ML101760194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 .Ju.ly 12, 2010 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: TRANSITION TO AREVA FUEL -
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME2831 AND ME2832)  
                                          .Ju.ly 12, 2010 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
 
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: TRANSITION TO AREVA FUEL - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME2831 AND ME2832)


==Dear Mr. Gellrich:==
==Dear Mr. Gellrich:==
By letters dated November 23, 2009, and April 22, 2010, you submitted 3 affidavits executed by Gayle F. Elliott, Manager, Product Licensing, for AREVA NP Inc. You requested that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
By letters dated November 23, 2009, and April 22, 2010, you submitted 3 affidavits executed by Gayle F. Elliott, Manager, Product Licensing, for AREVA NP Inc. You requested that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
ANP-2834(P), Revision 000, "Calvert Cliffs Nuclear Plant Unit 1 Cycle 21  
ANP-2834(P), Revision 000, "Calvert Cliffs Nuclear Plant Unit 1 Cycle 21 & Unit 2 Cycle 19, Realistic Large Break LOCA [Ioss-of-coolant accident] Summary Report,"
& Unit 2 Cycle 19, Realistic Large Break LOCA
September 2009. Affidavit signed September 14, 2009.
[Ioss-of-coolant accident] Summary Report," September 2009. Affidavit signed September 14, 2009.
ANP-2857(P), Revision 0, "Loss of Forced Reactor Coolant Flow Analysis for Calvert Cliffs Nuclear Power Plant, Unit 2," September 2009. Affidavit signed September 16, 2009.
ANP-2857(P), Revision 0, "Loss of Forced Reactor Coolant Flow Analysis for Calvert Cliffs Nuclear Power Plant, Unit 2," September 2009. Affidavit signed September 16, 2009. ANP-2915(P), Revision 1, "Request for Additional Information -Calvert Cliffs Unit 2 Cycle 19 Fuel Rod Thermal Mechanical Inputs," April 2010.
ANP-2915(P), Revision 1, "Request for Additional Information - Calvert Cliffs Unit 2 Cycle 19 Fuel Rod Thermal Mechanical Inputs," April 2010. Affidavit signed April 13, 2010.
Affidavit signed April 13, 2010. A nonproprietary copy of these documents has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
A nonproprietary copy of these documents has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service. The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
G. -2We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1364.
The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc. P.O. Box Lynchburg, VA Additional Distribution via Listserv G. -2We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-1364.
 
Sincerely, IRA! Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.
G. Gellrich                                      -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
P.O. Box Lynchburg, VA Additional Distribution via Listserv DISTRIBUTION:
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
PUBLIC LPL1-1 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-1 RidsNrrLASLittle RidsNrrPMCalvertCliffs RidsNrrDssSrxb RidsOgcMailCenter Resource RidsRgn1 MailCenter ADAMS Accession No'.. ML101760194 OFFICE LPL 1-1/PM LPL 1-1/LA SRXB/BC LPL 1-1/BC NAME DPickett SUttle AUlses NSalgado DATE 6/30/10 6/29/10 7/9 110 7/12/10 OFFICIAL RECORD COpy}}
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1364.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc:    Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.
P.O. Box 11646 Lynchburg, VA 24506 Additional Distribution via Listserv
 
G. Gellrich                                    -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1364.
Sincerely, IRA!
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.
P.O. Box 11646 Lynchburg, VA 24506 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC                   LPL1-1 r/f                     RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-1       RidsNrrLASLittle               RidsNrrPMCalvertCliffs RidsNrrDssSrxb           RidsOgcMailCenter Resource RidsRgn1 MailCenter ADAMS Accession No'.. ML101760194 OFFICE       LPL 1-1/PM             LPL 1-1/LA             SRXB/BC             LPL 1-1/BC NAME         DPickett               SUttle                 AUlses               NSalgado DATE         6/30/10                 6/29/10               7/9 110             7/12/10 OFFICIAL RECORD COpy}}

Revision as of 17:43, 13 November 2019

Request for Withholding Information from Public Disclosure Transition to Areva Fuel-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos. ME2831 and ME2832)
ML101760194
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/12/2010
From: Pickett D
Plant Licensing Branch 1
To: George Gellrich
Calvert Cliffs
pickett , NRR/DORL, 415-1364
References
TAC ME2832, TAC ME2831
Download: ML101760194 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

.Ju.ly 12, 2010 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: TRANSITION TO AREVA FUEL - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME2831 AND ME2832)

Dear Mr. Gellrich:

By letters dated November 23, 2009, and April 22, 2010, you submitted 3 affidavits executed by Gayle F. Elliott, Manager, Product Licensing, for AREVA NP Inc. You requested that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

ANP-2834(P), Revision 000, "Calvert Cliffs Nuclear Plant Unit 1 Cycle 21 & Unit 2 Cycle 19, Realistic Large Break LOCA [Ioss-of-coolant accident] Summary Report,"

September 2009. Affidavit signed September 14, 2009.

ANP-2857(P), Revision 0, "Loss of Forced Reactor Coolant Flow Analysis for Calvert Cliffs Nuclear Power Plant, Unit 2," September 2009. Affidavit signed September 16, 2009.

ANP-2915(P), Revision 1, "Request for Additional Information - Calvert Cliffs Unit 2 Cycle 19 Fuel Rod Thermal Mechanical Inputs," April 2010. Affidavit signed April 13, 2010.

A nonproprietary copy of these documents has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.

The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.

G. Gellrich -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1364.

Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.

P.O. Box 11646 Lynchburg, VA 24506 Additional Distribution via Listserv

G. Gellrich -2 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b )(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1364.

Sincerely, IRA!

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: Gayle F. Elliott, Manager, Product Licensing AREVA NP Inc.

P.O. Box 11646 Lynchburg, VA 24506 Additional Distribution via Listserv DISTRIBUTION:

PUBLIC LPL1-1 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-1 RidsNrrLASLittle RidsNrrPMCalvertCliffs RidsNrrDssSrxb RidsOgcMailCenter Resource RidsRgn1 MailCenter ADAMS Accession No'.. ML101760194 OFFICE LPL 1-1/PM LPL 1-1/LA SRXB/BC LPL 1-1/BC NAME DPickett SUttle AUlses NSalgado DATE 6/30/10 6/29/10 7/9 110 7/12/10 OFFICIAL RECORD COpy