IR 05000271/2006010

From kanterella
Jump to navigation Jump to search
IR 05000271-06-010 on 09/18/06 - 09/20/06 for Vermont Yankee Nuclear Power Station; Ti 2515/268
ML063000379
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/26/2006
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Ted Sullivan
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee
References
IR-06-010
Download: ML063000379 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 26, 2006

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - NRC INSPECTION REPORT 05000271/2006010

Dear Mr. Sullivan:

On September 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Vermont Yankee Nuclear Power Station. The enclosed report documents the inspection results which were discussed on September 22, 2006, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related issues contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

WARNING: Violation of Section 147, Safeguards Safeguards information determination made by:

Information, of the Atomic Agency Act is subject Name/Title Barry C.Westreich, Chief to civil and criminal penalties. Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/

Date 5/12/06 T. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-271 License No. DPR-28 Enclosure: NRC Inspection Report 05000271/2006010 ( )

cc w/o encl:

W. Maguire, General Manager J. M. DeVincentis, Licensing Manager cc w/encl; w/SGI:

P. Ryan, Security Manager W. Sherman; State Liaison Officer (SLO) Designee, State of Vermont C. Reinfurt; Homeland Security Advisor, State of Vermont C. Pope; Homeland Security Advisor and SLO, State of New Hampshire J. Giarrusso; Massachusetts Emergency Management Agency (MEMA), Commonwealth of Massachusetts SLO Designee, and Security Advisor