| | number = ML100970734 | | | number = ML100970734 |
| | issue date = 04/07/2010 | | | issue date = 04/07/2010 |
| | title = Dresden Nuclear Power Station, Unit 3 - Notification of NRC Inspection and Request for Information | | | title = Notification of NRC Inspection and Request for Information |
| | author name = Ring M A | | | author name = Ring M |
| | author affiliation = NRC/RGN-III/DRP/B1 | | | author affiliation = NRC/RGN-III/DRP/B1 |
| | addressee name = Pardee C G | | | addressee name = Pardee C |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
| | docket = 05000249 | | | docket = 05000249 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 7, 2010 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 7, 2010 EA-09-172 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 |
| | |
| EA-09-172 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear | |
| | |
| 4300 Winfield Road | |
| | |
| Warrenville, IL 60555 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION | | DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION |
|
| |
|
| ==Dear Mr. Pardee:== | | ==Dear Mr. Pardee:== |
|
| |
|
| By a letter dated October 26, 2009, the NRC communicated to you the final significance determination for a finding having low to moderate safety significance (White) at your Dresden Nuclear Power Station. The finding involved the failure on November 3, 2008, to prevent inadvertent and uncontrolled control rod withdrawal by non-licensed operators. | | By a letter dated October 26, 2009, the NRC communicated to you the final significance determination for a finding having low to moderate safety significance (White) at your Dresden Nuclear Power Station. The finding involved the failure on November 3, 2008, to prevent inadvertent and uncontrolled control rod withdrawal by non-licensed operators. |
| | | On April 5, 2010, we were notified by your staff that applicable corrective actions for that finding had either been completed or initiated, and that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding. Accordingly, we plan to conduct a supplemental inspection, beginning on May 10, 2010, at Dresden Nuclear Power Station using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. This on-site inspection is scheduled to be performed May 10 through May 14, 2010. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection. The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection. |
| On April 5, 2010, we were notified by your staff that applicable corrective actions for that finding had either been completed or initiated, and that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding. Accordingly, we plan to conduct a supplemental inspection, beginning on May 10, 2010, at Dresden Nuclear Power Station using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." This on-site inspection is scheduled to be performed May 10 through May 14, 2010. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection. The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the | |
| | |
| on-site portion of the inspection. | |
| We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Joseph Griffin of your organization. If there are any questions about this inspection or the material requested, please contact the inspection team leader, Mr. Brian Kemker at (217) 935-9521. | | We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Joseph Griffin of your organization. If there are any questions about this inspection or the material requested, please contact the inspection team leader, Mr. Brian Kemker at (217) 935-9521. |
| C. Pardee
| |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ | | C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Mark A. Ring, Chief Branch 1 Division of Reactor Projects | | Sincerely, |
| | | /RA/ |
| Docket No. 50-249 License No. DPR-25 | | Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-249 License No. DPR-25 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Supplemental Inspection Document Request cc w/encl: Distribution via ListServ C. Pardee | | Supplemental Inspection Document Request cc w/encl: Distribution via ListServ |
| | |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/
| |
| Mark A. Ring, Chief Branch 1 Division of Reactor Projects
| |
|
| |
|
| Docket No. 50-249 License No. DPR-25 | | C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Sincerely, |
| | /RA/ |
| | Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-249 License No. DPR-25 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Supplemental Inspection Document Request cc w/encl: Distribution via ListServ | | Supplemental Inspection Document Request cc w/encl: Distribution via ListServ DOCUMENT: G:\1-Secy\1-Work In Progress\DRES 95001 Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE ClinRIO E RIII E NAME JBenjamin for MRing BKemker DATE 04/07/10 04/07/10 OFFICIAL RECORD COPY |
|
| |
|
| DOCUMENT: G:\1-Secy\1-Work In Progress\DRES 95001 Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in th e concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE ClinRIO E RIII E NAME JBenjamin for BKemker MRing DATE 04/07/10 04/07/10 OFFICIAL RECORD COPY Letter to C. Pardee from M. Ring dated April 7, 2010
| | Letter to C. Pardee from M. Ring dated April 7, 2010 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION | | DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION: |
| | | Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource |
| DISTRIBUTION | |
| : Susan Bagley
| |
| | |
| RidsNrrDorlLpl3-2 | |
| | |
| RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck | |
| | |
| Allan Barker Carole Ariano Linda Linn | |
| | |
| DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource | |
| | |
| 1 Enclosure SUPPLEMENTAL INSPECTION DOCUMENT REQUEST
| |
| | |
| Inspection Dates: May 10-14, 2010 Inspection Procedure:
| |
| IP 95001, Supplemental Inspection Inspectors: Brian Kemker, Team Leader U.S. Nuclear Regulatory Commission ATTN: Resident Office - Clinton 8403 Power Road Clinton, IL 61727
| |
| | |
| Brian.Kemker@nrc.gov David Reeser U.S. Nuclear Regulatory Commission Region III - Division of Reactor Safety 2443 Warrenville Road, Suite 210 Lisle, Il 60532-4352 David.Reeser@nrc.gov
| |
| | |
| Information Requested One Week Prior to the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be delivered to each of the inspectors on or before May 3, 2010. If you have any questions regarding this information, please contact the inspectors as soon as possible.
| |
| | |
| All documents associated with your evaluation of the White finding identified in Dresden Nuclear Power Station Inspection Reports 05000249/2009009 and 05000249/2009010. The scope of the documents should include:
| |
|
| |
|
| Your analysis of the root cause(s) and contributing cause(s) of the identified issue; Your evaluation of the extent of condition and extent of cause of the issue; All corrective actions implemented for the identified issue, including the schedule established for implementing and completing the corrective actions; and Your assessment/evaluation of the effectiveness of the corrective actions that have been implemented. | | SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Inspection Dates: May 10-14, 2010 Inspection Procedure: IP 95001, Supplemental Inspection Inspectors: Brian Kemker, Team Leader U.S. Nuclear Regulatory Commission ATTN: Resident Office - Clinton 8403 Power Road Clinton, IL 61727 Brian.Kemker@nrc.gov David Reeser U.S. Nuclear Regulatory Commission Region III - Division of Reactor Safety 2443 Warrenville Road, Suite 210 Lisle, Il 60532-4352 David.Reeser@nrc.gov Information Requested One Week Prior to the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be delivered to each of the inspectors on or before May 3, 2010. If you have any questions regarding this information, please contact the inspectors as soon as possible. |
| | All documents associated with your evaluation of the White finding identified in Dresden Nuclear Power Station Inspection Reports 05000249/2009009 and 05000249/2009010. The scope of the documents should include: |
| | * Your analysis of the root cause(s) and contributing cause(s) of the identified issue; |
| | * Your evaluation of the extent of condition and extent of cause of the issue; |
| | * All corrective actions implemented for the identified issue, including the schedule established for implementing and completing the corrective actions; and |
| | * Your assessment/evaluation of the effectiveness of the corrective actions that have been implemented. |
| | 1 Enclosure |
|
| |
|
| 2 Enclosure Information Requested for the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be available at the entrance meeting for the inspection (May 10, 2010). The inspectors understand some of the requested documents or records may require special handling and will be available after the entrance meeting to ensure appropriate protection and control of the documents or records.
| | Information Requested for the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be available at the entrance meeting for the inspection (May 10, 2010). The inspectors understand some of the requested documents or records may require special handling and will be available after the entrance meeting to ensure appropriate protection and control of the documents or records. |
| If you have any questions regarding this information, please contact the inspectors as soon as possible. | | If you have any questions regarding this information, please contact the inspectors as soon as possible. |
| All supporting documents or records associated with your corrective actions implemented for the identified issue including plant procedure changes, Operating Experience Program changes, training requests, training completion records, etc.}} | | All supporting documents or records associated with your corrective actions implemented for the identified issue including plant procedure changes, Operating Experience Program changes, training requests, training completion records, etc. |
| | 2 Enclosure}} |
|
---|
Category:Letter
MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23037A9192023-02-0707 February 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000237/2023011 and 05000249/2023011 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22270A1032022-09-27027 September 2022 Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21097A2602021-04-0808 April 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21096A1752021-04-0606 April 2021 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000237/2021011; 05000249/2021011 ML21063A3202021-03-0202 March 2021 RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20337A4242020-12-0202 December 2020 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000237/2021401 and 05000249/2021401 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20231A7432020-08-18018 August 2020 Request for Additional Information (IOLB/HFT-RAI-1) Dresden MSIV LAR ML20224A3532020-08-11011 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2020004 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20094H0292020-03-27027 March 2020 Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements ML20071G2242020-03-11011 March 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19226A3712019-08-14014 August 2019 Ltr. 08/14/19 Dresden Nuclear Power Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2019004 (DRS-M.Domke) ML18330A2382018-11-21021 November 2018 Initial Information Request (Part 1) for the Upcoming Phase IV License Renewal Inspection; Inspection Report 05000237(249)/2019010; E-Mailed 11/21/18 (DRS-J.Corujo-Sandin) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17353A9492018-01-0909 January 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment ML17360A0082017-12-22022 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML18002A4572017-12-22022 December 2017 NRR E-mail Capture - (External_Sender) (External) Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17363A4422017-12-21021 December 2017 Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh) ML17342A7372017-12-0808 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Draft RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17191A2582017-07-11011 July 2017 RAI Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2 (CAC NOS.MF9295 and MF9296) ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16308A1002016-11-10010 November 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements (Cac. No. MF7325-MF7330) ML16208A0282016-07-25025 July 2016 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2016004 (LAS) ML16172A1112016-06-29029 June 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements(Cac Nos.MF7325-MF7330) ML16153A2812016-06-0808 June 2016 Request for Additional Information Related to the License Amendment Request to Increase the Minimum Required Fuel Oil in Each Standby Diesel Generator Fuel Oil Day Tank (CAC Nos. MF7158 and MF7159) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15329A2462016-01-19019 January 2016 Request for Additional Information Related to the License Amendment Request to Transition to Areva Fuel ML15232A6702015-09-29029 September 2015 Request for Additional Information Related to Dresden Units 2 and 3 License Amendment Request for Spent Fuel Storage Criticality Methodology ML15261A3912015-09-17017 September 2015 Ltr. 09/17/2015 Dresden Nuclear Plant, Unit 2 - Notification of NRC Inspection and Request for Information - Baseline Inspection (Txb) ML15232A7002015-08-31031 August 2015 Request for Additional Information Regarding License Amendment Request to Add Technical Specification for Inservice ML14346A4432015-02-0505 February 2015 Request for Additional Information Relate to License Amendment Request Technical Specification Changes, to Add an NRC Approved Topical Report Reference 2023-09-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 7, 2010 EA-09-172 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Pardee:
By a letter dated October 26, 2009, the NRC communicated to you the final significance determination for a finding having low to moderate safety significance (White) at your Dresden Nuclear Power Station. The finding involved the failure on November 3, 2008, to prevent inadvertent and uncontrolled control rod withdrawal by non-licensed operators.
On April 5, 2010, we were notified by your staff that applicable corrective actions for that finding had either been completed or initiated, and that you were ready for the NRC to conduct our supplemental inspection to review the actions taken to address the White finding. Accordingly, we plan to conduct a supplemental inspection, beginning on May 10, 2010, at Dresden Nuclear Power Station using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. This on-site inspection is scheduled to be performed May 10 through May 14, 2010. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection. The documents identified are those that the inspectors will need prior to and upon arrival at the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Joseph Griffin of your organization. If there are any questions about this inspection or the material requested, please contact the inspection team leader, Mr. Brian Kemker at (217) 935-9521.
C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-249 License No. DPR-25
Enclosure:
Supplemental Inspection Document Request cc w/encl: Distribution via ListServ
C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-249 License No. DPR-25
Enclosure:
Supplemental Inspection Document Request cc w/encl: Distribution via ListServ DOCUMENT: G:\1-Secy\1-Work In Progress\DRES 95001 Letter.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE ClinRIO E RIII E NAME JBenjamin for MRing BKemker DATE 04/07/10 04/07/10 OFFICIAL RECORD COPY
Letter to C. Pardee from M. Ring dated April 7, 2010
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNIT 3 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Inspection Dates: May 10-14, 2010 Inspection Procedure: IP 95001, Supplemental Inspection Inspectors: Brian Kemker, Team Leader U.S. Nuclear Regulatory Commission ATTN: Resident Office - Clinton 8403 Power Road Clinton, IL 61727 Brian.Kemker@nrc.gov David Reeser U.S. Nuclear Regulatory Commission Region III - Division of Reactor Safety 2443 Warrenville Road, Suite 210 Lisle, Il 60532-4352 David.Reeser@nrc.gov Information Requested One Week Prior to the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be delivered to each of the inspectors on or before May 3, 2010. If you have any questions regarding this information, please contact the inspectors as soon as possible.
All documents associated with your evaluation of the White finding identified in Dresden Nuclear Power Station Inspection Reports 05000249/2009009 and 05000249/2009010. The scope of the documents should include:
- Your analysis of the root cause(s) and contributing cause(s) of the identified issue;
- Your evaluation of the extent of condition and extent of cause of the issue;
- All corrective actions implemented for the identified issue, including the schedule established for implementing and completing the corrective actions; and
- Your assessment/evaluation of the effectiveness of the corrective actions that have been implemented.
1 Enclosure
Information Requested for the On-Site Inspection Week To assist NRC inspectors in conducting the supplemental inspection scheduled for the above dates, we request the following information, in hard copy or electronic format, be available at the entrance meeting for the inspection (May 10, 2010). The inspectors understand some of the requested documents or records may require special handling and will be available after the entrance meeting to ensure appropriate protection and control of the documents or records.
If you have any questions regarding this information, please contact the inspectors as soon as possible.
All supporting documents or records associated with your corrective actions implemented for the identified issue including plant procedure changes, Operating Experience Program changes, training requests, training completion records, etc.
2 Enclosure