{{#Wiki_filter:April 25, 2008  
{{#Wiki_filter:April 25, 2008 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
 
Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760  


==SUBJECT:==
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-017 (TAC NO. MD4148)  
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-017 (TAC NO. MD4148)


==Dear Mr. Allen:==
==Dear Mr. Allen:==


On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730470), regarding dissimilar metal welds in the pressurizer at Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This letter acknowledges receipt of your letter dated March 25, 2008 (ADAMS Accession No. ML080880147) informing the NRC of actions taken in response to this CAL.  
On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730470), regarding dissimilar metal welds in the pressurizer at Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This letter acknowledges receipt of your letter dated March 25, 2008 (ADAMS Accession No. ML080880147) informing the NRC of actions taken in response to this CAL.
 
In your letter, you stated FirstEnergy Nuclear Operating Company (FENOC) removed Davis-Besse from service on December 30, 2007, to support the mitigation activities as stated in Commitment No. 1 of your February 28, 2007, correspondence (ADAMS Accession No. ML070660476). FENOC completed the planned pressurizer structural weld overlays and performed final weld overlay ultrasonic inspections on January 20, 2008. No recordable indications were identified in the weld overlay volume.
In your letter, you stated FirstEnergy Nuclear Operating Company (FENOC) removed Davis-Besse from service on December 30, 2007, to support the mitigation activities as stated in Commitment No. 1 of your February 28, 2007, correspondence (ADAMS Accession No. ML070660476). FENOC completed the planned pressurizer structural weld overlays and performed final weld overlay ultrasonic inspections on January 20, 2008. No recordable indications were identified in the weld overlay volume.  
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letter have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control (TAC) No. MD4148 has been closed.
 
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letter have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control (TAC) No. MD4148 has been closed.  
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
 
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.  
 
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).  
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in t he NRC Public Document Room or from the NRC
=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/  Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket No. 50-346
 
cc:  See next page 
 
ML081070270 OFFICE  DCI/CPNB  DCI/CPNB  LPL3-2/PM LPL3-2/LA LPL3-2/BC
 
NAME  JCollins  TChan  TWengert  EWhitt  RGibbs DATE  4/17/08  4/17/08    4/17/08 4/17/08  4/25/08 OFFICE  DCI/D  DRP/D RIII DORL/D NAME  MEvans  CPedersen CHaney DATE    4/18/08 4/24/08  4/25/08 Page 1 of 2 Davis-Besse Nuclear Power Station, Unit No. 1      cc: Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760
 
Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH  43068-9009
 
Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH  43449-9760
 
Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7 th Floor Columbus, OH  43215
 
Carol O'Claire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH  43235-2206
 
Zack A. Clayton
 
DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH  43266-0149
 
State of Ohio - Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH  43266-0573
 
Principal Assistant Attorney General Environmental Enforcement Section State Office Tower 30 East Broad Street, 25 th Floor Columbus, OH  43215
 
President, Board of County Commissioners of Ottawa County Port Clinton, OH  43252 
 
President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH  43604-6506
 
The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515
 
The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107     
 
Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH  44308
 
David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH  44308
 
Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH  44308
 
Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH  44308


Page 2 of 2 Davis-Besse Nuclear Power Station, Unit 1  cc:  
B. Allen                                  In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
                                            /RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page


Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH  44308
ML081070270 OFFICE        DCI/CPNB        DCI/CPNB          LPL3-2/PM      LPL3-2/LA      LPL3-2/BC NAME          JCollins        TChan            TWengert        EWhitt          RGibbs DATE            4/17/08        4/17/08            4/17/08      4/17/08        4/25/08 OFFICE      DCI/D          DRP/D RIII        DORL/D NAME        MEvans          CPedersen          CHaney DATE          4/18/08      4/24/08            4/25/08


Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308  
Page 1 of 2 Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station            President, Board of County Mail Stop A-DB-3065                          Commissioners of Ottawa County 5501 North State Route 2                      Port Clinton, OH 43252 Oak Harbor, OH 43449-9760 President, Board of County Director, Ohio Department of Commerce        Commissioners of Lucas County Division of Industrial Compliance            One Government Center, Suite 800 Bureau of Operations & Maintenance            Toledo, OH 43604-6506 6606 Tussing Road P.O. Box 4009 The Honorable Dennis J. Kucinich Reynoldsburg, OH 43068-9009 United States House of Representatives Resident Inspector                            Washington, D.C. 20515 U.S. Nuclear Regulatory Commission 5503 North State Route 2                      The Honorable Dennis J. Kucinich Oak Harbor, OH 43449-9760                    United States House of Representatives 14400 Detroit Avenue Stephen Helmer                                Lakewood, OH 44107 Supervisor, Technical Support Section Bureau of Radiation Protection                Joseph J. Hagan Ohio Department of Health                    President and Chief Nuclear Officer 35 East Chestnut Street, 7th Floor            FirstEnergy Nuclear Operating Company Columbus, OH 43215                            Mail Stop A-GO-19 76 South Main Street Carol OClaire, Chief, Radiological Branch    Akron, OH 44308 Ohio Emergency Management Agency 2855 West Dublin Granville Road              David W. Jenkins, Attorney Columbus, OH 43235-2206                      FirstEnergy Corporation Mail Stop A-GO-15 Zack A. Clayton                              76 South Main Street DERR                                          Akron, OH 44308 Ohio Environmental Protection Agency P.O. Box 1049                                Danny L. Pace Columbus, OH 43266-0149                      Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company State of Ohio - Transportation Department    Mail Stop A-GO-14 Public Utilities Commission                  76 South Main Street 180 East Broad Street                        Akron, OH 44308 Columbus, OH 43266-0573 Manager, Fleet Licensing Principal Assistant Attorney General          FirstEnergy Nuclear Operating Company Environmental Enforcement Section            Mail Stop A-GO-2 State Office Tower                            76 South Main Street 30 East Broad Street, 25th Floor              Akron, OH 44308 Columbus, OH 43215


James H. Lash Senior Vice President of Operations   and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308}}
Page 2 of 2 Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308}}

Revision as of 18:46, 14 November 2019

Closure of Confirmatory Action Letter NRR-07-017
ML081070270
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/25/2008
From: Catherine Haney
Plant Licensing Branch III-2
To: Allen B
FirstEnergy Nuclear Operating Co
Wengert, Thomas J, NRR/DORL, 415-4037
References
TAC MD4148, NRR-07-017
Download: ML081070270 (5)


Text

April 25, 2008 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-017 (TAC NO. MD4148)

Dear Mr. Allen:

On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730470), regarding dissimilar metal welds in the pressurizer at Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This letter acknowledges receipt of your letter dated March 25, 2008 (ADAMS Accession No. ML080880147) informing the NRC of actions taken in response to this CAL.

In your letter, you stated FirstEnergy Nuclear Operating Company (FENOC) removed Davis-Besse from service on December 30, 2007, to support the mitigation activities as stated in Commitment No. 1 of your February 28, 2007, correspondence (ADAMS Accession No. ML070660476). FENOC completed the planned pressurizer structural weld overlays and performed final weld overlay ultrasonic inspections on January 20, 2008. No recordable indications were identified in the weld overlay volume.

Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letter have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control (TAC) No. MD4148 has been closed.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

B. Allen In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/

Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page

ML081070270 OFFICE DCI/CPNB DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME JCollins TChan TWengert EWhitt RGibbs DATE 4/17/08 4/17/08 4/17/08 4/17/08 4/25/08 OFFICE DCI/D DRP/D RIII DORL/D NAME MEvans CPedersen CHaney DATE 4/18/08 4/24/08 4/25/08

Page 1 of 2 Davis-Besse Nuclear Power Station, Unit No. 1 cc:

Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station President, Board of County Mail Stop A-DB-3065 Commissioners of Ottawa County 5501 North State Route 2 Port Clinton, OH 43252 Oak Harbor, OH 43449-9760 President, Board of County Director, Ohio Department of Commerce Commissioners of Lucas County Division of Industrial Compliance One Government Center, Suite 800 Bureau of Operations & Maintenance Toledo, OH 43604-6506 6606 Tussing Road P.O. Box 4009 The Honorable Dennis J. Kucinich Reynoldsburg, OH 43068-9009 United States House of Representatives Resident Inspector Washington, D.C. 20515 U.S. Nuclear Regulatory Commission 5503 North State Route 2 The Honorable Dennis J. Kucinich Oak Harbor, OH 43449-9760 United States House of Representatives 14400 Detroit Avenue Stephen Helmer Lakewood, OH 44107 Supervisor, Technical Support Section Bureau of Radiation Protection Joseph J. Hagan Ohio Department of Health President and Chief Nuclear Officer 35 East Chestnut Street, 7th Floor FirstEnergy Nuclear Operating Company Columbus, OH 43215 Mail Stop A-GO-19 76 South Main Street Carol OClaire, Chief, Radiological Branch Akron, OH 44308 Ohio Emergency Management Agency 2855 West Dublin Granville Road David W. Jenkins, Attorney Columbus, OH 43235-2206 FirstEnergy Corporation Mail Stop A-GO-15 Zack A. Clayton 76 South Main Street DERR Akron, OH 44308 Ohio Environmental Protection Agency P.O. Box 1049 Danny L. Pace Columbus, OH 43266-0149 Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company State of Ohio - Transportation Department Mail Stop A-GO-14 Public Utilities Commission 76 South Main Street 180 East Broad Street Akron, OH 44308 Columbus, OH 43266-0573 Manager, Fleet Licensing Principal Assistant Attorney General FirstEnergy Nuclear Operating Company Environmental Enforcement Section Mail Stop A-GO-2 State Office Tower 76 South Main Street 30 East Broad Street, 25th Floor Akron, OH 44308 Columbus, OH 43215

Page 2 of 2 Davis-Besse Nuclear Power Station, Unit 1 cc:

Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308