|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML091320704 | | | number = ML091320704 |
| | issue date = 06/09/2009 | | | issue date = 06/09/2009 |
| | title = North Anna Power Station, Units 1 & 2 - Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 | | | title = Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) |
| | author name = Stang J F | | | author name = Stang J |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000338, 05000339 | | | docket = 05000338, 05000339 |
Line 14: |
Line 14: |
| | page count = 4 | | | page count = 4 |
| | project = TAC:ME0965, TAC:ME0966 | | | project = TAC:ME0965, TAC:ME0966 |
| | stage = Withholding Request | | | stage = Withholding Request Acceptance |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 9,2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 |
| | |
| | ==SUBJECT:== |
| | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE CAMERON SUPPORTING DOCUMENTS (TAC NOS. ME0965 AND ME0966) |
| | |
| | ==Dear Mr. Heacock:== |
| | |
| | By letter dated March 26, 2009, Virginia Electric and Power Company submitted an affidavit dated February 18, 2009, executed by Calvin R. Hastings, General Manager of Caldon Ultrasonics Technology Center requesting that the following documents (in their entirety) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| | : 1) Caldon Ultrasonics Engineering Report ER-646 Rev. 2 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 1 Using the LEFM,I + |
| | System" |
| | : 2) Caldon Ultrasonics Engineering Report No. 689 Rev. 2 "LEFM,I + Meter Factor Calculation and Accuracy Assessment for North Anna Unit 1" |
| | : 3) Caldon Ultrasonics Engineering Report ER-637 Rev. 3 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 2 Using the LEFM,I + |
| | System" |
| | : 4) Caldon Ultrasonics Engineering Report No. 675 Rev. 2 "LEFM,I + Meter Factor Calculation and Accuracy Assessment for North Anna Unit 2" The affidavit stated that the above documents (in their entirety) should be considered exempt from mandatory public disclosure for the following reasons: |
| | (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies. |
| | (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. |
| | |
| | D. Heacock - 2 (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product. |
| | (d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Cameron, its customer or suppliers. |
| | (e) It reveals aspects of past, present or future Cameron or customer funded development plans and programs of potential customer value to Cameron. |
| | (f) It contains patentable ideas, for which patent protection may be desirable. |
| | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the four aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | |
| | D. Heacock -3 If you have any questions regarding this matter, I may be reached at 301-415-1345. |
| | n F. Stang, Senior reject Manager ant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv |
| | |
| | ML091320704 NRR-106 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlEICB/BC NRRlLPL2-1/BC NAME VSreenivas JSlang MO'Brien WKemper MWong DATE OS/27/09 06/09/09 OS/27/09 OS/27/09 06/09/09}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0909000552009-03-26026 March 2009 License Amendment Request, Measurement Uncertainty Recapture Power Uprate Project stage: Request ML0913104952009-05-21021 May 2009 Acceptance of Requested Licensing Action Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) Project stage: Withholding Request Acceptance ML0916003472009-06-17017 June 2009 Request for Additional Information (RAI) of Requested Licensing Action Measurement Uncertainty Recapture (Mur) Power Uprate Project stage: RAI ML0919102042009-07-0808 July 2009 Response to Request for Additional Information on Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0919705952009-07-16016 July 2009 Response to Request for Additional Information, License Amendment Request, Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0920507142009-07-24024 July 2009 Response to Request for Additional Information, License Amendment - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0922506162009-10-22022 October 2009 Units, 1 and 2, Issuance of Amendments 257 & 238 Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2009-06-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24
[Table view] Category:Proprietary Information Review
MONTHYEARML23101A0422023-05-0303 May 2023 Request for Withholding Information from Public Disclosure for North Anna Power Station Units 1 & 2, Surry Units 1 & 2 and Millstone Units 2 & 3, Request for Withholding, Appendix F of Fleet Report DOM-NAF-2-P ML22355A1832023-03-0101 March 2023 Request for Withholding Information from Public Disclosure for North Anna Station, Units 1 & 2, Surry Station, Units 1 & 2, and Millstone Station, Units 2 & 3 - Request for Withholding Appendix F of Fleet Report DOM-NAF-2 ML22335A4142022-12-21021 December 2022 Request for Withholding Information from Public Disclosure for Dominion Fleet Response to Request for Additional Information Regarding NRC Generic Letter 2004-02 ML21148A1502021-06-0808 June 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2, Surry Power Station, Units 1 & 2, and Millstone Power Station, Units 2 & 3, Request for Withholding Response to NRC Request for Additional ML21097A0272021-04-14014 April 2021 Request for Withholding from Public Disclosure Regarding Subsequent License Renewal Application ML21075A2592021-03-18018 March 2021 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Request for Withholding, Appendix E of Fleet Report Dom- ML20178A3212020-07-16016 July 2020 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 1, Proposed Inservice Inspection Interval Alternative N1 I5 NDE-002 ML19043A7452019-02-14014 February 2019 Request for Withholding Information from Public Disclosure for North Anna Power Station, Unit 2, Related to Inservice Inspection Alternative Request N2-I4-NDE-007 ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 ML13053A3612013-03-0707 March 2013 Request for Withholding Information from Public Disclosure for DNC, DEK, Virginia Kewaunee Unit 1, Millstone Power Station, Units 1, 2 & 3, North Anna Units 1 & 2, Surry Units 1 & 2 Information Pertaining to Foreign Interests ML13051A9652013-02-26026 February 2013 Request for Withholding Information from Public Disclosure ML12172A0532012-06-26026 June 2012 Request for Withholding Information from Public Disclosure ML1025601852010-09-28028 September 2010 ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13 ML0934504082009-12-23023 December 2009 Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined to Be Proprietary ML0913207042009-06-0909 June 2009 Request for Withholding Information from Public Disclosure for North Anna Power Station, Units 1 & 2 Regarding Measurement Uncertainty Recapture Power Uprate - Cameron Supporting Documents (TAC ME0965 & ME0966) ML0732400982007-11-29029 November 2007 Request for Withholding Information from Public for Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, and Millstone Power Station and Kewaunee Power Station (TAC Nos. MD6144, MD6145, MD6146, MD6147, MD6148, MD6149 ML0715000152007-06-26026 June 2007 Request for Withholding Information from Public Disclosure ML0621903542006-08-0707 August 2006 Withholding Information from Public Disclosure. ML0618004712006-07-18018 July 2006 Units 2 & 3, Withholding from Public Disclosure, CD-ROM Containing Electronic Gothic Input & Output Files from Benchmark Cases in Sections 4.3, 4.4, 4.5, & 4.6 of TR DOM-NAF-3, Gothic Methodology for Analyzing. ML0316204982003-06-11011 June 2003 Framatome Anp Request for Withholding Information from Public Disclosure ML0316106732003-06-10010 June 2003 Withholding from Public Disclosure, Document Response to Request for Additional Information and Revised Pages for March 2002 Evaluation Report - Framatome Fuel Transition Program Technical Specification Change ML0302402942003-01-24024 January 2003 Withholding from Public Disclosure, Equipment Specifications 676413, Rev. 1, General Reactor Vessel Specification & 953069, Rev. 0, Addendum to Equipment Specification 676433, Rev. 1 ML0235801542002-12-24024 December 2002 Request for Withholding Information from Public Disclosure, TAC Nos. MB5435, MB5436, MB5433, MB5434 ML0213606382002-05-13013 May 2002 Request for Withholding Information from Public Disclosure by Letter Dated 02/11/2002 2023-05-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 9,2009 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE CAMERON SUPPORTING DOCUMENTS (TAC NOS. ME0965 AND ME0966)
Dear Mr. Heacock:
By letter dated March 26, 2009, Virginia Electric and Power Company submitted an affidavit dated February 18, 2009, executed by Calvin R. Hastings, General Manager of Caldon Ultrasonics Technology Center requesting that the following documents (in their entirety) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
- 1) Caldon Ultrasonics Engineering Report ER-646 Rev. 2 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 1 Using the LEFM,I +
System"
- 2) Caldon Ultrasonics Engineering Report No. 689 Rev. 2 "LEFM,I + Meter Factor Calculation and Accuracy Assessment for North Anna Unit 1"
- 3) Caldon Ultrasonics Engineering Report ER-637 Rev. 3 "Bounding Uncertainty Analysis for Thermal Power Determination at North Anna Unit 2 Using the LEFM,I +
System"
- 4) Caldon Ultrasonics Engineering Report No. 675 Rev. 2 "LEFM,I + Meter Factor Calculation and Accuracy Assessment for North Anna Unit 2" The affidavit stated that the above documents (in their entirety) should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
D. Heacock - 2 (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Cameron, its customer or suppliers.
(e) It reveals aspects of past, present or future Cameron or customer funded development plans and programs of potential customer value to Cameron.
(f) It contains patentable ideas, for which patent protection may be desirable.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the four aforementioned documents marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
D. Heacock -3 If you have any questions regarding this matter, I may be reached at 301-415-1345.
n F. Stang, Senior reject Manager ant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339 cc: Distribution via Listserv
ML091320704 NRR-106 OFFICE NRRlLPL2-1/PM NRRlLPL2-1/PM NRRlLPL2-1/LA NRRlEICB/BC NRRlLPL2-1/BC NAME VSreenivas JSlang MO'Brien WKemper MWong DATE OS/27/09 06/09/09 OS/27/09 OS/27/09 06/09/09