ML070640415: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 27, 2007MEMORANDUM TO:Cynthia D. Pederson, Director Division of Reactor Safety
{{#Wiki_filter:March 27, 2007 MEMORANDUM TO: Cynthia D. Pederson, Director Division of Reactor Safety Region III FROM:                 Michael J. Case, Director     /RA by JGolder for/
 
Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Region IIIFROM:Michael J. Case, Director
/RA by JGolder for/
Division of Policy and Rulemaking
 
Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
FINAL RESPONSE TO QUAD CITIES NUCLEAR POWER STATION -TASK INTERFACE AGREEMENT (TIA) 2006-005 RE: APPENDIX R
FINAL RESPONSE TO QUAD CITIES NUCLEAR POWER STATION -
TASK INTERFACE AGREEMENT (TIA) 2006-005 RE: APPENDIX R DISPUTED VIOLATIONS (TAC NOS. MD3126 AND MD3127)
On September 28, 2006, the Region III Division of Reactor Safety requested assistance from the Office of Nuclear Reactor Regulation (NRR) to evaluate two contested violations from the Quad Cities Nuclear Power Station (QCNPS) triennial fire protection inspection. Specifically, Region III requested that NRR provide answers to the following questions:
With respect to Non-Cited Violation (NCV) 05000254(265)/2006002-01:
: 1. Can licensees perform a Title 10 of the Code of Federal Regulations (10 CFR)
Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in changing a previously approved alternate/dedicated Safe Shutdown system to a redundant system? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
: 2. If such evaluation processes can be utilized, what is the system design criteria which licensees must meet to rely upon these systems as redundant for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?
: 3. For boiling water reactors, what systems can licensees appropriately classify as preferred for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements? For those systems, has the NRC defined the design or functional requirements for systems to be classified as preferred?
: 4. With respect to the QCNPS NCV and licensee response, can the licensee classify the safe shutdown makeup pump as redundant to the reactor core isolation cooling system for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
: 5. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50 Appendix R, Section III.G.2 have merit and thereby warrant withdrawal of the NCV?


DISPUTED VIOLATIONS (TAC NOS. MD3126 AND MD3127)
With respect to NCV 05000254(265)/2006002-02:
On September 28, 2006, the Region III Division of Reactor Safety requested assistance from the Office of Nuclear Reactor Regulation (NRR) to evaluate two contested violations from the
: 6.     Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
 
: 7.     With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
Quad Cities Nuclear Power Station (QCNPS) trienni al fire protection inspection. Specifically, Region III requested that NRR provide answers to the following questions:
: 8.     With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?
With respect to Non-Cited Violation (NCV) 05000254(265)/2006002-01:1.Can licensees perform a Title 10 of the Code of Federal Regulations (10 CFR)Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire
The NRR staffs assessment is documented in the enclosed safety evaluation.
 
Docket Nos: 50-254 and 50-265
protection program changes which result in changing a previously approved
 
"alternate/dedicated" Safe Shutdown system to a "redundant" system?  If not, please identify what regulatory tool precludes the licensee from making such a
 
change and how we have communicated this expectation to licensees.2.If such evaluation processes can be utiliz ed, what is the system design criteria which licensees must meet to rely upon these systems as "redundant" for the
 
purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements? 3.For boiling water reactors, what system s can licensees appropriately classify as "preferred" for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?  For those systems, has the NRC defined the
 
design or functional requirements for systems to be classified as "preferred?" 4.With respect to the QCNPS NCV and licensee response, can the licensee classify the safe shutdown makeup pump as redundant to the reactor core
 
isolation cooling system for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2?5.With respect to the QCNPS NCV and licensee response, does the licensee's position asserting compliance with 10 CFR Part 50 Appendix R, Section III.G.2
 
have merit and thereby warrant withdrawal of the NCV?  With respect to NCV 05000254(265)/2006002-02:6.Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in
 
reliance on a multi-unit cross-tie capability for the purpose of meeting
 
10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what
 
regulatory tool precludes the licensee from making such a change and how we
 
have communicated this expectation to licensees.7.With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-
 
unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? 8.With respect to the QCNPS NCV and licensee response, does the licensee's position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby
 
warrant withdrawal of the NCV?
The NRR staff's assessment is documented in the enclosed safety evaluation.  
 
Docket Nos: 50-254 and 50-265


==Enclosure:==
==Enclosure:==
As stated CONTACTS:Sean E. Peters, DPRHolly D. Cruz, DPR301-415-1842301-415-1053 March 27,2007 With respect to NCV 05000254(265)/2006002-02:6.Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in
As stated CONTACTS: Sean E. Peters, DPR                          Holly D. Cruz, DPR 301-415-1842                            301-415-1053


reliance on a multi-unit cross-tie capability for the purpose of meeting
March 27,2007 With respect to NCV 05000254(265)/2006002-02:
 
: 6.      Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what
: 7.       With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
 
: 8.       With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?
regulatory tool precludes the licensee from making such a change and how we
The NRR staffs assessment is documented in the enclosed safety evaluation.
 
Docket Nos: 50-254 and 50-265
have communicated this expectation to licensees.7.With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-
 
unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? 8.With respect to the QCNPS NCV and licensee response, does the licensee's position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby
 
warrant withdrawal of the NCV?
The NRR staff's assessment is documented in the enclosed safety evaluation.  
 
Docket Nos: 50-254 and 50-265


==Enclosure:==
==Enclosure:==
As stated CONTACTS:Sean E. Peters, DPRHolly D. Cruz, DPR301-415-1842301-415-1053 DISTRIBUTION:RidsNrrAdroHollyCruzPUBLICPhilQuallsSusanUttal PSPB Reading FileDavidSolorio RidsNrrDprSunilWeerakkody RidsNrrDprPspbCorneliusHolden RidsNrrLADBaxleyRidsRgn1MailCenter RidsAcrsAcnwMailCenterRidsRgn2MailCenter RidsNrrPMSPetersRidsRgn3MailCenter RidsOgcMailCenter RidsRgn4MailCenter ADAMS ACCESSION NO: ML070640415OFFICEPSPB/PMPSPB/PMPSPB/LAEEEB/BCPSPB/BCOE/SCOGC/NLODPR/DNAMEHCruzSPetersDBaxleySWeerakkodySRosenbergDSolorioSUttalMCase DATE3/5/073/5/073/6/073/8/073/23/073/14/073/22/07 3/27/07             OFFICIAL RECORD COPY ENCLOSURE SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONDISPUTED APPENDIX R VIOLATIONS REGARDING QUAD CITIES NUCLEAR POWER STATION TASK INTERFACE AGREEMENT (TIA) 2006-005
As stated CONTACTS: Sean E. Peters, DPR                            Holly D. Cruz, DPR 301-415-1842                            301-415-1053 DISTRIBUTION:                   RidsNrrAdro                      HollyCruz PUBLIC                          PhilQualls                        SusanUttal PSPB Reading File                DavidSolorio RidsNrrDpr                      SunilWeerakkody RidsNrrDprPspb                  CorneliusHolden RidsNrrLADBaxley                RidsRgn1MailCenter RidsAcrsAcnwMailCenter          RidsRgn2MailCenter RidsNrrPMSPeters                RidsRgn3MailCenter RidsOgcMailCenter               RidsRgn4MailCenter ADAMS ACCESSION NO: ML070640415 OFFICE    PSPB/PM      PSPB/PM  PSPB/LA    EEEB/BC        PSPB/BC      OE/SC    OGC/NLO  DPR/D NAME      HCruz        SPeters  DBaxley    SWeerakkody    SRosenberg    DSolorio SUttal  MCase DATE      3/5/07      3/5/07    3/6/07      3/8/07        3/23/07        3/14/07 3/22/07 3/27/07 OFFICIAL RECORD COPY
 
==1.0  INTRODUCTION==
 
On July 31, 2006 (Agencywide Documents A ccess Management System (ADAMS) Accession No. ML062140118), the U.S. Nuclear Regulatory Commission (NRC) staff issued Inspection
 
Report 05000254(265)/2006002 for the Quad Cities Nuclear Power Station (QCNPS) 2006
 
triennial fire protection inspection. In this report, the NRC staff identified two non-cited
 
violations (NCVs) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R,"Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."  One
 
NCV involved the safe shutdown makeup pump (SSMP) and the other involved the residual
 
heat removal service water (RHRSW) system.
On August 31, 2006 (ADAMS Accession No. ML062560198), the licensee contested the two NCVs. Subsequently, on September 28, 2006 (ADAMS Accession No. ML062710539), the
 
NRC, Region III, Division of Reactor Safety requested assistance from the Office of Nuclear
 
Reactor Regulation (NRR) to evaluate the two contested violations from the QCNPS triennial
 
fire protection inspection.
 
==2.0  BACKGROUND==


The first finding, NCV 05000254(265)/2006002-01, involves the fact that the licensee credited the use of the dedicated SSMP for reactor coolant inventory makeup in lieu of ensuring that one
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DISPUTED APPENDIX R VIOLATIONS REGARDING QUAD CITIES NUCLEAR POWER STATION TASK INTERFACE AGREEMENT (TIA) 2006-005


of the redundant trains of reactor coolant inventory makeup water would remain free of fire
==1.0 INTRODUCTION==


damage. The NRC staff found this to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2.
On July 31, 2006 (Agencywide Documents Access Management System (ADAMS) Accession No. ML062140118), the U.S. Nuclear Regulatory Commission (NRC) staff issued Inspection Report 05000254(265)/2006002 for the Quad Cities Nuclear Power Station (QCNPS) 2006 triennial fire protection inspection. In this report, the NRC staff identified two non-cited violations (NCVs) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. One NCV involved the safe shutdown makeup pump (SSMP) and the other involved the residual heat removal service water (RHRSW) system.
With respect to the SSMP finding, the SSMP was originally installed as a dedicated shutdown system, and therefore, the system was required to meet the requirements in Appendix R, Section III.G.3. The licensee asserts that it has maintained compliance with
On August 31, 2006 (ADAMS Accession No. ML062560198), the licensee contested the two NCVs. Subsequently, on September 28, 2006 (ADAMS Accession No. ML062710539), the NRC, Region III, Division of Reactor Safety requested assistance from the Office of Nuclear Reactor Regulation (NRR) to evaluate the two contested violations from the QCNPS triennial fire protection inspection.


10 CFR Part 50, Appendix R, Section III.G.2 because the SSMP and reactor core isolation
==2.0 BACKGROUND==


cooling (RCIC) system are redundant. The licensee maintains that the SSMP and RCIC meet
The first finding, NCV 05000254(265)/2006002-01, involves the fact that the licensee credited the use of the dedicated SSMP for reactor coolant inventory makeup in lieu of ensuring that one of the redundant trains of reactor coolant inventory makeup water would remain free of fire damage. The NRC staff found this to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2.
With respect to the SSMP finding, the SSMP was originally installed as a dedicated shutdown system, and therefore, the system was required to meet the requirements in Appendix R, Section III.G.3. The licensee asserts that it has maintained compliance with 10 CFR Part 50, Appendix R, Section III.G.2 because the SSMP and reactor core isolation cooling (RCIC) system are redundant. The licensee maintains that the SSMP and RCIC meet the requirements to be considered redundant since they perform the same design functions.
However, the NRC Region III staff notes that the SSMP redundancy is limited to the inventory makeup function for a fire event. Since the SSMP would only be used for inventory makeup, plant safe shutdown would also require the use of other systems to perform the overall same system function as the RCIC system.
ENCLOSURE


the requirements to be considered redundant since they perform the same design functions.  
The second finding, NCV 05000254(265)/2006002-02, was also found to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2. In this violation, the NRC staff found that in the event of a severe fire, the licensee failed to ensure that one redundant train of the RHRSW system necessary to achieve and maintain hot shutdown conditions would be free of fire damage. Instead, the licensee credited the cross-tie of the RHRSW system train from the opposite unit for torus cooling during hot shutdown.
With respect to the RHRSW system finding, the licensee maintains that for multiple unit plants, systems shared between units may be credited as redundant for each unit. Accordingly, the licensee relies upon the opposite unit RHRSW system, through a locally-operated system cross-tie valve, for the purposes of meeting the 10 CFR Part 50, Appendix R, Section III.G.2 requirement to ensure that at least one redundant train of a system is available to support safe shutdown.
3.0 EVALUATION By this TIA, Region III requested answers to the following questions:
SSMP: NCV 05000254(265)/2006002-01:
: 1.      Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in changing a previously approved alternate/dedicated Safe Shutdown system to a redundant system? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
Yes. With respect to the structures, systems, and components (SSCs) described in the Updated Final Safety Analysis Report (UFSAR), licensees may make a change to the plant in accordance with 10 CFR 50.59. In addition, the licensee would also have to evaluate that change with respect to the fire protection program to determine that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. If the licensee makes the change in accordance with 10 CFR 50.59 and determines that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire, then the licensee may change their fire protection program without prior approval.
Precedent In its September 6, 2001, TIA 2001-05 response (ADAMS Accession No. ML012080008) to a question concerning change from a 10 CFR Part 50, Appendix R, Section III.G.2 fire area (redundant) to a III.G.3 (alternative or dedicated) fire area, the NRC staff stated:
Although, the licensee was licensed to operate after January 1, 1979, the requirements of 10 CFR Part 50, Appendix R, Section III.G.3, were incorporated into the approved fire protection program. In accordance with License Condition 2E, the licensee may change designation of a fire zone from 10 CFR Part 50, Appendix R, Section III.G.2, Separation Requirements, to 10 CFR Part 50, Appendix R, III.G.3, Alternative Shutdown, without prior approval, if a


However, the NRC Region III staff notes that the SSMP redundancy is limited to the inventory
licensee remains in compliance with the provisions of the specified requirements in 10 CFR Part 50, Appendix R, as set forth in the fire protection program. Fire protection program changes that adversely affect the ability of the plant to achieve safe shutdown, require prior NRC approval.
 
The cited precedent discusses a change from 10 CFR Part 50, Section III.G.2 compliance to 10 CFR Part 50, Appendix R, Section III.G.3 compliance for a plant licensed to operate after January 1, 1979. The precedent demonstrates that a licensee may make changes to their compliance strategy from one 10 CFR Part 50, Appendix R, Section III.G category to another.
makeup function for a fire event. Since t he SSMP would only be used for inventory makeup, plant safe shutdown would also require the use of other systems to perform the overall same system function as the RCIC system. The second finding, NCV 05000254(265)/2006002-02, was also found to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2. In this violation, the NRC staff found that in the
: 2. If such evaluation processes can be utilized, what is the system design criteria which licensees must meet to rely upon these systems as redundant for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?
 
event of a severe fire, the licensee failed to ensure that one redundant train of the RHRSW
 
system necessary to achieve and maintain hot shutdown conditions would be free of fire
 
damage. Instead, the licensee credited the cross-tie of the RHRSW system train from the
 
opposite unit for torus cooling during hot shutdown.
With respect to the RHRSW system finding, the licensee maintains that for multiple unit plants, systems shared between units may be credited as redundant for each unit. Accordingly, the
 
licensee relies upon the opposite unit RHRSW system , through a locally-operated system cross-tie valve, for the purposes of meeting the 10 CFR Part 50, Appendix R, Section III.G.2
 
requirement to ensure that at least one redundant train of a system is available to support safe
 
shutdown.3.0  EVALUATION By this TIA, Region III requested answers to the following questions:
 
SSMP:  NCV 05000254(265)/2006002-01:1.Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in changing a previously
 
approved "alternate/dedicated" Safe Shutdow n system to a "redundant" system?  If not, please identify what regulatory tool precludes the licensee from making such a change
 
and how we have communicated this expectation to licensees.
Yes. With respect to the structures, systems, and components (SSCs) described in the Updated Final Safety Analysis Report (UFSAR), licensees may make a change to the
 
plant in accordance with 10 CFR 50.59. In addition, the licensee would also have to
 
evaluate that change with respect to the fire protection program to determine that the
 
change does not adversely affect the ability to achieve and maintain safe shutdown in
 
the event of a fire. If the licensee makes the change in accordance with 10 CFR 50.59
 
and determines that the change does not adversely affect the ability to achieve and
 
maintain safe shutdown in the event of a fire, then the licensee may change their fire
 
protection program without prior approval.
 
Precedent In its September 6, 2001, TIA 2001-05 response (ADAMS Accession No. ML012080008)
 
to a question concerning change from a 10 CFR Part 50, Appendix R, Section III.G.2 fire
 
area ("redundant") to a III.G.3 ("alternative" or "dedicated") fire area, the NRC staff
 
stated:"Although, the licensee was licensed to operate after January 1, 1979, the requirements of 10 CFR Part 50, Appendix R, Section III.G.3, were incorporated
 
into the approved fire protection program. In accordance with License
 
Condition 2E, the licensee may change designation of a fire zone from 10 CFR
 
Part 50, Appendix R, Section III.G.2, Separation Requirements, to 10 CFR
 
Part 50, Appendix R, III.G.3, Alternative Shutdown, without prior approval, if a  licensee remains in compliance with the provisions of the specified requirements in 10 CFR Part 50, Appendix R, as set forth in the fire protection program. Fire
 
protection program changes that adversely affect the ability of the plant to
 
achieve safe shutdown, require prior NRC approval."
The cited precedent discusses a change from 10 CFR Part 50, Section III.G.2 compliance to 10 CFR Part 50, Appendix R, Section III.G.3 compliance for a plant
 
licensed to operate after January 1, 1979. The precedent demonstrates that a licensee
 
may make changes to their compliance strategy from one 10 CFR Part 50, Appendix R, Section III.G category to another.
 
2.If such evaluation processes can be utilized, what is the system design criteria which licensees must meet to rely upon these systems as "redundant" for the purposes of
 
meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?
The design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant.
The design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant.
The regulatory requirements classifying a system as "redundant" with respect to fire protection have been established in Appendix R. Regulatory guidance for when a
The regulatory requirements classifying a system as redundant with respect to fire protection have been established in Appendix R. Regulatory guidance for when a system is redundant for fire protection safe shutdown purposes was provided in Generic Letter (GL) 86-10 in the response to Question 3.8.3 which stated, in part:
If the system is being used to provide its design function, it generally is considered redundant. If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered an alternative shutdown capability.
With respect to the QCNPS NCV, the licensee originally installed the SSMP as a new system to provide dedicated shutdown system capability to comply with 10 CFR Part 50, Appendix R, Section III.G.3. This was consistent with the response to Question 3.8.3 and Footnote 1 in Appendix R, ...dedicated shutdown capability is provided by installing new structures and systems for the function of post-fire shutdown. However, at a later time the licensee reclassified the SSMP as redundant and asserted the SSMP meets III.G.2 requirements. In this case, the function of the SSMP system is for Appendix R safe shutdown and the SSMP system does not perform the same design function as the RCIC system. Therefore, the SSMP system is not redundant and the design function of the SSMP system should remain characterized as a Dedicated Shutdown system.
: 3. For boiling water reactors, what systems can licensees appropriately classify as preferred for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements? For those systems, has the NRC defined the design or functional requirements for systems to be classified as preferred?
As described below, the preferred system is a redundant system used to provide its design function; and it is also one of the two normal safe shutdown trains. The response to GL 86-10, Question 5.1.2 states in part, For the purposes of analysis to Section III.G.2 criteria, the safe shutdown capability is defined as one of the two normal safe


system is "redundant" for fire protection safe shutdown purposes was provided in
shutdown trains. If the criteria of Section III.G.2 are not met, an alternative shutdown capability is required.
 
Generic Letter (GL) 86-10 in the response to Question 3.8.3 which stated, in part:
"If the system is being used to provide its design function, it generally is considered redundant. If the system is being used in lieu of the preferred system
 
because the redundant components of the preferred system does not meet the
 
separation criteria of Section III.G.2, the system is considered an alternative
 
shutdown capability."
With respect to the QCNPS NCV, the licensee originally installed the SSMP as a new system to provide dedicated shutdown system capability to comply with 10 CFR Part 50, Appendix R, Section III.G.3. This was consistent with the response to Question 3.8.3
 
and Footnote 1 in Appendix R, "...
dedicated shutdown capability is provided by installingnew structures and systems for the function of post-fire shutdown".
However, at a later time the licensee reclassified the SSMP as "redundant" and asserted the SSMP meets
 
III.G.2 requirements. In this case, the function of the SSMP system is for Appendix R
 
safe shutdown and the SSMP system does not perform the same design function as the
 
RCIC system. Therefore, the SSMP system is not "redundant" and the design function
 
of the SSMP system should remain characte rized as a "Dedicated Shutdown" system.3.For boiling water reactors, what system s can licensees appropriately classify as "preferred" for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2
 
requirements?  For those systems, has the NRC defined the design or functional
 
requirements for systems to be classified as "preferred?"
As described below, the preferred system is a redundant system used to provide its design function; and it is also one of the two normal safe shutdown trains. The response
 
to GL 86-10, Question 5.1.2 states in part, "For the purposes of analysis to Section
 
III.G.2 criteria, the safe shutdown capability is defined as one of the two normal safe  shutdown trains. If the criteria of Section III.G.2 are not met, an alternative shutdown capability is required."
The following question pertains to regulatory guidance provided in GL 86-10, Question 3.8.3, which asks:
The following question pertains to regulatory guidance provided in GL 86-10, Question 3.8.3, which asks:
"3.8.3 Redundant Trains/Alternate Shutdown QUESTION: Confusion exists as to what will be classified as an alternate
3.8.3 Redundant Trains/Alternate Shutdown QUESTION: Confusion exists as to what will be classified as an alternate shutdown system and thus what systems might be required to be protected by suppression and detection under Section III.G.3.b....
 
RESPONSE: If the system is being used to provide its design function, it generally is considered redundant. If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered an alternative shutdown capability....
shutdown system and thus what system s might be required to be protected by suppression and detection under Section III.G.3.b....
As stated in the response to Question 2, the design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant. The system designs approved by the NRC staff will generally identify which systems are used to maintain plant conditions. In many cases, these systems are incorporated into technical specifications with mode restraint requirements.
RESPONSE: If the system is being used to provide its design function, it
: 4. With respect to the QCNPS NCV and the licensee response, can the licensee classify the SSMP as redundant to the RCIC system for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
 
No. With respect to the QCNPS NCV, the licensee has not demonstrated that the SSMP design function is the same as the RCIC system design function. As discussed in the response to Question 2, the design criteria for a redundant system is given in the plants design basis documents and the UFSAR.
generally is considered redundant. If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered
: 5. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2 have merit and thereby warrant withdrawal of the NCV?
 
No. The NCV should not be withdrawn because the licensee deviated from the regulatory requirements (Footnote to Appendix R defining dedicated systems for Alternate Shutdown capability) and regulatory guidance (Question 3.8.3 to GL 86-10).
an alternative shutdown capability...."
Although the 10 CFR 50.59 process used by the licensee may provide an approach to make a plant change to designate and credit a system as redundant (see responses to Questions 1 and 2), the licensee must also be able to demonstrate that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire, and the SSMP must be designated and shown to be one of the two normal safe shutdown trains (GL 86-10, Question 5.1.2 response).
As stated in the response to Question 2, the design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant. The system designs
The SSMP is not one of the two normal safe shutdown trains and, thus, is an alternative shutdown capability. In addition, the inspection report identified the concern with the fire
 
approved by the NRC staff will generally ident ify which systems are used to maintain plant conditions. In many cases, these systems are incorporated into technical
 
specifications with mode restraint requirements. 4.With respect to the QCNPS NCV and the licensee response, can the licensee classify the SSMP as redundant to the RCIC system for the purposes of meeting
 
10 CFR Part 50, Appendix R, Section III.G.2?
No. With respect to the QCNPS NCV, the licensee has not demonstrated that the SSMP design function is the same as the RCIC system design function. As discussed in the
 
response to Question 2, the design criteria for a redundant system is given in the plant's
 
design basis documents and the UFSAR. 5.With respect to the QCNPS NCV and licensee response, does the licensee's position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2 have merit and
 
thereby warrant withdrawal of the NCV?
No. The NCV should not be withdrawn because the licensee deviated from the regulatory requirements (Footnote to Appendix R defining "dedicated systems" for
 
Alternate Shutdown capability) and regulatory guidance (Question 3.8.3 to GL 86-10).
Although the 10 CFR 50.59 process used by the licensee may provide an approach to make a plant change to designate and credit a system as redundant (see responses to
 
Questions 1 and 2), the licensee must also be able to demonstrate that the change does
 
not adversely affect the ability to achieve and maintain safe shutdown in the event of a
 
fire, and the SSMP must be designated and shown to be one of the two normal safe
 
shutdown trains (GL 86-10, Question 5.1.2 response).
The SSMP is not one of the two normal safe shutdown trains and, thus, is an alternative shutdown capability. In addition, the inspection report identified the concern with the fire water system as the backup water source for reactor coolant inventory makeup for the SSMP. Although the licensee's August 31, 2006, response letter stated that it does not
 
consider the system difference (i.e., different backup water supply) to "substantially alter
 
the design function of the SSMP system,"
the letter did not fully address the system difference of the backup water supply, in that it did not address the lack of ability to
 
supply the SSMP from the suppression pool.
The acceptability of reliance on a system, other than the normal shutdown trains for the purpose of establishing compliance with 10 CFR Part 50, Appendix R, Section III.G.2, necessitates significant safety analysis and regulatory reviews. For example, after such
 
reviews, the NRC staff concluded that the use of safety relief valves and low pressure
 
systems as "redundant" post-fire safe shutdow n systems under the provisions of 10 CFR Part 50, Appendix R, was acceptable.  (Reference NRC letter to BWR Owners Group
 
dated December 12, 2000, ADAMS Accession No. ML003776828)
USE OF RHRSW SYSTEM CROSS-TIE BETWEEN UNITS
:  NCV 05000254(265)/2006002-02:6.Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit
 
cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?  If not, please identify what regulatory tool precludes the licensee from
 
making such a change and how we have communicated this expectation to licensees.
No. 10 CFR 50.48 states that "
Each operating nuclear power plant must have a fire protection plan that satisfies Criterion 3 of appendix A of this part" (emphasis added to
 
"each"). The regulations are applied to each nuclear power plant or unit, and in the case
 
of QCNPS each of the two units must individually comply with the regulations. With
 
respect to 10 CFR Part 50, Appendix R, Section III.G.2, the regulation states in part: 
"Except as provided for in paragraph G.3 of this section, where cables or equipment...of redundant trains of systems necessary to achieve and maintain
 
hot shutdown conditions are located within the same fire area outside of primary
 
containment, one of the following means of ensuring that one of the redundant
 
trains is free of fire damage shall be provided...."
Since the redundant trains of RHRSW system in one unit could be exposed to a single fire, the licensee is attempting to credit the non-fire affected unit's RHRSW system as
 
being redundant to the fire affected unit's RHRSW system and vice versa. This does not
 
satisfy the requirements of III.G.2 for a plant licensed to operate before January 1, 1979, because the redundant RHRSW system trains in the same unit are not free of fire
 
damage. The licensee's approach could be acceptable as an alternative shutdown method provided that the requirements of 10 CFR Part 50, Appendix R, Section III.G.3 and
 
Section III.L are met for plants licensed to operate before January 1, 1979. Plants
 
licensed to operate on or after January 1, 1979, must meet the requirements for
 
alternative shutdown as described in their approved fire protection program. For the
 
licensee's approach to be acceptable as an alternate shutdown method, there should be
 
assurance that during all modes and alignments on one unit, the RHRSW system is  available to support fire safe shutdown of the opposite unit. Technical specification or Technical Requirements addressing availability of the opposite unit's RHRSW system
 
should be in place to ensure that the RHRSW system is available.7.With respect to the QCNPS NCV and licensee response, for the RHRSW system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously
 
relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of
 
meeting 10 CFR Part 50, Appendix R, Section III.G.2?
No. In accordance with the answer to Question 6 above, neither unit at QCNPS can rely upon the multi-unit cross-tie capability to meet 10 CFR Part 50, Appendix R, Section III.G.2 unless an exemption request has been granted.      8.With respect to the QCNPS NCV and licensee response, does the licensee's position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance
 
upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the
 
NCV?No. The licensee contended that the systems shared between units are redundant because the systems perform their design functions. Although the systems may perform
 
their design function, 10 CFR Part 50, Appendix R applies to each unit individually as
 
discussed in the response to Question 6. Therefore, the use of components from one
 
unit to supply an adjacent, fire affected unit does not meet the requirement of 10 CFR
 
Part 50, Appendix R, Section III.G.2.
 
==4.0  CONCLUSION==
 
Redundant trains of equipment required for safe shutdown that are in the same fire area must be separated in accordance with 10 CFR Part 50, Appendix R, Section III.G.2 or they must meet
 
the requirements of 10 CFR Part 50, Appendix R, Section III.G.3. The condition of the operating
 
license allows fire protection program changes within the scope of "no adverse affect" on safe
 
shutdown capability so long as the regulatory requirements of 10 CFR 50.48, Criterion 3, and
 
applicable sections of 10 CFR Part 50, Appendix R are met. Changes to plant systems can be
 
made in accordance with 10 CFR 50.59. A change must comply with all of these requirements


or receive prior NRC staff approval.
water system as the backup water source for reactor coolant inventory makeup for the SSMP. Although the licensees August 31, 2006, response letter stated that it does not consider the system difference (i.e., different backup water supply) to substantially alter the design function of the SSMP system, the letter did not fully address the system difference of the backup water supply, in that it did not address the lack of ability to supply the SSMP from the suppression pool.
Each unit at QCNPS, licensed in 1972, must meet Section III.G.2 of 10 CFR Part 50, Appendix R, for their respective redundant trains or must satisfy the requirements of
The acceptability of reliance on a system, other than the normal shutdown trains for the purpose of establishing compliance with 10 CFR Part 50, Appendix R, Section III.G.2, necessitates significant safety analysis and regulatory reviews. For example, after such reviews, the NRC staff concluded that the use of safety relief valves and low pressure systems as redundant post-fire safe shutdown systems under the provisions of 10 CFR Part 50, Appendix R, was acceptable. (Reference NRC letter to BWR Owners Group dated December 12, 2000, ADAMS Accession No. ML003776828)
USE OF RHRSW SYSTEM CROSS-TIE BETWEEN UNITS: NCV 05000254(265)/2006002-02:
: 6. Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
No. 10 CFR 50.48 states that Each operating nuclear power plant must have a fire protection plan that satisfies Criterion 3 of appendix A of this part (emphasis added to each). The regulations are applied to each nuclear power plant or unit, and in the case of QCNPS each of the two units must individually comply with the regulations. With respect to 10 CFR Part 50, Appendix R, Section III.G.2, the regulation states in part:
Except as provided for in paragraph G.3 of this section, where cables or equipment...of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of the following means of ensuring that one of the redundant trains is free of fire damage shall be provided....
Since the redundant trains of RHRSW system in one unit could be exposed to a single fire, the licensee is attempting to credit the non-fire affected units RHRSW system as being redundant to the fire affected units RHRSW system and vice versa. This does not satisfy the requirements of III.G.2 for a plant licensed to operate before January 1, 1979, because the redundant RHRSW system trains in the same unit are not free of fire damage.
The licensee's approach could be acceptable as an alternative shutdown method provided that the requirements of 10 CFR Part 50, Appendix R, Section III.G.3 and Section III.L are met for plants licensed to operate before January 1, 1979. Plants licensed to operate on or after January 1, 1979, must meet the requirements for alternative shutdown as described in their approved fire protection program. For the licensee's approach to be acceptable as an alternate shutdown method, there should be assurance that during all modes and alignments on one unit, the RHRSW system is


10 CFR Part 50, Appendix R, Section III.G.3. Neither the SSMP or the RHRSW system
available to support fire safe shutdown of the opposite unit. Technical specification or Technical Requirements addressing availability of the opposite units RHRSW system should be in place to ensure that the RHRSW system is available.
: 7.      With respect to the QCNPS NCV and licensee response, for the RHRSW system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
No. In accordance with the answer to Question 6 above, neither unit at QCNPS can rely upon the multi-unit cross-tie capability to meet 10 CFR Part 50, Appendix R, Section III.G.2 unless an exemption request has been granted.
: 8.      With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?
No. The licensee contended that the systems shared between units are redundant because the systems perform their design functions. Although the systems may perform their design function, 10 CFR Part 50, Appendix R applies to each unit individually as discussed in the response to Question 6. Therefore, the use of components from one unit to supply an adjacent, fire affected unit does not meet the requirement of 10 CFR Part 50, Appendix R, Section III.G.2.


changes made by the licensee satisfy 10 CFR Part 50, Appendix R, Section III.G.2. NRC staff
==4.0 CONCLUSION==


agree that the QCNPS NCVs should not be withdrawn.
Redundant trains of equipment required for safe shutdown that are in the same fire area must be separated in accordance with 10 CFR Part 50, Appendix R, Section III.G.2 or they must meet the requirements of 10 CFR Part 50, Appendix R, Section III.G.3. The condition of the operating license allows fire protection program changes within the scope of no adverse affect on safe shutdown capability so long as the regulatory requirements of 10 CFR 50.48, Criterion 3, and applicable sections of 10 CFR Part 50, Appendix R are met. Changes to plant systems can be made in accordance with 10 CFR 50.59. A change must comply with all of these requirements or receive prior NRC staff approval.
Principal Contributors: P. Qualls A. KleinDate: March 27, 2007}}
Each unit at QCNPS, licensed in 1972, must meet Section III.G.2 of 10 CFR Part 50, Appendix R, for their respective redundant trains or must satisfy the requirements of 10 CFR Part 50, Appendix R, Section III.G.3. Neither the SSMP or the RHRSW system changes made by the licensee satisfy 10 CFR Part 50, Appendix R, Section III.G.2. NRC staff agree that the QCNPS NCVs should not be withdrawn.
Principal Contributors: P. Qualls A. Klein Date: March 27, 2007}}

Revision as of 08:51, 23 November 2019

Final Response to Quad Cities Nuclear Power Station - Task Interface Agreement (TIA) 2006-005 Appendix R Disputed Violations (TAC Nos. MD3126 and MD3127)
ML070640415
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/27/2007
From: Holly Cruz
NRC/NRR/ADRA/DPR
To: Pederson C
Division of Reactor Safety III
hdc1; jaf2
References
IR-06-002, TAC MD3126, TAC MD3127, TIA 2006-005
Download: ML070640415 (9)


Text

March 27, 2007 MEMORANDUM TO: Cynthia D. Pederson, Director Division of Reactor Safety Region III FROM: Michael J. Case, Director /RA by JGolder for/

Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FINAL RESPONSE TO QUAD CITIES NUCLEAR POWER STATION -

TASK INTERFACE AGREEMENT (TIA) 2006-005 RE: APPENDIX R DISPUTED VIOLATIONS (TAC NOS. MD3126 AND MD3127)

On September 28, 2006, the Region III Division of Reactor Safety requested assistance from the Office of Nuclear Reactor Regulation (NRR) to evaluate two contested violations from the Quad Cities Nuclear Power Station (QCNPS) triennial fire protection inspection. Specifically, Region III requested that NRR provide answers to the following questions:

With respect to Non-Cited Violation (NCV) 05000254(265)/2006002-01:

1. Can licensees perform a Title 10 of the Code of Federal Regulations (10 CFR)

Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in changing a previously approved alternate/dedicated Safe Shutdown system to a redundant system? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.

2. If such evaluation processes can be utilized, what is the system design criteria which licensees must meet to rely upon these systems as redundant for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?
3. For boiling water reactors, what systems can licensees appropriately classify as preferred for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements? For those systems, has the NRC defined the design or functional requirements for systems to be classified as preferred?
4. With respect to the QCNPS NCV and licensee response, can the licensee classify the safe shutdown makeup pump as redundant to the reactor core isolation cooling system for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
5. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50 Appendix R, Section III.G.2 have merit and thereby warrant withdrawal of the NCV?

With respect to NCV 05000254(265)/2006002-02:

6. Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
7. With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
8. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?

The NRR staffs assessment is documented in the enclosed safety evaluation.

Docket Nos: 50-254 and 50-265

Enclosure:

As stated CONTACTS: Sean E. Peters, DPR Holly D. Cruz, DPR 301-415-1842 301-415-1053

March 27,2007 With respect to NCV 05000254(265)/2006002-02:

6. Can licensees perform a 10 CFR Part 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.
7. With respect to the QCNPS NCV and licensee response, for the residual heat removal service water system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?
8. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?

The NRR staffs assessment is documented in the enclosed safety evaluation.

Docket Nos: 50-254 and 50-265

Enclosure:

As stated CONTACTS: Sean E. Peters, DPR Holly D. Cruz, DPR 301-415-1842 301-415-1053 DISTRIBUTION: RidsNrrAdro HollyCruz PUBLIC PhilQualls SusanUttal PSPB Reading File DavidSolorio RidsNrrDpr SunilWeerakkody RidsNrrDprPspb CorneliusHolden RidsNrrLADBaxley RidsRgn1MailCenter RidsAcrsAcnwMailCenter RidsRgn2MailCenter RidsNrrPMSPeters RidsRgn3MailCenter RidsOgcMailCenter RidsRgn4MailCenter ADAMS ACCESSION NO: ML070640415 OFFICE PSPB/PM PSPB/PM PSPB/LA EEEB/BC PSPB/BC OE/SC OGC/NLO DPR/D NAME HCruz SPeters DBaxley SWeerakkody SRosenberg DSolorio SUttal MCase DATE 3/5/07 3/5/07 3/6/07 3/8/07 3/23/07 3/14/07 3/22/07 3/27/07 OFFICIAL RECORD COPY

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION DISPUTED APPENDIX R VIOLATIONS REGARDING QUAD CITIES NUCLEAR POWER STATION TASK INTERFACE AGREEMENT (TIA) 2006-005

1.0 INTRODUCTION

On July 31, 2006 (Agencywide Documents Access Management System (ADAMS) Accession No. ML062140118), the U.S. Nuclear Regulatory Commission (NRC) staff issued Inspection Report 05000254(265)/2006002 for the Quad Cities Nuclear Power Station (QCNPS) 2006 triennial fire protection inspection. In this report, the NRC staff identified two non-cited violations (NCVs) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979. One NCV involved the safe shutdown makeup pump (SSMP) and the other involved the residual heat removal service water (RHRSW) system.

On August 31, 2006 (ADAMS Accession No. ML062560198), the licensee contested the two NCVs. Subsequently, on September 28, 2006 (ADAMS Accession No. ML062710539), the NRC, Region III, Division of Reactor Safety requested assistance from the Office of Nuclear Reactor Regulation (NRR) to evaluate the two contested violations from the QCNPS triennial fire protection inspection.

2.0 BACKGROUND

The first finding, NCV 05000254(265)/2006002-01, involves the fact that the licensee credited the use of the dedicated SSMP for reactor coolant inventory makeup in lieu of ensuring that one of the redundant trains of reactor coolant inventory makeup water would remain free of fire damage. The NRC staff found this to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2.

With respect to the SSMP finding, the SSMP was originally installed as a dedicated shutdown system, and therefore, the system was required to meet the requirements in Appendix R,Section III.G.3. The licensee asserts that it has maintained compliance with 10 CFR Part 50, Appendix R, Section III.G.2 because the SSMP and reactor core isolation cooling (RCIC) system are redundant. The licensee maintains that the SSMP and RCIC meet the requirements to be considered redundant since they perform the same design functions.

However, the NRC Region III staff notes that the SSMP redundancy is limited to the inventory makeup function for a fire event. Since the SSMP would only be used for inventory makeup, plant safe shutdown would also require the use of other systems to perform the overall same system function as the RCIC system.

ENCLOSURE

The second finding, NCV 05000254(265)/2006002-02, was also found to be a violation of 10 CFR Part 50, Appendix R, Section III.G.2. In this violation, the NRC staff found that in the event of a severe fire, the licensee failed to ensure that one redundant train of the RHRSW system necessary to achieve and maintain hot shutdown conditions would be free of fire damage. Instead, the licensee credited the cross-tie of the RHRSW system train from the opposite unit for torus cooling during hot shutdown.

With respect to the RHRSW system finding, the licensee maintains that for multiple unit plants, systems shared between units may be credited as redundant for each unit. Accordingly, the licensee relies upon the opposite unit RHRSW system, through a locally-operated system cross-tie valve, for the purposes of meeting the 10 CFR Part 50, Appendix R, Section III.G.2 requirement to ensure that at least one redundant train of a system is available to support safe shutdown.

3.0 EVALUATION By this TIA, Region III requested answers to the following questions:

SSMP: NCV 05000254(265)/2006002-01:

1. Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in changing a previously approved alternate/dedicated Safe Shutdown system to a redundant system? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.

Yes. With respect to the structures, systems, and components (SSCs) described in the Updated Final Safety Analysis Report (UFSAR), licensees may make a change to the plant in accordance with 10 CFR 50.59. In addition, the licensee would also have to evaluate that change with respect to the fire protection program to determine that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. If the licensee makes the change in accordance with 10 CFR 50.59 and determines that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire, then the licensee may change their fire protection program without prior approval.

Precedent In its September 6, 2001, TIA 2001-05 response (ADAMS Accession No. ML012080008) to a question concerning change from a 10 CFR Part 50, Appendix R, Section III.G.2 fire area (redundant) to a III.G.3 (alternative or dedicated) fire area, the NRC staff stated:

Although, the licensee was licensed to operate after January 1, 1979, the requirements of 10 CFR Part 50, Appendix R, Section III.G.3, were incorporated into the approved fire protection program. In accordance with License Condition 2E, the licensee may change designation of a fire zone from 10 CFR Part 50, Appendix R, Section III.G.2, Separation Requirements, to 10 CFR Part 50, Appendix R, III.G.3, Alternative Shutdown, without prior approval, if a

licensee remains in compliance with the provisions of the specified requirements in 10 CFR Part 50, Appendix R, as set forth in the fire protection program. Fire protection program changes that adversely affect the ability of the plant to achieve safe shutdown, require prior NRC approval.

The cited precedent discusses a change from 10 CFR Part 50, Section III.G.2 compliance to 10 CFR Part 50, Appendix R, Section III.G.3 compliance for a plant licensed to operate after January 1, 1979. The precedent demonstrates that a licensee may make changes to their compliance strategy from one 10 CFR Part 50, Appendix R, Section III.G category to another.

2. If such evaluation processes can be utilized, what is the system design criteria which licensees must meet to rely upon these systems as redundant for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements?

The design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant.

The regulatory requirements classifying a system as redundant with respect to fire protection have been established in Appendix R. Regulatory guidance for when a system is redundant for fire protection safe shutdown purposes was provided in Generic Letter (GL) 86-10 in the response to Question 3.8.3 which stated, in part:

If the system is being used to provide its design function, it generally is considered redundant. If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered an alternative shutdown capability.

With respect to the QCNPS NCV, the licensee originally installed the SSMP as a new system to provide dedicated shutdown system capability to comply with 10 CFR Part 50, Appendix R, Section III.G.3. This was consistent with the response to Question 3.8.3 and Footnote 1 in Appendix R, ...dedicated shutdown capability is provided by installing new structures and systems for the function of post-fire shutdown. However, at a later time the licensee reclassified the SSMP as redundant and asserted the SSMP meets III.G.2 requirements. In this case, the function of the SSMP system is for Appendix R safe shutdown and the SSMP system does not perform the same design function as the RCIC system. Therefore, the SSMP system is not redundant and the design function of the SSMP system should remain characterized as a Dedicated Shutdown system.

3. For boiling water reactors, what systems can licensees appropriately classify as preferred for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2 requirements? For those systems, has the NRC defined the design or functional requirements for systems to be classified as preferred?

As described below, the preferred system is a redundant system used to provide its design function; and it is also one of the two normal safe shutdown trains. The response to GL 86-10, Question 5.1.2 states in part, For the purposes of analysis to Section III.G.2 criteria, the safe shutdown capability is defined as one of the two normal safe

shutdown trains. If the criteria of Section III.G.2 are not met, an alternative shutdown capability is required.

The following question pertains to regulatory guidance provided in GL 86-10, Question 3.8.3, which asks:

3.8.3 Redundant Trains/Alternate Shutdown QUESTION: Confusion exists as to what will be classified as an alternate shutdown system and thus what systems might be required to be protected by suppression and detection under Section III.G.3.b....

RESPONSE: If the system is being used to provide its design function, it generally is considered redundant. If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered an alternative shutdown capability....

As stated in the response to Question 2, the design criteria for a redundant system is given in the design basis documents and the UFSAR for the plant. The system designs approved by the NRC staff will generally identify which systems are used to maintain plant conditions. In many cases, these systems are incorporated into technical specifications with mode restraint requirements.

4. With respect to the QCNPS NCV and the licensee response, can the licensee classify the SSMP as redundant to the RCIC system for the purposes of meeting 10 CFR Part 50, Appendix R, Section III.G.2?

No. With respect to the QCNPS NCV, the licensee has not demonstrated that the SSMP design function is the same as the RCIC system design function. As discussed in the response to Question 2, the design criteria for a redundant system is given in the plants design basis documents and the UFSAR.

5. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2 have merit and thereby warrant withdrawal of the NCV?

No. The NCV should not be withdrawn because the licensee deviated from the regulatory requirements (Footnote to Appendix R defining dedicated systems for Alternate Shutdown capability) and regulatory guidance (Question 3.8.3 to GL 86-10).

Although the 10 CFR 50.59 process used by the licensee may provide an approach to make a plant change to designate and credit a system as redundant (see responses to Questions 1 and 2), the licensee must also be able to demonstrate that the change does not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire, and the SSMP must be designated and shown to be one of the two normal safe shutdown trains (GL 86-10, Question 5.1.2 response).

The SSMP is not one of the two normal safe shutdown trains and, thus, is an alternative shutdown capability. In addition, the inspection report identified the concern with the fire

water system as the backup water source for reactor coolant inventory makeup for the SSMP. Although the licensees August 31, 2006, response letter stated that it does not consider the system difference (i.e., different backup water supply) to substantially alter the design function of the SSMP system, the letter did not fully address the system difference of the backup water supply, in that it did not address the lack of ability to supply the SSMP from the suppression pool.

The acceptability of reliance on a system, other than the normal shutdown trains for the purpose of establishing compliance with 10 CFR Part 50, Appendix R, Section III.G.2, necessitates significant safety analysis and regulatory reviews. For example, after such reviews, the NRC staff concluded that the use of safety relief valves and low pressure systems as redundant post-fire safe shutdown systems under the provisions of 10 CFR Part 50, Appendix R, was acceptable. (Reference NRC letter to BWR Owners Group dated December 12, 2000, ADAMS Accession No. ML003776828)

USE OF RHRSW SYSTEM CROSS-TIE BETWEEN UNITS: NCV 05000254(265)/2006002-02:

6. Can licensees perform a 10 CFR 50.59 evaluation (or other equivalent adverse effects evaluation) for fire protection program changes which result in reliance on a multi-unit cross-tie capability for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2? If not, please identify what regulatory tool precludes the licensee from making such a change and how we have communicated this expectation to licensees.

No. 10 CFR 50.48 states that Each operating nuclear power plant must have a fire protection plan that satisfies Criterion 3 of appendix A of this part (emphasis added to each). The regulations are applied to each nuclear power plant or unit, and in the case of QCNPS each of the two units must individually comply with the regulations. With respect to 10 CFR Part 50, Appendix R, Section III.G.2, the regulation states in part:

Except as provided for in paragraph G.3 of this section, where cables or equipment...of redundant trains of systems necessary to achieve and maintain hot shutdown conditions are located within the same fire area outside of primary containment, one of the following means of ensuring that one of the redundant trains is free of fire damage shall be provided....

Since the redundant trains of RHRSW system in one unit could be exposed to a single fire, the licensee is attempting to credit the non-fire affected units RHRSW system as being redundant to the fire affected units RHRSW system and vice versa. This does not satisfy the requirements of III.G.2 for a plant licensed to operate before January 1, 1979, because the redundant RHRSW system trains in the same unit are not free of fire damage.

The licensee's approach could be acceptable as an alternative shutdown method provided that the requirements of 10 CFR Part 50, Appendix R, Section III.G.3 and Section III.L are met for plants licensed to operate before January 1, 1979. Plants licensed to operate on or after January 1, 1979, must meet the requirements for alternative shutdown as described in their approved fire protection program. For the licensee's approach to be acceptable as an alternate shutdown method, there should be assurance that during all modes and alignments on one unit, the RHRSW system is

available to support fire safe shutdown of the opposite unit. Technical specification or Technical Requirements addressing availability of the opposite units RHRSW system should be in place to ensure that the RHRSW system is available.

7. With respect to the QCNPS NCV and licensee response, for the RHRSW system configuration, can the licensee rely upon the multi-unit cross-tie capability (previously relied upon for meeting 10 CFR Part 50, Appendix R, Section III.G.3), for the purpose of meeting 10 CFR Part 50, Appendix R, Section III.G.2?

No. In accordance with the answer to Question 6 above, neither unit at QCNPS can rely upon the multi-unit cross-tie capability to meet 10 CFR Part 50, Appendix R, Section III.G.2 unless an exemption request has been granted.

8. With respect to the QCNPS NCV and licensee response, does the licensees position asserting compliance with 10 CFR Part 50, Appendix R, Section III.G.2, through reliance upon the multi-unit cross-tie capability, have merit and thereby warrant withdrawal of the NCV?

No. The licensee contended that the systems shared between units are redundant because the systems perform their design functions. Although the systems may perform their design function, 10 CFR Part 50, Appendix R applies to each unit individually as discussed in the response to Question 6. Therefore, the use of components from one unit to supply an adjacent, fire affected unit does not meet the requirement of 10 CFR Part 50, Appendix R, Section III.G.2.

4.0 CONCLUSION

Redundant trains of equipment required for safe shutdown that are in the same fire area must be separated in accordance with 10 CFR Part 50, Appendix R, Section III.G.2 or they must meet the requirements of 10 CFR Part 50, Appendix R, Section III.G.3. The condition of the operating license allows fire protection program changes within the scope of no adverse affect on safe shutdown capability so long as the regulatory requirements of 10 CFR 50.48, Criterion 3, and applicable sections of 10 CFR Part 50, Appendix R are met. Changes to plant systems can be made in accordance with 10 CFR 50.59. A change must comply with all of these requirements or receive prior NRC staff approval.

Each unit at QCNPS, licensed in 1972, must meet Section III.G.2 of 10 CFR Part 50, Appendix R, for their respective redundant trains or must satisfy the requirements of 10 CFR Part 50, Appendix R, Section III.G.3. Neither the SSMP or the RHRSW system changes made by the licensee satisfy 10 CFR Part 50, Appendix R, Section III.G.2. NRC staff agree that the QCNPS NCVs should not be withdrawn.

Principal Contributors: P. Qualls A. Klein Date: March 27, 2007