Line 3: Line 3:
| issue date = 08/15/2006
| issue date = 08/15/2006
| title = IR 05000271/2006-008; 07/10/2006 - 07/14/2006; Vermont Yankee Nuclear Power Station; Physical Protection
| title = IR 05000271/2006-008; 07/10/2006 - 07/14/2006; Vermont Yankee Nuclear Power Station; Physical Protection
| author name = Lorson R K
| author name = Lorson R
| author affiliation = NRC/RGN-I/DRS/PSB1
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Sullivan T A
| addressee name = Sullivan T
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000271
| docket = 05000271
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ust 15, 2006
[[Issue date::August 15, 2006]]


Enclosure Contains Safeguards Information.When Separated from enclosure, thisdocument is not Safeguards Information. Mr. Theodore A. SullivanSite Vice President Entergy Nuclear Operations, Inc.
==SUBJECT:==
VERMONT YANKEE NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000271/2006008


Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
==Dear Mr. Sullivan:==
On July 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Vermont Yankee Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on July 14, 2006, with Mr. Edward Harms, Assistant Operations Manager, and other members of your staff.


SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC PHYSICALSECURITY BASELINE INSPECTION REPORT NO. 05000271/2006008
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
==Dear Mr. Sullivan:==
On July 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Vermont Yankee Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor OversightProcess. The enclosed report documents the inspection results, which were discussed on July 14, 2006, with Mr. Edward Harms, Assistant Operations Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/__________ DATE:_08/15/06
Energy Act, Safeguards Information is subject NAME/TITLE: Raymond K. Lorson, Chief to civil and criminal penalties  ORGANIZATION: RI/DRS/PSB1 BASIS: DG-SG-1:_(300) Physical Protection Program SIGNATURE____/RA/__________ DATE:_08/15/06_ Mr. Theodore No findings of significance were identified.
_ Mr. Theodore A. Sullivan2 No findings of significance were identified.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.


Sincerely,/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-271License Nos.DPR-28
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


===Enclosure:===
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
NRC Inspection Report Nos. 05000271/2006008


===w/Attachment:===
Sincerely,
Supplemental Information(CONTAINS (SGI))cc w/encl w/SGI
/RA/
:P. Ryan, Security Manager C. McCombs, Director, Commonwealth of Massachusetts, SLO Designee K. Doutt, Assistant Director, State of New Hampshire, SLO Designee W. Sherman, State of Vermont, SLO Designee Mr. Theodore
Raymond K. Lorson, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-271 License Nos. DPR-28 Enclosure: NRC Inspection Report Nos. 05000271/2006008 w/Attachment: Supplemental Information (CONTAINS (SGI))
cc w/encl w/SGI:
P. Ryan, Security Manager C. McCombs, Director, Commonwealth of Massachusetts, SLO Designee K. Doutt, Assistant Director, State of New Hampshire, SLO Designee W. Sherman, State of Vermont, SLO Designee Mr. Theodore
}}
}}

Latest revision as of 16:00, 23 November 2019

IR 05000271/2006-008; 07/10/2006 - 07/14/2006; Vermont Yankee Nuclear Power Station; Physical Protection
ML062280010
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/15/2006
From: Ray Lorson
Plant Support Branch 1
To: Ted Sullivan
Entergy Nuclear Operations
References
IR-06-008
Download: ML062280010 (4)


Text

ust 15, 2006

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000271/2006008

Dear Mr. Sullivan:

On July 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Vermont Yankee Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on July 14, 2006, with Mr. Edward Harms, Assistant Operations Manager, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:

Energy Act, Safeguards Information is subject NAME/TITLE: Raymond K. Lorson, Chief to civil and criminal penalties ORGANIZATION: RI/DRS/PSB1 BASIS: DG-SG-1:_(300) Physical Protection Program SIGNATURE____/RA/__________ DATE:_08/15/06_ Mr. Theodore No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Raymond K. Lorson, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-271 License Nos. DPR-28 Enclosure: NRC Inspection Report Nos. 05000271/2006008 w/Attachment: Supplemental Information (CONTAINS (SGI))

cc w/encl w/SGI:

P. Ryan, Security Manager C. McCombs, Director, Commonwealth of Massachusetts, SLO Designee K. Doutt, Assistant Director, State of New Hampshire, SLO Designee W. Sherman, State of Vermont, SLO Designee Mr. Theodore