| number = ML080660360
| issue date = 02/28/2008
| issue date = 02/28/2008
| title = Kewaunee - 2007 Annual Operating Report
| title = 2007 Annual Operating Report
| author name = Webb T J
| author name = Webb T
| author affiliation = Dominion, Dominion Energy Kewaunee, Inc
| author affiliation = Dominion, Dominion Energy Kewaunee, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:z11 irDominioill Dominion Energy Kewaunee, Inc.N490 Highway 42, Kewaunee, WI 54216-9511 FEB 2 8 2005 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No. 08-0103 LIC/MH:/RO Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION 2007 ANNUAL OPERATING REPORT Attached is the 2007 Kewaunee Power Station (KPS) Annual Operating Report. This report is being submitted in accordance with Section 6.9.a.2 of the KPS Technical Specifications.
{{#Wiki_filter:Dominion Energy Kewaunee, Inc.
This submittal also describes any turbine stop and control valve failures during 2007.This satisfies a commitment made by KPS upon NRC approval of KPS Technical Specification Amendment 84.If you have questions or require additional information, please feel free to contact Ms.Mary Jo Haese at 920-388-8277.
N490 Highway 42, Kewaunee, WI 54216-9511                     z11 irDominioill FEB 2 8 2005 ATTN: Document Control Desk                                   Serial No. 08-0103 U. S. Nuclear Regulatory Commission                           LIC/MH:/RO Washington, DC 20555-0001                                     Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.
Very truly yours, Thomas J. Webb Director Safety and Licensing Kewaunee Power Station Attachment Commitments made by this letter: NONE Cc j'kJR-k Serial No. 08-0103 Page 2 of 2 cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. P. D. Milano Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8-H-4a Washington, DC 20555-0001 NRC Senior Resident Inspector Kewaunee Power Station Serial No. 08-0103 ATTACHMENT 2007 KEWAUNEE POWER STATION ANNUAL OPERATING REPORT KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION 2007 ANNUAL OPERATING REPORT Attached is the 2007 Kewaunee Power Station (KPS) Annual Operating Report. This report is being submitted in accordance with Section 6.9.a.2 of the KPS Technical Specifications.
Serial No. 08-0103 Attachment Page 1 of 4 TABLE OF CONTENTS IN T R O D U C T IO N ............................................................................................  
This submittal also describes any turbine stop and control valve failures during 2007.
..1 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES .....................
This satisfies a commitment made by KPS upon NRC approval of KPS Technical Specification Amendment 84.
2 2.0 MAXIMUM COOLANT ACTIVITY ............................................................
If you have questions or require additional information, please feel free to contact Ms.
3 Serial No. 08-0103 Attachment Page 2 of 4 INTRODUCTION This annual operating report is being submitted to fulfill reporting requirements contained either in the Kewaunee Power Station (KPS) Technical Specifications (TS) or in commitments made by KPS to the Nuclear Regulatory Commission (NRC).Section 1.0 reports failures of turbine stop and control valves, if applicable, in accordance with a commitment made to the NRC upon approval of KPS TS Amendment 84.Section 2.0, in accordance with KPS TS 6.9.a.2.D, contains documentation of the results of specific analysis in which the reactor coolant exceeded the limits of KPS TS 3.1 .c.1 .A, if applicable.
Mary Jo Haese at 920-388-8277.
1 Serial No. 08-0103 Attachment Page 3 of 4 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES There were no failures of the turbine stop, reheat stop, control, or interceptor valves to close during 2007 testing.2 Serial No. 08-0103 Attachment Page 4 of 4 2.0 MAXIMUM COOLANT ACTIVITY KNPP TS 6.9.a.2.D requires the documentation of the results of specific activity analysis in which the reactor coolant exceeded the limits of TS 3.1 .c.1 .A during the past year.The reactor coolant did not exceed the limits of TS 3.1 .c.1 .A during 2007.3}}
Very truly yours, Thomas J. Webb Director Safety and Licensing Kewaunee Power Station Attachment Commitments made by this letter: NONE Cc j
                                                                                        'kJR-k
 
Serial No. 08-0103 Page 2 of 2 cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. P. D. Milano Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8-H-4a Washington, DC 20555-0001 NRC Senior Resident Inspector Kewaunee Power Station
 
Serial No. 08-0103 ATTACHMENT 2007 KEWAUNEE POWER STATION ANNUAL OPERATING REPORT KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
 
Serial No. 08-0103 Attachment Page 1 of 4 TABLE OF CONTENTS INT R O D UC T IO N............................................................................................       .. 1 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES .....................                                                   2 2.0 MAXIMUM COOLANT ACTIVITY ............................................................                               3
 
Serial No. 08-0103 Attachment Page 2 of 4 INTRODUCTION This annual operating report is being submitted to fulfill reporting requirements contained either in the Kewaunee Power Station (KPS) Technical Specifications (TS) or in commitments made by KPS to the Nuclear Regulatory Commission (NRC).
Section 1.0 reports failures of turbine stop and control valves, if applicable, in accordance with a commitment made to the NRC upon approval of KPS TS Amendment 84.
Section 2.0, in accordance with KPS TS 6.9.a.2.D, contains documentation of the results of specific analysis in which the reactor coolant exceeded the limits of KPS TS 3.1 .c.1 .A, if applicable.
1
 
Serial No. 08-0103 Attachment Page 3 of 4 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES There were no failures of the turbine stop, reheat stop, control, or interceptor valves to close during 2007 testing.
2
 
Serial No. 08-0103 Attachment Page 4 of 4 2.0 MAXIMUM COOLANT ACTIVITY KNPP TS 6.9.a.2.D requires the documentation of the results of specific activity analysis in which the reactor coolant exceeded the limits of TS 3.1 .c.1 .A during the past year.
The reactor coolant did not exceed the limits of TS 3.1 .c.1 .A during 2007.
3}}

Latest revision as of 19:54, 14 November 2019

2007 Annual Operating Report
ML080660360
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/28/2008
From: Webb T
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0103
Download: ML080660360 (7)


Text

Dominion Energy Kewaunee, Inc.

N490 Highway 42, Kewaunee, WI 54216-9511 z11 irDominioill FEB 2 8 2005 ATTN: Document Control Desk Serial No. 08-0103 U. S. Nuclear Regulatory Commission LIC/MH:/RO Washington, DC 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.

KEWAUNEE POWER STATION 2007 ANNUAL OPERATING REPORT Attached is the 2007 Kewaunee Power Station (KPS) Annual Operating Report. This report is being submitted in accordance with Section 6.9.a.2 of the KPS Technical Specifications.

This submittal also describes any turbine stop and control valve failures during 2007.

This satisfies a commitment made by KPS upon NRC approval of KPS Technical Specification Amendment 84.

If you have questions or require additional information, please feel free to contact Ms.

Mary Jo Haese at 920-388-8277.

Very truly yours, Thomas J. Webb Director Safety and Licensing Kewaunee Power Station Attachment Commitments made by this letter: NONE Cc j

'kJR-k

Serial No. 08-0103 Page 2 of 2 cc: Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. P. D. Milano Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8-H-4a Washington, DC 20555-0001 NRC Senior Resident Inspector Kewaunee Power Station

Serial No. 08-0103 ATTACHMENT 2007 KEWAUNEE POWER STATION ANNUAL OPERATING REPORT KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.

Serial No. 08-0103 Attachment Page 1 of 4 TABLE OF CONTENTS INT R O D UC T IO N............................................................................................ .. 1 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES ..................... 2 2.0 MAXIMUM COOLANT ACTIVITY ............................................................ 3

Serial No. 08-0103 Attachment Page 2 of 4 INTRODUCTION This annual operating report is being submitted to fulfill reporting requirements contained either in the Kewaunee Power Station (KPS) Technical Specifications (TS) or in commitments made by KPS to the Nuclear Regulatory Commission (NRC).

Section 1.0 reports failures of turbine stop and control valves, if applicable, in accordance with a commitment made to the NRC upon approval of KPS TS Amendment 84.

Section 2.0, in accordance with KPS TS 6.9.a.2.D, contains documentation of the results of specific analysis in which the reactor coolant exceeded the limits of KPS TS 3.1 .c.1 .A, if applicable.

1

Serial No. 08-0103 Attachment Page 3 of 4 1.0 FAILURES OF TURBINE STOP AND CONTROL VALVES There were no failures of the turbine stop, reheat stop, control, or interceptor valves to close during 2007 testing.

2

Serial No. 08-0103 Attachment Page 4 of 4 2.0 MAXIMUM COOLANT ACTIVITY KNPP TS 6.9.a.2.D requires the documentation of the results of specific activity analysis in which the reactor coolant exceeded the limits of TS 3.1 .c.1 .A during the past year.

The reactor coolant did not exceed the limits of TS 3.1 .c.1 .A during 2007.

3