ML15251A435: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000261/2016301]]
{{Adams
| number = ML15251A435
| issue date = 09/03/2015
| title = Notification of Licensed Operator Initial Examination 05000261/2016301
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| addressee name = Glover R
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000261
| license number = DPR-023
| contact person =
| case reference number = 50-261/16-301
| document type = Letter, License-Operator, Part 55 Historical Related Material
| page count = 3
}}
See also: [[see also::IR 05000261/2016301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                                NUCLEAR REGULATORY COMMISSION
                                              REGION II
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                        September 3, 2015
Richard Michael Glover
Site Vice President
H.B. Robinson Steam Electric Plant
Duke Energy Corporation
3581 West Entrance, RNPA01
Hartsville, SC 29550
SUBJECT:        H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
                OPERATOR INITIAL EXAMINATION 05000261/2016301
Dear R. Glover:
In a meeting on August 18, 2015, between Mr. Frank Giannone, Training Manager, and
Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration
of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is
scheduled to be administered during the weeks of February 1 and 8, 2016. The written
examination is scheduled to be administered the week of February 15, 2016. The on-site
preparatory week is scheduled for the week of January 4, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by November 8, 2015. Mr. Bacon provided the written examination outline to your staff
in July, 2015. The written examinations, operating tests, and supporting reference materials
identified in Attachment 3 to ES-201 will be due by December 3, 2015. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the examinations, and tests before they are
submitted to the Commission for review and approval. All materials shall be complete and
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your
staff to provide adequate space and accommodations in accordance with ES-402, and to make
the simulation facility available on the dates noted above. In accordance with ES-302, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the examination results are final.
 
R. Glover                                      2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page
of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Giannone has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet
E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
                                                Sincerely,
                                                /RA/
                                                Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
cc: Distribution via Listserv
 
 
_________________        SUNSI REVIEW COMPLETE      FORM 665 ATTACHED
OFFICE            RII:DRS        RII:DRS
SIGNATURE          DXB2            EFG
NAME              BACON          GUTHRIE
DATE                  9/3/2015        9/3/2015
E-MAIL COPY?        YES    NO      YES    NO                                                                  YES  NO
}}

Latest revision as of 21:34, 4 December 2019

Notification of Licensed Operator Initial Examination 05000261/2016301
ML15251A435
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/03/2015
From: Eugene Guthrie
Division of Reactor Safety II
To: Glover R
Duke Energy Carolinas
References
50-261/16-301
Download: ML15251A435 (3)


See also: IR 05000261/2016301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

September 3, 2015

Richard Michael Glover

Site Vice President

H.B. Robinson Steam Electric Plant

Duke Energy Corporation

3581 West Entrance, RNPA01

Hartsville, SC 29550

SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2016301

Dear R. Glover:

In a meeting on August 18, 2015, between Mr. Frank Giannone, Training Manager, and

Mr. Daniel Bacon, Senior Operations Engineer, arrangements were made for the administration

of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is

scheduled to be administered during the weeks of February 1 and 8, 2016. The written

examination is scheduled to be administered the week of February 15, 2016. The on-site

preparatory week is scheduled for the week of January 4, 2016.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by November 8, 2015. Mr. Bacon provided the written examination outline to your staff

in July, 2015. The written examinations, operating tests, and supporting reference materials

identified in Attachment 3 to ES-201 will be due by December 3, 2015. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations, and tests before they are

submitted to the Commission for review and approval. All materials shall be complete and

ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your

staff to provide adequate space and accommodations in accordance with ES-402, and to make

the simulation facility available on the dates noted above. In accordance with ES-302, your staff

should retain the original simulator performance data (e.g., system pressures, temperatures,

and levels) generated during the dynamic operating tests until the examination results are final.

R. Glover 2

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page

of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Giannone has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet

E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

cc: Distribution via Listserv

_________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE DXB2 EFG

NAME BACON GUTHRIE

DATE 9/3/2015 9/3/2015

E-MAIL COPY? YES NO YES NO YES NO