ML101400027

From kanterella
Jump to navigation Jump to search

University of California, Irvine, Response to the Request for Additional Information Dated December 3, 2009 in Regard to License Renewal Request
ML101400027
Person / Time
Site: University of California - Irvine
Issue date: 05/17/2010
From: Geoffrey Miller
University of California - Irvine
To: Linh Tran
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC ME1579
Download: ML101400027 (2)


Text

UNIVERSITY OF CALIFORNIA, IRVINE BERKELEY

  • DAVIS
  • IRVINE
  • LOS ANGELES ° RIVERSIDE ° SAN DIEGO
  • SAN FRANCISCO SANTA BARBARA
  • SANTA CRUZ George E. Miller IRVINE, CA 92697-2025 Senior Lecturer Emeritus (949) 824-6649 Department of Chemistry and FAX: (949) 824-6082 or (949) 824-8571 Director,NuclearReactor Facility Email: gemillerguci.edu Faculty Advisor for Science Website: http://chem.ps.uci.edu/-gemiller/

UCI Centerfor EducationalPartnerships US Nuclear Regulatory Commission Attention: Document Control Desk Washington D.C. 20555-0001 FedEx to:

US Nuclear Regulatory Commission Document Control desk 11555 Rockville Pike Rockville, MD 20852 Attention: Ms Linh Tran, Project Manager Ref: Docket 50-326, Licence R-116 University of California, Irvine I am pleased to submit, in an enclosure, an update response to the Request for Additional Information dated December 3 rd, 2009 (TAC No. ME1579) in regard to our license renewal request.

Please contact me if there are further questions in this regard.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on May 17th 2010 Sincerely yours, George E. Miller Director Nuclear Reactor Facility Senior Lecturer Emeritus, Department of Chemistry, University of California, Irvine AcDO

Ref:Docket 50-326, License R-116 University of California Irvine Addendum to RAI Response submitted 1/25/2010 The following changes/additions should be added to our application for license renewal.

1. In UCI's recent submission of a response to your RAI, I have reviewed the response, particularly appendix F, and realized that the thyroid exposure predicted for our MHA was over estimated in several ways. In addition to not adjusting for a realistic operating schedule instead of "infinite operation at full power", we did not allow for any plating of iodine isotopes on surfaces that would significantly reduce the airborne concentration, and hence significantly reduce the anticipated thyroid exposure rate and hence the total calculated exposure.

In Oregon State University's SAR, they adopted a method which suggests halogen release plates out to reduce the airborne concentrations to less than 25% of the initial release.

Thus I wish to revise my dose rate expected to the thyroid in the unlikely event of a water "free" fuel element cladding rupture, to 0.25 x 0.45 rads/second = 0.11 rads/second.

Given this rate and the 2 minute evacuation time for personnel from the facility, the revised maximum dose would be 13.2 Rads to the thyroid.

I hope you can accept this late revision to provide a more realistic, but still very conservative estimate of potential exposure.

2. I hereby state that no changes have been made to the reactor controls or safety related systems between the time of original application submission and the present time that resulted in any degradation of the functions or effectiveness of the safety systems, nor were any un-reviewed safety concerns introduced. Any changes thus were permitted under the provisions of the appropriate section of 10 CFR50.59.
3. I wish to state that no changes have been made to the Emergency Plan between the time of original application submission and the present time that resulted in any degradation of the effectiveness of the plan and so were not permitted under the provisions of the appropriate section of 10 CFR.50.54.
4. I wish to state that no changes have been made to the Physical Security Plan between the time of original application submission and the present time that resulted in any degradation of the effectiveness of the plan and so were not permitted under the provisions of the appropriate section of 10 CFR.50.54.