Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
OFFICE OF NUCLEAR REACTOR REGULATION | OFFICE OF NUCLEAR REACTOR REGULATION | ||
WASHINGTON, DC 20555-0001 | WASHINGTON, DC 20555-0001 July 7, 2008 NRC INFORMATION NOTICE 2008-12: BRAIDWOOD UNIT 1 REACTOR TRIP DUE TO | ||
July 7, 2008 | |||
OFF-SITE POWER FLUCTUATION | |||
==ADDRESSEES== | ==ADDRESSEES== | ||
Line 36: | Line 36: | ||
addressees of the results of a staff evaluation of a recent automatic trip of the Braidwood Unit 1 Nuclear Power Plant due to an offsite power voltage fluctuation coupled with a failed protective | addressees of the results of a staff evaluation of a recent automatic trip of the Braidwood Unit 1 Nuclear Power Plant due to an offsite power voltage fluctuation coupled with a failed protective | ||
relaying circuit. | relaying circuit. The NRC expects that recipients will review the information for applicability to | ||
their facilities and consider actions, as appropriate, to avoid similar problems. Suggestions | |||
contained in this IN are not NRC requirements; therefore, no specific action or written response | |||
is required. | is required. | ||
==DESCRIPTION OF CIRCUMSTANCES== | ==DESCRIPTION OF CIRCUMSTANCES== | ||
Braidwood Unit 1 experienced an automatic reactor trip from full power on June 27, 2007. | Braidwood Unit 1 experienced an automatic reactor trip from full power on June 27, 2007. The | ||
reactor trip was triggered by low flow in the 1D Reactor Coolant Loop after the 1D Reactor | reactor trip was triggered by low flow in the 1D Reactor Coolant Loop after the 1D Reactor | ||
Line 51: | Line 51: | ||
Coolant Pump (RCP) tripped (appropriate reactor protection system actuation given loss of flow | Coolant Pump (RCP) tripped (appropriate reactor protection system actuation given loss of flow | ||
due to the RCP trip). | due to the RCP trip). The event was initiated by a lighting strike 4.3 miles from the plant that | ||
created a single-phase-to-ground fault on transmission line number 2001, which is a 345kV | created a single-phase-to-ground fault on transmission line number 2001, which is a 345kV | ||
transmission line. | transmission line. The ground fault suppressed the B-phase voltage to 48 percent of nominal | ||
until 345kV protective breakers at Braidwood and the East Frankfort Transmission Substation | until 345kV protective breakers at Braidwood and the East Frankfort Transmission Substation | ||
isolated the line about 3 cycles after fault initiation. | isolated the line about 3 cycles after fault initiation. The suppressed B-phase voltage created a | ||
momentary phase imbalance on the Braidwood RCPs resulting in elevated current on the | momentary phase imbalance on the Braidwood RCPs resulting in elevated current on the | ||
unaffected A- and C-phases. | unaffected A- and C-phases. The C-phase current on the 1D RCP exceeded the trip set point of | ||
an instantaneous overcurrent protective relay. | an instantaneous overcurrent protective relay. Normally (by design), the RCP trip on momentary | ||
overcurrent would have been blocked by an in-series impedance relay; however, at the time of | overcurrent would have been blocked by an in-series impedance relay; however, at the time of | ||
Line 73: | Line 73: | ||
in an impedance monitoring circuit. | in an impedance monitoring circuit. | ||
The licensee has been working on a generic reliability issue with Bussman KTN and KTN-R style fuses over the last two years (based on Title 10, Part 21, | The licensee has been working on a generic reliability issue with Bussman KTN and KTN-R style | ||
fuses over the last two years (based on Title 10, Part 21, Reporting of Defects and | |||
Noncompliance, of the Code of Federal Regulations reporting for these fuses). There have | |||
been several intermittent or complete fuse failures caused by fuse element cracking | |||
characterized as fatigue failure. | characterized as fatigue failure. After a fuse failure on 6.9kV Bus 157 in January 2007, the licensee made the decision to replace all Bussman fuses installed on the 6.9kV bus | ||
protective relay circuits. | protective relay circuits. However, due to the risk of tripping an RCP during fuse replacement, these fuses were to be replaced during outages. The fuse that failed in the 1D RCP protective | ||
relay circuit was scheduled for replacement in the next refueling outage. The licensee | relay circuit was scheduled for replacement in the next refueling outage. The licensee | ||
Line 85: | Line 89: | ||
considered this a small risk, since fuse failures had been self-revealing and promptly replaced to | considered this a small risk, since fuse failures had been self-revealing and promptly replaced to | ||
restore the designed relay scheme. | restore the designed relay scheme. However, the only fuse in the RCP protective relaying circuit | ||
without a loss-of-bus-voltage indication or alarm (not self-revealing), failed in this event. Only | |||
the disturbance in the transmission system and the resulting Unit 1 trip indicated the vulnerability | |||
within the RCP protective relaying circuitry. | |||
The corrective action planned by the licensee was to either implement a design change to | The corrective action planned by the licensee was to either implement a design change to | ||
eliminate the identified vulnerability from the RCP protective relaying system, or, if design | eliminate the identified vulnerability from the RCP protective relaying system, or, if design | ||
changes were not appropriate, to develop alternate actions to address the vulnerability. | |||
Additional information is available in Braidwood Station, Unit 1, Licensee Event Report 2007- | Additional information is available in Braidwood Station, Unit 1, Licensee Event Report 2007- | ||
Line 107: | Line 109: | ||
The event was initiated by a lightning strike to a 345kV transmission line which caused a | The event was initiated by a lightning strike to a 345kV transmission line which caused a | ||
line-to-ground fault. | line-to-ground fault. The fault caused the voltage on B-phase to drop to 48 percent of the | ||
nominal voltage until the transmission line breakers opened, appropriately isolating the fault. The | nominal voltage until the transmission line breakers opened, appropriately isolating the fault. The | ||
Line 113: | Line 115: | ||
duration of the event from fault initiation until the breakers opened was about 0.051 seconds | duration of the event from fault initiation until the breakers opened was about 0.051 seconds | ||
(about 3 cycles). With the B-phase voltage low, the | (about 3 cycles). With the B-phase voltage low, the plants RCPs responded by drawing more | ||
current on A- and C-phases to maintain RCP power output. | current on A- and C-phases to maintain RCP power output. The 1D RCPs supply breaker | ||
tripped on overcurrent in the C-phase. | tripped on overcurrent in the C-phase. The instantaneous over-current relay set point was | ||
exceeded and it actuated appropriately. Based on the | exceeded and it actuated appropriately. Based on the circuits design, a series impedance relay | ||
should normally block the momentary overcurrent condition; however, at the time of this event, the impedance relay was in a tripped state due to a failed fuse in the impedance | should normally block the momentary overcurrent condition; however, at the time of this event, the impedance relay was in a tripped state due to a failed fuse in the impedance relays voltage | ||
sensing circuit. | sensing circuit. | ||
Line 127: | Line 129: | ||
The root cause of this event was a design flaw which allowed the RCP protective relay circuit to | The root cause of this event was a design flaw which allowed the RCP protective relay circuit to | ||
be in a degraded state without proper indication to the operators. | be in a degraded state without proper indication to the operators. This degraded relay circuit | ||
state placed the plant in a condition less tolerant to grid voltage excursions without the requisite | state placed the plant in a condition less tolerant to grid voltage excursions without the requisite | ||
Line 133: | Line 135: | ||
knowledge of the operators. A contributing factor was the failure of the fuse used in the relay | knowledge of the operators. A contributing factor was the failure of the fuse used in the relay | ||
voltage sensing circuit. | voltage sensing circuit. Consequently, as a result of the design flaw coupled with the grid | ||
voltage excursion, a reactor trip occurred from full power. | voltage excursion, a reactor trip occurred from full power. Unplanned reactor trips are identified | ||
in the | in the NRCs Reactor Oversight Process as a performance indicator associated with the | ||
Initiating Events cornerstone. | |||
Licensees rely on plant controls, indications, and alarms to inform operators of plant, system, and sub-system conditions such that proper operation of the plant can be conducted during | Licensees rely on plant controls, indications, and alarms to inform operators of plant, system, and sub-system conditions such that proper operation of the plant can be conducted during | ||
normal, abnormal, and emergency conditions. | normal, abnormal, and emergency conditions. More specifically, these controls, indications, and | ||
alarms allow the operation of the plant while avoiding unnecessary transients and automatic | alarms allow the operation of the plant while avoiding unnecessary transients and automatic | ||
trips. | trips. Relaying circuits should provide indication to the operators upon failure or partial failure of | ||
such circuits. | such circuits. In particular, circuits should indicate protective relay actuation within relaying | ||
circuits (such as the fuse opening and the impedance relay operation, in this case). | circuits (such as the fuse opening and the impedance relay operation, in this case). | ||
==CONTACT== | ==CONTACT== | ||
This IN requires no specific action or written response. | This IN requires no specific action or written response. Please direct any questions about this | ||
matter to the technical contact listed below. | matter to the technical contact listed below. | ||
/RA by TQuay for/ | /RA by TQuay for/ | ||
Michael J. Case, Director | Michael J. Case, Director | ||
Division of Policy and Rulemaking | Division of Policy and Rulemaking | ||
Line 166: | Line 168: | ||
===Technical Contact:=== | ===Technical Contact:=== | ||
(301) 415-3152 e-mail: | ===Kenneth A Miller, NRR=== | ||
(301) 415-3152 e-mail: Kenneth.miller2@nrc.gov | |||
Note: | Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov. Select Electronic Reading Room and then Document Collections. | ||
==CONTACT== | ==CONTACT== | ||
This IN requires no specific action or written response. | This IN requires no specific action or written response. Please direct any questions about this | ||
matter to the technical contact listed below. | matter to the technical contact listed below. | ||
/RA by TQuay for/ | /RA by TQuay for/ | ||
Michael J. Case, Director | |||
Division of Policy and Rulemaking | Division of Policy and Rulemaking | ||
Line 185: | Line 187: | ||
===Technical Contact:=== | ===Technical Contact:=== | ||
===Kenneth A Miller, NRR=== | |||
301-415-3152 e-mail: Kenneth.miller2@nrc.gov | |||
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections. | |||
Distribution: IN Reading File | |||
ADAMS Accession Number: ML081830163 OFFICE TECH EDITOR EEEB:DE BC:EEEB:DE D:EEEB | |||
NAME KAzariah-Kribbs KMIller GWilson PHiland | |||
D:DPR | DATE 06/26/2008 7/2/08 7/2/08 7/3/08 OFFICE LA:PGCB:DPR PGCB:DPR BC:PGCB:DPR D:DPR | ||
MMurphy | NAME CHawes DBeaulieu MMurphy TQuay for MCase | ||
DATE 7/3/08 7/03/08 7/07/08 7/07/08 OFFICIAL RECORD COPY}} | DATE 7/3/08 7/03/08 7/07/08 7/07/08 OFFICIAL RECORD COPY}} | ||
{{Information notice-Nav}} | {{Information notice-Nav}} |
Latest revision as of 16:19, 14 November 2019
ML081830163 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 07/07/2008 |
From: | Michael Case NRC/NRR/ADRO/DPR |
To: | |
lgs1, dls10 | |
References | |
IN-08-012 | |
Download: ML081830163 (4) | |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, DC 20555-0001 July 7, 2008 NRC INFORMATION NOTICE 2008-12: BRAIDWOOD UNIT 1 REACTOR TRIP DUE TO
OFF-SITE POWER FLUCTUATION
ADDRESSEES
All holders of operating licenses for nuclear power reactors, except those who have permanently
ceased operations and have certified that fuel has been permanently removed from the reactor
vessel.
PURPOSE
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform
addressees of the results of a staff evaluation of a recent automatic trip of the Braidwood Unit 1 Nuclear Power Plant due to an offsite power voltage fluctuation coupled with a failed protective
relaying circuit. The NRC expects that recipients will review the information for applicability to
their facilities and consider actions, as appropriate, to avoid similar problems. Suggestions
contained in this IN are not NRC requirements; therefore, no specific action or written response
is required.
DESCRIPTION OF CIRCUMSTANCES
Braidwood Unit 1 experienced an automatic reactor trip from full power on June 27, 2007. The
reactor trip was triggered by low flow in the 1D Reactor Coolant Loop after the 1D Reactor
Coolant Pump (RCP) tripped (appropriate reactor protection system actuation given loss of flow
due to the RCP trip). The event was initiated by a lighting strike 4.3 miles from the plant that
created a single-phase-to-ground fault on transmission line number 2001, which is a 345kV
transmission line. The ground fault suppressed the B-phase voltage to 48 percent of nominal
until 345kV protective breakers at Braidwood and the East Frankfort Transmission Substation
isolated the line about 3 cycles after fault initiation. The suppressed B-phase voltage created a
momentary phase imbalance on the Braidwood RCPs resulting in elevated current on the
unaffected A- and C-phases. The C-phase current on the 1D RCP exceeded the trip set point of
an instantaneous overcurrent protective relay. Normally (by design), the RCP trip on momentary
overcurrent would have been blocked by an in-series impedance relay; however, at the time of
the event, the impedance relay was in a tripped state due to a failed Bussman type KTN-R fuse
in an impedance monitoring circuit.
The licensee has been working on a generic reliability issue with Bussman KTN and KTN-R style
fuses over the last two years (based on Title 10, Part 21, Reporting of Defects and
Noncompliance, of the Code of Federal Regulations reporting for these fuses). There have
been several intermittent or complete fuse failures caused by fuse element cracking
characterized as fatigue failure. After a fuse failure on 6.9kV Bus 157 in January 2007, the licensee made the decision to replace all Bussman fuses installed on the 6.9kV bus
protective relay circuits. However, due to the risk of tripping an RCP during fuse replacement, these fuses were to be replaced during outages. The fuse that failed in the 1D RCP protective
relay circuit was scheduled for replacement in the next refueling outage. The licensee
considered this a small risk, since fuse failures had been self-revealing and promptly replaced to
restore the designed relay scheme. However, the only fuse in the RCP protective relaying circuit
without a loss-of-bus-voltage indication or alarm (not self-revealing), failed in this event. Only
the disturbance in the transmission system and the resulting Unit 1 trip indicated the vulnerability
within the RCP protective relaying circuitry.
The corrective action planned by the licensee was to either implement a design change to
eliminate the identified vulnerability from the RCP protective relaying system, or, if design
changes were not appropriate, to develop alternate actions to address the vulnerability.
Additional information is available in Braidwood Station, Unit 1, Licensee Event Report 2007-
001-00, dated August 27, 2007 (ADAMS Accession No. ML072400074).
DISCUSSION
The event was initiated by a lightning strike to a 345kV transmission line which caused a
line-to-ground fault. The fault caused the voltage on B-phase to drop to 48 percent of the
nominal voltage until the transmission line breakers opened, appropriately isolating the fault. The
duration of the event from fault initiation until the breakers opened was about 0.051 seconds
(about 3 cycles). With the B-phase voltage low, the plants RCPs responded by drawing more
current on A- and C-phases to maintain RCP power output. The 1D RCPs supply breaker
tripped on overcurrent in the C-phase. The instantaneous over-current relay set point was
exceeded and it actuated appropriately. Based on the circuits design, a series impedance relay
should normally block the momentary overcurrent condition; however, at the time of this event, the impedance relay was in a tripped state due to a failed fuse in the impedance relays voltage
sensing circuit.
The root cause of this event was a design flaw which allowed the RCP protective relay circuit to
be in a degraded state without proper indication to the operators. This degraded relay circuit
state placed the plant in a condition less tolerant to grid voltage excursions without the requisite
knowledge of the operators. A contributing factor was the failure of the fuse used in the relay
voltage sensing circuit. Consequently, as a result of the design flaw coupled with the grid
voltage excursion, a reactor trip occurred from full power. Unplanned reactor trips are identified
in the NRCs Reactor Oversight Process as a performance indicator associated with the
Initiating Events cornerstone.
Licensees rely on plant controls, indications, and alarms to inform operators of plant, system, and sub-system conditions such that proper operation of the plant can be conducted during
normal, abnormal, and emergency conditions. More specifically, these controls, indications, and
alarms allow the operation of the plant while avoiding unnecessary transients and automatic trips. Relaying circuits should provide indication to the operators upon failure or partial failure of
such circuits. In particular, circuits should indicate protective relay actuation within relaying
circuits (such as the fuse opening and the impedance relay operation, in this case).
CONTACT
This IN requires no specific action or written response. Please direct any questions about this
matter to the technical contact listed below.
/RA by TQuay for/
Michael J. Case, Director
Division of Policy and Rulemaking
Office of Nuclear Reactor Regulation
Technical Contact:
Kenneth A Miller, NRR
(301) 415-3152 e-mail: Kenneth.miller2@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov. Select Electronic Reading Room and then Document Collections.
CONTACT
This IN requires no specific action or written response. Please direct any questions about this
matter to the technical contact listed below.
/RA by TQuay for/
Michael J. Case, Director
Division of Policy and Rulemaking
Office of Nuclear Reactor Regulation
Technical Contact:
Kenneth A Miller, NRR
301-415-3152 e-mail: Kenneth.miller2@nrc.gov
Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.
Distribution: IN Reading File
ADAMS Accession Number: ML081830163 OFFICE TECH EDITOR EEEB:DE BC:EEEB:DE D:EEEB
NAME KAzariah-Kribbs KMIller GWilson PHiland
DATE 06/26/2008 7/2/08 7/2/08 7/3/08 OFFICE LA:PGCB:DPR PGCB:DPR BC:PGCB:DPR D:DPR
NAME CHawes DBeaulieu MMurphy TQuay for MCase
DATE 7/3/08 7/03/08 7/07/08 7/07/08 OFFICIAL RECORD COPY