ML060610412: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML060610412
| number = ML060610412
| issue date = 03/02/2006
| issue date = 03/02/2006
| title = Summer, Inspection / Activity Plan, 03/01/2006 - 09/30/2007
| title = Inspection / Activity Plan, 03/01/2006 - 09/30/2007
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Summer Inspection / Activity Plan 03/01/2006
{{#Wiki_filter:Page 1 of 2                                                                                      Summer 03/02/2006    11:48:05                                                                Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                                    No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                  on Site       Start    End              Type PI&R           - PROBLEM IDENTIFICATION AND RESOLUTION                                                               4 1              IP 71152B                Identification and Resolution of Problems                                                      03/13/2006 03/17/2006 Baseline Inspections 1             IP 71152B               Identification and Resolution of Problems                                                       03/27/2006 03/31/2006 Baseline Inspections EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                   5 1              IP 7111121              Component Design Bases Inspection                                                              05/08/2006 05/12/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               05/22/2006 05/26/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               06/05/2006 06/09/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               06/19/2006 06/23/2006 Baseline Inspections PS2-EP         - EP INSP                                                                                             1 1             IP 7111402               Alert and Notification System Testing                                                           07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111403               Emergency Response Organization Augmentation Testing                                           07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111404               Emergency Action Level and Emergency Plan Changes                                               07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                               07/31/2006 08/04/2006 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                             07/31/2006 08/04/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                   2 1              IP 7111111B              Licensed Operator Requalification Program                                                      08/21/2006 08/25/2006 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                                       2 1              IP 7112101              Access Control to Radiologically Significant Areas                                              10/09/2006 10/13/2006 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                                    10/09/2006 10/13/2006 Baseline Inspections EB3-ISI       - INSERVICE INSPECTION                                                                                 1 1              IP 7111108P              Inservice Inspection Activities - PWR                                                          10/16/2006 10/20/2006 Baseline Inspections EB3TI150       - 2515/150 RPV & VHP NOZZLE                                                                           1 1             IP 2515/150             Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA             10/16/2006 10/19/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI                                                                           1 1             IP 71111                 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity                         11/05/2006 11/10/2006 Baseline Inspections TFP           - TFP INFO TRIP                                                                                       4 1              IP 7111105T              Fire Protection [Triennial]                                                                    02/27/2007 03/01/2007 Baseline Inspections TFP            - TRIENNIAL FIRE PROTECTION                                                                            4 1             IP 7111105T             Fire Protection [Triennial]                                                                     03/19/2007 03/23/2007 Baseline Inspections 1             IP 7111105T             Fire Protection [Triennial]                                                                     04/02/2007 04/06/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                   3 1                V23249                SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES                                                  05/14/2007 05/18/2007 Not Applicable OL EXAM        - INITIAL EXAM                                                                                        3 1                 V23249               SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES                                                   06/04/2007 06/08/2007 Not Applicable This report does not include INPO and OUTAGE activities.
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:48:05 Report 22 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/13/2006 03/17/2006 1     71152B IP Identification and Resolution of Problems Baseline Inspections 03/27/2006 03/31/2006 1    71152B IP Identification and Resolution of Problems 5 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/08/2006 05/12/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 05/22/2006 05/26/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 06/05/2006 06/09/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 06/19/2006 06/23/2006 1    7111121 IP Component Design Bases Inspection 1 PS2-EP-EP INSP Baseline Inspections 07/31/2006 08/04/2006 1     7111402 IP A lert and Notification System Testing Baseline Inspections 07/31/2006 08/04/2006 1     7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/31/2006 08/04/2006 1     7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/31/2006 08/04/2006 1     7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/31/2006 08/04/2006 1     71151 IP Performance Indicator Verification 2 OL RQ-REQUAL INSPECTION Baseline Inspections 08/21/2006 08/25/2006 1    7111111B IP Licensed Operator Requalification Program 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 10/09/2006 10/13/2006 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/09/2006 10/13/2006 1    7112102 IP A LARA Planning and Controls 1 EB3-ISI-INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1    7111108P IP Inservice Inspection Activities - PWR 1 EB3TI150-2515/150 RPV & VHP NOZZLE Safety Issues 10/16/2006 10/19/2006 1     2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI Baseline Inspections 11/05/2006 11/10/2006 1     71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 4 TFP-TFP INFO TRIP Baseline Inspections 02/27/2007 03/01/2007 1     7111105T IP Fire Protection [Triennial]
4 TFP-TRIENNIAL FIRE PROTECTION Baseline Inspections 03/19/2007 03/23/2007 1     7111105T IP Fire Protection [Triennial]
Baseline Inspections 04/02/2007 04/06/2007 1    7111105T IP Fire Protection [Triennial]
3 OL PREP-INITIAL EXAM PREP Not Applicable 05/14/2007 05/18/2007 1     V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM Not Applicable 06/04/2007 06/08/2007 1    V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Summer Inspection / Activity Plan 03/01/2006
Enclosure
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:48:05 Report 22 1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 06/25/2007 06/29/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas 1 EB3-HS-HEAT SINK Baseline Inspections 07/23/2007 07/27/2007 1    7111107B IP Heat Sink Performance 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 07/23/2007 07/27/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/23/2007 07/27/2007 1     7112102 IP A LARA Planning and Controls Baseline Inspections 07/23/2007 07/27/2007 1     7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 07/23/2007 07/27/2007 1     71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
 
Page 2 of 2                                                                                    Summer 03/02/2006    11:48:05                                                                Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type PSB1-RP       - RP OCCUPATIONAL PRE-INSP VISIT                                                             1 1              IP 7112101              Access Control to Radiologically Significant Areas                                    06/25/2007 06/29/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                 1 1              IP 7111107B              Heat Sink Performance                                                                07/23/2007 07/27/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                             3 1             IP 7112101               Access Control to Radiologically Significant Areas                                   07/23/2007 07/27/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                           07/23/2007 07/27/2007 Baseline Inspections 1             IP 7112202               Radioactive Material Processing and Transportation                                   07/23/2007 07/27/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                   07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 21:38, 23 November 2019

Inspection / Activity Plan, 03/01/2006 - 09/30/2007
ML060610412
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB5
To:
Shared Package
ML060610408 List:
References
IR-06-001
Download: ML060610412 (2)


Text

Page 1 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 03/13/2006 03/17/2006 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/27/2006 03/31/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1 IP 7111121 Component Design Bases Inspection 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 05/22/2006 05/26/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/19/2006 06/23/2006 Baseline Inspections PS2-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/31/2006 08/04/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 08/21/2006 08/25/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 1 IP 7112101 Access Control to Radiologically Significant Areas 10/09/2006 10/13/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/09/2006 10/13/2006 Baseline Inspections EB3-ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3TI150 - 2515/150 RPV & VHP NOZZLE 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/16/2006 10/19/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/05/2006 11/10/2006 Baseline Inspections TFP - TFP INFO TRIP 4 1 IP 7111105T Fire Protection [Triennial] 02/27/2007 03/01/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION 4 1 IP 7111105T Fire Protection [Triennial] 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 04/02/2007 04/06/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 05/14/2007 05/18/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 06/04/2007 06/08/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/29/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 07/23/2007 07/27/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 3 1 IP 7112101 Access Control to Radiologically Significant Areas 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 07/23/2007 07/27/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.