ML22273A149

From kanterella
Jump to navigation Jump to search
Review of Decommissioning Funding Status 2022
ML22273A149
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/04/2022
From: Kimberly Conway
Division of Decommissioning, Uranium Recovery and Waste Programs
To: State S
Vermont Yankee
K. Conway, NMSS/DUWP 415-1335
References
Download: ML22273A149 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

October 4, 2022

Mr. Scott E. State, Chief Nuclear Officer Northstar Vermont Yankee, LLC Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION'S ANALYSIS OF NORTHSTAR VERMONT YANKEE, LLC'S DECOMMISSIONING FUNDING STATUS REPORT FOR THE VERMONT YANKEE NUCLEAR POWER STATION,

DOCKET NO. 50-271

Dear Scott State:

By letter dated March 23, 2022, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System (ADAMS] Accession No. ML22083A066) for the Vermont Yankee Nuclear Power Station (VYNPS).

The NRC has reviewed and analyzed the site-specific decommissioning cost estimate, as required in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(4)(i), and the amount(s) stated within the licensee's decommissioning trust fund, as of December 31, 2021,

for the above plant, as well as earnings assumptions. Based on the reported decommissioning trust balance, together with earnings credits specified under NRC regulations, the NRC has determined that as of December 31, 2021, Northstar Vermont Yankee, LLC (NorthStar), is providing a total amount of decommissioning funding assurance in the amount of $305,372,000 forVYNPS.

This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that NorthStar has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82, for VYNPS on December 31, 2021. A summary report completed by NRC staff reflecting decommissioning power reactor DFS is expected to be completed and made publicly available by the end of calendar year 2022.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS. ADAMS is accessible from the NRC website at https://www. nrc.gov/reading - rm / adams.html.

S. State - 2 -

If you have any questions, please call me at (301) 415-1335 or email me at Kimberly.Conway@nrc.gov.

Sincerely,

Signed by Conway, Kimberly on 10/04/22

Kim Conway, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards

Docket No. 50-271

License No. DPR-28

Cc:

Tom Silko, VYNPS Mr. Corey R. Daniels,VYNPS Mr. Billy Reid, Jr.

Vermont Yankee ListServ

Ms. June Tierney, Commissioner Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05602-2601 S. State - 3 -

SUBJECT : VERMONT YANKEE NUCLEAR - NRC'S ANALYSIS OF NORTHSTAR VERMONT YANKEE, LLC'S DECOMMISSIONING FUNDING STATUS REPORT FOR THE VERMONT YANKEE NUCLEAR POWER STATION (LICENSE DPR-28, DOCKET NO. 50-271) DATE October 4, 2022

DISTRIBUTION:

RTurtil, NMSS/REFS/FAB

ADAMS Accession No.: ML22273A149 Concurrence Case: 20220930-10011 *concur via e-Concurrence OFFICE NMSS/DUWP/RDB / PM NMSS/DUWP/RDB/BC NMSS/DUWP/RDB/PM NAME KConway SAnderson KConway DATE 09/30/2022 10/ 04/2022 10/04/2022 OFFIC IA L RECORD COPY