==SUMMARY==
==SUMMARY==


MN No: 11-019 LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.  
MN No:           11-019 LICENSEE:       DOMINION NUCLEAR CONNECTICUT, INC.
 
FACILITY:       MILLSTONE POWER STATION
FACILITY: MILLSTONE POWER STATION  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)  
OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)
 
On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.
On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.  
The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRCs 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.
 
The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.
The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRC's 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.
The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominion's performance at Millstone and the role of the agency in ensuring safe plant operations.  
Sincerely,
 
                                                      /RA/
The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.         Sincerely,
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects
      /RA/         Donald E. Jackson, Chief       Projects Branch 5       Division of Reactor Projects  


==Attachment:==
==Attachment:==
Meeting Attendees  
Meeting Attendees


MEETING  
MEETING  
Line 45: Line 43:
==SUMMARY==
==SUMMARY==


MN No: 11-019 LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.  
MN No:                 11-019 LICENSEE:             DOMINION NUCLEAR CONNECTICUT, INC.
 
FACILITY:             MILLSTONE POWER STATION
FACILITY: MILLSTONE POWER STATION  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)  
OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)
 
On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.
On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.
The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRC's 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.  
The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRCs 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.
 
The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.
The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominion's performance at Millstone and the role of the agency in ensuring safe plant operations.  
The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
Sincerely,
The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.         Sincerely,       /RA/       Donald E. Jackson, Chief Projects Branch 5       Division of Reactor Projects Attachments: Meeting Attendees Distribution: (see attached page)
                                                                                  /RA/
SUNSI Review Complete:               DEJ             (Reviewer
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Attachments: Meeting Attendees Distribution: (see attached page)
=s Initials) ML111880644 DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2010 EOC\Meeting Summaries\Millstone NEAC Meeting Summary.doc After declaring this document AAn Official Agency Record
SUNSI Review Complete:                   DEJ           (Reviewer=s Initials)                 ML111880644 DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2010 EOC\Meeting Summaries\Millstone NEAC Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
@ it will be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy OFFICE RI/DRP RI/DRP NAME TSetzer/dej for DJackson/dej DATE 07/07/11 07/07/11 OFFICIAL RECORD COPY 2  Distribution:  W. Dean, ORA D. Lew, ORA  D. Roberts, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP D. Dodson, DRP E. Keighley S. Shaffer, DRP B. Haagensen. DRP J. Krafty, DRP C. Kowalyshyn, OA
To receive a copy of this document, indicate in the box: C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE                   RI/DRP                           RI/DRP NAME                     TSetzer/dej for                 DJackson/dej DATE                     07/07/11                         07/07/11 OFFICIAL RECORD COPY


A-1  LIST OF ATTENDEES MILLSTONE POWER STATION MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)
2 Distribution:
MAY 25, 2011
W. Dean, ORA D. Lew, ORA D. Roberts, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP D. Dodson, DRP E. Keighley S. Shaffer, DRP B. Haagensen. DRP J. Krafty, DRP C. Kowalyshyn, OA


NAME       ORGANIZATION Sharon Berry     Waterford Resident Nancy Burton     CCAM  
A-1 LIST OF ATTENDEES MILLSTONE POWER STATION MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)
MAY 25, 2011 NAME                                 ORGANIZATION Sharon Berry                         Waterford Resident Nancy Burton                         CCAM


Attachment}}
Attachment}}

Latest revision as of 18:44, 12 November 2019

Summary of the Millstone 2011 Annual Assessment Meeting with the Connecticut Nuclear Energy Advisory Council (Neac)
ML111880644
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/07/2011
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Jackson, D E RI/DRP/PB5/610-337-5306
Shared Package
ML110610692 List:
References
MN 11-019
Download: ML111880644 (5)


Text

July 7, 2011 MEETING

SUMMARY

MN No: 11-019 LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.

The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRCs 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.

The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.

The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects

Attachment:

Meeting Attendees

MEETING

SUMMARY

MN No: 11-019 LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF MAY 25, 2011, MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

On May 25, 2011, at 6:30 p.m., a public meeting was conducted at the Waterford Town Hall, Waterford, CT, between the Nuclear Regulatory Commission (NRC) and NEAC to discuss the implementation of the Reactor Oversight Process and to answer questions regarding the Millstone Nuclear Power Plant performance for calendar year 2010.

The NRC presented and discussed its assessment of the safety performance of Millstone for the period from January 1 through December 31, 2010. The NRC presentation included a discussion of the NRCs 2010 Millstone performance assessment results and U.S. nuclear plant safety in light of Japan events. As part of the meeting, the NRC provided NEAC with an overall assessment of plant performance and with specific information concerning selected inspection findings.

The public observed the meeting and was offered the opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.

The NRC's assessment letter can be found in ADAMS with an accession number of ML110620174. The meeting notice, with the attached agenda, can be found in ADAMS with accession number ML111250122, and the NRC meeting slides can be found in ADAMS with accession number ML111880064. The Attachment provides a list of individuals that attended the meeting as well as the slides used during the presentation. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Attachments: Meeting Attendees Distribution: (see attached page)

SUNSI Review Complete: DEJ (Reviewer=s Initials) ML111880644 DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2010 EOC\Meeting Summaries\Millstone NEAC Meeting Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME TSetzer/dej for DJackson/dej DATE 07/07/11 07/07/11 OFFICIAL RECORD COPY

2 Distribution:

W. Dean, ORA D. Lew, ORA D. Roberts, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP D. Dodson, DRP E. Keighley S. Shaffer, DRP B. Haagensen. DRP J. Krafty, DRP C. Kowalyshyn, OA

A-1 LIST OF ATTENDEES MILLSTONE POWER STATION MEETING WITH THE CONNECTICUT NUCLEAR ENERGY ADVISORY COUNCIL (NEAC)

MAY 25, 2011 NAME ORGANIZATION Sharon Berry Waterford Resident Nancy Burton CCAM

Attachment