Line 3: Line 3:
| issue date = 01/26/2011
| issue date = 01/26/2011
| title = Univ of California, Irvine Nuclear Reactor Facility RAI Re License Renewal, May 26, 2010
| title = Univ of California, Irvine Nuclear Reactor Facility RAI Re License Renewal, May 26, 2010
| author name = Miller G E
| author name = Miller G
| author affiliation = Univ of California - Irvine
| author affiliation = Univ of California - Irvine
| addressee name = DiMeglio A F, Tran L N
| addressee name = Dimeglio A, Tran L
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000326
| docket = 05000326
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 1
| page count = 1
| project = TAC:ME1579
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNIVERSITY OF CALIFORNIA, IRVINE BERKELEY
* DAVIS - IRVINE
* LOS ANGELES - RIVERSIDE - SAN DIEGO
* SAN FRANCISCO      SANTA BARBARA
* SANTA CRUZ George E. Miller                                                                  IRVINE, CA 92697-2025 Senior Lecturer Emeritus                                                        (949) 824-6649 or 824-6082 Departmentof Chemistry and                                                            FAX: (949) 824-8571 Director,Nuclear Reactor Facility                                                  email : gemiller@uci.edu FacultyA dvisorfor Science, UCI Centerfor EducationPartnerships January 26, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 ATTN: Linh Tran; Frencis DiMeglio.
==References:==
Docket 50-326. License R-1 16 UC Irvine Nuclear Reactor Facility RAI re License Renewal, TAC ME1579, May 26t 2010 I regret to inform you that reactor core thermal and neutronic analyses requested in the referenced RAI have not yet been completed fully by our contractor. In addition we will need some time for review and response preparation of the information and so are not yet in a position to complete the remaining responses. Respectfully, we must request more time for this process. We currently anticipate that completion should be possible by the end of February, so that final action in these specifics should be taken by March 1st 2011.
Thank you for your patience and consi eration.
Dr. George E. Miller Director and Acting Supervisor b1 -o P}}

Latest revision as of 03:40, 13 November 2019

Univ of California, Irvine Nuclear Reactor Facility RAI Re License Renewal, May 26, 2010
ML110400202
Person / Time
Site: University of California - Irvine
Issue date: 01/26/2011
From: Geoffrey Miller
University of California - Irvine
To: Dimeglio A, Linh Tran
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC ME1579
Download: ML110400202 (1)


Text

UNIVERSITY OF CALIFORNIA, IRVINE BERKELEY

  • DAVIS - IRVINE
  • LOS ANGELES - RIVERSIDE - SAN DIEGO
  • SAN FRANCISCO SANTA BARBARA
  • SANTA CRUZ George E. Miller IRVINE, CA 92697-2025 Senior Lecturer Emeritus (949) 824-6649 or 824-6082 Departmentof Chemistry and FAX: (949) 824-8571 Director,Nuclear Reactor Facility email : gemiller@uci.edu FacultyA dvisorfor Science, UCI Centerfor EducationPartnerships January 26, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 ATTN: Linh Tran; Frencis DiMeglio.

References:

Docket 50-326. License R-1 16 UC Irvine Nuclear Reactor Facility RAI re License Renewal, TAC ME1579, May 26t 2010 I regret to inform you that reactor core thermal and neutronic analyses requested in the referenced RAI have not yet been completed fully by our contractor. In addition we will need some time for review and response preparation of the information and so are not yet in a position to complete the remaining responses. Respectfully, we must request more time for this process. We currently anticipate that completion should be possible by the end of February, so that final action in these specifics should be taken by March 1st 2011.

Thank you for your patience and consi eration.

Dr. George E. Miller Director and Acting Supervisor b1 -o P