ML17019A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17019A073
| number = ML17019A073
| issue date = 01/16/2017
| issue date = 01/16/2017
| title = 2017/01/16 NRR E-mail Capture - [External_Sender] Davis-Besse Nuclear Station Information Request Related to Dbnps Mitigating Strategies FIP - Personnel Habitability
| title = NRR E-mail Capture - (External_Sender) Davis-Besse Nuclear Station Information Request Related to DBNPS Mitigating Strategies FIP - Personnel Habitability
| author name = Nevins K J
| author name = Nevins K
| author affiliation = First Energy Services, Inc
| author affiliation = First Energy Services, Inc
| addressee name = Hughey J D
| addressee name = Hughey J
| addressee affiliation = NRC/NRR/JLD
| addressee affiliation = NRC/NRR/JLD
| docket = 05000346
| docket = 05000346
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Nevins, Kathleen J. <kjnevins@firstenergycorp.com>Sent:Monday, January 16, 2017 12:00 PMTo:Hughey, John
{{#Wiki_filter:NRR-PMDAPEm Resource From:                               Nevins, Kathleen J. <kjnevins@firstenergycorp.com>
Sent:                               Monday, January 16, 2017 12:00 PM To:                                 Hughey, John


==Subject:==
==Subject:==
[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Attachments:White Paper - FLEX Heat Habitability.docxDuring the telephone call discussion held on January 11, 2017, the NRC staff requested clarification on wording used in the Davis-Besse Nuclear Power Station (DBNPS) Final Integrated Plan, Section 2.11.1, Ventilation.
[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Attachments:                         White Paper - FLEX Heat Habitability.docx During the telephone call discussion held on January 11, 2017, the NRC staff requested clarification on wording used in the Davis-Besse Nuclear Power Station (DBNPS) Final Integrated Plan, Section 2.11.1, Ventilation.
The manner in which the section was written brought into question whether ventilation may be required in some areas. During the discussion, FENOC communicated to the NRC staff that this was not the intent. The intent was to describe that ventilation is not required; however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available for use. The NRC staff requested that FENOC provide additional supporting information for this via e-mail so that the detail may be publicly available in ADAMS. A white paper is attached to support that the worst case area temperatures remain low enough to allow operators to safety complete tasks without ventilation.  
The manner in which the section was written brought into question whether ventilation may be required in some areas.
During the discussion, FENOC communicated to the NRC staff that this was not the intent. The intent was to describe that ventilation is not required; however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available for use. The NRC staff requested that FENOC provide additional supporting information for this via e-mail so that the detail may be publicly available in ADAMS.
A white paper is attached to support that the worst case area temperatures remain low enough to allow operators to safety complete tasks without ventilation.
This e-mail and its attachment may be made publicly available in ADAMS.
Thank you.
Kathleen J. Nevins Fleet Licensing A-WAC-B1 Office: 330-315-6840 Cell: 567-277-0416 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1


This e-mail and its attachment may be made publicly available in ADAMS. Thank you.
Hearing Identifier:   NRR_PMDA Email Number:         3276 Mail Envelope Properties   (BN6PR05MB2914D9A9511F2A42CF0D4FA9CB7D0)
Kathleen J. Nevins Fleet Licensing A-WAC-B1 Office: 330-315-6840 Cell: 567-277-0416 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
Hearing Identifier: NRR_PMDA Email Number: 3276   Mail Envelope Properties   (BN6PR05MB2914D9A9511F2A42CF0D4FA9CB7D0)  


==Subject:==
==Subject:==
  [External_Sender] Additional Information on DBNPS FLEX Heat Habitability   Sent Date:   1/16/2017 11:59:55 AM Received Date: 1/16/2017 12:00:01 PM From:   Nevins, Kathleen J. Created By:   kjnevins@firstenergycorp.com Recipients:     "Hughey, John" <John.Hughey@nrc.gov>
[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Sent Date:           1/16/2017 11:59:55 AM Received Date:       1/16/2017 12:00:01 PM From:                 Nevins, Kathleen J.
Tracking Status: None Post Office:   BN6PR05MB2914.namprd05.prod.outlook.com   Files     Size     Date & Time MESSAGE   1732     1/16/2017 12:00:01 PM White Paper - FLEX Heat Habitability.docx   138218   Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Created By:           kjnevins@firstenergycorp.com Recipients:
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation. Page 1 of 3  Extreme heat conditions during an ELAP were considered to determine Davis Besse FLEX deployment strategies and timelines as applicable to ventilation. Calculations support that the worst case temperature in each area is low enough to allow operators to safely complete the mitigation tasks without deployment restoration of ventilation. NORM-LP-7201, DAVIS BESSE FLEX VALIDATION PROCESS REPORT, validated the FLEX strategy timelines with minimum crew manning assumed. The team concluded that ventilation can be deployed as resources become available. The following page from the validation report shows assignments of the 6 Station Blackout Equipment Operators (SBOEO) for the first 6 hours until additional resources are assumed per NEI 12-06.
"Hughey, John" <John.Hughey@nrc.gov>
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation. Page 2 of 3  The table below was created to clarify the calculation cross reference to maximum area temperatures used for habitability reviews. Location Description Max &deg;F without ventilation Calculation HVSG High Voltage Switchgear Rooms 323, 324, 325 115.5&deg;F C-ME-099.25-001 referencing Calc 24.001 (steady state calc) LVSG Low Voltage Switchgear Rooms 428/A/B, 429/A/B 114.4&deg;F C-ME-099.25-001 referencing Calc 25.020 (Time vs. Temp calc showing temp plateau/steady state) CTRM Control Room 505 110.3&deg;F C-ME-099.25-001 referencing Calc 57.001 (steady state calc) MP3 Mechanical Penetration Room 303 104&deg;F C-ME-099.25-001 Fan Alley Rooms 500, 501, 515 104&deg;F C-ME-099.25-001 SFP Spent Fuel Pool Room 300 104&deg;F C-ME-099.25-001 RM100 BWST Pipe Chase Room 100/101 86&deg;F C-ME-050.05-008 (steady state calc) RM124 CWRT 1 Room 124 95&deg;F C-ME-050.05-008 (steady state calc) EFWF1 Emergency Feedwater Facility 118.5&deg;F S&L Evaluation 2016-05980 (Time vs. Temp 0-2.5 hrs after ELAP; referenced in EFWF HVAC sizing calc C-ME-050.05-007) 1 EFWF ventilation is restored when 480V is aligned to EFWF MCC by T+2.5 hours after ELAP, maintaining temperature  120&deg;F. Time sensitive operator actions are discussed throughout the Final Integrated Plan and section 3.1.2 includes a table for those actions. Columns have been added to the table to combine the detail from the validation report (Reference Page 1) and maximum area temperatures (Reference table above). Time Sensitive Operator Action Task Description Time required for completion from Loss of all AC power Task Performed By Task Location Time in Area Maximum Equilibrium Room Temp assumed at T+0 FLEX Action 1 - Preserve RCS Inventory. Following a Station Blackout, isolate RCS Letdown and Reactor Coolant Pump Seal Return. 10 minutes CTRM Staff CTRM Continuous 110.3&deg;F FLEX Action 2 - Declare an ELAP. Following a Station Blackout, declare an Extended Loss of AC Power. 10 minutes CTRM Staff CTRM Continuous 110.3&deg;F FLEX Action 3 - DC Bus Load Shed.
Tracking Status: None Post Office:         BN6PR05MB2914.namprd05.prod.outlook.com Files                         Size                     Date & Time MESSAGE                       1732                     1/16/2017 12:00:01 PM White Paper - FLEX Heat Habitability.docx                     138218 Options Priority:                     Standard Return Notification:         No Reply Requested:             No Sensitivity:                 Normal Expiration Date:
Align 480V to E1 or E2 Following a Station Blackout, align DC Buses and Loads to extend the life of Station Batteries.
Recipients Received:
Connect Cables across HVSG Rooms to E1 or F1 for power to PZR Heaters 30 minutes for 1st phase and a total of 60 minutes for all actions.
 
180 minutes SBOEO1 Phase 1 SBOEO2 Phase 2 SBOEO2 LVSG LVSG HVSG  30 minutes 15 minutes 30 minutes 114.4&deg;F 114.4&deg;F  115.5&deg;F FLEX Action 4 - Manually Start the EFW Pump. Following a Station Blackout and loss of all AFW, manually start the EFW Pump and supply inventory to SG1. 10 minutes CTRM Staff CTRM Continuous 110.3&deg;F White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation. Page 3 of 3  Time Sensitive Operator Action Task Description Time required for completion from Loss of all AC power Task Performed By Task Location Time in Area Maximum Equilibrium Room Temp assumed at T+0 FLEX Action 5 - Provide inventory to SG2. Following a Station Blackout and AFW System Failure, manually align Emergency Feedwater to provide inventory to SG2. 90 minutes SBOEO5 MP3 25 minutes After alignment, SG2 flow control is required, but does not require SBOEO5 to remain in area continuously 104&deg;F FLEX Action 6 - Mechanically align FLEX Charging Pump for RCS inventory. Following a Station Blackout, mechanically align a FLEX Charging Pump to provide inventory to the Reactor Coolant System. 150 minutes SBOEO1 RM100 or RM124 60 minutes After alignment, pump start and stop is required, but does not require SBOEO1 to remain in area continuously 86&deg;F 95&deg;F FLEX Action 7 - Electrically align FLEX Charging Pump for RCS inventory. Following a Station Blackout, electrically align a FLEX Charging Pump to provide inventory to the Reactor Coolant System. 150 minutes SBOEO6 RM100  RM 100, RM124 30 minutes Primary connection  120 minutes Alt connection 86&deg;F  95&deg;F FLEX Action 8 -
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
Electrically align 480 volt power to EFWF MCC. Following a Station Blackout, electrically align 480 volt power to the EFW Facility MCC. 150 minutes SBOEO6 EFWF1 30 minutes After start, monitoring does not require SBOEO6 to remain in area continuously 118.5&deg;F FLEX Action 9 - Initiate RCS Cooldown. Following a Station Blackout, initiate cooldown of the Reactor Coolant System. 4.5 hours CTRM Staff SBOEO1 SBOEO3 SBOEO5 CTRM RM100 Fan Alley MP3 Continuous As Required, not continuous As Required, not continuous As Required, not continuous 110.3&deg;F  Based on time before required completion, expected time in area for task, effort required, and maximum area temperatures, it is reasonable to expect that the tasks can be performed without ventilation restoration or deployment. The FSGs have been written to deploy ventilation as resources become available. Wording in FIP section 2.11.1 had been interpreted to suggest that ventilation may be required in some areas. The intent was to describe that ventilation is not required, however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available.
Extreme heat conditions during an ELAP were considered to determine Davis Besse FLEX deployment strategies and timelines as applicable to ventilation.
}}
Calculations support that the worst case temperature in each area is low enough to allow operators to safely complete the mitigation tasks without deployment restoration of ventilation. NORM-LP-7201, DAVIS BESSE FLEX VALIDATION PROCESS REPORT, validated the FLEX strategy timelines with minimum crew manning assumed. The team concluded that ventilation can be deployed as resources become available. The following page from the validation report shows assignments of the 6 Station Blackout Equipment Operators (SBOEO) for the first 6 hours until additional resources are assumed per NEI 12-06.
Page 1 of 3
 
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
The table below was created to clarify the calculation cross reference to maximum area temperatures used for habitability reviews.
Location         Description                                                   Max &deg;F without ventilation   Calculation HVSG             High Voltage Switchgear Rooms 323, 324, 325                   115.5&deg;F                       C-ME-099.25-001 referencing Calc 24.001 (steady state calc)
LVSG             Low Voltage Switchgear Rooms 428/A/B, 429/A/B                 114.4&deg;F                       C-ME-099.25-001 referencing Calc 25.020 (Time vs. Temp calc showing temp plateau/steady state)
CTRM             Control Room 505                                               110.3&deg;F                       C-ME-099.25-001 referencing Calc 57.001 (steady state calc)
MP3               Mechanical Penetration Room 303                               104&deg;F                         C-ME-099.25-001 Fan Alley         Rooms 500, 501, 515                                           104&deg;F                         C-ME-099.25-001 SFP               Spent Fuel Pool Room 300                                       104&deg;F                         C-ME-099.25-001 RM100             BWST Pipe Chase Room 100/101                                   86&deg;F                         C-ME-050.05-008 (steady state calc)
RM124             CWRT 1 Room 124                                               95&deg;F                         C-ME-050.05-008 (steady state calc)
EFWF1             Emergency Feedwater Facility                                   118.5&deg;F                       S&L Evaluation 2016-05980 (Time vs. Temp 0-2.5 hrs after ELAP; referenced in EFWF HVAC sizing calc C-ME-050.05-007) 1 EFWF ventilation is restored when 480V is aligned to EFWF MCC by T+2.5 hours after ELAP, maintaining temperature  120&deg;F.
Time sensitive operator actions are discussed throughout the Final Integrated Plan and section 3.1.2 includes a table for those actions. Columns have been added to the table to combine the detail from the validation report (Reference Page 1) and maximum area temperatures (Reference table above).
Time Sensitive       Task Description                         Time required for           Task Performed By   Task Location         Time in Area                       Maximum Operator Action                                              completion from Loss of                                                                                    Equilibrium all AC power                                                                                              Room Temp assumed at T+0 FLEX Action 1 -     Following a Station Blackout, isolate   10 minutes                 CTRM Staff           CTRM                 Continuous                         110.3&deg;F Preserve RCS        RCS Letdown and Reactor Coolant Inventory.          Pump Seal Return.
FLEX Action 2 -     Following a Station Blackout, declare an 10 minutes                 CTRM Staff           CTRM                 Continuous                         110.3&deg;F Declare an ELAP. Extended Loss of AC Power.
FLEX Action 3 -     Following a Station Blackout, align DC   30 minutes for 1st phase    SBOEO1 Phase 1      LVSG                  30 minutes                          114.4&deg;F DC Bus Load          Buses and Loads to extend the life of   and a total of 60 minutes   SBOEO2 Phase 2       LVSG                 15 minutes                         114.4&deg;F Shed.                Station Batteries.                       for all actions.
115.5&deg;F Align 480V to E1    Connect Cables across HVSG Rooms to      180 minutes                SBOEO2              HVSG                  30 minutes or E2                E1 or F1 for power to PZR Heaters FLEX Action 4 -      Following a Station Blackout and loss of 10 minutes                  CTRM Staff          CTRM                  Continuous                          110.3&deg;F Manually Start      all AFW, manually start the EFW Pump the EFW Pump.        and supply inventory to SG1.
Page 2 of 3
 
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
Time Sensitive     Task Description                         Time required for       Task Performed By  Task Location     Time in Area                     Maximum Operator Action                                              completion from Loss of                                                                          Equilibrium all AC power                                                                                      Room Temp assumed at T+0 FLEX Action 5 -   Following a Station Blackout and AFW     90 minutes              SBOEO5              MP3                25 minutes                        104&deg;F Provide inventory  System Failure, manually align                                                                           After alignment, SG2 flow to SG2.            Emergency Feedwater to provide                                                                           control is required, but does not inventory to SG2.                                                                                        require SBOEO5 to remain in area continuously FLEX Action 6 -   Following a Station Blackout,             150 minutes             SBOEO1             RM100             60 minutes                       86&deg;F Mechanically      mechanically align a FLEX Charging                                                    or                After alignment, pump start and align FLEX        Pump to provide inventory to the                                                      RM124              stop is required, but does not   95&deg;F Charging Pump     Reactor Coolant System.                                                                                   require SBOEO1 to remain in for RCS                                                                                                                      area continuously inventory.
FLEX Action 7 -    Following a Station Blackout,             150 minutes              SBOEO6              RM100              30 minutes Primary connection    86&deg;F Electrically align electrically align a FLEX Charging Pump FLEX Charging      to provide inventory to the Reactor                                                   RM 100, RM124     120 minutes Alt connection       95&deg;F Pump for RCS      Coolant System.
inventory.
FLEX Action 8 -   Following a Station Blackout,             150 minutes              SBOEO6              EFWF1              30 minutes                        118.5&deg;F Electrically align electrically align 480 volt power to the                                                                 After start, monitoring does not 480 volt power to  EFW Facility MCC.                                                                                        require SBOEO6 to remain in EFWF MCC.                                                                                                                    area continuously FLEX Action 9 -   Following a Station Blackout, initiate   4.5 hours               CTRM Staff         CTRM               Continuous                        110.3&deg;F Initiate RCS      cooldown of the Reactor Coolant                                    SBOEO1              RM100              As Required, not continuous Cooldown.          System.                                                            SBOEO3              Fan Alley          As Required, not continuous SBOEO5              MP3                As Required, not continuous Based on time before required completion, expected time in area for task, effort required, and maximum area temperatures, it is reasonable to expect that the tasks can be performed without ventilation restoration or deployment. The FSGs have been written to deploy ventilation as resources become available.
Wording in FIP section 2.11.1 had been interpreted to suggest that ventilation may be required in some areas. The intent was to describe that ventilation is not required, however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available.
Page 3 of 3}}

Latest revision as of 10:59, 4 December 2019

NRR E-mail Capture - (External_Sender) Davis-Besse Nuclear Station Information Request Related to DBNPS Mitigating Strategies FIP - Personnel Habitability
ML17019A073
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/16/2017
From: Nevins K
First Energy Services
To: John Hughey
Japan Lessons-Learned Division
References
Download: ML17019A073 (5)


Text

NRR-PMDAPEm Resource From: Nevins, Kathleen J. <kjnevins@firstenergycorp.com>

Sent: Monday, January 16, 2017 12:00 PM To: Hughey, John

Subject:

[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Attachments: White Paper - FLEX Heat Habitability.docx During the telephone call discussion held on January 11, 2017, the NRC staff requested clarification on wording used in the Davis-Besse Nuclear Power Station (DBNPS) Final Integrated Plan, Section 2.11.1, Ventilation.

The manner in which the section was written brought into question whether ventilation may be required in some areas.

During the discussion, FENOC communicated to the NRC staff that this was not the intent. The intent was to describe that ventilation is not required; however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available for use. The NRC staff requested that FENOC provide additional supporting information for this via e-mail so that the detail may be publicly available in ADAMS.

A white paper is attached to support that the worst case area temperatures remain low enough to allow operators to safety complete tasks without ventilation.

This e-mail and its attachment may be made publicly available in ADAMS.

Thank you.

Kathleen J. Nevins Fleet Licensing A-WAC-B1 Office: 330-315-6840 Cell: 567-277-0416 The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

1

Hearing Identifier: NRR_PMDA Email Number: 3276 Mail Envelope Properties (BN6PR05MB2914D9A9511F2A42CF0D4FA9CB7D0)

Subject:

[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Sent Date: 1/16/2017 11:59:55 AM Received Date: 1/16/2017 12:00:01 PM From: Nevins, Kathleen J.

Created By: kjnevins@firstenergycorp.com Recipients:

"Hughey, John" <John.Hughey@nrc.gov>

Tracking Status: None Post Office: BN6PR05MB2914.namprd05.prod.outlook.com Files Size Date & Time MESSAGE 1732 1/16/2017 12:00:01 PM White Paper - FLEX Heat Habitability.docx 138218 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.

Extreme heat conditions during an ELAP were considered to determine Davis Besse FLEX deployment strategies and timelines as applicable to ventilation.

Calculations support that the worst case temperature in each area is low enough to allow operators to safely complete the mitigation tasks without deployment restoration of ventilation. NORM-LP-7201, DAVIS BESSE FLEX VALIDATION PROCESS REPORT, validated the FLEX strategy timelines with minimum crew manning assumed. The team concluded that ventilation can be deployed as resources become available. The following page from the validation report shows assignments of the 6 Station Blackout Equipment Operators (SBOEO) for the first 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> until additional resources are assumed per NEI 12-06.

Page 1 of 3

White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.

The table below was created to clarify the calculation cross reference to maximum area temperatures used for habitability reviews.

Location Description Max °F without ventilation Calculation HVSG High Voltage Switchgear Rooms 323, 324, 325 115.5°F C-ME-099.25-001 referencing Calc 24.001 (steady state calc)

LVSG Low Voltage Switchgear Rooms 428/A/B, 429/A/B 114.4°F C-ME-099.25-001 referencing Calc 25.020 (Time vs. Temp calc showing temp plateau/steady state)

CTRM Control Room 505 110.3°F C-ME-099.25-001 referencing Calc 57.001 (steady state calc)

MP3 Mechanical Penetration Room 303 104°F C-ME-099.25-001 Fan Alley Rooms 500, 501, 515 104°F C-ME-099.25-001 SFP Spent Fuel Pool Room 300 104°F C-ME-099.25-001 RM100 BWST Pipe Chase Room 100/101 86°F C-ME-050.05-008 (steady state calc)

RM124 CWRT 1 Room 124 95°F C-ME-050.05-008 (steady state calc)

EFWF1 Emergency Feedwater Facility 118.5°F S&L Evaluation 2016-05980 (Time vs. Temp 0-2.5 hrs after ELAP; referenced in EFWF HVAC sizing calc C-ME-050.05-007) 1 EFWF ventilation is restored when 480V is aligned to EFWF MCC by T+2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after ELAP, maintaining temperature 120°F.

Time sensitive operator actions are discussed throughout the Final Integrated Plan and section 3.1.2 includes a table for those actions. Columns have been added to the table to combine the detail from the validation report (Reference Page 1) and maximum area temperatures (Reference table above).

Time Sensitive Task Description Time required for Task Performed By Task Location Time in Area Maximum Operator Action completion from Loss of Equilibrium all AC power Room Temp assumed at T+0 FLEX Action 1 - Following a Station Blackout, isolate 10 minutes CTRM Staff CTRM Continuous 110.3°F Preserve RCS RCS Letdown and Reactor Coolant Inventory. Pump Seal Return.

FLEX Action 2 - Following a Station Blackout, declare an 10 minutes CTRM Staff CTRM Continuous 110.3°F Declare an ELAP. Extended Loss of AC Power.

FLEX Action 3 - Following a Station Blackout, align DC 30 minutes for 1st phase SBOEO1 Phase 1 LVSG 30 minutes 114.4°F DC Bus Load Buses and Loads to extend the life of and a total of 60 minutes SBOEO2 Phase 2 LVSG 15 minutes 114.4°F Shed. Station Batteries. for all actions.

115.5°F Align 480V to E1 Connect Cables across HVSG Rooms to 180 minutes SBOEO2 HVSG 30 minutes or E2 E1 or F1 for power to PZR Heaters FLEX Action 4 - Following a Station Blackout and loss of 10 minutes CTRM Staff CTRM Continuous 110.3°F Manually Start all AFW, manually start the EFW Pump the EFW Pump. and supply inventory to SG1.

Page 2 of 3

White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.

Time Sensitive Task Description Time required for Task Performed By Task Location Time in Area Maximum Operator Action completion from Loss of Equilibrium all AC power Room Temp assumed at T+0 FLEX Action 5 - Following a Station Blackout and AFW 90 minutes SBOEO5 MP3 25 minutes 104°F Provide inventory System Failure, manually align After alignment, SG2 flow to SG2. Emergency Feedwater to provide control is required, but does not inventory to SG2. require SBOEO5 to remain in area continuously FLEX Action 6 - Following a Station Blackout, 150 minutes SBOEO1 RM100 60 minutes 86°F Mechanically mechanically align a FLEX Charging or After alignment, pump start and align FLEX Pump to provide inventory to the RM124 stop is required, but does not 95°F Charging Pump Reactor Coolant System. require SBOEO1 to remain in for RCS area continuously inventory.

FLEX Action 7 - Following a Station Blackout, 150 minutes SBOEO6 RM100 30 minutes Primary connection 86°F Electrically align electrically align a FLEX Charging Pump FLEX Charging to provide inventory to the Reactor RM 100, RM124 120 minutes Alt connection 95°F Pump for RCS Coolant System.

inventory.

FLEX Action 8 - Following a Station Blackout, 150 minutes SBOEO6 EFWF1 30 minutes 118.5°F Electrically align electrically align 480 volt power to the After start, monitoring does not 480 volt power to EFW Facility MCC. require SBOEO6 to remain in EFWF MCC. area continuously FLEX Action 9 - Following a Station Blackout, initiate 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> CTRM Staff CTRM Continuous 110.3°F Initiate RCS cooldown of the Reactor Coolant SBOEO1 RM100 As Required, not continuous Cooldown. System. SBOEO3 Fan Alley As Required, not continuous SBOEO5 MP3 As Required, not continuous Based on time before required completion, expected time in area for task, effort required, and maximum area temperatures, it is reasonable to expect that the tasks can be performed without ventilation restoration or deployment. The FSGs have been written to deploy ventilation as resources become available.

Wording in FIP section 2.11.1 had been interpreted to suggest that ventilation may be required in some areas. The intent was to describe that ventilation is not required, however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available.

Page 3 of 3