |||
0018), Office of Management and Budget, Washington, DC 20503. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, | |||
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available | |||
electronically for public inspection in the NRCs Public Document Room or from the Publicly | |||
Available Records (PARS) component of the NRCs Agencywide Documents Access and | |||
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page | |||
of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Thank you for your cooperation in this matter. Mr. Giannone has been advised of the policies | |||
and guidelines referenced in this letter. If you have any questions regarding the NRC's | |||
examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet | |||
E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail: | |||
Eugene.Guthrie@nrc.gov). | |||
Sincerely, | |||
/RA/ | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
Docket No.: 50-261 | |||
License No.: DPR-23 | |||
cc: Distribution via Listserv | |||
_________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED | |||
OFFICE RII:DRS RII:DRS | |||
SIGNATURE DXB2 EFG | |||
NAME BACON GUTHRIE | |||
DATE 9/3/2015 9/3/2015 | |||
E-MAIL COPY? YES NO YES NO YES NO | |||
}} |
Latest revision as of 21:34, 4 December 2019
ML15251A435 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 09/03/2015 |
From: | Eugene Guthrie Division of Reactor Safety II |
To: | Glover R Duke Energy Carolinas |
References | |
50-261/16-301 | |
Download: ML15251A435 (3) | |
See also: IR 05000261/2016301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
September 3, 2015
Richard Michael Glover
Site Vice President
H.B. Robinson Steam Electric Plant
Duke Energy Corporation
3581 West Entrance, RNPA01
Hartsville, SC 29550
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000261/2016301
Dear R. Glover:
In a meeting on August 18, 2015, between Mr. Frank Giannone, Training Manager, and
Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration
of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is
scheduled to be administered during the weeks of February 1 and 8, 2016. The written
examination is scheduled to be administered the week of February 15, 2016. The on-site
preparatory week is scheduled for the week of January 4, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by November 8, 2015. Mr. Bacon provided the written examination outline to your staff
in July, 2015. The written examinations, operating tests, and supporting reference materials
identified in Attachment 3 to ES-201 will be due by December 3, 2015. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the examinations, and tests before they are
submitted to the Commission for review and approval. All materials shall be complete and
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the examination results are final.
R. Glover 2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page
of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Giannone has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet
E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
cc: Distribution via Listserv
_________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE DXB2 EFG
NAME BACON GUTHRIE
DATE 9/3/2015 9/3/2015
E-MAIL COPY? YES NO YES NO YES NO