ML073540392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/19/2007
| issue date = 12/19/2007
| title = Change to Inspection Plan 1/1/08 - 12/31/08
| title = Change to Inspection Plan 1/1/08 - 12/31/08
| author name = Riemer K R
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRP/B2
| author affiliation = NRC/RGN-III/DRP/B2
| addressee name = Anderson R L
| addressee name = Anderson R
| addressee affiliation = Florida Power & Light Co
| addressee affiliation = Florida Power & Light Co
| docket = 05000331, 07200032
| docket = 05000331, 07200032
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:December 19, 2007  
{{#Wiki_filter:December 19, 2007 Mr. Richard L. Anderson Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
 
Mr. Richard L. Anderson  
 
Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785  


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER  
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER


==Dear Mr. Anderson:==
==Dear Mr. Anderson:==


As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors' arrival onsite. Routine resident inspections are not listed due to their continuous nature. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
R. Anderson                                Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA by Nick Shah Acting for/
Sincerely,
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49  
                                              /RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49


==Enclosure:==
==Enclosure:==
As Stated  
As Stated cc w/encl:     J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer
 
cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney  
 
M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director  
 
D. Curtland, Plant Manager  
 
S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section,   Dept. Of Homeland Security M. Rasmusson, State Liaison Officer


Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
R. Anderson                                                            Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA by Nick Shah Acting for/
Sincerely,
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49  
                                                                          /RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49


==Enclosure:==
==Enclosure:==
As Stated  
As Stated cc w/encl:               J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\DUANE ARNOLD.DOC G Publicly Available                        G Non-Publicly Available                  G Sensitive              G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                            E RIII                              RIII                              RIII NAME                NShah, Acting for KRiemer:cms DATE                12/19/07 OFFICIAL RECORD COPY
 
cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney  
 
M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director  
 
D. Curtland, Plant Manager  
 
S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section,   Dept. Of Homeland Security M. Rasmusson, State Liaison Officer  


DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\DUANE ARNOLD.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy OFFICE  RIII  E  RIII    RIII    RIII    NAME  NShah, Acting for KRiemer:cms DATE  12/19/07        OFFICIAL RECORD COPY Letter to R. Anderson from K. Riemer dated December 19, 2007  
Letter to R. Anderson from K. Riemer dated December 19, 2007


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
TEB DWS RidsNrrDirsIrib  
TEB DWS RidsNrrDirsIrib MAS KGO JKH3 SRI Duane Arnold CAA1 DRPIII DRSIII PLB1 TXN


MAS KGO JKH3 SRI Duane Arnold CAA1 DRPIII DRSIII PLB1 TXN Duane Arnold Inspection / Activity Plan 01/01/2008
Duane Arnold Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff   Planned Dates        Inspection Inspection Activity                                              Title                        on Site       Start    End            Type BI ENG       - COMPONENT DESIGN BASES INSPECTION                                                     6 IP 7111121          Component Design Bases Inspection                                                    02/11/2008 03/14/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                               1 IP 7112101          Access Control to Radiologically Significant Areas                                    02/04/2008 02/08/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                               1 IP 7112201         Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems             03/31/2008 04/04/2008 Baseline Inspections IP 71151-PR01       RETS/ODCM Radiological Effluent                                                       03/31/2008 04/04/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                               1 IP 7112103         Radiation Monitoring Instrumentation and Protective Equipment                         08/04/2008 08/08/2008 Baseline Inspections IP 71151-BI01       Reactor Coolant System Activity                                                       08/04/2008 08/08/2008 Baseline Inspections IP 71151-OR01       Occupational Exposure Control Effectiveness                                           08/04/2008 08/08/2008 Baseline Inspections BI OL         - BIENNIAL REQUAL. PROGRAM INSPECTION                                                   2 IP 7111111B        Licensed Operator Requalification Program                                            10/06/2008 10/10/2008 Baseline Inspections BI EP         - EP EXERCISE INSPECTION / PI VERIFICATION                                               3 IP 7111401         Exercise Evaluation                                                                   10/20/2008 10/24/2008 EP Baseline Inspectio IP 71151-EP01       Drill/Exercise Performance                                                           10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP02       ERO Drill Participation                                                               10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP03       Alert & Notification System                                                           10/20/2008 10/24/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                               1 IP 7112102          ALARA Planning and Controls                                                          10/20/2008 10/24/2008 Baseline Inspections}}
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 1 12/19/2007 Report 22 6 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 02/11/2008 03/14/2008 1    7111121 IP Component Design Bases Inspection 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/04/2008 02/08/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/31/2008 04/04/2008 1     7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/31/2008 04/04/2008 1    71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 08/04/2008 08/08/2008 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/04/2008 08/08/2008 1    71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 08/04/2008 08/08/2008 1    71151-OR01 IP Occupational Exposure Control Effectiveness 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 10/06/2008 10/10/2008 1    7111111B IP Licensed Operator Requalification Program 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspecti o 10/20/2008 10/24/2008 1    7111401 IP Exercise Evaluation Baseline Inspections 10/20/2008 10/24/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/20/2008 10/24/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 10/20/2008 10/24/2008 1    71151-EP03 IP A lert & Notification System 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1    7112102 IP A LARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 21:46, 14 November 2019

Change to Inspection Plan 1/1/08 - 12/31/08
ML073540392
Person / Time
Site: Duane Arnold  NextEra Energy icon.png
Issue date: 12/19/2007
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To: Richard Anderson
Florida Power & Light Co
References
Download: ML073540392 (5)


Text

December 19, 2007 Mr. Richard L. Anderson Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER

Dear Mr. Anderson:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Nick Shah Acting for/

Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49

Enclosure:

As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer

R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Nick Shah Acting for/

Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49

Enclosure:

As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\DUANE ARNOLD.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME NShah, Acting for KRiemer:cms DATE 12/19/07 OFFICIAL RECORD COPY

Letter to R. Anderson from K. Riemer dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION:

TEB DWS RidsNrrDirsIrib MAS KGO JKH3 SRI Duane Arnold CAA1 DRPIII DRSIII PLB1 TXN

Duane Arnold Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 02/11/2008 03/14/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 02/04/2008 02/08/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/31/2008 04/04/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/31/2008 04/04/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/04/2008 08/08/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 08/04/2008 08/08/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 08/04/2008 08/08/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 10/06/2008 10/10/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/20/2008 10/24/2008 EP Baseline Inspectio IP 71151-EP01 Drill/Exercise Performance 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/20/2008 10/24/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections