{{#Wiki_filter: | {{#Wiki_filter: (2) Technical Specifications and Environmental Protection. Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. | ||
Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.APS shall operate the facility in accordance with the Technical Specifications and the Environmental. | APS shall operate the facility in accordance with the Technical Specifications and the Environmental. Protection Plan, except where otherwise stated in specific license conditions. | ||
Protection Plan, except where otherwise stated in specific license conditions. | (3) Antitrust Conditions This license is subject to the antitrust conditions delineated iri Appendix C to this license. | ||
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated iri Appendix C to this license.(4) OperatinaqStaff Experience Requirements Deleted (5) Post-Fuel-Loadinq Initial Test Pro-gram (Section 14, SER and SSER 2)'Deleted (6) Environmental Qualification Deleted (7) Fire Protection Progiram APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision: | (4) OperatinaqStaff Experience Requirements Deleted (5) Post-Fuel-Loadinq Initial Test Pro-gram (Section 14, SER and SSER 2)' | ||
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the* ability to achieve and maintain safe shutdown in the event of a fire.(8) Emerqency Preparedness Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | Deleted (6) Environmental Qualification Deleted (7) Fire Protection Progiram APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision: | ||
Amendment No. 164 | APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the*ability to achieve and maintain safe shutdown in the event of a fire. | ||
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.(4) Operating Staff Experience Requirements (Section 13.1.2, SSER 9)" Deleted (5) Initial Test Program (Section 14, SER and SSER 2)Deleted (6) Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision: | (8) Emerqency Preparedness Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | ||
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.(7) Inservice Inspection Program (Sections 5.2.4 and 6.6. SER and SSER Deleted (8) Supplement No. 1 to NUREG-0737 Requirements Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | Amendment No. 164 | ||
Amendment No. 164 | |||
' | (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised throughAmendment No.164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. | ||
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.(4) Initial Test Program (Section 14, SER and SSER 2)Deleted-(5) Additional Conditions Deleted D. APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. | APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions. | ||
E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | (3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license. | ||
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Amendment No. 164 Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS)3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with: a. Pressurizer water level | (4) Operating Staff Experience Requirements (Section 13.1.2, SSER 9)" | ||
MODES 1, 2, and 3.-NOTE ---------------------------- | Deleted (5) Initial Test Program (Section 14, SER and SSER 2) | ||
The pressurizer water level limit does not apply during: a | Deleted (6) Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision: | ||
PALO VERDE UNITS 1,2,3 3.4.9-1 AMENDMENT NO. 4-1-7,164 AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME*A. (continued). | APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. | ||
A.3 Restore required 72 hours offsite circuit to OPERABLE status. AND 13 days from discovery of failure to meet LCO | (7) Inservice Inspection Program (Sections 5.2.4 and 6.6. SER and SSER Deleted (8) Supplement No. 1 to NUREG-0737 Requirements Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | ||
B.1 Perform SR 3.8.1 for the OPERABLE required offsite circuit(s). | Amendment No. 164 | ||
AND B.3.1 Determine OPERABLE DG is not inoperable due to common cause failure.1 | ' (1) Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3876 megawatts thermal (100% power) through operating cycle 13, and 3990 megawatts thermal (100% oWer) after operating cycle 13, in accordance with the conditiins specified herein. | ||
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where Otherwise stated in specific license conditions. | |||
B.4 Restore DG | (3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license. | ||
inoperability of redundant required feature(s) | (4) Initial Test Program (Section 14, SER and SSER 2) | ||
AND C.2 Restore one required 24 hours offsite-circuit to OPERABLE status.(continued) | Deleted-(5) Additional Conditions Deleted D. APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12. | ||
With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission. | |||
CONDITION REQUIRED ACTION COMPLETION TIME D. One or more DGs with D.1 Restore stored fuel 30 days new fuel oil properties oil properties to not within limits. within limits.E. One or more DGs with a E.1 Restore starting air 48 hours required starting air receiver pressure to receiver pressure _ 230-psig.< 230 psig and _ 185 psig.F. Required Action and F.1 Declare as'sociated DG Immediately associated Completion inoperable. | E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Amendment No. 164 | ||
Time not met.OR-----NOTE------ | |||
Should the required starting air receiver pressure momentarily drop to <185 psig While starting the DG on one air receiver only, then entry into Condition F is not required.One or more DGs with diesel fuel oil, lube oil, or starting air subsystem inoperable for reasons other than Condition A, B, C, D, or E.PALO VERDE UNITS 1,2,3 3.8.3-2 AMENDMENT NO. 164 Diesel. Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVE I LLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 31 days> 80% indicated fuel level.SR 3.8.3.2 Verify lubricating oil inventory is 31 days> 2.5 inches visible in the sightglass. | Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with: | ||
SR 3.8.3.3 Verify fuel oil properties of new and In accordance stored fuel oil are tested in accordance with the Diesel with, and maintained within the limits of, Fuel Oil the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each DG starting air receiver 31 days pressure is _> 230 psig.SR 3.8.3.5 Check for and remove accumulated water from 92 days each fuel oil storage tank.PALO VERDE UNITS 1,2,3 3.8.3-3 AMENDMENT NO. 44-ý, 164}} | : a. Pressurizer water level Ž 27% and | ||
* 56%; and | |||
: b. Two groups of pressurizer heaters OPERABLE with the capacity of each group Ž 125 kW. | |||
I APPLICABILITY: MODES 1, 2, and 3. | |||
-NOTE ---------------------------- | |||
The pressurizer water level limit does not apply during: | |||
: a. THERMAL POWER ramp > 5% RTP per minute; or | |||
: b. THERMAL POWER step > 10% RTP. | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer water A.1 Be in MODE 3 6 hours level not within with reactor limit. trip breakers open. | |||
AND A.2 Be in MODE 4. 12 hours B. One required group of B.1 Restore required 72 hours pressurizer heaters group of pressurizer inoperable, heaters to OPERABLE status. | |||
(continued) | |||
PALO VERDE UNITS 1,2,3 3.4.9-1 AMENDMENT NO. 4-1-7,164 | |||
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME | |||
*A. (continued). A.3 Restore required 72 hours offsite circuit to OPERABLE status. AND 13 days from discovery of I | |||
failure to meet LCO B. One DG inoperable. B.1 Perform SR 3.8.1 1 1 hour for the OPERABLE required offsite AND circuit(s). | |||
Once per 8 hours thereafter AND B.2 Declare required 4 hours from feature(s) supported discovery of by the inoperable DG Condition B inoperable when its concurrent with redundant required inoperability of feature(s) is redundant inoperable. required feature(s) | |||
AND B.3.1 Determine OPERABLE 24 hours DG is not inoperable due to common cause failure. | |||
OR B.3.2 Perform SR 3.8.1.2 24 hours for OPERABLE DG. | |||
AND (continued) | |||
PALO VERDE UNITS 1,2,3 3.8.1-2 AMENDMENT NO. 164 | |||
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.4 Restore DG to OPERABLE status. | |||
10 Days I AND 13 days from discovery of failure to meet LCO C. Two required offsite C.1 Declare required .12 hours from circuits inoperable, feature(s) inoperable discovery of when its redundant Condition C required feature(s) concurrent with is inoperable. inoperability of redundant required feature(s) | |||
AND C.2 Restore one required 24 hours offsite-circuit to OPERABLE status. | |||
(continued) | |||
PALO VERDE UNITS 1,2,3 3.8.1-3 AMENDMENT NO. 14-ý,164 | |||
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued) | |||
CONDITION REQUIRED ACTION COMPLETION TIME D. One or more DGs with D.1 Restore stored fuel 30 days new fuel oil properties oil properties to not within limits. within limits. | |||
E. One or more DGs with a E.1 Restore starting air 48 hours required starting air receiver pressure to receiver pressure _ 230-psig. | |||
< 230 psig and _ 185 psig. | |||
F. Required Action and F.1 Declare as'sociated DG Immediately associated Completion inoperable. | |||
Time not met. | |||
OR | |||
----- NOTE------ | |||
Should the required starting air receiver pressure momentarily drop to <185 psig While starting the DG on one air receiver only, then entry into Condition F is not required. | |||
One or more DGs with diesel fuel oil, lube oil, or starting air subsystem inoperable for reasons other than Condition A, B, C, D, or E. | |||
PALO VERDE UNITS 1,2,3 3.8.3-2 AMENDMENT NO. 164 | |||
Diesel. Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVE I LLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 31 days | |||
> 80% indicated fuel level. | |||
SR 3.8.3.2 Verify lubricating oil inventory is 31 days | |||
> 2.5 inches visible in the sightglass. | |||
SR 3.8.3.3 Verify fuel oil properties of new and In accordance stored fuel oil are tested in accordance with the Diesel with, and maintained within the limits of, Fuel Oil the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each DG starting air receiver 31 days pressure is _>230 psig. | |||
SR 3.8.3.5 Check for and remove accumulated water from 92 days each fuel oil storage tank. | |||
PALO VERDE UNITS 1,2,3 3.8.3-3 AMENDMENT NO. 44-ý, 164}} |
Latest revision as of 11:37, 23 November 2019
ML063390530 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 12/05/2006 |
From: | NRC/NRR/ADRO/DORL/LPLIV |
To: | |
Fields M, NRR/DORL/LP4, 415-3062 | |
Shared Package | |
ML063350069 | List: |
References | |
TAC MC9425, TAC MC9426, TAC MC9427 | |
Download: ML063390530 (8) | |
Text
(2) Technical Specifications and Environmental Protection. Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental. Protection Plan, except where otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated iri Appendix C to this license.
(4) OperatinaqStaff Experience Requirements Deleted (5) Post-Fuel-Loadinq Initial Test Pro-gram (Section 14, SER and SSER 2)'
Deleted (6) Environmental Qualification Deleted (7) Fire Protection Progiram APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the*ability to achieve and maintain safe shutdown in the event of a fire.
(8) Emerqency Preparedness Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 164
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised throughAmendment No.164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.
(4) Operating Staff Experience Requirements (Section 13.1.2, SSER 9)"
Deleted (5) Initial Test Program (Section 14, SER and SSER 2)
Deleted (6) Fire Protection Program APS shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility, as supplemented and amended, and as approved in the SER through Supplement 11, subject to the following provision:
APS may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(7) Inservice Inspection Program (Sections 5.2.4 and 6.6. SER and SSER Deleted (8) Supplement No. 1 to NUREG-0737 Requirements Deleted The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 164
' (1) Maximum Power Level Arizona Public Service Company (APS) is authorized to operate the facility at reactor core power levels not in excess of 3876 megawatts thermal (100% power) through operating cycle 13, and 3990 megawatts thermal (100% oWer) after operating cycle 13, in accordance with the conditiins specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 164, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where Otherwise stated in specific license conditions.
(3) Antitrust Conditions This license is subject to the antitrust conditions delineated in Appendix C to this license.
(4) Initial Test Program (Section 14, SER and SSER 2)
Deleted-(5) Additional Conditions Deleted D. APS has previously been granted an exemption from Paragraph III.D.2(b)(ii) of Appendix J to 10 CFR Part 50. This exemption was previously granted in Facility Operating License NPF-65 pursuant to 10 CFR 50.12.
With the granting of this exemption, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. The licensees shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Palo Amendment No. 164
Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:
- a. Pressurizer water level Ž 27% and
- 56%; and
- b. Two groups of pressurizer heaters OPERABLE with the capacity of each group Ž 125 kW.
I APPLICABILITY: MODES 1, 2, and 3.
-NOTE ----------------------------
The pressurizer water level limit does not apply during:
- a. THERMAL POWER ramp > 5% RTP per minute; or
- b. THERMAL POWER step > 10% RTP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer water A.1 Be in MODE 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> level not within with reactor limit. trip breakers open.
AND A.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. One required group of B.1 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters group of pressurizer inoperable, heaters to OPERABLE status.
(continued)
PALO VERDE UNITS 1,2,3 3.4.9-1 AMENDMENT NO. 4-1-7,164
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
- A. (continued). A.3 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> offsite circuit to OPERABLE status. AND 13 days from discovery of I
failure to meet LCO B. One DG inoperable. B.1 Perform SR 3.8.1 1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for the OPERABLE required offsite AND circuit(s).
Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s) supported discovery of by the inoperable DG Condition B inoperable when its concurrent with redundant required inoperability of feature(s) is redundant inoperable. required feature(s)
AND B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DG is not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE DG.
AND (continued)
PALO VERDE UNITS 1,2,3 3.8.1-2 AMENDMENT NO. 164
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.4 Restore DG to OPERABLE status.
10 Days I AND 13 days from discovery of failure to meet LCO C. Two required offsite C.1 Declare required .12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from circuits inoperable, feature(s) inoperable discovery of when its redundant Condition C required feature(s) concurrent with is inoperable. inoperability of redundant required feature(s)
AND C.2 Restore one required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> offsite-circuit to OPERABLE status.
(continued)
PALO VERDE UNITS 1,2,3 3.8.1-3 AMENDMENT NO. 14-ý,164
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. One or more DGs with D.1 Restore stored fuel 30 days new fuel oil properties oil properties to not within limits. within limits.
E. One or more DGs with a E.1 Restore starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> required starting air receiver pressure to receiver pressure _ 230-psig.
< 230 psig and _ 185 psig.
F. Required Action and F.1 Declare as'sociated DG Immediately associated Completion inoperable.
Time not met.
NOTE------
Should the required starting air receiver pressure momentarily drop to <185 psig While starting the DG on one air receiver only, then entry into Condition F is not required.
One or more DGs with diesel fuel oil, lube oil, or starting air subsystem inoperable for reasons other than Condition A, B, C, D, or E.
PALO VERDE UNITS 1,2,3 3.8.3-2 AMENDMENT NO. 164
Diesel. Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVE I LLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains 31 days
> 80% indicated fuel level.
SR 3.8.3.2 Verify lubricating oil inventory is 31 days
> 2.5 inches visible in the sightglass.
SR 3.8.3.3 Verify fuel oil properties of new and In accordance stored fuel oil are tested in accordance with the Diesel with, and maintained within the limits of, Fuel Oil the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each DG starting air receiver 31 days pressure is _>230 psig.
SR 3.8.3.5 Check for and remove accumulated water from 92 days each fuel oil storage tank.
PALO VERDE UNITS 1,2,3 3.8.3-3 AMENDMENT NO. 44-ý, 164