ML101940174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/06/2010
| issue date = 07/06/2010
| title = Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses
| title = Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses
| author name = Crowell P L
| author name = Crowell P
| author affiliation = Idaho State Univ
| author affiliation = Idaho State Univ
| addressee name = Hardesty D A
| addressee name = Hardesty D
| addressee affiliation = NRC/Document Control Desk, NRC/NMSS, NRC/NRR
| addressee affiliation = NRC/Document Control Desk, NRC/NMSS, NRC/NRR
| docket = 05000284, 07001374
| docket = 05000284, 07001374
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:July 6, 2010 NRC Public Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North Mail Stop: OWFN-1-F13 11555 Rockville Pike Rockville, MD 20852-2738 Attention:
{{#Wiki_filter:July 6, 2010 NRC Public Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North                             Attention: Mr. Duane Hardesty Mail Stop: OWFN-1-F13                                         Program Manager 11555 Rockville Pike                                           Research & Test Reactors Rockville, MD 20852-2738                                       Mail Stop: 0-12 D-03 11555 Rockville Pike Rockville, MD 20852 STATE UNIVERSITY          
Mr. Duane Hardesty Program Manager Research & Test Reactors Mail Stop: 0-12 D-03 11555 Rockville Pike Rockville, MD 20852 STATE UNIVERSITY Office of Research 921 South 8th Avenue, Stop 8130 Pocatello, Idaho 83209-8130 Physical Address: 1010 South 5th St.Bldg 11, Room 205


==SUBJECT:==
==SUBJECT:==
Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses.Enclosed is Revision #Sof the Physical Security Plan for the Nuclear Engineering Laboratory complex at Idaho State University.
Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses.
This document is intended to replace Revision #5, which was produced earlier this year. The revisions incorporated in this document reflect only additional information about the construction of the facility and clarification concerning our confirming to protocol, as recommended by members of your staff in their visit a few months ago. None of the wording changes and additions affect the level of security.This plan concerns the two reactor NRC licenses: R-1 10 License, with Duane Hardesty as the NRC Project Manager SNM-1373 License, with Mary Adams as the NRC Project Manager Please note that the document, Physical Security Plan, is designated as Safeguards Information.
Enclosed is Revision #Softhe Physical Security Plan for the Nuclear Engineering Laboratory complex at Idaho State University. This document is intended to replace Revision #5, which was produced earlier this year. The revisions incorporated in this Office of Research document reflect only additional information about the construction of the facility and 921 South 8th Avenue, clarification concerning our confirming to protocol, as recommended by members of your Stop 8130              staff in their visit a few months ago. None of the wording changes and additions affect the Pocatello, Idaho      level of security.
It is not for public disclosure.
83209-8130 This plan concerns the two reactor NRC licenses:
Physical Address:              R-1 10 License, with Duane Hardesty as the NRC Project Manager 1010 South 5th St.
Bldg 11, Room 205 SNM-1373 License, with Mary Adams as the NRC Project Manager Please note that the document, Physical Security Plan, is designated as Safeguards Information. It is not for public disclosure.
Should you have any questions, please refer them to the Reactor Administrator, Dr. Jay Kunze, at 208-282-4147, kunzejay@isu.edu.
Should you have any questions, please refer them to the Reactor Administrator, Dr. Jay Kunze, at 208-282-4147, kunzejay@isu.edu.
Sincerely, ,L,1 Pamela L. Crowell, PhD Vice President of Research* 00 Affirmation: °Pu "o% 0 I certify that the foregoing is true and correct: v',,4. O .Executed on L July, 2010. Signature:
Sincerely,
Jmv_, ru Y4.-c: Mr. Duane Hardesty, Mail Stop 0-12 D-03 9 Note: This letter is not Safeguards Information when separated from the enclosure Phone: (208) 282-2714 Fax: (208) 282-4529 www.isu.edu/research SDD~f ISU Is An Equal Opportunity Employer}}
                                                                                      ,L,1 Pamela L. Crowell, PhD Vice President of Research
* 00 Affirmation:                                             *,0 °Pu         "o
                                                                                        %       0 I certify that the foregoing is true and correct:                     O        .
v',,4.
Executed on     L       July, 2010. Signature: Jmv_, ru .I4*-'          Y4.-
c: Mr. Duane Hardesty, Mail Stop 0-12 D-03                                                   9 Note: This letter is not Safeguards Information when separated from the enclosure Phone: (208) 282-2714 Fax:   (208) 282-4529 www.isu.edu/research                                                                                           SDD~f ISU Is An Equal Opportunity Employer}}

Latest revision as of 16:14, 13 November 2019

Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses
ML101940174
Person / Time
Site: Idaho State University, 07001374
Issue date: 07/06/2010
From: Crowell P
Idaho State University
To: Duane Hardesty
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML101940174 (1)


Text

July 6, 2010 NRC Public Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North Attention: Mr. Duane Hardesty Mail Stop: OWFN-1-F13 Program Manager 11555 Rockville Pike Research & Test Reactors Rockville, MD 20852-2738 Mail Stop: 0-12 D-03 11555 Rockville Pike Rockville, MD 20852 STATE UNIVERSITY

SUBJECT:

Transmittal of Revision #6 to the Physical Security Plan for R-110 and SNM 1373 Licenses.

Enclosed is Revision #Softhe Physical Security Plan for the Nuclear Engineering Laboratory complex at Idaho State University. This document is intended to replace Revision #5, which was produced earlier this year. The revisions incorporated in this Office of Research document reflect only additional information about the construction of the facility and 921 South 8th Avenue, clarification concerning our confirming to protocol, as recommended by members of your Stop 8130 staff in their visit a few months ago. None of the wording changes and additions affect the Pocatello, Idaho level of security.

83209-8130 This plan concerns the two reactor NRC licenses:

Physical Address: R-1 10 License, with Duane Hardesty as the NRC Project Manager 1010 South 5th St.

Bldg 11, Room 205 SNM-1373 License, with Mary Adams as the NRC Project Manager Please note that the document, Physical Security Plan, is designated as Safeguards Information. It is not for public disclosure.

Should you have any questions, please refer them to the Reactor Administrator, Dr. Jay Kunze, at 208-282-4147, kunzejay@isu.edu.

Sincerely,

,L,1 Pamela L. Crowell, PhD Vice President of Research

  • 00 Affirmation: *,0 °Pu "o

% 0 I certify that the foregoing is true and correct: O .

v',,4.

Executed on L July, 2010. Signature: Jmv_, ru .I4*-' Y4.-

c: Mr. Duane Hardesty, Mail Stop 0-12 D-03 9 Note: This letter is not Safeguards Information when separated from the enclosure Phone: (208) 282-2714 Fax: (208) 282-4529 www.isu.edu/research SDD~f ISU Is An Equal Opportunity Employer