(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML111870059 | | | number = ML111870059 |
| | issue date = 07/06/2011 | | | issue date = 07/06/2011 |
| | title = Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System(Tac No. ME5129) | | | title = Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System |
| | author name = | | | author name = |
| | author affiliation = Energy Northwest | | | author affiliation = Energy Northwest |
| | addressee name = Gibson L K | | | addressee name = Gibson L |
| | addressee affiliation = NRC/NRR/DORL/LPLIV | | | addressee affiliation = NRC/NRR/DORL/LPLIV |
| | docket = 05000397 | | | docket = 05000397 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Columbia PRNM ARTS/MELLLA License Amendment Request Pre-submittal Meeting July 6, 2011 Meeting GoalsTo discuss the status of Columbia's Power Range Neutron Monitoring System (PRNMS) | | {{#Wiki_filter:Columbia PRNM ARTS/MELLLA License Amendment Request Pre-submittal Meeting July 6, 2011 |
| License Amendment RequestTounderstandthetypeandlevelofinformationTo understand the type and level of information the NRC is expecting Columbia to provide to meet ISG-06 guidance To obtain an understanding of what is needed for NRC review acceptance 2
| |
| LAR StatusTargeting August 2011 submittal dateApproval requested by March 2013StagedapproachStaged approachNeed to resolve Columbia specific concerns with ISG-06 3
| |
| Columbia LAR and ISG-06ISG-06 Phase 1 deliverables: Information from previous submittal reformatted into ISG-06 structureRelativegenericinformationfrommostrecentGrandRelative generic information from most recent Grand Gulf PRNM RAI's will be incorporated ProDesCon Critical Design Review of the as-delivered PRNM System will be included 4
| |
| Columbia LAR and ISG-06As-built Phase 2 information to be provided with Phase 1 submittal.This includes: As-executed validation and verification test performed by GEHFactory Acceptance Test performed by ENW Surveillance testing performed by ENW, and other Phase 2 deliverables 5
| |
| Columbia LAR and ISG-06ENW plans to provide a commitment to perform compensatory actions as agreed
| |
|
| |
|
| upon during Phase 0 meetingThttfthtildbbittdTh e ou t pu t o f th ese ac tions wou ld b e su b m itt e d as a supplementary submittal of Phase 2 related information.
| | Meeting Goals To discuss the status of Columbias Power Range Neutron Monitoring System (PRNMS) |
| 6 Columbia LAR and ISG-06Primary compensatory topics/actions to be discussed:Level of independence for GEH Module Testing, Integration Testin g, and V&V Testin g executed durin g the Columbia PRNM gggsystem development, and a discussion about re-testing optionsDiscussion related to the execution of the FAT and surveillance testing performed by ENWPotential for a supplemental retroactive software safety analysis since the system is already built 7
| | License Amendment Request To understand the type and level of information the NRC is expecting Columbia to provide to meet ISG-06 guidance To obtain an understanding of what is needed for NRC review acceptance 2 |
| Columbia LAR and ISG-06ENW looking for NRC's agreement on level of retroactive testing and/or analysis | |
|
| |
|
| that will be expected.This will ensure proper commitments are made by ENW to support the NRC's
| | LAR Status Targeting August 2011 submittal date Approval requested by March 2013 Staged approach Need to resolve Columbia specific concerns with ISG-06 3 |
|
| |
|
| acceptance criteria. | | Columbia LAR and ISG-06 ISG-06 Phase 1 deliverables: |
| 8 QUESTIONS? | | Information from previous submittal reformatted into ISG-06 structure Relative generic information from most recent Grand Gulf PRNM RAIs will be incorporated ProDesCon Critical Design Review of the as-delivered PRNM System will be included 4 |
| | |
| | Columbia LAR and ISG-06 As-built Phase 2 information to be provided with Phase 1 submittal. |
| | This includes: |
| | As-executed validation and verification test performed by GEH Factory Acceptance Test performed by ENW Surveillance testing performed by ENW, and other Phase 2 deliverables 5 |
| | |
| | Columbia LAR and ISG-06 ENW plans to provide a commitment to perform compensatory actions as agreed upon during Phase 0 meeting Th The output t t off these th actions ti would ld be b submitted b itt d as a supplementary submittal of Phase 2 related information. |
| | 6 |
| | |
| | Columbia LAR and ISG-06 Primary compensatory topics/actions to be discussed: |
| | Level of independence for GEH Module Testing, Integration Testing, g and V&V Testing g executed duringg the Columbia PRNM system development, and a discussion about re-testing options Discussion related to the execution of the FAT and surveillance testing performed by ENW Potential for a supplemental retroactive software safety analysis since the system is already built 7 |
| | |
| | Columbia LAR and ISG-06 ENW looking for NRCs agreement on level of retroactive testing and/or analysis that will be expected. |
| | This will ensure proper commitments are made by ENW to support the NRCs acceptance criteria. |
| | 8 |
| | |
| | QUESTIONS? |
| 9}} | | 9}} |
Letter Sequence Meeting |
---|
TAC:ME5129, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEARML1100300742010-12-14014 December 2010 Correction to Forthcoming Pre-Licensing Meeting with Energy Northwest(Tac No. ME5129), to Discuss Proposed Installation of a Digital Power Range Neutron Monitoring System, Average Power Range Monitor/Rod Block Monitor/Technical Specificatio Project stage: Meeting ML1034003172010-12-14014 December 2010 Notice of Forthcoming Pre-application Meeting on 1/18/2011 with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request Project stage: Meeting ML1101803812011-01-18018 January 2011 Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station Project stage: Meeting ML1102101302011-02-0303 February 2011 1/18/2011 Summary of Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station Project stage: Meeting ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station Project stage: Meeting ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System Project stage: Meeting ML1119900742011-08-0404 August 2011 Summary of Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station Project stage: Meeting 2011-02-03
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18317A0862018-11-15015 November 2018 Licensee Pre-Submittal Presentation Regarding Chiller System for Columbia Generating Station, Pending LAR (EPID-L-2018-LRM-0070) ML16264A0362016-09-20020 September 2016 Licensee Presentation Regarding Columbia Presubmittal Meeting - Change 7-Day Completion Time to Support Replace RHR-A Pump, Motor Affects TS 3.5.1A, 3.6.1.5.A, 3.6.2.3.A ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML11161A0612011-08-23023 August 2011 04/27/2010 Columbia Generating Station License Renewal Environmental Review (Log No.: 121007-20-NRC) ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0401504532004-01-14014 January 2004 Summary of Meeting with Energy Northwest Columbia Generating Station General Engineering Issues and Licensee Improvement Innitiatives ML0234700902002-12-12012 December 2002 Columbia - Meeting Slides - Alternate Source Term Resubmittal ML0227604042002-10-0202 October 2002 Meeting Handouts from Energy Northwest Columbia Generating Station Energy Northwest/Framatome Anp Transition Cycle Licensing ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML17037B8491975-08-23023 August 1975 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... 2024-06-28
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4502024-05-21021 May 2024 2023 Annual Assessment Meeting - NRC Presentation Slides GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML23275A2422023-10-0505 October 2023 Pre-Submittal Meeting Slides ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21292A1412021-10-19019 October 2021 Meeting Slides ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17136A2062017-05-16016 May 2017 Summary of Regulatory Conference to Discuss Safety Significance of Columbia Generating Station Radwaste Shipping Deficiency ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A1722016-05-0303 May 2016 Licencee Presentation Regarding Chiller System, Pending LAR ML16134A1822016-05-0202 May 2016 Licensee Presentation Regarding Portional Reclassification of the Reactor Water Cleanup System, Pending LAR ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15163A1802015-06-15015 June 2015 Energy Northwest Columbia Generating Station Slides for Regulatory Conference June 15 2015-Final ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1101803812011-01-18018 January 2011 Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1012505192010-05-10010 May 2010 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0812305602008-05-0101 May 2008 Summary of Meeting with Energy Northwest to Discuss Initiatives at the Columbia Generating Station Equipment Reliability and Engineering Issues Along with Burial Ground Assessment and Remediation Activities ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0615901672006-06-0808 June 2006 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0535603372005-12-22022 December 2005 Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station ML0534901532005-12-0808 December 2005 Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time Extension ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0510400832004-04-13013 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station ML0407703812004-03-16016 March 2004 Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time Extension ML0401505812004-01-14014 January 2004 Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment ML0401404472004-01-13013 January 2004 Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003 2024-06-28
[Table view] |
Text
Columbia PRNM ARTS/MELLLA License Amendment Request Pre-submittal Meeting July 6, 2011
Meeting Goals To discuss the status of Columbias Power Range Neutron Monitoring System (PRNMS)
License Amendment Request To understand the type and level of information the NRC is expecting Columbia to provide to meet ISG-06 guidance To obtain an understanding of what is needed for NRC review acceptance 2
LAR Status Targeting August 2011 submittal date Approval requested by March 2013 Staged approach Need to resolve Columbia specific concerns with ISG-06 3
Columbia LAR and ISG-06 ISG-06 Phase 1 deliverables:
Information from previous submittal reformatted into ISG-06 structure Relative generic information from most recent Grand Gulf PRNM RAIs will be incorporated ProDesCon Critical Design Review of the as-delivered PRNM System will be included 4
Columbia LAR and ISG-06 As-built Phase 2 information to be provided with Phase 1 submittal.
This includes:
As-executed validation and verification test performed by GEH Factory Acceptance Test performed by ENW Surveillance testing performed by ENW, and other Phase 2 deliverables 5
Columbia LAR and ISG-06 ENW plans to provide a commitment to perform compensatory actions as agreed upon during Phase 0 meeting Th The output t t off these th actions ti would ld be b submitted b itt d as a supplementary submittal of Phase 2 related information.
6
Columbia LAR and ISG-06 Primary compensatory topics/actions to be discussed:
Level of independence for GEH Module Testing, Integration Testing, g and V&V Testing g executed duringg the Columbia PRNM system development, and a discussion about re-testing options Discussion related to the execution of the FAT and surveillance testing performed by ENW Potential for a supplemental retroactive software safety analysis since the system is already built 7
Columbia LAR and ISG-06 ENW looking for NRCs agreement on level of retroactive testing and/or analysis that will be expected.
This will ensure proper commitments are made by ENW to support the NRCs acceptance criteria.
8
QUESTIONS?
9