IR 05000387/2009404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 24: Line 24:


==Dear Mr. Rausch:==
==Dear Mr. Rausch:==
On August 7, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC
On August 7, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 7, 2009, with you and other members of your staff.
=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 7, 2009, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified.
Based on the results of this inspection, no findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
=s enclosure will not be available for public inspection.


When separated from its Enclosure, this document is DECONTROLLED. - SECURI TY-RELATED INFORMATION In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC
When separated from its Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,
Sincerely,
/RA/ James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety  
/RA/
 
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Enclosure: NRC Inspection Report Nos. 05000387/2009404 and 05000388/2009404 w/Attachment: Supplemental Information (CONTAINS (OUO-SRI))
Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Enclosure: NRC Inspection Report Nos. 05000387/2009404 and 05000388/2009404 w/Attachment: Supplemental Information (CONTAINS (OUO-SRI))
}}
}}

Latest revision as of 02:22, 14 November 2019

IR 05000387-09-404 and 05000388-09-404, on 08/3/2009 - 08/7/2009, Susquehanna Steam Electric Station, Security (Letter Only)
ML092520308
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/09/2009
From: James Trapp
Plant Support Branch 1
To: Rausch T
Susquehanna
References
IR-09-404
Download: ML092520308 (5)


Text

ber 9, 2009

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION- NRC SECURITY INSPECTION REPORT NOS. 05000387/2009404 AND 05000388/2009404

Dear Mr. Rausch:

On August 7, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 7, 2009, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

When separated from its Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Enclosure: NRC Inspection Report Nos. 05000387/2009404 and 05000388/2009404 w/Attachment: Supplemental Information (CONTAINS (OUO-SRI))