MONTHYEARIR 07200059/20184012018-11-20020 November 2018 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2018401 (Cover Letter Only - Public) ML1016502102010-06-14014 June 2010 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0806504492008-03-0505 March 2008 Notification of Inspection of the Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Using Temporary Instruction 2515/171 IR 05000271/20074022007-07-31031 July 2007 IR 05000271-07-402, on 07/09/2007 - 07/13/2007, Vermont Yankee Nuclear Power Station, Physical Protection IR 05000271/20072012007-06-11011 June 2007 Security Inspection 05000271/2007201 IR 05000271/20070082007-04-12012 April 2007 IR 05000271-07-008; 03/12/2007 - 03/29/2007; Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Triennial Fire Protection Team Inspection IR 05000271/20060042006-10-30030 October 2006 IR 05000271-06-004, on 07/01/2006 -09/30/2006, for Vermont Yankee, Event Followup IR 05000271/20060102006-10-26026 October 2006 IR 05000271-06-010 on 09/18/06 - 09/20/06 for Vermont Yankee Nuclear Power Station; Ti 2515/268 IR 05000271/20060082006-08-15015 August 2006 IR 05000271/2006-008; 07/10/2006 - 07/14/2006; Vermont Yankee Nuclear Power Station; Physical Protection IR 05000271/20050072005-07-11011 July 2005 IR 05000271-05-007; 05/23/2005-5/27/2005; Vermont Yankee Nuclear Power Station; Emergency Preparedness Exercise; Supplemental Inspection for the White Finding Associated with the Distribution and Maintenance of the Tone Alert Radios ML0500401312004-01-0404 January 2004 Letter to David O'Brien, Chairman, VT State Nuclear Advisory Panel 2018-11-20
[Table view] Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] |
Text
March 5, 2008 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station 600 Rocky Hill Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - NOTIFICATION OF INSPECTION OF THE IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES USING TEMPORARY INSTRUCTION 2515/171
Dear Mr. Sullivan:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct an inspection at Vermont Yankee Nuclear Power Station the week of April 7, 2008. The inspection team will be led by Mr. William Cook from the NRC Region I office. The team will be composed of the resident inspector, an NRR inspector/contractor, and the team leader. The inspection will be conducted in accordance with NRC Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 and 3 Mitigation Strategies.
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to the NRC team lead, resident inspector, and NRR inspector (one copy each) at least two weeks prior to the planned on site inspection.
Please have available on site at the beginning of the inspection the documents listed in . Mr. Wayne Limber, of your staff, has been advised of this request and other inspection team support needs, including the names and addresses of the inspectors assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
Mr. Theodore Sullivan 2 Your cooperation and support during this inspection will be appreciated. If you have any questions regarding this inspection, please contact Mr. Cook at (610)337-5074, or me at (610)337-5146.
Sincerely,
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-271 License No. DPR-28
Enclosures:
- 1. Documentation Requested Prior to the Inspection
- 2. Arrangements/Documents Requested to be Available Onsite During the Inspection Week
Mr. Theodore Sullivan 2 Your cooperation and support during this inspection will be appreciated. If you have any questions regarding this inspection, please contact Mr. Cook at (610)337-5074, or me at (610)337-5146.
Sincerely,
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-271 License No. DPR-28
Enclosures:
- 1. Documentation Requested Prior to the Inspection
- 2. Arrangements/Documents Requested to be Available Onsite During the Inspection Week SUNSI Review Complete: WAC (Reviewers Initials)
DOCUMENT NAME: G:\DRS\DIRECTOR\COOK\Vermont Yankee Request Letter for B5b info.doc ADAMS ACC#ML080650449 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRP NAME WCook/WAC JRogge/JFR RPowell/RP DATE 03/4/2008 03/5/2008 03/5/2008 OFFICIAL RECORD COPY
Mr. Theodore Sullivan 3 cc w/encl:
Vice President, Operations, Entergy Nuclear Operations Senior Vice President, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety & Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Manager, Licensing, Entergy Nuclear Operations G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon C. Pope, State of New Hampshire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw
Mr. Theodore Sullivan 4 Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS D. Lew, DRP J. Clifford, DRP R. Powell, DRP B. Norris, DRP N. Sieller, DRP G. West, RI OEDO (Acting)
M. Kowal, NRR J. Lubinski, NRR J. Kim, PM, NRR J. Boska, Backup PM, NRR J. Rogge, DRS W. Cook, DRS R. Fernandes, SRI B. Sienel, DRP, Resident Inspector A. Rancourt, DRP, Resident OA Region I Docket Room (with concurrences)
DOCUMENTATION REQUESTED PRIOR TO THE INSPECTION Please provide the items below two weeks prior to the onsite inspection week. For any items below not supplied prior to the onsite inspection week, please have the item available at the start of the onsite inspection. Please provide as much as possible in electronic format. You are reminded to properly identify and handle all Official Use Only-Security-Related Information and/or Proprietary Information in accordance with current guidance.
- 1. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be Extensive Damage Mitigation Guidelines (EDMGs), SAMGs, EOPs, AOPs, etc.
- 2. A matrix that shows the correlation between the mitigation strategies identified in NEI 06-12 and the site-specific procedures or guidelines that are used to implement the strategy.
- 3. Engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.
- 4. Simplified flow diagrams for systems relied upon in the mitigation strategies.
These diagrams could be the type used for training.
- 5. Simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.
Enclosure 1
ARRANGEMENTS/DOCUMENTS REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK
- 1. Provide a conference room to accommodate up to four (4) NRC staff. Preferably this would be outside the protected area.
- 2. Site B.5.b contact person(s) should be available for the week
- 3. B.5.b engineering persons(s) should be on call for questions about any engineering calculations.
- 4. Appropriate Operations staff should be available, as needed, for plant walkdowns throughout the week.
- 5. Modification packages for any plant modifications performed as a result of B.5.b.
- 6. Detailed drawings (e.g., P&IDs) of systems used to implement mitigating strategies.
- 7. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be Extensive Damage Mitigation Guidelines (EDMGs), SAMGs, EOPs, AOPs, etc. This is the same as Item 1 to Enclosure 1, except that hard copies of these procedures/guidelines should be made available for each member of the inspection team.
- 8. Copies of procedures used to inventory equipment used in the mitigation strategies (e.g., hoses, fittings, pumps, etc.).
- 9. Training records/ training matrix/ lesson plans related to B.5.b.
- 10. Copies of Memoranda of Understanding (MOUs) with local fire departments or other emergency services that are required to implement any mitigating strategies.
- 11. Copies of any evaluations performed to document that enough equipment is available to implement the mitigating strategies (e.g., enough fire hose or electrical cable is available based on a plant walkdown or review of drawings).
- 12. You are reminded to properly identify and handle all Official Use Only - Security-Related Information and/or Proprietary Information in accordance with current guidance.
Enclosure 2