MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:Confirmatory Action Letter (CAL)
MONTHYEARML11336A3552011-12-0202 December 2011 Ltr 12/2/2011 Davis-Besse CAL 3-11-001 ML1133606772011-12-0202 December 2011 Press Release-iiii-11-036: NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter ML1017405192010-06-23023 June 2010 Confirmatory Action Letter - Davis-Besse Nuclear Power Station ML0810702702008-04-25025 April 2008 Closure of Confirmatory Action Letter NRR-07-017 L-08-080, Response to Confirmatory Action Letter No. NRR-07-0172008-03-25025 March 2008 Response to Confirmatory Action Letter No. NRR-07-017 ML0707304702007-03-20020 March 2007 Confirmatory Action Letter - Davis-Besse ML0406411712004-03-0808 March 2004 EA-03-214, CAL No. 3-02-001, Approval to Restart the Davis-Besse Nuclear Power Station Closure of Confirmatory Action Letter, and Issuance of Confirmatory Order ML0414900952004-02-23023 February 2004 Panel Restart Deliberation Briefing ML0319900822003-07-17017 July 2003 Update of Confirmatory Action Letter (CAL) 3-02-001C Status ML0302201652003-01-21021 January 2003 Letter Dated 01/21/03: Davis-Besse Confirmatory Action Letter 3-02-001C. Update of Confirmatory Action Letter 3-02-001B Status for Davis-Besse Nuclear Power Station ML0236002672002-12-24024 December 2002 Letter Dated 12/24/2002: Davis-Besse Confirmatory Action Letter 3-02-001A and 3-02-001 ML0207302252002-03-13013 March 2002 Confirmatory Action Letter, RPV Head Degradation 2011-12-02
[Table view] |
Text
April 25, 2008 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-017 (TAC NO. MD4148)
Dear Mr. Allen:
On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730470), regarding dissimilar metal welds in the pressurizer at Davis-Besse Nuclear Power Station, Unit 1 (Davis-Besse). This letter acknowledges receipt of your letter dated March 25, 2008 (ADAMS Accession No. ML080880147) informing the NRC of actions taken in response to this CAL.
In your letter, you stated FirstEnergy Nuclear Operating Company (FENOC) removed Davis-Besse from service on December 30, 2007, to support the mitigation activities as stated in Commitment No. 1 of your February 28, 2007, correspondence (ADAMS Accession No. ML070660476). FENOC completed the planned pressurizer structural weld overlays and performed final weld overlay ultrasonic inspections on January 20, 2008. No recordable indications were identified in the weld overlay volume.
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letter have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. Technical Assignment Control (TAC) No. MD4148 has been closed.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
B. Allen In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: See next page
ML081070270 OFFICE DCI/CPNB DCI/CPNB LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME JCollins TChan TWengert EWhitt RGibbs DATE 4/17/08 4/17/08 4/17/08 4/17/08 4/25/08 OFFICE DCI/D DRP/D RIII DORL/D NAME MEvans CPedersen CHaney DATE 4/18/08 4/24/08 4/25/08 Page 1 of 2 Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station President, Board of County Mail Stop A-DB-3065 Commissioners of Ottawa County 5501 North State Route 2 Port Clinton, OH 43252 Oak Harbor, OH 43449-9760 President, Board of County Director, Ohio Department of Commerce Commissioners of Lucas County Division of Industrial Compliance One Government Center, Suite 800 Bureau of Operations & Maintenance Toledo, OH 43604-6506 6606 Tussing Road P.O. Box 4009 The Honorable Dennis J. Kucinich Reynoldsburg, OH 43068-9009 United States House of Representatives Resident Inspector Washington, D.C. 20515 U.S. Nuclear Regulatory Commission 5503 North State Route 2 The Honorable Dennis J. Kucinich Oak Harbor, OH 43449-9760 United States House of Representatives 14400 Detroit Avenue Stephen Helmer Lakewood, OH 44107 Supervisor, Technical Support Section Bureau of Radiation Protection Joseph J. Hagan Ohio Department of Health President and Chief Nuclear Officer 35 East Chestnut Street, 7th Floor FirstEnergy Nuclear Operating Company Columbus, OH 43215 Mail Stop A-GO-19 76 South Main Street Carol OClaire, Chief, Radiological Branch Akron, OH 44308 Ohio Emergency Management Agency 2855 West Dublin Granville Road David W. Jenkins, Attorney Columbus, OH 43235-2206 FirstEnergy Corporation Mail Stop A-GO-15 Zack A. Clayton 76 South Main Street DERR Akron, OH 44308 Ohio Environmental Protection Agency P.O. Box 1049 Danny L. Pace Columbus, OH 43266-0149 Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company State of Ohio - Transportation Department Mail Stop A-GO-14 Public Utilities Commission 76 South Main Street 180 East Broad Street Akron, OH 44308 Columbus, OH 43266-0573 Manager, Fleet Licensing Principal Assistant Attorney General FirstEnergy Nuclear Operating Company Environmental Enforcement Section Mail Stop A-GO-2 State Office Tower 76 South Main Street 30 East Broad Street, 25th Floor Akron, OH 44308 Columbus, OH 43215
Page 2 of 2 Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Paul A. Harden Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308