ML16133A120: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16133A120
| number = ML16133A120
| issue date = 05/12/2016
| issue date = 05/12/2016
| title = 2016/05/12 NRR E-mail Capture - NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
| title = NRR E-mail Capture - NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
| author name = Orenak M D
| author name = Orenak M
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Joyce R M
| addressee name = Joyce R
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000366
| docket = 05000366
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project =
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:NRR-PMDAPEm Resource From:                            Orenak, Michael Sent:                            Thursday, May 12, 2016 9:08 AM To:                              Joyce, Ryan M.
Cc:                              McElroy, G. Ken; CRPIERCE@southernco.com
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
: Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1
Hearing Identifier:  NRR_PMDA Email Number:        2840 Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:            5/12/2016 9:07:31 AM Received Date:        5/12/2016 9:07:00 AM From:                Orenak, Michael Created By:          Michael.Orenak@nrc.gov Recipients:
"McElroy, G. Ken" <GKMCELRO@southernco.com>
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files                        Size                    Date & Time MESSAGE                      2025                  5/12/2016 9:07:00 AM Options Priority:                    Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From:                            Orenak, Michael Sent:                            Thursday, May 12, 2016 9:08 AM To:                              Joyce, Ryan M.
Cc:                              McElroy, G. Ken; CRPIERCE@southernco.com
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
: Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1
Hearing Identifier:  NRR_PMDA Email Number:        2840 Mail Envelope Properties  (Michael.Orenak@nrc.gov20160512090700)
==Subject:==
NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date:            5/12/2016 9:07:31 AM Received Date:        5/12/2016 9:07:00 AM From:                Orenak, Michael Created By:          Michael.Orenak@nrc.gov Recipients:
"McElroy, G. Ken" <GKMCELRO@southernco.com>
Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>
Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>
Tracking Status: None Post Office:
Files                        Size                    Date & Time MESSAGE                      2025                  5/12/2016 9:07:00 AM Options Priority:                    Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:}}

Latest revision as of 16:48, 4 December 2019

NRR E-mail Capture - NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02
ML16133A120
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/12/2016
From: Michael Orenak
Plant Licensing Branch II
To: Joyce R
Southern Nuclear Operating Co
References
MF7692
Download: ML16133A120 (2)


Text

NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.

Cc: McElroy, G. Ken; CRPIERCE@southernco.com

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02

Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2840 Mail Envelope Properties (Michael.Orenak@nrc.gov20160512090700)

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date: 5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:

"McElroy, G. Ken" <GKMCELRO@southernco.com>

Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>

Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2025 5/12/2016 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Orenak, Michael Sent: Thursday, May 12, 2016 9:08 AM To: Joyce, Ryan M.

Cc: McElroy, G. Ken; CRPIERCE@southernco.com

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02

Ryan, By letter dated May 6, 2016, Southern Nuclear Operating Company, Inc. submitted a request for alternative for Edwin I. Hatch Nuclear Plant (HNP), Unit 2 (ADAMS Accession No. ML16127A191; TAC No. MF7692) to perform the VT-2 visual examination during a system leakage test of Class 1 components with mechanical joint connections at a pressure lower than the Code-required pressure following repair and replacement activities on several SRVs installed in HNP, Unit 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Michael D. Orenak Hatch Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2840 Mail Envelope Properties (Michael.Orenak@nrc.gov20160512090700)

Subject:

NRC Acceptance Review for Alternative Request HNP-ISI-ALT-05-02 Sent Date: 5/12/2016 9:07:31 AM Received Date: 5/12/2016 9:07:00 AM From: Orenak, Michael Created By: Michael.Orenak@nrc.gov Recipients:

"McElroy, G. Ken" <GKMCELRO@southernco.com>

Tracking Status: None "CRPIERCE@southernco.com" <CRPIERCE@southernco.com>

Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2025 5/12/2016 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: