MONTHYEARML11336A3552011-12-0202 December 2011 Ltr 12/2/2011 Davis-Besse CAL 3-11-001 ML1133606772011-12-0202 December 2011 Press Release-iiii-11-036: NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter ML1017405192010-06-23023 June 2010 Confirmatory Action Letter - Davis-Besse Nuclear Power Station ML0810702702008-04-25025 April 2008 Closure of Confirmatory Action Letter NRR-07-017 L-08-080, Response to Confirmatory Action Letter No. NRR-07-0172008-03-25025 March 2008 Response to Confirmatory Action Letter No. NRR-07-017 ML0707304702007-03-20020 March 2007 Confirmatory Action Letter - Davis-Besse ML0406411712004-03-0808 March 2004 EA-03-214, CAL No. 3-02-001, Approval to Restart the Davis-Besse Nuclear Power Station Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order ML0414900952004-02-23023 February 2004 Panel Restart Deliberation Briefing ML0319900822003-07-17017 July 2003 Update of Confirmatory Action Letter (CAL) 3-02-001C Status ML0302201652003-01-21021 January 2003 Letter Dated 01/21/03: Davis-Besse Confirmatory Action Letter 3-02-001C. Update of Confirmatory Action Letter 3-02-001B Status for Davis-Besse Nuclear Power Station ML0236002672002-12-24024 December 2002 Letter Dated 12/24/2002: Davis-Besse Confirmatory Action Letter 3-02-001A and 3-02-001 ML0207302252002-03-13013 March 2002 Confirmatory Action Letter, RPV Head Degradation 2011-12-02
[Table view] Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
July 17, 2003 CAL No. 3-02-001D Mr. Lew Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
UPDATE OF CONFIRMATORY ACTION LETTER 3-02-001C STATUS FOR DAVIS-BESSE NUCLEAR POWER STATION
Dear Mr. Myers:
On March 13, 2002, the Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter No. 3-02-001 regarding the reactor pressure vessel head degradation at the Davis-Besse Nuclear Power Station. On May 15, 2002, the NRC revised the Confirmatory Action Letter, to address the option of replacing the reactor pressure vessel head. The Confirmatory Action Letter documented six sets of commitments you intended to take prior to restart of Davis-Besse.
On December 24, 2002, the NRC provided a letter to you, documenting our understanding of the current status of each of the items. On January 21, 2003, the NRC provided a letter to you to clarify the status of Confirmatory Action letter Issue No. 1. As discussed between Mr. R. Fast of your staff and Mr. W. Ruland, Vice Chairman of the Davis-Besse Oversight Panel on July 16, 2003, the enclosure to this letter revises the status of CAL Issue No. 1, including our understanding of your planned actions regarding the quarantined material from the damaged reactor vessel head. Notify me if your understanding differs from that described in the enclosure.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
L. Myers If you have any questions regarding the information in this letter, please contact me at 630-829-9657, or John Grobe at 630-829-9637.
Sincerely,
/RA/
J. E. Dyer Regional Administrator Docket No. 50-346 License No. NPF-3
Enclosure:
Confirmatory Action Letter Issue No. 1 Status cc w/encl: The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Of Lucas County Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists
DOCUMENT NAME: G:DRP\Davis-Besse 0350\ML031990082.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII RIII E NRR E NAME Mmitchell/klg CLipa BClayton WRuland DATE 07/17/03 07/17/03 07/17/03 07/17/03 via e-mail OFFICE RIII E RES RIII NAME JGrobe MMayfield JDyer DATE 07/16/03 07/17/03 07/17/03 OFFICIAL RECORD COPY
L. Myers ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG DMC HBC CST1 C. Ariano (hard copy)
DRPIII DRSIII PLB1 JRK1 DB0350
Enclosure Confirmatory Action Letter Issue No. 1 Status "Quarantine components or other material from the RPV [Reactor Pressure Vessel] head and CRDM [Control Rod Drive Mechanism] nozzle penetrations that are deemed necessary to fully address the root cause of the occurrence of degradation of the leaking penetrations. Prior to implementation, plans for further inspection and data gathering to support determination of the root cause will be provided to the NRC for review and comment."
Status Applicable components and material have been adequately quarantined and plans for inspection and data gathering to support root cause determination have been provided to the NRC for review and comment. Following discussions between Mr. R. Schrauder of your staff and Mr. W. Dean, Vice Chairman of the Davis-Besse Oversight Panel on November 1, 2002, it is our understanding that the following additional specimens will be removed from the damaged reactor vessel head:
- 1) Approximately 8 inches diameter of head material unaffected by heat around CRDM penetration Nozzles 2 and 46,
- 2) Nozzle base material from any two of Nozzles 1, 2, 4, or 5 (heat no. M3935),
- 3) Nozzle base material from Nozzle 47 (heat no. C2649-1), and
- 4) Nozzle base material from any two of Nozzles 7, 12, 16, 20, 22-25, 27-29, 38-44, 48-55, 57, 64, 68, or 69 (heat no. C2649-1).
The nozzle base material will be cut off both at the head and below the bimetallic weld, resulting in pieces about 7 to 8 inches long. The point of contact for the shipments of these specimens to Battelle Northwest Laboratory (BNL) is Mr. William Cullen, Jr., Senior Materials Engineer, Materials Engineering Branch, Office of Research (RES). Mr. Cullen can be reached at 301-415-6754. Following removal of the material described above, and its shipment to BNL, the NRC releases the head from quarantine. With respect to the specimen materials sent to Lynchburg, Virginia, the quarantine is lifted because the Phase 3 test plan for material is complete. The specimen material sent to Canada is now considered released from quarantine.