{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Britt T. McKinney Senior Vice President, and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard - NUCSB3 Berwick, PA 18603-0467 | ||
ADAMS is | |||
==SUBJECT:== | |||
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | |||
-337-5186 | SUSQUEHANNA STEAM ELECTRIC STATION | ||
==Dear Mr. McKinney:== | |||
On August 7, 2006, the NRC staff completed its performance review of Susquehanna Steam Electric Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | |||
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan. | |||
Plant performance for the most recent quarter at Susquehanna Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an inspection associated with power uprate activities. | |||
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. | |||
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
B. McKinney 2 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5186 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA/ | |||
James M. Trapp, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-387; 50-388 License Nos. NPF-14, NPF-22 | |||
==Enclosure:== | |||
Susquehanna Inspection/ Activity Plan cc w/encl: | |||
R. A. Saccone, Vice President - Nuclear Operations A. J. Wrape, III, General Manager- Performance Improvement and Oversight T. L. Harpster, General Manager - Plant Support R. D. Pagodin, General Manager - Nuclear Engineering R. R. Sgarro, Manager - Nuclear Regulatory Affairs W. E. Morrissey, Supervisor, Nuclear Regulatory Affairs M. H. Crowthers, Supervising Engineer, Nuclear Regulatory Affairs S. Cook, Manager - Quality Assurance L. A. Ramos, Community Relations Manager, Susquehanna B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation Supervisor - Document Control Services R. W. Osborne, Allegheny Electric Cooperative, Inc. | |||
Director - Bureau of Radiation Protection, PA Department of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee | |||
B. McKinney 2 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the chang e as soo n as pos sible. Please co ntact m e at 610-337-5 186 with any questions you m ay have regarding this letter or the inspection plan. | |||
Sin cerely, | |||
/RA/ | |||
Jam es M . Trapp, Ch ief Reactor Projects Branch 4 Division of R eac tor Projec ts Docket Nos. 50-387; 50-388 License Nos. NPF-14, NPF-22 | |||
==Enclosure:== | ==Enclosure:== | ||
Susquehanna Inspection/ Activity Plan Distribution w/e ncl: (via E-m ail) T. Colburn, PM (backup), NRR S. Collins, RA Region I Docket Room (with concurrences) | |||
M. Dapas, DRA D. Screnci, PAO J. Trapp, DRP N. Sheenhan, PAO C. Khan, DRP DRS D irector A. Blamey, DRP - SRI Susquehanna DRS D eputy Director F. Jaxheimer, DRP - RI Susquehanna DR S Branc h Chiefs S. Farrell, DRP - Susquehanna OA RidsNrrDiplipb@nrs.gov B. Sosa, RI OEDO Institute of Nuclear Power Organization (INPO) | |||
R. Laufer, NRR R. Guzman, PM, NRR SUN SI Rev iew C om plete: CBK (Re view ers In itials) | |||
DO CU ME NT NA ME : S:\ROP 7 M id Cycle Review\2006 ROP7 Mid-Cycle Letters\SUS 2006 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public. | |||
To receive a co py of this do cum ent, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP E NAME ABlamey/CBK CKhan JTrapp DATE 08/28/06 08/28/06 08/28 /06 OFFICIAL RECORD COPY | |||
Page 1 of 2 Susquehanna 08/31/2006 11:44:28 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI 2 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 05/01/2006 07/15/2006 Other Routine 60855 - OPERATION OF AN ISFSI 3 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 06/12/2006 08/30/2006 Other Routine 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/14/2006 08/18/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & PI VERIFICATION 4 1, 2 IP 7111401 Exercise Evaluation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections TI-169 - TI: MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 10/30/2006 11/10/2006 Safety Issues 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/27/2006 12/01/2006 Baseline Inspections P UPRATE - POWER UPRATE FOR UNIT 2 3 2 IP 71004 Power Uprate 01/01/2007 03/31/2007 Other Routine 71114 - EP PRGM INSP 2 1, 2 IP 7111402 Alert and Notification System Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections 7111107 - HEAT SINK INSP 2 1, 2 IP 7111107B Heat Sink Performance 03/05/2007 03/09/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 03/12/2007 03/16/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 03/12/2007 03/16/2007 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/12/2007 03/16/2007 Baseline Inspections 7111108G - IN SERVICE INSPECTION 2 2 IP 7111108G Inservice Inspection Activities - BWR 03/19/2007 03/23/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/07/2007 05/11/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
-03/31/2008 | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Susquehanna Inspection / Activity Plan 07/01/2006 | |||
-03/31/2008 | Page 2 of 2 Susquehanna 08/31/2006 11:44:28 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/07/2007 05/11/2007 Baseline Inspections 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 6 1 IP 7111121 Component Design Bases Inspection 05/21/2007 05/25/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/04/2007 06/08/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/18/2007 06/22/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/18/2007 06/22/2007 Baseline Inspections 7111111B - L.O. REQUAL. PROG. + P/F REVIEW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 09/25/2007 09/29/2007 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 10/02/2007 10/06/2007 Baseline Inspections 12/10+EX - OPERATOR LICENSING INITIAL EXAMS 4 1 U01629 SUSQUEHANNA UNIT 1 & 2 INITIAL EXAM (FY08) 11/12/2007 11/16/2007 Not Applicable 1 U01629 SUSQUEHANNA UNIT 1 & 2 INITIAL EXAM (FY08) 12/10/2007 12/21/2007 Not Applicable 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/26/2007 11/30/2007 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 01/14/2008 01/18/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 01/28/2008 02/01/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/11/2008 02/15/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} |
Latest revision as of 15:32, 23 November 2019
ML062430525 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 08/31/2006 |
From: | James Trapp Reactor Projects Region 1 Branch 4 |
To: | Mckinney B Susquehanna |
Trapp J | |
References | |
Download: ML062430525 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Britt T. McKinney Senior Vice President, and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard - NUCSB3 Berwick, PA 18603-0467
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SUSQUEHANNA STEAM ELECTRIC STATION
Dear Mr. McKinney:
On August 7, 2006, the NRC staff completed its performance review of Susquehanna Steam Electric Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Susquehanna Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an inspection associated with power uprate activities.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
B. McKinney 2 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5186 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
James M. Trapp, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-387; 50-388 License Nos. NPF-14, NPF-22
Enclosure:
Susquehanna Inspection/ Activity Plan cc w/encl:
R. A. Saccone, Vice President - Nuclear Operations A. J. Wrape, III, General Manager- Performance Improvement and Oversight T. L. Harpster, General Manager - Plant Support R. D. Pagodin, General Manager - Nuclear Engineering R. R. Sgarro, Manager - Nuclear Regulatory Affairs W. E. Morrissey, Supervisor, Nuclear Regulatory Affairs M. H. Crowthers, Supervising Engineer, Nuclear Regulatory Affairs S. Cook, Manager - Quality Assurance L. A. Ramos, Community Relations Manager, Susquehanna B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation Supervisor - Document Control Services R. W. Osborne, Allegheny Electric Cooperative, Inc.
Director - Bureau of Radiation Protection, PA Department of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee
B. McKinney 2 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the chang e as soo n as pos sible. Please co ntact m e at 610-337-5 186 with any questions you m ay have regarding this letter or the inspection plan.
Sin cerely,
/RA/
Jam es M . Trapp, Ch ief Reactor Projects Branch 4 Division of R eac tor Projec ts Docket Nos. 50-387; 50-388 License Nos. NPF-14, NPF-22
Enclosure:
Susquehanna Inspection/ Activity Plan Distribution w/e ncl: (via E-m ail) T. Colburn, PM (backup), NRR S. Collins, RA Region I Docket Room (with concurrences)
M. Dapas, DRA D. Screnci, PAO J. Trapp, DRP N. Sheenhan, PAO C. Khan, DRP DRS D irector A. Blamey, DRP - SRI Susquehanna DRS D eputy Director F. Jaxheimer, DRP - RI Susquehanna DR S Branc h Chiefs S. Farrell, DRP - Susquehanna OA RidsNrrDiplipb@nrs.gov B. Sosa, RI OEDO Institute of Nuclear Power Organization (INPO)
R. Laufer, NRR R. Guzman, PM, NRR SUN SI Rev iew C om plete: CBK (Re view ers In itials)
DO CU ME NT NA ME : S:\ROP 7 M id Cycle Review\2006 ROP7 Mid-Cycle Letters\SUS 2006 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a co py of this do cum ent, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP E NAME ABlamey/CBK CKhan JTrapp DATE 08/28/06 08/28/06 08/28 /06 OFFICIAL RECORD COPY
Page 1 of 2 Susquehanna 08/31/2006 11:44:28 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI 2 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 05/01/2006 07/15/2006 Other Routine 60855 - OPERATION OF AN ISFSI 3 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 06/12/2006 08/30/2006 Other Routine 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/14/2006 08/18/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/14/2006 08/18/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & PI VERIFICATION 4 1, 2 IP 7111401 Exercise Evaluation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections TI-169 - TI: MSPI VERIFICATION 1 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 10/30/2006 11/10/2006 Safety Issues 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 11/27/2006 12/01/2006 Baseline Inspections P UPRATE - POWER UPRATE FOR UNIT 2 3 2 IP 71004 Power Uprate 01/01/2007 03/31/2007 Other Routine 71114 - EP PRGM INSP 2 1, 2 IP 7111402 Alert and Notification System Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections 7111107 - HEAT SINK INSP 2 1, 2 IP 7111107B Heat Sink Performance 03/05/2007 03/09/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 2 IP 7112101 Access Control to Radiologically Significant Areas 03/12/2007 03/16/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 03/12/2007 03/16/2007 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/12/2007 03/16/2007 Baseline Inspections 7111108G - IN SERVICE INSPECTION 2 2 IP 7111108G Inservice Inspection Activities - BWR 03/19/2007 03/23/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/07/2007 05/11/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Susquehanna 08/31/2006 11:44:28 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/07/2007 05/11/2007 Baseline Inspections 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 6 1 IP 7111121 Component Design Bases Inspection 05/21/2007 05/25/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/04/2007 06/08/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/18/2007 06/22/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/18/2007 06/22/2007 Baseline Inspections 7111111B - L.O. REQUAL. PROG. + P/F REVIEW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 09/25/2007 09/29/2007 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 10/02/2007 10/06/2007 Baseline Inspections 12/10+EX - OPERATOR LICENSING INITIAL EXAMS 4 1 U01629 SUSQUEHANNA UNIT 1 & 2 INITIAL EXAM (FY08) 11/12/2007 11/16/2007 Not Applicable 1 U01629 SUSQUEHANNA UNIT 1 & 2 INITIAL EXAM (FY08) 12/10/2007 12/21/2007 Not Applicable 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/26/2007 11/30/2007 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 01/14/2008 01/18/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 01/28/2008 02/01/2008 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/11/2008 02/15/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.