ML12023A194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Bryan, Robert H Jr [rhbryan@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                       Bryan, Robert H Jr [rhbryan@tva.gov]
Sent: Wednesday, January 18, 2012 3:18 PM To: Poole, Justin Cc: Arent, Gordon; Boyd, Desiree L
Sent:                       Wednesday, January 18, 2012 3:18 PM To:                         Poole, Justin Cc:                         Arent, Gordon; Boyd, Desiree L


==Subject:==
==Subject:==
FW: Updated HH Open Item Status Lists Attachments:WATTS BAR 2 APPENDIX HH Status 12-30-11.docxJustin, I have updated TVA actions. I noted items that are addressed in the 1/19/12 I&C letter that is in concurrence.
FW: Updated HH Open Item Status Lists Attachments:               WATTS BAR 2 APPENDIX HH Status 12-30-11.docx
: Justin, I have updated TVA actions. I noted items that are addressed in the 1/19/12 I&C letter that is in concurrence.
From: Poole, Justin [mailto:Justin.Poole@nrc.gov]
From: Poole, Justin [mailto:Justin.Poole@nrc.gov]
Sent: Thursday, January 12, 2012 8:20 AM To: Arent, Gordon Cc: Bryan, Robert H Jr; WBN2HearingFile Resource  
Sent: Thursday, January 12, 2012 8:20 AM To: Arent, Gordon Cc: Bryan, Robert H Jr; WBN2HearingFile Resource


==Subject:==
==Subject:==
Updated HH Open Item Status Lists Bob, Here is the list as I had updated it over the holidays plus some things that we talked about yesterday. Thanks.
Updated HH Open Item Status Lists
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 634   Mail Envelope Properties   (2C6C555CFCCE9A4697B80C42FB52CF8003E1427C)
: Bob, Here is the list as I had updated it over the holidays plus some things that we talked about yesterday. Thanks.
1
 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           634 Mail Envelope Properties     (2C6C555CFCCE9A4697B80C42FB52CF8003E1427C)


==Subject:==
==Subject:==
FW: Updated HH Open Item Status Lists Sent Date:   1/18/2012 3:18:17 PM Received Date: 1/18/2012 3:18:25 PM From:   Bryan, Robert H Jr Created By:   rhbryan@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
FW: Updated HH Open Item Status Lists Sent Date:               1/18/2012 3:18:17 PM Received Date:           1/18/2012 3:18:25 PM From:                   Bryan, Robert H Jr Created By:             rhbryan@tva.gov Recipients:
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None  
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None Post Office:            TVANASXVS2.main.tva.gov Files                            Size                  Date & Time MESSAGE                          479                  1/18/2012 3:18:25 PM WATTS BAR 2 APPENDIX HH Status 12-30-11.docx                        134930 Options Priority:                        Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:


Post Office:   TVANASXVS2.main.tva.gov Files     Size     Date & Time MESSAGE   479     1/18/2012 3:18:25 PM  WATTS BAR 2 APPENDIX HH Status 12-30-11.docx    134930 
APPENDIX HH STATUS - (12/0630/2011)
WATTS BAR UNIT 2 ACTION ITEMS TABLE This table provides a status of required action items associated of all open items, confirmatory issues, and proposed license conditions that the staff has identified.
CI - Confirmatory Issue Item    Type                Action Required            NRC      TVA        TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead  Response                                                                          Date Required/
TVA Lead (1)      CI    Review evaluations and corrective      EEEB    Yes/      EC:5/1/12                        TVA to provide letter to NRR                  26 actions associated with a power                  ELE      FC:                               documenting any power assisted assisted cable pull. (NRC safety                          TVA to provide letter to NRR      cable pulls if performed. NRR evaluation dated August 31, 2009,                          documenting any power assisted    and/or RII to review calculations on ADAMS Accession No.                                       cable pulls if performed. NRR     any power assisted cable pulls.
ML092151155)                                              and/or RII to review calculations Results documented in inspection on any power assisted cable      report. Letter from TVA if no power pulls. Results documented in     assisted cable pulls were done.
inspection report. Letter from TVA if no power assisted cable pulls were done. NRR Calculation Review Addressed by Maximo Commitment Closure package 10181059 (2)      CI   Conduct appropriate inspection          RII      No/     EC: 02/29/2012                   Include in inspection planning and            26 activities to verify cable lengths used          Elec      FC:                               conduct inspection. Reference in calculations and analysis match                        For NRC Inspection / Review      closure in IR and SER.
as-installed configuration. (NRC                          Provide NRC Residents access safety evaluation dated August 31,                        to as-constructed ICRDS          Pending TVAs completion of cable 2009, ADAMS Accession No.                                  database and associated calcs. installation and update of ICRDS for ML092151155)                                                                                as-installed cable lengths Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.
Page 1 of 50


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
APPENDIX HH STATUS - (12/0630/2011)
APPENDIX HH STATUS - (12/
Item Type             Action Required             NRC     TVA       TVA Action Required to Close      NRC Action Required to Close     Due SSER Lead    Response                                                                        Date Required/
06 30/2011) Page 1 of 50 WATTS BAR UNIT 2 ACTION ITEMS TABLE This table provides a status of required action items associated of all open items, confirmatory issues, and proposed license conditions that the staff has identified.
TVA Lead (4) CI Conduct appropriate inspection          RII      No      EC: Complete                      Include in inspection planning and      26 activities to verify that TVAs                          FC: N/A                          conduct inspection. Reference maximum SWBP criteria for signal                          Closed by IR 2010604              closure in IR and SER.
CI - Confirmatory Issue Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(1) CI Review evaluations and corrective actions associated with a power assisted cable pull. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155) EEEB Yes/ ELE EC:5/1/12 FC: TVA to provide letter to NRR documenting any power assisted cable pulls if performed. NRR and/or RII to review calculations on any power assisted cable pulls. Results documented in inspection report. Letter from TVA if no power assisted cable pulls were done. NRR Calculation Review Addressed by Maximo Commitment Closure package 10181059  TVA to provide letter to NRR documenting any power assisted cable pulls if performed. NRR and/or RII to review calculations on any power assisted cable pulls. Results documented in inspection report. Letter from TVA if no power assisted cable pulls were done. 26 (2) CI Conduct appropriate inspection activities to verify cable lengths used in calculations and analysis match as-installed configuration. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No.
level and coaxial cables do not exceed the cable manufacturers                                                              See IR 2010-604 maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No.
ML092151155) RII No/ Elec EC: 02/29/2012 FC: For NRC Inspection / Review Provide NRC Residents access to as-constructed ICRDS database and associated calcs.
ML092151155)
(5)  CI  Verify timely submittal of pre-startup SRXB      Yes     EC: Complete                      NRR review and evaluate pre-            26 core map and perform technical                            FC: N/A                          startup core map. Document in review. (TVA letter dated September                      Response provided in TVA to      SER.
7, 2007, ADAMS Accession No.                              NRC letter dated April 6, 2011.
ML072570676)                                                                                See Att 1 to 4/6/11 Ltr provides.
(6)  CI  Verify implementation of TSTF-449. ITSB/     Yes      EC: Complete                      NRR confirm TSs for proper              26 (TVA letter dated September 7,        EICB              FC: N/A                          implementation.
2007, ADAMS Accession No.                                Response provided in TVA to ML072570676)                                              NRC letter dated April 6, 2011. See current TSs Rev. B (7)  CI  Verify commitment completion and         RII      No/     EC: Ongoing                      Include in inspection planning and      26 review electrical design calculations.           Elec    FC: N/A                          conduct inspection. Reference (TVA letter dated October 9, 1990,                        For NRC Inspection / Review      closure in IR and SER. Specific ADAMS Accession No.                                       See commitments in TVA Letter. actions need to be clarified with ML073551056)                                              Provide Guillermo Crespo a copy  EEEB.
of related electrical calculation procedures and provide NRC access to calculations (8)  CI  TVA should provide a pre-startup      SRXB      Yes      EC: Complete                      NRR review and evaluate pre-            2526 map to the NRC staff indicating the                      FC: N/A                          startup core map. Document in rodded fuel assemblies and a                              Response provided in TVA to      SER. Conduct with item (5) above.
projected end of cycle burnup of                          NRC letter dated April 6, 2011.
each rodded assembly for the initial                                                        NRR to verify that Att 1 to 4/6/11 fuel cycle 6-months prior to fuel                                                          letter is acceptable.
load. (NRC safety evaluation dated May 3, 2010, ADAMS Accession No.
Page 2 of 50


Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction. Include in inspection planning and conduct inspection. Reference closure in IR and SER.  
APPENDIX HH STATUS - (12/0630/2011)
Item  Type            Action Required          NRC      TVA      TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead    Response                                                                        Date Required/
TVA Lead ML101200035)
(9)  CI  Confirm that education and            RII      No/    EC: Complete                    RII include in inspection planning        26 experience of management and                    LIC    FC: N/A                          and conduct inspection. Reference principal supervisory positions down                    For NRC Inspection / Review      closure in IR and update status in through the shift supervisory level                    Education and experience        Appendix HH.
conform to Regulatory Guide 1.8.                        information has been provided to (SSER 22, Section 13.1.3., pg 13-2)                    NRC Residents on 9/21/11.       TVA to provide education and experience info to RII staff.
(10)  CI  Confirm that TVA has an adequate      RII      No/    EC: Complete                    RII include in inspection planning       26 number of licensed and non-                    OPS      FC: N/A                          and conduct inspection. Reference licensed operators in the training                      For NRC Inspection/ Review      closure in IR and update status in pipeline to support the                                Information for closure provided Appendix HH.
preoperational test program, fuel                      to RI on 9/28/11.
loading, and dual unit operation.
(SSER 22, Section 13.1.3, pg 13-2)
(12)      TVAs implementation of              DORL      Yes      EC: 2/10/12                      TVA provided letter on 6/17/11            26 NGDC PP-20 and EDCR Appendix J                          FC: N/A                          summarizing QA audits of licensing is subject to future NRC audit and                      For NRC Inspection / Review      basis program. NRR conduct inspection. (SSER 22, Section 25.9,                                                      review/audit of the program.
pg 25-3)                                                Licensing to perform self        Document in audit report and assessment in January, 2012. update status in Appendix HH.
(13)      TVA is expected to submit an IST    CPTB      Yes/    EC: 3/15/12                      NRR tech staff review of ISI/IST          27 program and specific relief requests          ISO      FC: N/A                          programs upon receipt from TVA.
for WBN Unit 2 nine months before                      Provide submittal addressing IST Document in letter and staff the projected date of OL issuance.                      program and relief requests. evaluation.
(SSER 22, Section 3.9.6, pg 3-11)
(16)      Based on the uniqueness of EQ, the    RII/      No/    EC: Ongoing Inspection          Conduct EQ inspection. Document          26 NRC staff must perform a detailed    EEEB      ELE      FC: N/A                          in IR and update status in Appendix inspection and evaluation prior to                                                      HH.
fuel load to determine how the WBN                      For NRC Inspection / Review Unit 2 EQ program complies with the                    Provide NRC Lisa Castelli copies requirements of 10 CFR 50.49.                          of EQ documents as requested Page 3 of 50


Pending TVA's completion of cable installation and update of ICRDS for as-installed cable lengths  26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 2 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(4) CI Conduct appropriate inspection activities to verify that TVA's maximum SWBP criteria for signal level and coaxial cables do not exceed the cable manufacturers maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155) RII No EC: Complete FC: N/A Closed by IR 2010604 Include in inspection planning and conduct inspection. Reference closure in IR and SER.  
Item Type           Action Required             NRC     TVA       TVA Action Required to Close      NRC Action Required to Close       Due SSER Lead    Response                                                                        Date Required/
TVA Lead (SSER 22, Section 3.11.2, pg 3-                          for the onsite inspections.
12/13)
(17)     The NRC staff should verify the        RII/      No/    EC: Ongoing Inspection          Conduct EQ inspection. Document            26 accuracy of the WBN Unit 2 EQ list    EEEB      ELE      FC: N/A                          in IR and update status in Appendix prior to fuel load. (SSER 22, Section                                                    HH.
3.11.2.1, pg 3-13)                                      For NRC Inspection/Review:
provide NRC Lisa Castellicopies of EQ documents as requested for the onsite inspections.
(23)      Resolve whether or not TVAs          EEEB      Yes/    EC: Complete                    NRR reviewing the April 6, 2011            26 reasoning for not upgrading the                 ELE      FC: N/A                          response. TVA stated that the MSIV solenoid valves to Category I                      Response provided in TVA to      MSIV solenoids would be upgraded is a sound reason to the contrary, as                    NRC letter dated April 6, 2011. to Cat I.
specified in 10 CFR 50.49(l). (SSER 22, Section 3.11.2.2.1, pg 3-15)
(25)      Prior to the issuance of an operating PFAIB    Yes      EC: 7/1/12                      TVA to provide indemnity letter for        28 license, TVA is required to provide              LIC    FC: N/A                         tech staff review and update status satisfactory documentation that it                      TVA to sign indemnity letter and in Appendix HH. Include indemnity has obtained the maximum                                provide to NRC.                  agreement with operating license.
secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (SSER 22, Section 22.3, pg 22-1)
(26)      For the scenario with an accident in  EEEB      Yes      EC: Open                        TVA provided information in April 6,      26 one unit and concurrent shutdown of                      FC: N/A                          2011 letter. Additional RAIs were the second unit without offsite                          Response provided in TVA to      sent to TVA on 11/18/2011. NRR power, TVA stated that Unit 2 pre-                      NRC letter dated April 6, 2011. tech staff review and document in operational testing will validate the                                                    SER. This item was also partially Page 4 of 50


See IR 2010-604 26 (5) CI Verify timely submittal of pre-startup core map and perform technical review. (TVA letter dated September 7, 2007, ADAMS Accession No.
APPENDIX HH STATUS - (12/0630/2011)
ML072570676) SRXB Yes  EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close      NRC Action Required to Close      Due SSER Lead    Response                                                                        Date Required/
NRR review and evaluate pre-startup core map. Document in SER.
TVA Lead diesel response to sequencing of                                                            reviewed during EDSFI. EEEB to loads on the Unit 2 emergency                                                              review results of IDVP and EDSFI diesel generators (EDGs). The NRC                                                          reports for impact in this area.
See Att 1 to 4/6/11 Ltr provides. 26 (6) CI Verify implementation of TSTF-449. (TVA letter dated September 7, 2007, ADAMS Accession No.
staff will evaluate the status of this issue and will update the status of the EDG load response in a future SSER. (SSER 22, Section 8.1)
ML072570676)
(30)     TVA should confirm that all other      RII/    NO/      EC: Complete                     TVA submitted letter dated August        26 safety-related equipment (in addition  EEEB      ELE      FC: N/A                           12, 2011. NRR tech staff review to the Class 1E motors) will have                        Submitted letter 8/12/11.        and document in SER.
ITSB/EICB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
adequate starting and running voltage at the most limiting safety                                                        Will review during Unit 1 CDBI, related components (such as motor                                                          January 2012.
NRR confirm TSs for proper implementation.  
operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (SSER 22, Section 8.3.1.2, , pg 8-10)
(32)     TVA should provide to the NRC staff    EEEB      Yes/     Due date: TBD (Hilmes)            TVA to provide information on EDG        26 the details of the administrative                ELE      FC: N/A                           admin limits. NRR tech staff review limits of EDG voltage and speed                                                            and document in SER. TVA to range, and the basis for its                              Tech Spec review is with          submit amendment to TSs for Unit conclusion that the impact is                            Corporate Licensing (Joe Shea). 12. (FYI we decided to submit on negligible, and describe how it                          Provide response for submittal to U2 first) accounts for the administrative limits                    NRR.
in the Technical Specification surveillance requirements for EDG voltage and frequency. (SSER 22, Section 8.3.1.14, pg 8-14)                                Note - NRC RII may have an issue with the actual DG loading Page 5 of 50


See current TSs Rev. B 26 (7) CI Verify commitment completion and review electrical design calculations. (TVA letter dated October 9, 1990, ADAMS Accession No. ML073551056) RII No/ Elec EC: Ongoing FC: N/A For NRC Inspection / Review See commitments in TVA Letter. Provide Guillermo Crespo a copy of related electrical calculation procedures and provide NRC access to calculations Include in inspection planning and conduct inspection. Reference closure in IR and SER. Specific actions need to be clarified with EEEB. 26 (8) CI TVA should provide a pre-startup map to the NRC staff indicating the rodded fuel assemblies and a projected end of cycle burnup of each rodded assembly for the initial fuel cycle 6-months prior to fuel load. (NRC safety evaluation dated May 3, 2010, ADAMS Accession No. SRXB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
APPENDIX HH STATUS - (12/0630/2011)
NRR review and evaluate pre-startup core map. Document in SER. Conduct with item (5) above.
Item  Type            Action Required              NRC      TVA      TVA Action Required to Close      NRC Action Required to Close      Due SSER Lead    Response                                                                        Date Required/
TVA Lead (33) CI TVA stated in Attachment 9 of its        RII/     Yes/    EC: Complete                    TVA provided information in April 6,      26 letter dated July 31, 2010, that        EEEB              FC:                             2011 letter. TVA to notify RII when certain design change notices                              Response provided in TVA to      work completed. RII to verify (DCNs) are required or anticipated                          NRC letter dated April 6, 2011. completion of DCNs and include in for completion of WBN Unit 2, and                                                           IR. Update status in Appendix HH.
that these DCNs were unverified assumptions used in its analysis of the 125 V dc vital battery system.
Verification of completion of these DCNs to the NRC staff is necessary prior to issuance of the operating license. (SSER 22, Section 8.3.2.3, pg 8-16)
(35)     TVA should provide information to       CSGB/    Yes/    EC: Complete                    TVA provided information on water          26 the NRC staff that the CCS will          DORL      LIC    FC: N/A                          purity in 6/7/11 letter. NRR tech produce feedwater purity in                                Response provided in TVA to     staff review and document in SER.
accordance with BTP MTEB 5-3 or,                            NRC letter dated June 7, 2011.
alternatively, provide justification for producing feedwater purity to another acceptable standard. (SSER 22, Section 10.4.6, pg 10-9)
(37)  CI  The NRC staff will review the            NSIR      Yes/    EC: 06/1/12                      TVA to provide Appendix C within 6        26 combined WBN Unit 1 and 2                          REP      FC: N/A                         months of fuel load. NSIR to review Appendix C prior to issuance of the                        Submit final Unit 1/2 REP to NRC and document in SER.
Unit 2 OL to confirm (1) that the                          (Appx C and NP-REP are ready proposed Unit 2 changes were                                for LIC review) incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement.
(SSER 22, Section 13.3.2, pg 13-8)
Page 6 of 50


NRR to verify that Att 1 to 4/6/11 letter is acceptable.
APPENDIX HH STATUS - (12/0630/2011)
2 5 26 APPENDIX HH STATUS - (12/
Item Type           Action Required           NRC       TVA       TVA Action Required to Close      NRC Action Required to Close         Due SSER Lead    Response                                                                            Date Required/
06 30/2011)  Page 3 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERML101200035) (9) CI Confirm that education and experience of management and principal supervisory positions down through the shift supervisory level conform to Regulatory Guide 1.8.
TVA Lead (38) CI The NRC staff will confirm the        RII/    Yes/    EC: 11/14/11                      TVA states that ERDS software              2627 availability and operability of the  NSIR      REP      FC: 6/15/12                        previously modified and tested for ERDS for Unit 2 prior to issuance of                    For NRC Inspection / Review        Unit 2 addition and to send data the Unit 2 OL. (SSER 22, Section                       The Emergency Response Data        from the WBN PEDS to the CECC.
(SSER 22, Section 13.1.3., pg 13-2) RII No/ LIC EC: Complete FC: N/A For NRC Inspection / Review Education and experience information has been provided to NRC Residents on 9/21/11. RII include in inspection planning and conduct inspection. Reference closure in IR and update status in Appendix HH.  
13.3.2.6, pg 13-14)                                    System software has previously    Official list of points for WBN 2 has been modified and tested for the  not been provided to TVA Computer Watts Bar Unit 2 addition. This    Engineering Group for addition to unit can be selected from the      the ERDS software; official testing ERDS menu to send data to the      of software cannot be completed NRC at this time. In addition, the with NRC to declare the WBN 2 software has been developed and    ERDS operational. NRC needs list tested to send data from the      to add to the NRC data systems, WBN PEDS to the CECC. The          write the test, schedule the test with final WBN 2 list of ERDS data      TVA/NRC, run the test, and TVA points has been provided to the    submit the results.
TVA Computer Engineering Group for addition to the ERDS    RII to review and document in IR.
software. As a partial response    NSIR to update status in Appendix to this item, the WBN 2 list of    HH.
ERDS data points will be provided to the NRC on I&C response letter scheduled for 11/14/11. A commitment to update the data point list (if required) based on the results of PER 450041 will be included in the letter with a 6/15/12 due date. The due date is based on the Corporate Computer Engineering PER action completion date of 4/27/12. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule Page 7 of 50


TVA to provide education and experience info to RII staff. 26 (10) CI Confirm that TVA has an adequate number of licensed and non-licensed operators in the training pipeline to support the preoperational test program, fuel loading, and dual unit operation. (SSER 22, Section 13.1.3, pg 13-2) RII No/ OPS EC: Complete FC: N/A For NRC Inspection/ Review Information for closure provided to RI on 9/28/11. RII include in inspection planning and conduct inspection. Reference closure in IR and update status in Appendix HH. 26 (12)  TVA's implementation of NGDC PP-20 and EDCR Appendix J is subject to future NRC audit and inspection. (SSER 22, Section 25.9, pg 25-3) DORL Yes EC: 2/10/12 FC: N/A For NRC Inspection / Review Licensing to perform self assessment in January, 2012. TVA provided letter on 6/17/11 summarizing QA audits of licensing basis program. NRR conduct review/audit of the program.
APPENDIX HH STATUS - (12/0630/2011)
Document in audit report and update status in Appendix HH. 26 (13)  TVA is expected to submit an IST program and specific relief requests for WBN Unit 2 nine months before the projected date of OL issuance. (SSER 22, Section 3.9.6, pg 3-11) CPTB Yes/ ISO EC: 3/15/12 FC: N/A Provide submittal addressing IST program and relief requests.  
Item  Type            Action Required          NRC      TVA       TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead    Response                                                                          Date Required/
TVA Lead the test with TVA/NRC, run the test, and TVA submit the results.
(Detchemendy)
(39) CI  The NRC staff will confirm the        RII/     Yes/    EC: Complete                     Closed by IR 05000391/2011609,            26 adequacy of the communications      NSIR      REP      FC: N/A                           dated 12/16/2011. ADAMS capability to support dual unit                        NRC completed inspection wk of    Accession No. ML11350A229.
operations prior to issuance of the                    10/17/11 and stated intent to Unit 2 OL. (SSER 22, Section                           close item. Provide NRC          NSIR staff does not believe that, 13.3.2.6, pg 13-14)                                    Residents copies of related      based on what is currently present documents as requested for the    in the TVA Action Required to onsite inspection.                Close column, that the response to OI 38 would cover OI 39. OI 39 Detchemendy                      deals with all other communications, not specifically ERDS.
(40) CI  The NRC staff will confirm the        RII/    Yes/    EC: Complete                      TVA to perform self assessment to          26 adequacy of the emergency facilities NSIR      REP      FC: N/A                           verify processes and materials in and equipment to support dual unit                      For NRC Inspection / Review       MCR, TSC, OSC, EOF and local operations prior to issuance of the                    Perform self assessment to verify recovery facility. Provide RI staff Unit 2 OL. (SSER 22, Section                            processes and materials in main  copies of self assessment 13.3.2.8, pg 13-15)                                    control room, TSC, OSC, EOF      documents. RII to review and and local recovery facility.     document in IR. NSIR to update Provide NRC Residents copies of  status in Appendix HH.
self assessment documents for the onsite inspection.
SA WBN-F-11-007 provided to residents on 9/21/11.
(Detchemendy)
(41) CI TVA committed to (1) update plant    RII/    Yes/                                       TVA to provide demonstration of            27 data displays as necessary to        NSIR      PSE      EC: 11/14/11 (Detchemendy)        capability of SPDS, ICS and PEDS include Unit 2, and (2) to update                                                        data system displays by 7/1/12; and dose assessment models to provide                      Will submit during OCT24 NRR      to submit EPIP-13. (describe RED, capabilities for assessing releases                    audit.                            FRED and BRED data systems) by Page 8 of 50


NRR tech staff review of ISI/IST programs upon receipt from TVA. Document in letter and staff evaluation. 27 (16)  Based on the uniqueness of EQ, the NRC staff must perform a detailed inspection and evaluation prior to fuel load to determine how the WBN Unit 2 EQ program complies with the requirements of 10 CFR 50.49. RII/ EEEB No/ ELE EC: Ongoing Inspection FC: N/A For NRC Inspection / Review Provide NRC Lisa Castelli copies of EQ documents as requested Conduct EQ inspection. Document in IR and update status in Appendix HH. 26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 4 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(SSER 22, Section 3.11.2, pg 3-12/13)   for the onsite inspections.
Item  Type            Action Required          NRC      TVA      TVA Action Required to Close    NRC Action Required to Close    Due  SSER Lead    Response                                                                    Date Required/
TVA Lead from both WBN units. The NRC                                                            10/1/11. RII to review and staff will confirm the adequacy of                                                     document in IR. NSIR to update these items prior to issuance of the                   1) Submit EPIP-13 (Describe    status in Appendix HH.
Unit 2 OL. (SSER 22, Section                            RED, FRED and BRED data 13.3.2.9, pg 13-16)                                    systems).
* Confirm calcs OK for U2 EC: Done
* Revise EPIP-13 EC:
TBD
* CEG revise dose assessment code EC:
TBD PSE: 7/1/12 (Olson)
: 2) For NRC Inspection / Review.
Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.
(42)  CI  The NRC staff will confirm the        RII/    Yes/                                    Closed by IR 05000391/2011609,          27 adequacy of the accident            NSIR      PSE      EC: 11/14/11 (Detchemendy)      dated 12/16/2011. ADAMS assessment capabilities to support                                                      Accession No. ML11350A229.
dual unit operations prior to issuance of the Unit 2 OL. (SSER                       Will submit during OCT24 NRR    RII to review and document in IR.
22, Section 13.3.2.9, pg 13-16)                        audit.                          NSIR to update status in Appendix HH. Complete with Item 41.
: 1) Submit EPIP-13 (Describe RED, FRED and BRED data systems).
* Confirm calcs OK for U2 EC: Done
* Revise EPIP-13 EC:
TBD Page 9 of 50


(17The NRC staff should verify the accuracy of the WBN Unit 2 EQ list prior to fuel load. (SSER 22, Section 3.11.2.1, pg 3-13) RII/ EEEB No/ ELE EC: Ongoing Inspection FC: N/For NRC Inspection/Review: provide NRC Lisa Castellicopies of EQ documents as requested for the onsite inspections. Conduct EQ inspection. Document in IR and update status in Appendix HH. 26 (23) Resolve whether or not TVA's reasoning for not upgrading the MSIV solenoid valves to Category I is a sound reason to the contrary, as specified in 10 CFR 50.49(l). (SSER 22, Section 3.11.2.2.1, pg 3-15)   EEEB Yes/ ELE EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
APPENDIX HH STATUS - (12/0630/2011)
NRR reviewing the April 6, 2011 response. TVA stated that the MSIV solenoids would be upgraded to Cat I. 26 (25) Prior to the issuance of an operating license, TVA is required to provide satisfactory documentation that it has obtained the maximum secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (SSER 22, Section 22.3, pg 22-1) PFAIB Yes LIC EC: 7/1/12 FC: N/A TVA to sign indemnity letter and provide to NRC.
Item Type          Action Required            NRC      TVA      TVA Action Required to Close    NRC Action Required to Close      Due  SSER Lead  Response                                                                      Date Required/
TVA Lead
* CEG revise dose assessment code EC:
TBD FC: 7/1/12 (Olson)
: 2) For NRC Inspection / Review.
Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.
(43)  CI  Section V of Appendix E to 10 CFR    NSIR    Yes/    EC: 5/1/12                      TVA to submit EPIPs 6 months              27 Part 50 requires TVA to submit its            REP      FC: N/A                        before OL. NSIR to update status detailed implementing procedures                      TVA to answer later.            in Appendix HH.
for its emergency plan no less than                    Submit Unit 1/2 REP 180 days before the scheduled                          implementing procedures (EPIP-1 issuance of an operating license.                      thru EPIP-17) to Completion of this requirement will                    NRC.(Detchemendy) be confirmed by the NRC staff prior to the issuance of an operating license. (SSER 22, Section 13.3.2.18, pg 13-23)
(47)      The NRC staff noted that TVAs      SCVB    Yes     EC: Complete                   TVA to provide correction in future      2526 changes to Section 6.2.6 in FSAR                      FC: N/A                         amendment (A105) to FSAR. See Amendment 97, regarding the                            Response provided in TVA to     also info in letter of 6/7/11. NRR implementation of Option B of                          NRC letter dated June 7, 2011. tech staff review and document in Appendix J, were incomplete,                          However, one FSAR Note was      SER.
because several statements                            missed.
remained regarding performing                          A105 corrected FSAR (8/12/11).
water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J Page 10 of 50


TVA to provide indemnity letter for tech staff review and update status in Appendix HH. Include indemnity agreement with operating license. 28 (26)  For the scenario with an accident in one unit and concurrent shutdown of the second unit without offsite power, TVA stated that Unit 2 pre-operational testing will validate the EEEB Yes EC: Open FC: N/A Response provided in TVA to NRC letter dated April 6, 2011. TVA provided information in April 6, 2011 letter. Additional RAIs were sent to TVA on 11/18/2011.
APPENDIX HH STATUS - (12/0630/2011)
NRR tech staff review and document in SER. This item was also partially  26 APPENDIX HH STATUS - (12/
Item Type           Action Required               NRC     TVA       TVA Action Required to Close      NRC Action Required to Close       Due SSER Lead  Response                                                                          Date Required/
06 30/2011)  Page 5 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERdiesel response to sequencing of loads on the Unit 2 emergency diesel generators (EDGs). The NRC staff will evaluate the status of this issue and will update the status of the EDG load response in a future SSER. (SSER 22, Section 8.1)   reviewed during EDSFI. EEEB to review results of IDVP and EDSFI reports for impact in this area.
TVA Lead retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (SSER 22, Section 6.2.6, pg 6-12)
(30TVA should confirm that all other safety-related equipment (in addition to the Class 1E motors) will have adequate starting and running voltage at the most limiting safety related components (such as motor operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (SSER 22, Section 8.3.1.2, , pg 8-10)   RII/ EEEB NO/ ELE EC: Complete FC: N/A Submitted letter 8/12/11.
(48CI  The NRC staff should verify that its    DORL/    Yes      EC: Complete                      Upon NRR completion of SER                2526 conclusions in the review of FSAR        AADB              FC: N/A                          Chapter 15 review, tech staff review Section 15.4.1 do not affect the                          Response provided in TVA to       and document in SER update to conclusions of the staff regarding                        NRC letter dated June 7, 2011. section 6.5.3. See also info in TVA the acceptability of Section 6.5.3.                                                          letter of 6/7/11.
TVA submitted letter dated August 12, 2011. NRR tech staff review and document in SER.  
(SSER 22, Section 6.5.3, pg 6-15)
(49)  CI  The NRC staff was unable to              RII     No      EC: Complete                     TVA provided RI staff with how the        2526 determine how TVA linked the                              FC: N/A                           refurb training requirements are training qualification requirements of                    For NRC Inspection / Review      linked to the ANSI standard.
ANSI N45.2-1971 to TVA Procedure                          Provided NRC Residents how the    Provided training records for refurb TI-119. Therefore, the                                    refurb training requirements are  inspectors. RII to review and implementation of training and                            linked to the ANSI standard.      document in IR and update status in qualification for inspectors will be the                  Provided the training records for Appendix HH.
subject of future NRC staff                                refurb inspectors.
inspections. (NRC letter dated July 2, 2010, ADAMS Accession No.
ML101720050)
(50)  CI  TVA stated that about 5 percent of        RII      No/    EC: Ongoing Inspection            TVA to notify RI staff of anchor bolt      26 the anchor bolts for safety-related              Plant    FC:                              pull tests. RII to review and pipe supports do not have quality                Design    For NRC Inspection / Review      document in IR and update status in control documentation, because the                        Notify NRC Residents of anchor    Appendix HH.
pull tests have not yet been                              bolt pull tests.
performed. Since the documentation is still under                              Inspection of pull tests ongoing development, the NRC staff will                            (Gilley) conduct inspections to follow-up on Page 11 of 50


Will review during Unit 1 CDBI, January 2012. 26 (32)  TVA should provide to the NRC staff the details of the administrative limits of EDG voltage and speed range, and the basis for its conclusion that the impact is negligible, and describe how it accounts for the administrative limits in the Technical Specification surveillance requirements for EDG voltage and frequency. (SSER 22, Section 8.3.1.14, pg 8-14)
APPENDIX HH STATUS - (12/0630/2011)
EEEB Yes/ ELE Due date: TBD (Hilmes) FC: N/A Tech Spec review is with Corporate Licensing (Joe Shea). Provide response for submittal to NRR.
Item  Type          Action Required            NRC      TVA      TVA Action Required to Close          NRC Action Required to Close  Due  SSER Lead  Response                                                                        Date Required/
TVA Lead the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No.
ML101720050)
(51CI  The implementation of TVA             RII      No/    EC: Ongoing inspection              RII to review and document in IR        26 Procedure TI-119 will be the subject          Moll    FC:                                and update status in Appendix HH.
of NRC follow-up inspection to                         For NRC Inspection / Review determine if the construction                          Provide NRC Residents the refurbishment program requirements                    results of the refurb program.
are being adequately implemented.
(NRC letter dated July 2, 2010,                        (Moll)
ADAMS Accession No.
ML101720050)
(59)      The staffs evaluation of the        CVIB    Yes      EC: Open                            Tech staff review and document in      2526 compatibility of the ESF system                        FC: N/A                            SER.
materials with containment sprays                      Response provided in TVA to and core cooling water in the event                    NRC letter dated June 7, 2011.
of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit
: 2. (SSER 23, Section 6.1.1.4, pg 6-2)
(60)  CI  TVA should amend the FSAR            SBPB    Yes     EC: Complete                        TVA provided information in A103.      2526 description of the design and                          FC: N/A                             NRR tech staff review and update operation of the spent fuel pool                      Response provided in TVA to        status in Appendix HH.
cooling and cleanup system in                          NRC letter dated June 7, 2011.
FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (SSER 23, Section 9.1.3, pg 9-3 )
(61)     TVA should provide information to    SNPB    Yes      Will result in a License Condition. NRR tech staff review and              26 the NRC staff to demonstrate that                                                          document in SER. May require PAD 4.0 can conservatively                            Is an Additional Submittal          license condition.
calculate the fuel temperature and                    Required?
other impacted variables, such as Page 12 of 50


Note - NRC RII may have an issue with the actual DG loading TVA to provide information on EDG admin limits. NRR tech staff review and document in SER. TVA to submit amendment to TSs for Unit
APPENDIX HH STATUS - (12/0630/2011)
: 12.  (FYI we decided to submit on U2 first)  26 APPENDIX HH STATUS - (12/
Item Type           Action Required             NRC     TVA       TVA Action Required to Close    NRC Action Required to Close       Due SSER Lead  Response                                                                        Date Required/
06 30/2011)  Page 6 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(33) CI TVA stated in Attachment 9 of its letter dated July 31, 2010, that certain design change notices (DCNs) are required or anticipated for completion of WBN Unit 2, and that these DCNs were unverified assumptions used in its analysis of the 125 V dc vital battery system. Verification of completion of these DCNs to the NRC staff is necessary prior to issuance of the operating license. (SSER 22, Section 8.3.2.3, pg 8-16) RII/ EEEB Yes/ EC: Complete FC:  Response provided in TVA to NRC letter dated April 6, 2011. TVA provided information in April 6, 2011 letter. TVA to notify RII when work completed. RII to verify completion of DCNs and include in IR. Update status in Appendix HH. 26 (35)  TVA should provide information to the NRC staff that the CCS will produce feedwater purity in accordance with BTP MTEB 5-3 or, alternatively, provide justification for producing feedwater purity to another acceptable standard. (SSER 22, Section 10.4.6, pg 10-9)   CSGB/DORL Yes/ LIC EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 7, 2011.
TVA Lead stored energy, given the lack of a fuel thermal conductivity degradation model. (SSER 23, Section 4.2.2, pg 4-5)
TVA provided information on water purity in 6/7/11 letter. NRR tech staff review and document in SER. 26 (37) CI The NRC staff will review the combined WBN Unit 1 and 2 Appendix C prior to issuance of the Unit 2 OL to confirm (1) that the proposed Unit 2 changes were incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staff's findings in this SER supplement. (SSER 22, Section 13.3.2, pg 13-8)   NSIR Yes/ REP EC: 06/1/12 FC: N/A Submit final Unit 1/2 REP to NRC (Appx C and NP-REP are ready for LIC review)
(63) CI  TVA should confirm to the NRC staff     RII      No/    EC:                            RII to inspect testing and document        27 that testing prior to Unit 2 fuel load          PSE      FC: 7/1/12                      in IR. Update status in Appendix has demonstrated that two-way                            Hot functional testing.        HH. From I&C matrix 171 communications is impossible with                        I&C Matrix Item None the Eagle 21 communications                              This will be addressed by a interface. (SSER 23, Section                             License Condition (Duplicate of 7.2.1.1, pg 7-7)                                        SSER 23 Item 93)
(64) CI  TVA stated that, Post modification    RII     No/     EC: 12/9/11                    RII to inspect testing and document        26 testing will be performed to verify             PSE      FC: 1/31/12                    in IR. Update status in Appendix that the design change corrects the                      FCN issued 10/14/11; to be      HH. From I&C matrix 127 Eagle 21, Rack 2 RTD accuracy                            incorporated into an EDCR, to issue prior to WBN Unit 2 fuel load.                    issue Mod is 12/9/11; and to This issue is open pending NRC                           implement Mod and Test 1/31/12 staff review of the testing results.
(SSER 23, Section 7.2.1.1, pg 7-8)                       For NRC Inspection / Review I&C Matrix Item None Provide requested info (65)      TVA should provide justification to    EICB    Yes/     EC: Complete                   NRR tech staff reviewing provided        2526 the staff regarding why different                I&C    FC: N/A                         information and will document in revisions of WCAP-13869 are                              Response provided in TVA to     SSER 26 referenced in WBN Unit 1 and Unit                        NRC letter dated June 7, 2011.
: 2. (SSER 23, Section 7.2.1.1, pg 7-                      I&C Matrix Item 323            Tech staff review and document in 3/4, 7-10)                                              Changes are reflected in FSAR  SER. Changes in FSAR A104 Amendment 104.
I&C matrix 323 (66) CI TVA should clarify FSAR Section        SBPB    Yes/    EC: Complete                    TVA to provide information in future      2526 9.2.5 to add the capability of the             Mech    FC: N/A                        amendment. NRR tech staff review UHS to bring the non-accident unit                      A105 update of the FSAR.        and update status in Appendix HH.
to cold shutdown within 72 hours.
(SSER 23, Section 9.2.5, pg 9-8)
Page 13 of 50


TVA to provide Appendix C within 6 months of fuel load. NSIR to review and document in SER. 26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 7 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(38) CI The NRC staff will confirm the availability and operability of the ERDS for Unit 2 prior to issuance of the Unit 2 OL. (SSER 22, Section 13.3.2.6, pg 13-14)  RII/ NSIR Yes/ REP EC: 11/14/11 FC: 6/15/12 For NRC Inspection / Review The Emergency Response Data System software has previously been modified and tested for the Watts Bar Unit 2 addition. This unit can be selected from the ERDS menu to send data to the NRC at this time. In addition, the software has been developed and tested to send data from the WBN PEDS to the CECC. The final WBN 2 list of ERDS data points has been provided to the TVA Computer Engineering Group for addition to the ERDS software. As a partial response to this item, the WBN 2 list of ERDS data points will be provided to the NRC on I&C response letter scheduled for 11/14/11. A commitment to update the data point list (if required) based on the results of PER 450041 will be included in the letter with a 6/15/12 due date. The due date is based on the Corporate Computer Engineering  PER action completion date of  4/27/12. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule TVA states that ERDS software previously modified and tested for Unit 2 addition and to send data from the WBN PEDS to the CECC.
Item Type           Action Required           NRC     TVA       TVA Action Required to Close      NRC Action Required to Close       Due SSER Lead  Response                                                                          Date Required/
Official list of points for WBN 2 has not been provided to TVA Computer Engineering Group for addition to the ERDS software; official testing of software cannot be completed with NRC to declare the WBN 2 ERDS operational. NRC needs list to add to the NRC data systems, write the test, schedule the test with TVA/NRC, run the test, and TVA submit the results.
TVA Lead (67) CI TVA should confirm, and the NRC        RII     No/     EC: Complete                      TVA provided EDCR closure                  27 staff should verify, that the                  Civil    FC:7/1/12                         document to RI staff on installation component cooling booster pumps                        For NRC Inspection / Review       of CCS thermal barrier booster for Unit 2 are above PMF level.                         Provide EDCR closure              pump dike. RII to review, inspect (SSER 23, Section 9.2.2, pg 9-6)                        documentation for installation of installation, and document in IR and CCS thermal barrier booster      update status in Appendix HH.
RII to review and document in IR. NSIR to update status in Appendix HH. 2 6 27 APPENDIX HH STATUS - (12/
pump dike. AA FCR issued.
06 30/2011) Page 8 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERthe test with TVA/NRC, run the test, and TVA submit the results.
Inspect after field complete (69) CI  The WBN Unit 2 RCS vent system is     RII      No      EC: N/A                          TVA to provide EDCR closure                27 acceptable, pending verification that          Mech    FC: 7/1/12                       document for installation of RCS the RCS vent system is installed.                       For NRC Inspection / Review      vents to RI staff. RII to review, (SSER 23, Section 5.4.5, pg 5-5)                        Provide EDCR closure              inspect, and document in IR and documentation for installation of update status in Appendix HH.
(Detchemendy) (39) CI The NRC staff will confirm the adequacy of the communications capability to support dual unit operations prior to issuance of the Unit 2 OL. (SSER 22, Section 13.3.2.6, pg 13-14) RII/ NSIR Yes/ REP EC: Complete FC: N/A NRC completed inspection wk of 10/17/11 and stated intent to close item. Provide NRC Residents copies of related documents as requested for the onsite inspection. 
vents.
(70)      TVA should provide the revised        CVIB    Yes/    EC: 3/1/12 (Tinley)               TVA needs to provide PSI program          26 WBN Unit 2 PSI program ASME                    ISO      FC: N/A                          information to NRR. NRR tech staff Class 1, 2, and 3 Supports                              Provide requested info            review and document in SER.
Summary Tables, to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of SSER 23, pg z-11, z-13)
(71)      By letter dated April 21, 2011        CVIB    Yes/     EC: Complete                     TVA requested to withdraw                  26 (ADAMS Accession No.                          Mech    FC: N/A                           commitment to replace X-750 bolts ML111110513), TVA withdrew its                          Initial response provided in TVA  by letter dated April 21, 2011. NRR commitment to replace the Unit 2                        to NRC letter dated June 7, 2011. tech staff reviewing request. TVA clevis insert bolts. TVA should                                                          needs to justify use on low-temp provide further justification for the                  TVA to NRC letter dated          heat treated bolts. TVA provided decision to not replace the bolts to                    10/24/2011, provided additional  additional information in the the NRC staff. (SSER 23, Section                        justification (from WEC) for this 10/24/11 letter.
3.9.5, pg 3-2/3)                                        commitment withdrawal (i.e., to not replace the bolts).          NRR staff reviewing provided information and will document in SSER 26.
Page 14 of 50


Detchemendy Closed by IR 05000391/2011609, dated 12/16/2011. ADAMS Accession No. ML11350A229.
APPENDIX HH STATUS - (12/0630/2011)
NSIR staff does not believe that, based on what is currently present in the "TVA Action Required to Close" column, that the response to OI 38 would cover OI 39. OI 39 deals with all other communications, not specifically ERDS.
Item  Type            Action Required              NRC      TVA      TVA Action Required to Close       NRC Action Required to Close    Due  SSER Lead  Response                                                                        Date Required/
26 (40) CI The NRC staff will confirm the adequacy of the emergency facilities and equipment to support dual unit operations prior to issuance of the Unit 2 OL. (SSER 22, Section 13.3.2.8, pg 13-15)  RII/ NSIR Yes/ REP EC: Complete FC: N/A For NRC Inspection / Review Perform self assessment to verify processes and materials in main control room, TSC, OSC, EOF and local recovery facility. Provide NRC Residents copies of self assessment documents for the onsite inspection. SA WBN-F-11-007 provided to residents on 9/21/11.
TVA Lead (73) CI The NRC staff will inspect to confirm   RII     No/     EC: 2/1/12                        TVA to provide EOPs to RI staff.         26 that TVA has completed the WBN                  OPS      FC: N/A                          RII to review and document in IR Unit 2 EOPs prior to fuel load.                           For NRC Inspection / Review      and update status in Appendix HH.
(Detchemendy) TVA to perform self assessment to verify processes and materials in MCR, TSC, OSC, EOF and local recovery facility. Provide RI staff copies of self assessment documents. RII to review and document in IR. NSIR to update status in Appendix HH. 26 (41) CI TVA committed to (1) update plant data displays as necessary to include Unit 2, and (2) to update dose assessment models to provide capabilities for assessing releases RII/ NSIR Yes/ PSE EC: 11/14/11 (Detchemendy) Will submit during OCT24 NRR audit. TVA to provide demonstration of capability of SPDS, ICS and PEDS data system displays by 7/1/12; and to submit EPIP-13. (describe RED, FRED and BRED data systems) by 27 APPENDIX HH STATUS - (12/
(SSER 23, Section 7.5.3, pg 7-119)                        Provide copies of EOPs for inspection.
06 30/2011) Page 9 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERfrom both WBN units. The NRC staff will confirm the adequacy of these items prior to issuance of the Unit 2 OL. (SSER 22, Section 13.3.2.9, pg 13-16)
(74CI The NRC staff will verify installation  RII      No/    EC: 5/1/12                        TVA to provide EDCR closure              27 of the acoustic-monitoring system                I&C    FC:                               documentation for acoustic monitors for the power-operated relief valve                      For NRC Inspection / Review       to RI staff. RII to review and (PORV) position indication in WBN                        Provide EDCR closure              document in IR and update status in Unit 2 before fuel load. (SSER 23,                       documentation for installation of Appendix HH.
: 1) Submit EPIP-13 (Describe RED, FRED and BRED data systems).
Section 7.8.1, pg 7-167)                                 acoustic monitors.
* Confirm calcs OK for U2 EC: Done
Panels installed 5/18/11 Probes not installed (75CI  The NRC staff will verify that the test  RII      No/    EC: N/A                          RII to review and document in IR         26 procedures and qualification testing            PSE      PSE: 7/1/12                      and update status in Appendix HH.
* Revise EPIP-13  EC: TBD
for auxiliary feedwater initiation and                    FC: N/A control and flow indication are                          For NRC Inspection / Review completed in WBN Unit 2 before fuel                      Provide copies of test procedures load. (SSER 23, Section 7.8.2, pg 7-                     for inspection.
* CEG revise dose assessment code  EC:
167)
TBD PSE: 7/1/12 (Olson) 2) For NRC Inspection / Review.
(77)     It is unclear to the NRC staff which    EICB    Yes/    EC: Complete                     NRR tech staff reviewing                  26 software V&V documents are                        I&C    FC: N/A                           September 1 and November 14, applicable to the HRCAR monitors.                        Response provided in TVA to       2011 letters. Staff still has a TVA should clarify which software                        NRC letter dated Sept. 1, 2011. question on procedure used for V&V documents are applicable, in                         Proprietary information provided  system verification tests. See TVA order for the staff to complete its                      in TVA to NRC letter dated        5.
Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.
evaluation. (SSER 23, Section                             10/13/11 and non-proprietary 7.5.2.3, pg 7-109)                                       versions provided in TVA to NRC   TVA needs to obtain V&V letter dated 7/15/10. This older  documents from vendor and provide submittal discussed in 11/14/11  to NRR. NRR tech staff review and TVA to NRC letter.                document in SER.
10/1/11. RII to review and document in IR. NSIR to update status in Appendix HH. (42) CI The NRC staff will confirm the adequacy of the accident assessment capabilities to support dual unit operations prior to issuance of the Unit 2 OL. (SSER 22, Section 13.3.2.9, pg 13-16)   RII/ NSIR Yes/ PSE EC: 11/14/11 (Detchemendy)
(79) CI TVA should perform a radiated          EICB    Yes/    EC: 7/1/12                        TVA to provide confirmation of           27 susceptibility survey, after the               Hilmes,   FC:                               satisfactory completion of rad installation of the hardware but prior          Brehm                                      survey/testing. NRR tech staff Page 15 of 50
Will submit during OCT24 NRR audit. 1) Submit EPIP-13 (Describe RED, FRED and BRED data systems).
* Confirm calcs OK for U2 EC: Done
* Revise EPIP-13 EC: TBD Closed by IR 05000391/2011609, dated 12/16/2011. ADAMS Accession No. ML11350A229.
RII to review and document in IR. NSIR to update status in Appendix HH. Complete with Item 41.
27 APPENDIX HH STATUS - (12/
06 30/2011)  Page 10 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER* CEG revise dose assessment code  EC: TBD  FC: 7/1/12 (Olson) 2) For NRC Inspection / Review.
Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.
(43) CI Section V of Appendix E to 10 CFR Part 50 requires TVA to submit its detailed implementing procedures for its emergency plan no less than 180 days before the scheduled issuance of an operating license. Completion of this requirement will be confirmed by the NRC staff prior to the issuance of an operating license. (SSER 22, Section 13.3.2.18, pg 13-23)  NSIR Yes/ REP EC:  5/1/12  FC: N/A TVA to answer later.
Submit Unit 1/2 REP implementing procedures (EPIP-1 thru EPIP-17) to NRC.(Detchemendy) TVA to submit EPIPs 6 months before OL. NSIR to update status in Appendix HH. 27 (47)  The NRC staff noted that TVA's changes to Section 6.2.6 in FSAR Amendment 97, regarding the implementation of Option B of Appendix J, were incomplete, because several statements remained regarding performing water-sealed valve leakage tests "as specified in 10 CFR [Part] 50, Appendix J."  With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J SCVB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 7, 2011. However, one FSAR Note was missed. A105 corrected FSAR (8/12/11). TVA to provide correction in future amendment (A105) to FSAR. See also info in letter of 6/7/11. NRR tech staff review and document in SER. 2 5 26 APPENDIX HH STATUS - (12/
06 30/2011)  Page 11 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERretains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (SSER 22, Section 6.2.6, pg 6-12) (48) CI The NRC staff should verify that its conclusions in the review of FSAR Section 15.4.1 do not affect the conclusions of the staff regarding the acceptability of Section 6.5.3. (SSER 22, Section 6.5.3, pg 6-15) DORL/AADB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 7, 2011.
Upon NRR completion of SER Chapter 15 review, tech staff review and document in SER update to section 6.5.3. See also info in TVA letter of 6/7/11.
25 26 (49) CI The NRC staff was unable to determine how TVA linked the training qualification requirements of ANSI N45.2-1971 to TVA Procedure TI-119. Therefore, the implementation of training and qualification for inspectors will be the subject of future NRC staff inspections.  (NRC letter dated July 2, 2010, ADAMS Accession No. ML101720050) RII No EC: Complete FC: N/A For NRC Inspection / Review Provided NRC Residents how the refurb training requirements are linked to the ANSI standard. Provided the training records for refurb inspectors.
TVA provided RI staff with how the refurb training requirements are linked to the ANSI standard. Provided training records for refurb inspectors. RII to review and document in IR and update status in Appendix HH.
25 26 (50) CI TVA stated that about 5 percent of the anchor bolts for safety-related pipe supports do not have quality control documentation, because the pull tests have not yet been performed. Since the documentation is still under development, the NRC staff will conduct inspections to follow-up on RII No/ Plant Design EC: Ongoing Inspection FC: For NRC Inspection / Review Notify NRC Residents of anchor bolt pull tests.


Inspection of pull tests ongoing (Gilley) TVA to notify RI staff of anchor bolt pull tests. RII to review and document in IR and update status in Appendix HH. 26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 12 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERthe adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No.
Item Type           Action Required             NRC     TVA       TVA Action Required to Close      NRC Action Required to Close     Due SSER Lead  Response                                                                        Date Required/
ML101720050) (51) CI The implementation of TVA Procedure TI-119 will be the subject of NRC follow-up inspection to determine if the construction refurbishment program requirements are being adequately implemented.
TVA Lead to the RM-1000 being placed in                          For NRC Inspection / Review      review and document in SER.
(NRC letter dated July 2, 2010, ADAMS Accession No.
service, to establish the need for                      I&C Matrix Item 355 (closed to    I&C matrix item 355 exclusion distance for the HRCAR                        commitment) monitors while using handheld portable devices (e.g., walkie-talkie)                  TVA made a commitment to in the control room, as documented                      perform the survey and provide in Attachment 23 to TVAs letter                        results to NRC dated February 25, 2011, and item number 355 of TVAs letter dated                         Owner: R. Brehm April 15, 2011. (SSER 23, Section 7.5.2.3, pg 7-110)
ML101720050) RII No/ Moll EC: Ongoing inspection FC: For NRC Inspection / Review Provide NRC Residents the results of the refurb program.  
(80)     TVA should provide clarification to    EICB    Yes/    EC: Open                          NRR tech staff reviewed May 6,            26 the staff on how TVA Standard                    I&C    FC: N/A                          2011 letter and determined that Specification SS-E18-14.1 meets                                                            additional information is required.
the guidance of RG 1.180, and                            Responses to items 1 and 2.i in  RAI letter dated 9/21/11. Staff should address any deviations from                      letter dated 10/13/11. TVA       reviewing RAI response dated the guidance of the RG. (SSER 23,                        9/30/11 letter to NRC addressed  9/30/11. Additional RAI on Section 7.5.2.3, pg 7-115)                              2ii thru ix; the same letter      11/18/11.
committed to responding to 1 & 2i within two weeks of response      I&C matrix item 340 from vendor (GA-ESI).
Response provided in TVA to NRC letter dated May 6, 2011, has been reviewed.
I&C Matrix Item 340 -- submitted Additional response submitted in TVA letter to NRC dated 12/22/11 (81)     The extent to which TVAs supplier,    EICB    Yes/     EC: Open                          TVA to provide revised procedure          26 General Atomics (GA), complies                  I&C    FC: N/A                          on GA commercial dedication with EPRI TR-106439 and the                              Revised procedure submitted      process based on NRC letter of methods that GA used for its                            9/30/11. White paper and          7/11/11. Staff reviewing RAI commercial dedication process                            attachment submitted 10/13/11. response dated 9/30/11.
should be provided by TVA to the                                                           NRR tech staff review and NRC staff for review. (SSER 23,                          NRC comments on GA procedure      document in SER. Additional RAI Page 16 of 50


(Moll) RII to review and document in IR and update status in Appendix HH. 26 (59The staff's evaluation of the compatibility of the ESF system materials with containment sprays and core cooling water in the event of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit 2. (SSER 23, Section 6.1.1.4, pg 6-2) CVIB Yes EC: Open FC: N/A Response provided in TVA to NRC letter dated June 7, 2011.
APPENDIX HH STATUS - (12/0630/2011)
Tech staff review and document in SER. 2 5 26 (60) CI TVA should amend the FSAR description of the design and operation of the spent fuel pool cooling and cleanup system in FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (SSER 23, Section 9.1.3, pg 9-3 ) SBPB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 7, 2011.
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close    NRC Action Required to Close        Due  SSER Lead    Response                                                                          Date Required/
TVA provided information in A103. NRR tech staff review and update status in Appendix HH.
TVA Lead Section 7.5.2.3, pg 7-117)                               received 7/11/11 sent to GA for on 11/18/11.
25 26 (61)  TVA should provide information to the NRC staff to demonstrate that PAD 4.0 can conservatively calculate the fuel temperature and other impacted variables, such as SNPB Yes Will result in a License Condition.
resolution.
Is an Additional Submittal Required? NRR tech staff review and document in SER. May require license condition. 26 APPENDIX HH STATUS - (12/
11/18/11 RAI response provided  I&C matrix item 353 in TVA letter to NRC dated 12/22/11.
06 30/2011)  Page 13 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERstored energy, given the lack of a fuel thermal conductivity degradation model. (SSER 23, Section 4.2.2, pg 4-5) (63) CI TVA should confirm to the NRC staff that testing prior to Unit 2 fuel load has demonstrated that two-way communications is impossible with the Eagle 21 communications interface.  (SSER 23, Section 7.2.1.1, pg 7-7) RII No/ PSE EC:  FC: 7/1/12 Hot functional testing.
(83CI  TVA should confirm to the NRC staff   EICB      Yes/    EC: Open                        TVA to provide confirmation of               27 the completion of the data storm test          PSE      PSE: 07/01/12                  satisfactory completion of testing.
I&C Matrix Item None This will be addressed by a License Condition (Duplicate of SSER 23 Item 93) RII to inspect testing and document in IR. Update status in Appendix HH. From I&C matrix 171  27 (64) CI TVA stated that, "Post modification testing will be performed to verify that the design change corrects the Eagle 21, Rack 2 RTD accuracy issue prior to WBN Unit 2 fuel load."  This issue is open pending NRC staff review of the testing results.  (SSER 23, Section 7.2.1.1, pg 7-8) RII No/ PSE EC: 12/9/11 FC: 1/31/12 FCN issued 10/14/11; to be incorporated into an EDCR, to issue Mod is 12/9/11; and to implement Mod and Test 1/31/12
on the DCS. (SSER 23, Section                           FC:                            NRR tech staff review and 7.7.1.4, pg 7-159)                                      For NRC Inspection / Review    document in SER.
I&C Matrix Item None Provide requested info (90) CI  The NRC staff should verify that the  RII/      No/    EC: N/A                         RII to inspect the satisfactory              27 ERCW dual unit flow balance          SBPB      Mech    FC: 7/1/12                      completion of ERCW testing. RII to confirms that the ERCW pumps                            Complete ERCW Flow Balance. review and document in IR and meet all specified performance                                                          update status in Appendix HH.
requirements and have sufficient capability to supply all required ERCW normal and accident flows for dual unit operation and accident response, in order to verify that the ERCW pumps meet GDC 5 requirements for two-unit operation.
(SSER 23, Section 9.2.1, pg 9-4)
(91)     TVA should update the FSAR with      SBPB     Yes/    EC: Complete                   TVA provided updated information            26 information describing how WBN                MECH      FC: N/A                         in A106 to section 9.2.2. Staff is Unit 2 meets GDC 5, assuming the                                                        looking for TVA to provide similar worst case single failure and a                          Response provided TVA letter to information in Section 9.2.1 in future LOOP, as provided in TVAs letter                        NRC, dated 11/17/11,            FSAR amendment. TVA provided dated April 13, 2011. (SSER 23,                         Amendment 107.                  update in A107. NRR tech staff to Section 9.2.1, pg 9-5)                                                                   confirm and update status in Appendix HH.
(93) CI TVA should confirm to the staff that   CI      Yes/    EC:                            RII to inspect testing and document          27 testing of the Eagle 21 system has              PSE      PSE: 7/1/12                     in IR. Update status in Appendix sufficiently demonstrated that two-                      FC:                            HH.
way communication to the ICS is                          TVA to answer later.
Page 17 of 50


For NRC Inspection / Review I&C Matrix Item None Provide requested info RII to inspect testing and document in IR. Update status in Appendix HH. From I&C matrix 127  26 (65)  TVA should provide justification to the staff regarding why different revisions of WCAP-13869 are referenced in WBN Unit 1 and Unit 2. (SSER 23, Section 7.2.1.1, pg 7-3/4, 7-10) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 7, 2011. I&C Matrix Item 323 Changes are reflected in FSAR Amendment 104. NRR tech staff reviewing provided information and will document in SSER 26  Tech staff review and document in SER. Changes in FSAR A104 I&C matrix 323 2 5 26 (66) CI TVA should clarify FSAR Section 9.2.5 to add the capability of the UHS to bring the non-accident unit to cold shutdown within 72 hours.
APPENDIX HH STATUS - (12/0630/2011)
(SSER 23, Section 9.2.5, pg 9-8) SBPB Yes/ Mech EC: Complete FC: N/A A105 update of the FSAR. TVA to provide information in future amendment. NRR tech staff review and update status in Appendix HH.
Item  Type            Action Required          NRC     TVA      TVA Action Required to Close        NRC Action Required to Close    Due  SSER Lead  Response                                                                        Date Required/
2 5 26 APPENDIX HH STATUS - (12/
TVA Lead precluded with the described                          I&C Matrix Item None configurations. (SSER 23, Section                     Complete - This will be 7.9.3.2, pg 7-175)                                    addressed by a License Condition (Duplicate of SSER 23 Item 63(F))
06 30/2011)  Page 14 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(67) CI TVA should confirm, and the NRC staff should verify, that the component cooling booster pumps for Unit 2 are above PMF level.
(94)     TVA should provide to the staff      EICB     Yes/     EC: Open.                          NRR tech staff reviewing                26 either information that demonstrates          I&C     FC: N/A                           September 1, 2011, letter.
(SSER 23, Section 9.2.2, pg 9-6) RII No/ Civil EC: Complete FC:7/1/12 For NRC Inspection / Review Provide EDCR closure documentation for installation of CCS thermal barrier booster pump dike. AA FCR issued. Inspect after field complete TVA provided EDCR closure document to RI staff on installation of CCS thermal barrier booster pump dike. RII to review, inspect installation, and document in IR and update status in Appendix HH. 27 (69) CI The WBN Unit 2 RCS vent system is acceptable, pending verification that the RCS vent system is installed.
that the WBN Unit 2 Common Q                          Response provided in TVA to       Additional RAI in 11/18/11 letter.
(SSER 23, Section 5.4.5, pg 5-5)  RII No Mech EC: N/A FC:  7/1/12 For NRC Inspection / Review Provide EDCR closure documentation for installation of vents. TVA to provide EDCR closure document for installation of RCS vents to RI staff. RII to review, inspect, and document in IR and update status in Appendix HH. 27 (70)  TVA should provide the revised WBN Unit 2 PSI program ASME Class 1, 2, and 3 Supports "Summary Tables," to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of SSER 23, pg z-11, z-13) CVIB Yes/ ISO EC: 3/1/12 (Tinley) FC: N/A Provide requested info
PAMS meets the applicable                              NRC letter dated Sept. 1, 2011.
requirements in IEEE Std. 603-1991,                    Response provided in TVA to        NRR tech staff review and or justification for why the Common                    NRC Letter 5/6/11                  document in SSER.
Q PAMS should not meet those                          I&C Matrix Item 364 item 1, 367, requirements. (SSER 23, Section                       372 7.5.2.2.3, pg 7-50, 7-87)
(98)      TVA should demonstrate that the      EICB    Yes/     EC: Complete                       TVA to provide additional                26 WBN Unit 2 Common Q PAMS is in                I&C    FC: N/A                           information. Additional RAI in conformance with RG 1.152,                            Response provided in TVA to        11/18/11 letter.
Revision 2, or provide justification                  NRC letter dated May 6, 2011 for not conforming. (SSER 23,                         I&C Matrix Item 368                NRR tech staff review and Section 7.5.2.2.3, pg 7-53, 7-60, 7-                  Needs to be in Table 7.1-1        document in SSER.
102)                                                  Response provided in TVA to NRC letter dated August 4, 2011 (101)     TVA should demonstrate that the      EICB    Yes/     EC: Open                          NRR staff reviewing information          26 WBN Unit 2 Common Q PAMS                      I&C    FC: N/A                            provided by TVA on 10/13/11. NRR application software is in                                                                tech staff review and document in conformance with RG 1.168,                             Analysis to demonstrate            SSER.
Revision 1, or provide justification                  compliance provided in letter for not conforming. (SSER 23,                         dated 10/13/11. Initial response Section 7.5.2.2.3, pg 7-54, 7-60, 7-                  was not accepted by staff. WEC
: 65)                                                    to provide analysis similar to the one for IEEE 603 demonstrating compliance.
Response provided in TVA to NRC letter dated February 25, 2011.
Page 18 of 50


TVA needs to provide PSI program information to NRR. NRR tech staff review and document in SER. 26 (71) By letter dated April 21, 2011 (ADAMS Accession No. ML111110513), TVA withdrew its commitment to replace the Unit 2 clevis insert bolts. TVA should provide further justification for the decision to not replace the bolts to the NRC staff.   (SSER 23, Section 3.9.5, pg 3-2/3) CVIB Yes/ Mech EC: Complete FC: N/A Initial response provided in TVA to NRC letter dated June 7, 2011.
APPENDIX HH STATUS - (12/0630/2011)
TVA to NRC letter dated 10/24/2011, provided additional justification (from WEC) for this commitment withdrawal (i.e., to not replace the bolts). TVA requested to withdraw commitment to replace X-750 bolts by letter dated April 21, 2011. NRR tech staff reviewing request. TVA needs to justify use on low-temp heat treated bolts. TVA provided additional information in the 10/24/11 letter.
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close        NRC Action Required to Close    Due  SSER Lead  Response                                                                        Date Required/
NRR staff reviewing provided information and will document in SSER 26. 26 APPENDIX HH STATUS - (12/
TVA Lead Additional information provided in TVA to NRC letter dated 12/22/11.
06 30/2011)  Page 15 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(73) CI The NRC staff will inspect to confirm that TVA has completed the WBN Unit 2 EOPs prior to fuel load. (SSER 23, Section 7.5.3, pg 7-119) RII No/ OPS EC: 2/1/12 FC: N/A For NRC Inspection / Review Provide copies of EOPs for inspection. TVA to provide EOPs to RI staff. RII to review and document in IR and update status in Appendix HH. 26 (74) CI The NRC staff will verify installation of the acoustic-monitoring system for the power-operated relief valve (PORV) position indication in WBN Unit 2 before fuel load.  (SSER 23, Section 7.8.1, pg 7-167) RII No/ I&C EC: 5/1/12 FC: For NRC Inspection / Review Provide EDCR closure documentation for installation of acoustic monitors.
Additional response scheduled for 2/24/12 I&C Matrix Item 081 (105)     TVA should produce an acceptable        EICB    Yes/    EC: Open.                         TVA to provide additional                26 description of how the WBN Unit 2                 I&C    FC: N/A                            information. Additional RAI in Common Q PAMS SysRS and SRS                              Response provided in TVA to       11/18/11 letter.
implement the design basis                                NRC letter dated Sept. 1, 2011.
requirements of IEEE Std. 603-1991                                                          NRR tech staff review and Clause 4. (SSER 23, Section                               Response scheduled for 2/24/12    document in SSER.
7.5.2.2.3.4.3.1, pg 7-71)
I&C Matrix Item 213 & 372 (108)     TVA should demonstrate to the NRC      EICB    Yes/     EC: Open.                          Additional RAI in 11/18/11 letter.      26 staff that there are no synergistic              I&C    FC: N/A effects between temperature and                          Response provided in TVA to       NRR tech staff reviewing provided humidity for the Common Q PAMS                            NRC letter dated Sept. 1, 2011. information.
equipment. (SSER 23, Section 7.5.2.2.3.5.2, pg 7-75)                                  Response provided in TVA to NRC letter dated 12/22/11.
Additional response in TVA to NRC letter dated 1/19/12.
I&C Matrix Item None (110)      TVA should provide information to       EICB    Yes/    EC: Complete.                     TVA to provide additional               26 the NRC staff describing how the                 I&C    FC: N/A                            information. NRR tech staff review WBN Unit 2 Common Q PAMS                                  Response provided in TVA to        and document in SSER.
design supports periodic testing of                       NRC letter dated Sept. 1, 2011.
the RVLIS function. (SSER 23,                             I&C Matrix Item None Section 7.5.2.2.3.9.2.6, pg 7-93)
(111)     TVA should confirm to the staff that    EICB    Yes/     EC: Complete                      TVA to provide additional                26 there are no changes required to the              I&C    FC: N/A                           information. NRR tech staff review technical specifications as a result of                   Response provided in TVA to       and document in SSER.
Page 19 of 50


Panels installed 5/18/11 Probes not installed TVA to provide EDCR closure documentation for acoustic monitors to RI staff. RII to review and document in IR and update status in Appendix HH. 27 (75) CI The NRC staff will verify that the test procedures and qualification testing for auxiliary feedwater initiation and control and flow indication are completed in WBN Unit 2 before fuel load. (SSER 23, Section 7.8.2, pg 7-167RII No/ PSE EC: N/A PSE: 7/1/12 FC: N/A For NRC Inspection / Review Provide copies of test procedures for inspection. RII to review and document in IR and update status in Appendix HH. 26 (77It is unclear to the NRC staff which software V&V documents are applicable to the HRCAR monitors.
APPENDIX HH STATUS - (12/0630/2011)
TVA should clarify which software V&V documents are applicable, in order for the staff to complete its evaluation. (SSER 23, Section 7.5.2.3, pg 7-109) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated Sept. 1, 2011.
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close  NRC Action Required to Close    Due  SSER Lead  Response                                                                    Date Required/
Proprietary information provided in TVA to NRC letter dated 10/13/11 and non-proprietary versions provided in TVA to NRC letter dated 7/15/10. This older submittal discussed in 11/14/11 TVA to NRC letter.
TVA Lead the modification installing the                          NRC letter dated May 6, 2011 Common Q PAMS. If any changes                            I&C Matrix Item 374 to the technical specifications are required, TVA should provide the changes to the NRC staff for review.
NRR tech staff reviewing September 1 and November 14 , 2011 letter
(SSER 23, Section 7.5.2.2.3.11, pg 7-102)
: s. Staff still has a question on procedure used for system verification tests. See TVA
(112CI  TVA should provide an update to the    IHPB    Yes/     EC: Complete.                NRR tech staff review A105 and          26 FSAR reflecting the radiation                    LIC    FC: N/A                       document in SSER.
: 5. TVA needs to obtain V&V documents from vendor and provide to NRR. NRR tech staff review and document in SER. 26 (79) CI TVA should perform a radiated susceptibility survey, after the installation of the hardware but prior EICB Yes/
protection design features                              Addressed in A105 - change descriptive information provided in                     package 2-105-04 its letter dated October 4, 2010.
Hilmes, Brehm EC: 7/1/12 FC:  TVA to provide confirmation of satisfactory completion of rad survey/testing. NRR tech staff 27 APPENDIX HH STATUS - (12/
(SSER 24, Section 12.4)
06 30/2011)  Page 16 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERto the RM-1000 being placed in service, to establish the need for exclusion distance for the HRCAR monitors while using handheld portable devices (e.g., walkie-talkie) in the control room, as documented in Attachment 23 to TVA's letter dated February 25, 2011, and item number 355 of TVA's letter dated April 15, 2011. (SSER 23, Section 7.5.2.3, pg 7-110) For NRC Inspection / Review I&C Matrix Item 355 (closed to commitment)  
(113CI  TVA should provide an update to the   IHPB    Yes/    EC: Complete.                NRR tech staff review A015 and          26 FSAR reflecting the justification for            I&C    FC: N/A                      document in SSER.
the periodicity of the COT frequency                    A105 update of the FSAR -
for WBN non-safety related area                          change package 2-105-07 radiation monitors. (SSER 24, Section 12.4)
(114) CI  TVA should update the FSAR to          IHPB    Yes/     EC: Complete.                NRR tech staff review A105 and          26 reflect that WBN meets the radiation            LIC    FC: N/A                       document in SSER.
monitoring requirements of 10 CFR                        Addressed in A105. - change 50.68. (SSER 24, Section 12.4)                          package 2-105-01 (115)  CI  TVA should update the FSAR to          IHPB    Yes/    EC: Complete                  TVA to provide additional                26 reflect the information regarding                LIC    FC: N/A                      information. NRR tech staff review design changes to be implemented                                                      and document in SSER.
to lower radiation levels as provided                    FSAR updated in A105 (Section in its letter the NRC dated June 3,                      4.3.2.7) 2010. (SSER 24, Section 12.5)
(116) CI TVA should update the FSAR to          IHPB    Yes/     EC: Complete.                 NRR tech staff review A105 and          26 reflect the qualification standards of          LIC    FC: N/A                      document in SSER.
the RPM as provided in its letter to                     Addressed in A105. - change the NRC dated October 4, 2010.                          package 2-105-06.
(SSER 24, Section 12.6)
Page 20 of 50


TVA made a commitment to perform the survey and provide results to NRC Owner: R. Brehm review and document in SER. I&C matrix item 355 (80)  TVA should provide clarification to the staff on how TVA Standard Specification SS-E18-14.1 meets the guidance of RG 1.180, and should address any deviations from the guidance of the RG. (SSER 23, Section 7.5.2.3, pg 7-115) EICB Yes/ I&C EC: Open FC: N/A Responses to items 1 and 2.i in letter dated 10/13/11. TVA 9/30/11 letter to NRC addressed 2ii thru ix; the same letter committed to responding to 1 & 2i within two weeks of response from vendor (GA-ESI). Response provided in TVA to NRC letter dated May 6, 2011, has been reviewed. I&C Matrix Item 340
APPENDIX HH STATUS - (12/0630/2011)
-- submitted Additional response submitted in TVA letter to NRC dated 12/22/11 NRR tech staff reviewed May 6, 2011 letter and determined that additional information is required. RAI letter dated 9/21/11. Staff reviewing RAI response dated 9/30/11. Additional RAI on 11/18/11. I&C matrix item 340  26 (81)  The extent to which TVA's supplier, General Atomics (GA), complies with EPRI TR-106439 and the methods that GA used for its commercial dedication process should be provided by TVA to the NRC staff for review. (SSER 23, EICB Yes/ I&C EC: Open FC: N/A Revised procedure submitted 9/30/11. White paper and attachment submitted 10/13/11.  
Item  Type            Action Required          NRC      TVA       TVA Action Required to Close        NRC Action Required to Close      Due  SSER Lead  Response                                                                          Date Required/
TVA Lead (117) CI TVA should update the FSAR to        IHPB    Yes/    EC: 1/27/12                        TVA to provide additional                26 reflect the calculational basis for            LIC    FC: N/A                            information. NRR tech staff review access to vital areas as provided in                                                      and document in SSER.
its letter dated February 25, 2011.                   Update FSAR.
(SSER 24, Section 12.7.1)
(118)     TVA should provide to the NRC staff  EICB     Yes/     EC: Complete                      TVA provided additional information      26  Formatted Table a description of how the other                I&C     FC: N/A                           on 9/30/11 and 10/13/11. NRR tech vanadium detectors within the IITA                                                        staff review and document in SSER.
would be operable following the                        Additional information provided in failure of an SPND. (SSER 24,                          letter dated 10/13/11. Response Section 7.7.1.9.2)                                     provided in TVA to NRC letter dated Sept. 30, 2011.
(120)      TVA should confirm to the NRC staff  EICB    Yes/     EC: OpenClosed                    NRR tech staff has reviewed               26 that the maximum over-voltage or              I&C    FC: N/A                            September 1, 2011, letter and surge voltage that could affect the                    Provide a revised response        determined that additional system is 264 VAC, assuming that                        Response provided in TVA to      information is required. NRR staff the power supply cable to the SPS                      NRC letter dated Sept. 1, 2011. needs conformation that the power cabinet is not routed with other                      Note that the non-prop/affidavits  supply cable to the SPS is not cables greater than 264 VAC.                          to be provided by 12/1/11         routed with other cables greater (SSER 24, Section 7.7.1.9.5)                                                              than 264 VAC.
Open items completed by TVA to NRC letter dated 12/22/11 (121)      TVA should submit the results to the EICB    Yes/     EC: CompleteOpen                  TVA to provide additional                26 NRC staff of a 600 VDC dielectric              I&C     FC: N/A                            information. NRR tech staff review strength test performed on the IITA                                                      and document in SSER.
assembly. (SSER 24, Section                            Response provided TVA letter to 7.7.1.9.5)                                             NRC, dated 11/30/11.
Further response provided in TVA to NRC letter dated 1/19/12.
(123)      TVA should provide an explanation    EICB     Yes/     EC: Complete                      TVA provided additional information      26 to the NRC staff of how the system            I&C     FC: N/A                           on 9/30/11. NRR tech staff review will assign a data quality value to                                                      and document in SSER.
notify the power distribution                          Response provided in TVA to calculation software to disregard                      NRC letter dated Sept. 30, 2011 Page 21 of 50


NRC comments on GA procedure TVA to provide revised procedure on GA commercial dedication process based on NRC letter of 7/11/11. Staff reviewing RAI response dated 9/30/11. NRR tech staff review and document in SER. Additional RAI  26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 17 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERSection 7.5.2.3, pg 7-117) received 7/11/11 sent to GA for resolution.
Item Type           Action Required           NRC       TVA     TVA Action Required to Close      NRC Action Required to Close     Due SSER Lead  Response                                                                        Date Required/
11/18/11 RAI response provided in TVA letter to NRC dated 12/22/11. on 11/18/11.
TVA Lead data from a failed SPND. (SSER 24, Section 7.7.1.9.5)
I&C matrix item 353 (83) CI TVA should confirm to the NRC staff the completion of the data storm test on the DCS. (SSER 23, Section 7.7.1.4, pg 7-159) EICB Yes/ PSE EC: Open PSE: 07/01/12 FC: For NRC Inspection / Review I&C Matrix Item None  Provide requested info TVA to provide confirmation of satisfactory completion of testing. NRR tech staff review and document in SER. 27 (90) CI The NRC staff should verify that the ERCW dual unit flow balance confirms that the ERCW pumps meet all specified performance requirements and have sufficient capability to supply all required ERCW normal and accident flows for dual unit operation and accident response, in order to verify that the ERCW pumps meet GDC 5 requirements for two-unit operation. (SSER 23, Section 9.2.1, pg 9-4) RII/ SBPB No/ Mech  EC: N/A FC: 7/1/12 Complete ERCW Flow Balance. RII to inspect the satisfactory completion of ERCW testing. RII to review and document in IR and update status in Appendix HH. 27 (91) TVA should update the FSAR with information describing how WBN Unit 2 meets GDC 5, assuming the worst case single failure and a LOOP, as provided in TVA's letter dated April 13, 2011. (SSER 23, Section 9.2.1, pg 9-5) SBPB Yes/
(125)     TVA should provide clarification to   EICB      Yes/    EC: Complete                      TVA provided additional information      26 the NRC staff of the type of                   I&C    FC: N/A                          on 9/30/11. NRR tech staff review connector used with the MI cable in                                                      and document in SSER.
MECH EC: Complete FC: N/A Response provided TVA letter to NRC, dated 11/17/11, Amendment 107. TVA provided updated information in A106 to section 9.2.2. Staff is looking for TVA to provide similar information in Section 9.2.1 in future FSAR amendment. TVA provided update in A107. NRR tech staff to confirm and update status in Appendix HH. 26 (93) CI TVA should confirm to the staff that testing of the Eagle 21 system has sufficiently demonstrated that two-way communication to the ICS is CI Yes/ PSE EC: PSE: 7/1/12
Unit 2, and which EQ test is                            Response provided in TVA to applicable. (SSER 24, Section                           NRC letter dated Sept. 30, 2011 7.7.1.9.5)
(126)     To enable the NRC staff to evaluate  EICB     Yes/   EC: Complete                      TVA provided additional information      26 and review the IITA environmental              I&C    FC: N/A                          on 9/30/11. Staff to review qualification, TVA should provide the                                                    documents in Westinghouse summary report of the                                  Response provided TVA letter to  Rockville office. NRR tech staff environmental qualification for the                    NRC, dated 11/30/11.              review and document in SSER.
IITA. (SSER 24, Section 7.7.1.9.5)
(127)     TVA should provide a summary to      EICB      Yes/   EC: Complete                      TVA provided additional information      26 the NRC staff of the electro-                  I&C    FC: N/A                           on 9/30/11. NRR tech staff review magnetic interference/radio-                                                              and document in SSER.
frequency interference (EMI/RFI)                       Response provided in TVA to testing for the MI cable electro-                      NRC letter dated November 14, magnetic compatibility (EMC)                            2011 qualification test results. (SSER 24, Section 7.7.1.9.5)
(129)      TVA should verify to the NRC staff    EICB      Yes/   EC: Complete                     TVA provided additional information      26 resolution of the open item in WNA-          ELE, I&C  FC: N/A                           on 9/30/11. NRR tech staff review CN-00157-WBT for the power                                                                and document in SSER.
supply (to be installed in the SPS                      Response provided TVA letter to cabinet) to undergo EMC testing of 4                    NRC, dated 11/30/11.
kV to validate the assumptions made in the Westinghouse analysis.
(SSER 24, Section 7.7.1.9.5)
(131)     TVA should review the EOP action      EICB      Yes/   EC: Complete                      TVA provided additional information      26 level setpoint to account for the              Koontz                                    on 10/13/11. NRR tech staff review difference between core exit                            Response provided in letter dated and document in SSER.
temperature readings for Unit 1 and                    10/13/11.
Unit 2 and confirm the EOP action Page 22 of 50


FC: TVA to answer later. RII to inspect testing and document in IR. Update status in Appendix HH. 27 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 18 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERprecluded with the described configurations. (SSER 23, Section 7.9.3.2, pg 7-175) I&C Matrix Item None Complete - This will be addressed by a License Condition (Duplicate of SSER 23 Item 63(F))  (94)  TVA should provide to the staff either information that demonstrates that the WBN Unit 2 Common Q PAMS meets the applicable requirements in IEEE Std. 603-1991, or justification for why the Common Q PAMS should not meet those requirements.  (SSER 23, Section 7.5.2.2.3, pg 7-50, 7-87) EICB Yes/ I&C EC: Open. FC: N/A Response provided in TVA to NRC letter dated Sept. 1, 2011.
Item Type           Action Required             NRC       TVA     TVA Action Required to Close    NRC Action Required to Close     Due  SSER Lead  Response                                                                      Date Required/
Response provided in TVA to NRC Letter 5/6/11 I&C Matrix Item 364 item 1, 367, 372  NRR tech staff reviewing September 1, 2011, letter.
TVA Lead level setpoint to the NRC staff.
Additional RAI in 11/18/11 letter.
(SSER 24, Section 7.7.1.9.5)
NRR tech staff review and document in SSER. 26 (98) TVA should demonstrate that the WBN Unit 2 Common Q PAMS is in conformance with RG 1.152, Revision 2, or provide justification for not conforming.  (SSER 23, Section 7.5.2.2.3, pg 7-53, 7-60, 7-102) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated May 6, 2011 I&C Matrix Item 368  Needs to be in Table 7.1-1  Response provided in TVA to NRC letter dated August 4, 2011 TVA to provide additional information. Additional RAI in 11/18/11 letter.
(132)     TVA must provide the NRC staff with   SRXB      Yes/   EC: 12/15/11                    TVA to provide additional               26 analyses of the boron dilution event            Mech    FC: N/A                         information. NRR tech staff review that meet the criteria of SRP                                                            and document in SSER.
NRR tech staff review and document in SSER. 26 (101)  TVA should demonstrate that the WBN Unit 2 Common Q PAMS application software is in conformance with RG 1.168, Revision 1, or provide justification for not conforming.  (SSER 23, Section 7.5.2.2.3, pg 7-54, 7-60, 7-65) EICB Yes/ I&C EC: Open FC: N/A Analysis to demonstrate compliance provided in letter dated 10/13/11. Initial response was not accepted by staff. WEC to provide analysis similar to the one for IEEE 603 demonstrating compliance. Response provided in TVA to NRC letter dated February 25, 2011. NRR staff reviewing information provided by TVA on 10/13/11. NRR tech staff review and document in SSER. 26 APPENDIX HH STATUS - (12/
Section 15.4.6, including a                              Provide analysis results to NRC description of the methods and procedures used by the operators to                       Response provided by TVA to identify the dilution path(s) and                        NRC letter dated 1/12/12.
06 30/2011)  Page 19 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERAdditional information provided in TVA to NRC letter dated 12/22/11. Additional response scheduled for 2/24/12 I&C Matrix Item 081 (105)  TVA should produce an acceptable description of how the WBN Unit 2 Common Q PAMS SysRS and SRS implement the design basis requirements of IEEE Std. 603-1991 Clause 4.  (SSER 23, Section 7.5.2.2.3.4.3.1, pg 7-71) EICB Yes/ I&C EC: Open. FC: N/A Response provided in TVA to NRC letter dated Sept. 1, 2011.
terminate the dilution, in order for the staff to determine that the analyses comply with GDC 10.
Response scheduled for  2/24/12 I&C Matrix Item 213 & 372 TVA to provide additional information. Additional RAI in 11/18/11 letter.
(SSER 24, Section 15.2.4.4)
NRR tech staff review and document in SSER. 26 (108)  TVA should demonstrate to the NRC staff that there are no synergistic effects between temperature and humidity for the Common Q PAMS equipment.  (SSER 23, Section 7.5.2.2.3.5.2, pg 7-75) EICB Yes/ I&C EC: Open. FC: N/A Response provided in TVA to NRC letter dated Sept. 1, 2011.
(133)     In order to confirm the stability      EMCB      Yes/   EC: Complete                   TVA to provide additional                26 analysis of the sand baskets used              Licensing FC: N/A                         information. NRR tech staff review by TVA in the WBN Unit 2 licensing                                                        and document in SSER.
Response provided in TVA to NRC letter dated 12/22/11. Additional response in TVA to NRC letter dated 1/19/12.
basis, TVA will perform either a                         10/31/2011 TVA letter provided hydrology analysis without crediting                      analysis.
I&C Matrix Item None  Additional RAI in 11/18/11 letter.
the use of the sand baskets at the Fort Loudoun dam for the seismic                          Letter committed to revising dam failure and flood combination,                       FSAR. (A107) or TVA will perform a seismic test of                    [Commitment 112870791]
NRR tech staff reviewing provided information. 26 (110)  TVA should provide information to the NRC staff describing how the WBN Unit 2 Common Q PAMS design supports periodic testing of the RVLIS function. (SSER 23, Section 7.5.2.2.3.9.2.6, pg 7-93) EICB Yes/ I&C EC: Complete. FC: N/A Response provided in TVA to NRC letter dated Sept. 1, 2011. I&C Matrix Item None TVA to provide additional information. NRR tech staff review and document in SSER. 26 (111)  TVA should confirm to the staff that there are no changes required to the technical specifications as a result of EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to TVA to provide additional information. NRR tech staff review and document in SSER. 26 APPENDIX HH STATUS - (12/
the sand baskets, as stated in TVAs letter dated April 20, 2011. TVA will                    Information was incorporated in report the results of this analysis or                    FSAR A107.
06 30/2011)  Page 20 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERthe modification installing the Common Q PAMS. If any changes to the technical specifications are required, TVA should provide the changes to the NRC staff for review.  (SSER 23, Section 7.5.2.2.3.11, pg 7-102) NRC letter dated May 6, 2011 I&C Matrix Item 374 (112) CI TVA should provide an update to the FSAR reflecting the radiation protection design features descriptive information provided in its letter dated October 4, 2010.  (SSER 24, Section 12.4) IHPB Yes/ LIC EC: Complete. FC: N/A Addressed in A105 - change package 2-105-04 NRR tech staff review A105 and document in SSER. 26 (113) CI TVA should provide an update to the FSAR reflecting the justification for the periodicity of the COT frequency for WBN non-safety related area radiation monitors.  (SSER 24, Section 12.4) IHPB Yes/ I&C EC: Complete. FC: N/A A105 update of the FSAR - change package 2-105-07 NRR tech staff review A015 and document in SSER. 26 (114) CI TVA should update the FSAR to reflect that WBN meets the radiation monitoring requirements of 10 CFR 50.68.  (SSER 24, Section 12.4) IHPB Yes/ LIC EC: Complete. FC: N/A Addressed in A105. - change package 2-105-01 NRR tech staff review A105 and document in SSER. 26 (115) CI TVA should update the FSAR to reflect the information regarding design changes to be implemented to lower radiation levels as provided in its letter the NRC dated June 3, 2010. (SSER 24, Section 12.5) IHPB Yes/ LIC EC: Complete FC: N/A FSAR updated in A105 (Section 4.3.2.7) TVA to provide additional information. NRR tech staff review and document in SSER. 26 (116) CI TVA should update the FSAR to reflect the qualification standards of the RPM as provided in its letter to the NRC dated October 4, 2010.  (SSER 24, Section 12.6) IHPB Yes/ LIC EC: Complete. FC: N/A Addressed in A105. - change package 2-105-06. NRR tech staff review A105 and document in SSER. 26 APPENDIX HH STATUS - (12/
test to the NRC by October 31, 2011. (SSER 24, Section 2.4.10)
06 30/2011)  Page 21 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(117) CI TVA should update the FSAR to reflect the calculational basis for access to vital areas as provided in its letter dated February 25, 2011.
(134)     TVA should provide to the NRC staff   EMCB      Yes/   EC: 08/31/2012                  TVA to provide additional               26 supporting technical justification for         CORP      FC: N/A                         information. NRR tech staff review the statements in Amendment 104                  CIVIL                                    and document in SSER.
(SSER 24, Section 12.7.1) IHPB Yes/ LIC EC: 1/27/12 FC: N/A Update FSAR. TVA to provide additional information. NRR tech staff review and document in SSER. 26 (118)  TVA should provide to the NRC staff a description of how the other vanadium detectors within the IITA would be operable following the failure of an SPND.  (SSER 24, Section 7.7.1.9.2) EICB Yes/ I&C EC: Complete FC: N/A  Additional information provided in letter dated 10/13/11. Response provided in TVA to NRC letter dated Sept. 30, 2011. TVA provided additional information on 9/30/11 and 10/13/11. NRR tech staff review and document in SSER.
of FSAR Section 2.4.4.1, Dam                            Provide analysis to NRC.
26 (120)  TVA should confirm to the NRC staff that the maximum over-voltage or surge voltage that could affect the system is 264 VAC, assuming that the power supply cable to the SPS cabinet is not routed with other cables greater than 264 VAC.  (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: OpenClosed FC: N/A Provide a revised response  Response provided in TVA to NRC letter dated Sept. 1, 2011. Note that the non-prop/affidavits to be provided by 12/1/11 Open items completed by TVA to NRC letter dated 12/22/11 NRR tech staff has reviewed September 1, 2011, letter and determined that additional information is required. NRR staff needs conformation that the power supply cable to the SPS is not routed with other cables greater than 264 VAC.
Failure Permutations, page 2.4-32 (in the section Multiple Failures) that, Fort Loudoun, Tellico, and Page 23 of 50
26 (121) TVA should submit the results to the NRC staff of a 600 VDC dielectric strength test performed on the IITA assembly.  (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: CompleteOpen FC: N/A  Response provided TVA letter to NRC, dated 11/30/11.
Further response provided in TVA to NRC letter dated 1/19/12.
TVA to provide additional information. NRR tech staff review and document in SSER. 26 (123)  TVA should provide an explanation to the NRC staff of how the system will assign a data quality value to notify the power distribution calculation software to disregard EICB Yes/ I&C EC: Complete FC: N/A  Response provided in TVA to NRC letter dated Sept. 30, 2011 TVA provided additional information on 9/30/11. NRR tech staff review and document in SSER. 26 Formatted Table APPENDIX HH STATUS - (12/
06 30/2011)  Page 22 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERdata from a failed SPND.  (SSER 24, Section 7.7.1.9.5) (125) TVA should provide clarification to the NRC staff of the type of connector used with the MI cable in Unit 2, and which EQ test is applicable.  (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: Complete FC: N/A  Response provided in TVA to NRC letter dated Sept. 30, 2011 TVA provided additional information on 9/30/11. NRR tech staff review and document in SSER. 26 (126)  To enable the NRC staff to evaluate and review the IITA environmental qualification, TVA should provide the summary report of the environmental qualification for the IITA. (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC:  Complete FC: N/A Response provided TVA letter to NRC, dated 11/30/11. TVA provided additional information on 9/30/11. Staff to review documents in Westinghouse Rockville office. NRR tech staff review and document in SSER. 26 (127)  TVA should provide a summary to the NRC staff of the electro-magnetic interference/radio-frequency interference (EMI/RFI) testing for the MI cable electro-magnetic compatibility (EMC) qualification test results. (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: Complete FC: N/A  Response provided in TVA to NRC letter dated November 14, 2011  TVA provided additional information on 9/30/11. NRR tech staff review and document in SSER. 26 (129)  TVA should verify to the NRC staff resolution of the open item in WNA-CN-00157-WBT for the power supply (to be installed in the SPS cabinet) to undergo EMC testing of 4 kV to validate the assumptions made in the Westinghouse analysis.
(SSER 24, Section 7.7.1.9.5) EICB Yes/ ELE, I&C EC: Complete FC: N/A  Response provided TVA letter to NRC, dated 11/30/11.
TVA provided additional information on 9/30/11. NRR tech staff review and document in SSER. 26 (131)  TVA should review the EOP action level setpoint to account for the difference between core exit temperature readings for Unit 1 and Unit 2 and confirm the EOP action EICB Yes/ Koontz EC: Complete


Response provided in letter dated 10/13/11. TVA provided additional information on 10/13/11. NRR tech staff review and document in SSER. 26 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 23 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERlevel setpoint to the NRC staff. (SSER 24, Section 7.7.1.9.5) (132)  TVA must provide the NRC staff with analyses of the boron dilution event that meet the criteria of SRP Section 15.4.6, including a description of the methods and procedures used by the operators to identify the dilution path(s) and terminate the dilution, in order for the staff to determine that the analyses comply with GDC 10.  (SSER 24, Section 15.2.4.4) SRXB Yes/ Mech EC: 12/15/11 FC: N/A Provide analysis results to NRC Response provided by TVA to NRC letter dated 1/12/12.
Item Type           Action Required             NRC     TVA       TVA Action Required to Close  NRC Action Required to Close Due  SSER Lead   Response                                                               Date Required/
TVA to provide additional information. NRR tech staff review and document in SSER. 26 (133)  In order to confirm the stability analysis of the sand baskets used by TVA in the WBN Unit 2 licensing basis, TVA will perform either a hydrology analysis without crediting the use of the sand baskets at the Fort Loudoun dam for the seismic dam failure and flood combination, or TVA will perform a seismic test of the sand baskets, as stated in TVA's letter dated April 20, 2011. TVA will report the results of this analysis or test to the NRC by October 31, 2011.  (SSER 24, Section 2.4.10) EMCB Yes/ Licensing EC: Complete FC: N/A  10/31/2011 TVA letter provided analysis.
TVA Lead Watts Bar have previously been judged not to fail for the OBE (0.09 g). Postulation of Tellico failure in this combination has not been evaluated but is bounded by the SSE failure of Norris, Cherokee, Douglas and Tellico. (SSER 24, Section 2.4.10)
Letter committed to revising FSAR.  (A107)
(136) CI TVA should provide an update to the     AADB    Yes      FSAR A107 11/18/11            TVA to provide updated FSAR.        26 WBN Unit 2 FSAR that includes the                                                       NRR tech staff to confirm and JFD summary for the 1991 through                                                       document in SSER.
[Commitment 112870791]
2010 data period provided by e-mail dated July 20, 2011, and a discussion of the long term representativeness of these data.
Information was incorporated in FSAR A107.
NRC staff should confirm that these updates have been made, upon receipt of the updated FSAR.
TVA to provide additional information. NRR tech staff review and document in SSER. 26 (134)  TVA should provide to the NRC staff supporting technical justification for the statements in Amendment 104 of FSAR Section 2.4.4.1, "Dam Failure Permutations," page 2.4-32 (in the section "Multiple Failures") that, "Fort Loudoun, Tellico, and EMCB Yes/ CORP CIVIL EC: 08/31/2012 FC: N/A Provide analysis to NRC. TVA to provide additional information. NRR tech staff review and document in SSER. 26 APPENDIX HH STATUS - (12/
(SSER 25, Section 2.3.3)
06 30/2011)  Page 24 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERWatts Bar have previously been judged not to fail for the OBE (0.09 g). Postulation of Tellico failure in this combination has not been evaluated but is bounded by the SSE failure of Norris, Cherokee, Douglas and Tellico.(SSER 24, Section 2.4.10) (136) CI TVA should provide an update to the WBN Unit 2 FSAR that includes the JFD summary for the 1991 through 2010 data period provided by e-mail dated July 20, 2011, and a discussion of the long term representativeness of these data. NRC staff should confirm that these updates have been made, upon receipt of the updated FSAR.
(137)  CI  TVA should incorporate, and the        AADB     Yes     FSAR A107 11/18/11           TVA to provide updated FSAR.         26 NRC staff should confirm upon                                                          NRR tech staff to confirm and receipt, that the updated CR /Q                                                       document in SSER.
(SSER 25, Section 2.3.3) AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. NRR tech staff to confirm and document in SSER. 26 (137) CI TVA should incorporate, and the NRC staff should confirm upon receipt, that the updated CR /Q values from TVA's September 15, 2011, letter have been integrated into a future amendment of the FSAR. (SSER 25, Section 2.3.4) AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. NRR tech staff to confirm and document in SSER. 26 (138) CI Upon receipt of the updated ODCM, the NRC staff should confirm that corresponding revisions related to the updated annual average /Q and D/Q values have been made to the ODCM. (SSER 25, Section 2.3.5) AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. NRR tech staff to confirm and document in SSER. 26 (139) CI TVA should update the FSAR to reflect the results of the cost-benefit analysis required by 10 CFR Part IHPB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. NRR tech staff to confirm and document in SSER. 26 APPENDIX HH STATUS - (12/
values from TVAs September 15, 2011, letter have been integrated into a future amendment of the FSAR. (SSER 25, Section 2.3.4)
06 30/2011)  Page 25 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER50, Appendix I, subsection II.D.  (SSER 25, Section 11.3) Proposed Open Items Outstanding I&C Matrix Items        TVA 5  All safety related work must be quality controlled per 10CFR50, App. B. TVA to confirm that the procedure used for the RM
(138)  CI  Upon receipt of the updated ODCM,      AADB     Yes     FSAR A107 11/18/11           TVA to provide updated FSAR.         26 the NRC staff should confirm that                                                       NRR tech staff to confirm and corresponding revisions related to                                                     document in SSER.
-1000 system verification tests (04507007) was actually a procedure that was prepared per 10CFR50, App. B. 7.5.2.3 EICB I&C EC: Complete FC: N/A  Response provided in letter dated 10/13/11. I&C Matrix Item 346 See OI 77  TVA 7  Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?
the updated annual average /Q and D/Q values have been made to the ODCM. (SSER 25, Section 2.3.5)
EICB I&C EC: Complete FC: N/A Response in letter dated 4/15/11 I&C Matrix Item 361 NRC Review Pending TVA 8  OI#199 requested TVA to provide information concerning how TVA plans to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) associated with the Technical Support Center and Nuclear Data Link. TVA responded in Letter Dated October 5, 2010, Item 63;  however, TVA's response does not address the quality aspects of these system features. A similar question had been asked for Quality Criteria adherence for the SPDS and the BISI functions of the Integrated Computer System. In response to that request EICB I&C EC: Complete FC: N/A  Response submitted in letter dated 5/16/11 I&C Matrix Item 363 NRC Review pending Additional information provided in TVA to NRC letter dated 1/19/12.
(139) CI TVA should update the FSAR to           IHPB     Yes     FSAR A107 11/18/11           TVA to provide updated FSAR.         26 reflect the results of the cost-benefit                                                NRR tech staff to confirm and analysis required by 10 CFR Part                                                        document in SSER.
Page 24 of 50


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011) Page 26 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS.
Item Type           Action Required                 NRC     TVA       TVA Action Required to Close      NRC Action Required to Close Due SSER Lead  Response                                                                    Date Required/
Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
TVA Lead 50, Appendix I, subsection II.D.
(SSER 25, Section 11.3)
Proposed Open Items Outstanding I&C Matrix Items TVA       All safety related work must be             EICB      I&C    EC: Complete                      See OI 77 5      quality controlled per 10CFR50,                               FC: N/A App. B. TVA to confirm that the procedure used for the RM-1000                                Response provided in letter dated system verification tests (04507007)                          10/13/11.
was actually a procedure that was prepared per 10CFR50, App. B.                                I&C Matrix Item 346 7.5.2.3 TVA      Was the Foxboro IA system                  EICB      I&C    EC: Complete 7      developed under a 10 CFR 50                                  FC: N/A Appendix B compliant program?                                Response in letter dated 4/15/11 I&C Matrix Item 361 NRC Review Pending TVA      OI#199 requested TVA to provide            EICB      I&C    EC: Complete 8      information concerning how TVA plans                          FC: N/A to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) associated with the                        Response submitted in letter Technical Support Center and Nuclear Data Link. TVA responded in Letter dated 5/16/11 Dated October 5, 2010, Item 63; however, TVAs response does not                              I&C Matrix Item 363 address the quality aspects of these system features. A similar question had                      NRC Review pending been asked for Quality Criteria adherence for the SPDS and the BISI                          Additional information provided in functions of the Integrated Computer                          TVA to NRC letter dated 1/19/12.
System. In response to that request Page 25 of 50


Specifically, what is the scope of TVA Procedure SPP-2.6 "Computer Software Control"? How does it apply to the ICS functions of a) SPDS, b) BISI, and c)
APPENDIX HH STATUS - (12/0630/2011)
TSC and NDL functions? Wouldn't there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed? TVA 21  Provide proprietary, non-proprietary versions and affidavits for withholding for the following documents:
Item Type            Action Required              NRC      TVA      TVA Action Required to Close NRC Action Required to Close Due  SSER Lead  Response                                                              Date Required/
* General Atomics Electronic Systems 04038903-1SP, Qualification Basis for EICB I&C EC: 11/14/11 FC: N/A Provide response to NRC.
TVA Lead (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS.
Documents provided by letter dated 1/19/12.
Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?
Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply to the ICS functions of a) SPDS, b) BISI, and c)
TSC and NDL functions? Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?
TVA       Provide proprietary, non-proprietary     EICB     I&C     EC: 11/14/11 21      versions and affidavits for                                FC: N/A withholding for the following documents:                                                  Provide response to NRC.
* General Atomics Electronic Systems 04038903-1SP,                                Documents provided by letter Qualification Basis for                              dated 1/19/12.
Page 26 of 50


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011) Page 27 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER04031101-001 (2-RE-90-130 &131). 10/5/11
Item Type           Action Required           NRC       TVA     TVA Action Required to Close NRC Action Required to Close Due SSER Lead  Response                                                              Date Required/
TVA Lead 04031101-001 (2-RE-90-130                         I&C Matrix Item 396
              &131). 10/5/11
* General Atomics Electron Systems 04038903-2SP, Qualification Basis for 04031301-001 (2_RE-90-106).
* General Atomics Electron Systems 04038903-2SP, Qualification Basis for 04031301-001 (2_RE-90-106).
10/7/11
10/7/11
* General Atomics Electronic Systems 04038903-4SP, Qualification Basis for 04031501-001 (2-RE-90-112). 10/21/11 I&C Matrix Item 396            License Amendment Requests (LARs) for WBN Unit 1  
* General Atomics Electronic Systems 04038903-4SP, Qualification Basis for 04031501-001 (2-RE-90-112).
- Dual Unit Operation
10/21/11 License Amendment Requests (LARs) for WBN Unit 1 - Dual Unit Operation-Impact Licensing WBN Unit 2 1       Relief Request needed for WBN                           TVA Due Date 12/2011 - See Unit 1 refueling outage (RFO) that is                   (ML11252A530) scheduled for September 2012.
- Impact Licensing WBN Unit 2 1 Relief Request needed for WBN Unit 1 refueling outage (RFO) that is scheduled for September 2012.
2      Technical Specification (TS) Task                      TVA Due Date 12/2011 - See Force -340 to allow a 7-day                             (ML11252A530) completion time for the turbine-driven auxiliary feedwater pump if inoperability occurs in reactor Mode 3 following a RFO is needed for WBN Unit 1 September 2012 RFO.
TVA Due Date 12/2011  
3      Emergency Diesel Generator (EDG)                        TVA Due Date 12/2011 - See Frequency Test TS change to                            (ML11252A530) perform an analysis for alignment with WBN Unit 2.
- See (ML11252A530) 2  Technical Specification (TS) Task Force -340 to allow a 7
Page 27 of 50
-day completion time for the turbine
 
-driven auxiliary feedwater pump if inoperability occurs in reactor Mode 3 following a RFO is needed for WBN Unit 1 September 2012 RFO.
APPENDIX HH STATUS - (12/0630/2011)
TVA Due Date 12/2011  
Item  Type          Action Required            NRC      TVA      TVA Action Required to Close    NRC Action Required to Close        Due  SSER Lead  Response                                                                          Date Required/
- See (ML11252A530) 3  Emergency Diesel Generator (EDG) Frequency Test TS change to perform an analysis for alignment with WBN Unit 2.
TVA Lead 4      Fuel Handling Accident TS change                       TVA Due Date 12/2011 - See to adopt partial Alternate Source                      (ML11252A530)
TVA Due Date 12/2011  
Term for alignment with WBN Unit 2.
- See (ML11252A530)
5      Primary reactor coolant system                          TVA Due Date 12/2011 - See chemistry iodine concentration TS                      (ML11252A530) change to align with a regulatory guide.
6      Change reporting requirements for                      TVA Due Date 12/2011 - See WBN Unit 1 License Condition 2.G                        (ML11252A530) to align with Title 10 of the Code of Federal Regulations Sections 50.72 and 50.73 7      TS change to allow interchange of A                    TVA Due Date 12/2011 - See and B with C and 0 Common Station                      (ML11252A530)
Service Transformers.
8      Change EDG TS allowed outage                            TVA Due Date 12/2011 - See time from 72-hours to 7 -day or 14-                    (ML11252A530) day with a temporary EDG.
Closed (3)  CI  Confirm TVA submitted update to      EEEB    Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.              24 FSAR section 8.3.1.4.1. (NRC safety                    NRC letter dated April 6, 2011.
evaluation dated August 31, 2009,                      Complete                        TVA to include in amendment to ADAMS Accession No.                                                                    FSAR and highlight in transmittal ML092151155)                                                                            letter. NRR staff review of FSAR update.
In 4/6/11 letter, TVA states it was in AMD 95.
(11)  CI  The plant administrative procedures  IOLB      No/    EC: Complete                    Closed in SSER 25, Section 13.1.3            25 should clearly state that, when the            OPS      FC: N/A Assistant Shift Engineer assumes                        TVA Letter dated 9/1/11        NRR tech staff reviewing provided his duties as Fire Brigade Leader,                                                      information and will document in Page 28 of 50
 
APPENDIX HH STATUS - (12/0630/2011)
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead    Response                                                                        Date Required/
TVA Lead his control room duties are                                                                SSER 25.
temporarily assumed by the Shift Supervisor (Shift Engineer), or by another SRO, if one is available.
The plant administrative procedures should clearly describe this transfer of control room duties. (SSER 22, Section 13.1.3, pg 13-2)
(14)      TVA stated that the Unit 2 PTLR is    CVIB      Yes      EC: Complete                    Closed in SSER 25, Section 5.3.1          25 included in the Unit 2 System                            FC: N/A Description for the Reactor Coolant                      Response provided in TVA to      NRR tech staff reviewing provided System (WBN2-68-4001), which will                        NRC letter dated April 6, 2011. information and will document in be revised to reflect required                                                            SSER 25.
revisions to the PTLR by September                        R. Bryans 10/11 e-mail provided 17, 2010. (SSER 22, Section 5.3.1,                        necessary portion of WBN2            pg 5-8)                                                  4001 to NRR.
(15)      TVA should confirm to the NRC staff    CPNB      Yes      Response provided in TVA to      Closed in SSER 24, Section 3.6.3.        24 the completion of Primary Stress                          NRC letter dated April 6, 2011.
Corrosion Cracking (PWSCC)                                Complete                        TVA submitted information in A103.
mitigation activities on the Alloy 600                                                    NRR tech staff review and dissimilar metal butt welds (DMBWs)                                                        document in SER.
in the primary loop piping. (Section 3.6.3)
(18)      Based on the extensive layup period    RII/      No      Response provided in TVA to      Closed in Inspection Report              24 of equipment within WBN Unit 2, the    EEEB              NRC letter dated April 6, 2011. 0500391/2011604, dated June 29, NRC staff must review, prior to fuel                      Complete                        2011, ADAMS Accession No.
load, the assumptions used by TVA                                                          ML111810890.
to re-establish a baseline for the qualified life of equipment. The                                                          Conduct EQ inspection. Document purpose of the staffs review is to                                                        in IR and update status in Appendix ensure that TVA has addressed the                                                          HH.
effects of environmental conditions on equipment during the layup                                                              See TVA response (RAI 3.11-EQ-period. (Section 3.11.2.2)                                                                1) in letter dated 12/17/10.
Page 29 of 50
 
APPENDIX HH STATUS - (12/0630/2011)
Item  Type          Action Required              NRC      TVA      TVA Action Required to Close    NRC Action Required to Close      Due  SSER Lead    Response                                                                      Date Required/
TVA Lead (19)      The NRC staff should complete its        RII/      No      For NRC Inspection / Review    Closed in Inspection Report              24 review of TVAs EQ Program              EEEB              Provide NRC Residents copies of 0500391/2011604, dated June 29, procedures for WBN Unit 2 prior to                        EQ documents as requested for  2011, ADAMS Accession No.
fuel load. (Section 3.11.2.2.1)                            the onsite inspection          ML111810890.
Complete - Expect NRC to close  TVA to provide RI staff with copies in next inspection report      of EQ documents. Conduct EQ inspection. Document in IR and update status in Appendix HH.
(20)      Resolve whether or not routine          RII/    Yes      Response provided in TVA to    Closed in Inspection Report              24 maintenance activities should result    EEEB              NRC letter dated April 6, 2011. 0500391/2011605, dated August 5, in increasing the EQ of the 6.9 kV                        Complete                        2011, ADAMS Accession No.
motors to Category I status in                                                            ML112201418.
accordance with 10 CFR 50.49.
(SSER 22, Section 3.11.2.2.1).                                                            TVA submitted letter dated April 6, 2011. NRR tech staff review and document in SER.
(21)      The NRC staff should confirm that        RII/      No      EC: Complete                    Closed in Inspection Report              25 the Electrical Penetration              EEEB              FC: N/A                        05000391/2011607, dated Assemblies (EPAs) are installed in                                                        September 30, 2011, ADAMS the tested configuration, and that the                    Closed in IR 2011-607 (issued  Accession No. ML112730197.
feedthrough module is manufactured                        9/30/11 by the same company and is consistent with the EQ test report for the EPA. (SSER 22, Section 3.11.2.2.1, pg 3-14)
(22)      TVA must clarify its use of the term    EEEB      Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.          24 equivalent (e.g., identical, similar)                    NRC letter dated April 6, 2011.
regarding the replacement terminal                        Complete                        NRR in receipt of information to blocks to the NRC staff. If the                                                            address this item in TVA letter of blocks are similar, then a similarity                                                      4/6/11. NRR tech staff review and analysis should be completed and                                                          document in SER.
presented to the NRC for review.
(Section 3.11.2.2.1)
Page 30 of 50
 
APPENDIX HH STATUS - (12/0630/2011)
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close    NRC Action Required to Close        Due  SSER Lead  Response                                                                        Date Required/
TVA Lead (24)      The NRC staff requires supporting      EEEB    Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.            24 documentation from TVA to justify its                    NRC letter dated April 6, 2011.
establishment of a mild environment                      Complete                        TVA provided information in April 6, threshold for total integrated dose of                                                  2011 letter. NRR tech staff review less than 1x103 rads for electronic                                                      and document in SER.
components such as semiconductors or electronic components containing organic material. (Section 3.11.2.2.1)
(27)      TVA should provide a summary of        EEEB    Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.            24 margin studies based on scenarios                        NRC letter dated April 6, 2011.
described in Section 8.1 for CSSTs                      Complete                        TVA provided information in April 6, A, B, C, and D. (SSER 22, Section                                                        2011 letter. NRR tech staff review 8.2.2)                                                                                  and document in SER.
(28)      TVA should provide to the NRC staff    EEEB    Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.            24 a detailed discussion showing that                      NRC letter dated April 6, 2011.
the load tap changer is able to                          Complete                        TVA provided information in April 6, maintain the 6.9 kV bus voltage                                                          2011 letter. NRR tech staff review control band given the normal and                                                        and document in SER.
post-contingency transmission operating voltage band, bounding voltage drop on the grid, and plant conditions. (SSER 22, Section 8.2.2)
(29)      TVA should provide information        EEEB    Yes      Response provided in TVA to    Closed in SSER 24, Section 8.1.            24 about the operating characteristics                      NRC letter dated June 7, 2011.
of the offsite power supply at the                      Complete                        TVA to provide updated grid stability Watts Bar Hydro Plant (for dual-unit                                                    analysis. TVA provided information operation), including the operating                                                      in letter of 6/7/11. NRR tech staff voltage range, postcontingency                                                          review and document in SER.
voltage drops (including bounding values and post-unit trip values),
and operating frequency range.
(SSER 22, Section 8.2.2) (corrected version of Open Item 29 from previous SSER Appendix HH)
Page 31 of 50


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 28 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER 4  Fuel Handling Accident TS change to adopt partial Alternate Source Term for alignment with WBN Unit 2.
Item Type             Action Required           NRC     TVA       TVA Action Required to Close    NRC Action Required to Close       Due SSER Lead  Response                                                                        Date Required/
TVA Due Date 12/2011
TVA Lead (31)     TVA should clarify the loading        EEEB    Yes      Response provided in TVA to     Closed in SSER 24, Section 8.1.           24 sequence as explained in its letter                    NRC letter dated April 6, 2011.
- See (ML11252A530) 5  Primary reactor coolant system chemistry iodine concentration TS change to align with a regulatory guide. TVA Due Date 12/2011  
dated December 6, 2010 to the staff.                   Complete.                       TVA provided information in April 6, TVA should clarify whether the                                                          2011 letter. NRR tech staff review existing statements in FSAR                                                            and document in SER.
- See (ML11252A530) 6 Change reporting requirements for WBN Unit 1 License Condition 2.G to align with Title 10 of the Code of Federal Regulations Sections 50.72 and 50.73 TVA Due Date 12/2011  
regarding automatic sequencing logic are correct. If the FSAR description is correct, TVA should explain how the EDG and logic sequencing circuitry will respond to a LOCA followed by a LOOP scenario. (SSER 22, Section 8.3.1.11) (corrected version of Open Item 31 from SSER 22 Appendix HH)
- See (ML11252A530) 7  TS change to allow interchange of A and B with C and 0 Common Station Service Transformers.
(34) CI TVA stated that the method of        SBPB    Yes      Response provided in TVA to    Closed in SSER 24, Section 9.1.4.          24 compliance with Phase I guidelines                      NRC letter dated April 6, 2011.
TVA Due Date 12/2011
would be substantially similar to the                  Complete.                      TVA submitted information in 4/6/11 current Unit 1 program and that a                                                      letter and A103. NRR tech staff new Section 3.12 will be added to                                                       review and document in SER.
- See (ML11252A530) 8  Change EDG TS allowed outage time from 72
the Unit 2 FSAR that will be materially equivalent to Section 3.12 of the current Unit 1 FSAR. (SSER 22, Section 9.1.4)
-hours to 7
(36)     TVA should provide information to    CSGB/    Yes     Response provided in TVA to     Closed in SSER 24, Section 10.4.8.        24 the NRC staff to enable verification  DORL              NRC letter dated April 6, 2011.
-day or 14-day with a temporary EDG.
that the SGBS meets the                                Complete.                      TVA provided information in April 6, requirements and guidance                                                              2011 letter. NRR tech staff review specified in the SER or provide                                                        and document in SER.
TVA Due Date 12/2011
justification that the SGBS meets other standards that demonstrate conformance to GDC 1 and GDC
- See (ML11252A530)
: 14. (SSER 22, Section 10.4.8)
Closed        (3) CI Confirm TVA submitted update to FSAR section 8.3.1.4.1. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No. ML092151155) EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 8.1.  
Page 32 of 50


TVA to include in amendment to FSAR and highlight in transmittal letter. NRR staff review of FSAR update. In 4/6/11 letter, TVA states it was in AMD 95. 24 (11) CI The plant administrative procedures should clearly state that, when the Assistant Shift Engineer assumes his duties as Fire Brigade Leader, IOLB No/ OPS EC: Complete FC: N/A TVA Letter dated 9/1/11 Closed in SSER 25, Section 13.1.3 NRR tech staff reviewing provided information and will document in 25 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 29 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERhis control room duties are temporarily assumed by the Shift Supervisor (Shift Engineer), or by another SRO, if one is available. The plant administrative procedures should clearly describe this transfer of control room duties. (SSER 22, Section 13.1.3, pg 13-2) SSER 25. (14)  TVA stated that the Unit 2 PTLR is included in the Unit 2 System Description for the Reactor Coolant System (WBN2-68-4001), which will be revised to reflect required revisions to the PTLR by September 17, 2010. (SSER 22, Section 5.3.1, pg 5-8) CVIB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
Item Type           Action Required             NRC     TVA       TVA Action Required to Close      NRC Action Required to Close     Due SSER Lead  Response                                                                      Date Required/
R. Bryan's 10/11 e-mail provided necessary portion of WBN2-68-4001 to NRR. Closed in SSER 25, Section 5.3.1
TVA Lead (44)     TVA should provide additional          CVIB    Yes      EC: Complete.                    Closed in SSER 25, Section 5.3.1.       25 information to clarify how the initial                  FC: N/A and irradiated RTNDT was                                Response provided in TVA to      NRR tech staff reviewing provided determined. (SSER 22, Section                           NRC letter dated April 6, 2011. information and will document in 5.3.1, pg 5-9, 5-11, 5-13, 5-17, 5-28,                                                    SSER 25.
5-29, 5-31, 5-32)
(45) CI TVA stated in its response to RAI      CVIB    Yes      EC: Complete                    Closed in SSER 25, Section 5.3.2.        25 5.3.2-2, dated July 31, 2010, that the                  FC: N/A PTLR would be revised to                                 Response provided in TVA to     NRR tech staff reviewing provided incorporate the COMS arming                              NRC letter dated April 6, 2011. information and will document in temperature. (SSER 22, Section                                                           SSER 25.
5.3.2, pg 5-28/29, 5-32)                                R. Bryans 10/11 e-mail provided necessary portion of WBN2                                                                    4001 to NRR.
(46) CI  The LTOP lift settings were not        CVIB     Yes     EC: Complete                     Closed in SSER 25, Section 5.3.2.        25 included in the PTLR, but were                          FC: N/A provided in TVAs response to RAI                        Response provided in TVA to     NRR tech staff reviewing provided 5.3.2-2 in its letter dated July 31,                    NRC letter dated April 6, 2011. information and will document in 2010. TVA stated in its RAI                                                              SSER 25.
response that the PTLR would be                          R. Bryans 10/11 e-mail provided revised to incorporate the LTOP lift                    necessary portion of WBN2           settings into the PTLR. (SSER 22,                        4001 to NRR.
Section 5.3.2, pg 5-28/29, 5-32) )
(52)      TVA should provide an update to the    IHPB              Response provided in TVA to      Never issued in SSER, issued as FSAR replacing Table 12.2-3 with                        NRC letter dated June 7, 2011. RAI questions. TVA provided the expected source strength values                      Complete.                        information in February 25, 2011 of the freshly irradiated IITAs.                                                          letter. See also letter of 6/7/11.
(Section 12.3)
(53)      TVA should provide an update to the    IHPB                                              Never issued in SSER, issued as FSAR reflecting the information                                                          RAI questions. TVA provided provided in its letter dated October                                                      information in February 25, 2011 4, 2010, regarding the WBN                                                                letter.
radiation protection design features, including controlled access areas, decontamination areas, and onsite Page 33 of 50


NRR tech staff reviewing provided information and will document in SSER 25. 25 (15)  TVA should confirm to the NRC staff the completion of Primary Stress Corrosion Cracking (PWSCC) mitigation activities on the Alloy 600 dissimilar metal butt welds (DMBWs) in the primary loop piping. (Section 3.6.3) CPNB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 3.6.3.
APPENDIX HH STATUS - (12/0630/2011)
TVA submitted information in A103. NRR tech staff review and document in SER.
Item Type            Action Required            NRC      TVA       TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead  Response                                                                        Date Required/
24 (18)  Based on the extensive layup period of equipment within WBN Unit 2, the NRC staff must review, prior to fuel load, the assumptions used by TVA to re-establish a baseline for the qualified life of equipment. The purpose of the staff's review is to ensure that TVA has addressed the effects of environmental conditions on equipment during the layup period. (Section 3.11.2.2)   RII/ EEEB No Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in Inspection Report 0500391/2011604, dated June 29, 2011, ADAMS Accession No. ML111810890.
TVA Lead laboratories and counting rooms.
Conduct EQ inspection. Document in IR and update status in Appendix HH. See TVA response (RAI 3.11-EQ-1) in letter dated 12/17/10.
(Section 12.4)
24 APPENDIX HH STATUS - (12/
(54)     TVA should provide adequate            IHPB              On bucket list.                 Never issued in SSER, issued as technical justification to the staff to                  Calculation has been issued and  RAI questions. TVA to provide relax the frequency of the radiation                      is ready to submit.             revised wording in FSAR to discuss monitor channel quarterly operability                                                      statistically sound justification to tests. TVA should provide sufficient                      Meeting with NRC next week      justify relaxation of channel check information to the staff to determine                                                      frequency.
06 30/2011Page 30 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(19)  The NRC staff should complete its review of TVA's EQ Program procedures for WBN Unit 2 prior to fuel load. (Section 3.11.2.2.1) RII/ EEEB No For NRC Inspection / Review Provide NRC Residents copies of EQ documents as requested for the onsite inspection Complete - Expect NRC to close in next inspection report
that the portable airborne radiation monitors comply with the requirements of 10 CFR 20.1501.
TVA should provide sufficient information to the staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4)
(55)     TVA should provide sufficient          IHPB              TVA to NRC letter submitted July Never issued in SSER, issued as information to the staff to                              14, 2011.                       RAI questions. TVA clarify previous demonstrate that the two area                            A 105 Change package prepared    RAI response from letter 2/25/11 in radiation monitors for the Spent Fuel                                                      new letter of 6/14/11.
Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4)
(56CI  TVA should update the FSAR to           IHPB                                              Never issued in SSER, issued as reflect the information regarding the                                                      RAI questions.
dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)
Page 34 of 50


Closed in Inspection Report 0500391/2011604, dated June 29, 2011, ADAMS Accession No. ML111810890.  
APPENDIX HH STATUS - (12/0630/2011)
Item  Type            Action Required              NRC      TVA      TVA Action Required to Close      NRC Action Required to Close        Due  SSER Lead  Response                                                                          Date Required/
TVA Lead (57)  CI  TVA should update the FSAR to          IHPB                                              Never issued in SSER, issued as reflect the qualification standards of                                                    RAI questions.
the RPM as provided in its letter to the NRC dated October 4, 2010.
(Section 12.6)
(58)  CI  The staff has insufficient information  IHPB              (I&C Matrix Item 349)            Never issued in SSER, issued as to conclude that TVA has taken                            WBNAPS3-126, EQ Dose in the    RAI questions. TVA provided appropriate actions to reduce                            U1/U2 Auxiliary Instrument      information in February 25, 2011 radiation levels and increase the                        Rooms and the Computer Room      letter. TVA to provide calculation or capability of operators to control and                    in the Control Building        summary of calculation when mitigate the consequences of an                                                            complete.
accident at WBN Unit 2, in                                WBNAPS3-127 EQ Dose in the accordance with the guidance of                          Control Building NUREG-0737, Item II.B.2, or can maintain occupational doses to plant                      TVA to review operators within the requirements of GDC 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1)
(62)  CI  Confirm TVAs change to FSAR            SBPB    Yes      Response provided in TVA to      Closed in SSER 24, Section 10.4.9.          24 Section 10.4.9 to reflect its intention                  NRC letter dated June 7, 2011.
to operate with each CST isolated                        Complete                        TVA provided information in letter of from the other. (SSER 23, Section                                                          6/7/11 and A103. NRR tech staff 10.4.9)                                                                                    review and update status in Appendix HH.
(68)      TVA should clarify to the NRC staff    SBPB                                              Never issued in SSER how the CSS complies with GDC 5.
(Section 9.2.2)
(72)      The NRC staff should complete its      EICB      No/    EC:Complete                      Closed in SSER 25, Section 7.5.2.2.        25 review and evaluation of the                      I&C    FC: N/A additional information provided by                        Open pending NRC review          NRR tech staff reviewing provided TVA regarding the ICC                                    Responses provided in multiple  information and will document in instrumentation. (SSER 23, Section                        TVA to NRC letters.              SSER 25.
4.4.8, pg 4-22)                                          I&C Matrix Item 041, , 244, 245, I&C Matrix Items 041, 043, 067, Page 35 of 50


TVA to provide RI staff with copies of EQ documents. Conduct EQ inspection. Document in IR and update status in Appendix HH.
APPENDIX HH STATUS - (12/0630/2011)
24 (20Resolve whether or not routine maintenance activities should result in increasing the EQ of the 6.9 kV motors to Category I status in accordance with 10 CFR 50.49. (SSER 22, Section 3.11.2.2.1). RII/ EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in Inspection Report 0500391/2011605, dated August 5, 2011, ADAMS Accession No. ML112201418.
Item Type            Action Required            NRC      TVA      TVA Action Required to Close      NRC Action Required to Close      Due  SSER Lead  Response                                                                          Date Required/
TVA submitted letter dated April 6, 2011. NRR tech staff review and document in SER.
TVA Lead 246, 250, 251, 252, 367, 368,    068, 069, 074, 081, 086, 101, 138, 372, 373, and 374                142, 143, 144, 145, 183, 185, 202, 212, 244, 245, 246, 250, 251, 252, 367, 368, 372, 373, and 374 (76) CI The NRC staff will verify that the     RII     No/     EC:                               Closed in Inspection Report                25 derivative time constant is set to              PSE      PSE: 07/01/12                    05000391/2011607, dated zero in WBN Unit 2 before fuel load.                    FC:                              September 30, 2011, ADAMS (SSER 23, Section 7.8.3, pg 7-167)                      For NRC Inspection / Review      Accession No. ML112730197.
24 (21)  The NRC staff should confirm that the Electrical Penetration Assemblies (EPAs) are installed in the tested configuration, and that the feedthrough module is manufactured by the same company and is consistent with the EQ test report for the EPA. (SSER 22, Section 3.11.2.2.1, pg 3-14) RII/ EEEB No EC: Complete  FC: N/A  Closed in IR 2011-607 (issued 9/30/11 Closed in Inspection Report 05000391/2011607, dated September 30, 2011, ADAMS Accession No. ML112730197.
Provide copies of test procedures for inspection.
25 (22)  TVA must clarify its use of the term "equivalent" (e.g., identical, similar) regarding the replacement terminal blocks to the NRC staff. If the blocks are similar, then a similarity analysis should be completed and presented to the NRC for review. (Section 3.11.2.2.1) EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 8.1.
(78)     TVA intends to issue a revised        EICB    Yes/    EC: Complete.                     Closed in SSER 25, Section 7.5.2.3.       25 calculation reflecting that the TID in           I&C    FC: N/A the control room is less than 1x103                      Provide requested calculation    NRR tech staff reviewing provided rads, which will be evaluated by the                    I&C Matrix Item 349 -            information and will document in NRC staff. (SSER 23, Section                             Calculation WBNAPS3-127 EQ      SSER 25.
NRR in receipt of information to address this item in TVA letter of 4/6/11. NRR tech staff review and document in SER.
7.5.2.3, pg 7-110, 7-116)                               Dose in the Control Building is ready to submit                  TVA to provide revised calculation Calculation submitted in TVA to   WBNAPS3-127 EQ Dose in the NRC letter dated August 4, 2011   Control Building. NRR tech staff review and document in SER.
24 APPENDIX HH STATUS - (12/
I&C matrix item 349 (82)     The staff concluded that the           EICB    Yes     Response provided in TVA to       Closed in SSER 24, Section                 24 information provided by TVA                             NRC letter dated June 10, 2011   7.6.1.4.5.
06 30/2011)  Page 31 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(24)  The NRC staff requires supporting documentation from TVA to justify its establishment of a mild environment threshold for total integrated dose of less than 1x10 3 rads for electronic components such as semiconductors or electronic components containing organic material. (Section 3.11.2.2.1) EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 8.1.
pertaining to the in-containment                        I&C Matrix Item 362 LPMS equipment qualification for                                                          TVA provided LPMS equipment vibration was incomplete. TVA                           Complete - Staff accepted the     vibration qualification in letter of should provide (item number 362 of                       response and closed the I&C      6/10/11. NRR tech staff review and ADAMS Accession No.                                     Matrix Item as of 7/11/11.       document in SER.
TVA provided information in April 6, 2011 letter. NRR tech staff review and document in SER.
ML111050009), documentation that demonstrates the LPMS in-                                                                 I&C matrix item 362 containment equipment has been qualified to remain functional in its normal operating vibration environment, per RG 1.133, Revision 1. (SSER 23, Section Page 36 of 50
24 (27)  TVA should provide a summary of margin studies based on scenarios described in Section 8.1 for CSSTs A, B, C, and D. (SSER 22, Section 8.2.2)   EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 8.1.
TVA provided information in April 6, 2011 letter. NRR tech staff review and document in SER.
24 (28) TVA should provide to the NRC staff a detailed discussion showing that the load tap changer is able to maintain the 6.9 kV bus voltage control band given the normal and post-contingency transmission operating voltage band, bounding voltage drop on the grid, and plant conditions. (SSER 22, Section 8.2.2)  EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011. Complete Closed in SSER 24, Section 8.1.
TVA provided information in April 6, 2011 letter. NRR tech staff review and document in SER.
24 (29)  TVA should provide information about the operating characteristics of the offsite power supply at the Watts Bar Hydro Plant (for dual-unit operation), including the operating voltage range, postcontingency voltage drops (including bounding values and post-unit trip values), and operating frequency range. (SSER 22, Section 8.2.2) (corrected version of Open Item 29 from previous SSER Appendix HH) EEEB Yes Response provided in TVA to NRC letter dated June 7, 2011. Complete Closed in SSER 24, Section 8.1.
TVA to provide updated grid stability analysis. TVA provided information in letter of 6/7/11. NRR tech staff review and document in SER.
24 APPENDIX HH STATUS - (12/
06 30/2011)  Page 32 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(31)  TVA should clarify the loading sequence as explained in its letter dated December 6, 2010 to the staff. TVA should clarify whether the existing statements in FSAR regarding automatic sequencing logic are correct. If the FSAR description is correct, TVA should explain how the EDG and logic sequencing circuitry will respond to a LOCA followed by a LOOP scenario. (SSER 22, Section 8.3.1.11) (corrected version of Open Item 31 from SSER 22 Appendix HH) EEEB Yes Response provided in TVA to NRC letter dated April 6, 2011.
Complete. Closed in SSER 24, Section 8.1.
TVA provided information in April 6, 2011 letter. NRR tech staff review and document in SER.
24 (34) CI TVA stated that the method of compliance with Phase I guidelines would be substantially similar to the current Unit 1 program and that a new Section 3.12 will be added to the Unit 2 FSAR that will be materially equivalent to Section 3.12 of the current Unit 1 FSAR. (SSER 22, Section 9.1.4)  SBPB Yes Response provided in TVA to NRC letter dated April 6, 2011.
Complete. Closed in SSER 24, Section 9.1.4.
TVA submitted information in 4/6/11 letter and A103. NRR tech staff review and document in SER.
24 (36)  TVA should provide information to the NRC staff to enable verification that the SGBS meets the requirements and guidance specified in the SER or provide justification that the SGBS meets other standards that demonstrate conformance to GDC 1 and GDC 14. (SSER 22, Section 10.4.8)  CSGB/DORL Yes Response provided in TVA to NRC letter dated April 6, 2011.
Complete. Closed in SSER 24, Section 10.4.8.
TVA provided information in April 6, 2011 letter. NRR tech staff review and document in SER.
24 APPENDIX HH STATUS - (12/
06 30/2011) Page 33 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(44)  TVA should provide additional information to clarify how the initial and irradiated RTNDT  was determined. (SSER 22, Section 5.3.1, pg 5-9, 5-11, 5-13, 5-17, 5-28, 5-29, 5-31, 5-32)
CVIB Yes EC: Complete. FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
Closed in SSER 25, Section 5.3.1.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (45) CI TVA stated in its response to RAI 5.3.2-2, dated July 31, 2010, that the PTLR would be revised to incorporate the COMS arming temperature. (SSER 22, Section 5.3.2, pg 5-28/29, 5-32)
CVIB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
R. Bryan's 10/11 e-mail provided necessary portion of WBN2-68-4001 to NRR. Closed in SSER 25, Section 5.3.2.


NRR tech staff reviewing provided information and will document in SSER 25. 25 (46) CI The LTOP lift settings were not included in the PTLR, but were provided in TVA's response to RAI 5.3.2-2 in its letter dated July 31, 2010. TVA stated in its RAI response that the PTLR would be revised to incorporate the LTOP lift settings into the PTLR. (SSER 22, Section 5.3.2, pg 5-28/29, 5-32) )
APPENDIX HH STATUS - (12/0630/2011)
CVIB Yes EC: Complete FC: N/A Response provided in TVA to NRC letter dated April 6, 2011.
Item  Type            Action Required            NRC      TVA      TVA Action Required to Close    NRC Action Required to Close Due  SSER Lead  Response                                                                Date Required/
R. Bryan's 10/11 e-mail provided necessary portion of WBN2-68-4001 to NRR. Closed in SSER 25, Section 5.3.2.
TVA Lead 7.6.1)
NRR tech staff reviewing provided information and will document in SSER 25. 25 (52)   TVA should provide an update to the FSAR replacing Table 12.2
(84)     TVA should provide additional          NRR              Response provided in TVA to     Never issued in SSER information for the NRC staff to                        NRC Letter dated July 18, 2011.
-3 with the expected source strength values of the freshly irradiated IITAs.  (Section 12.3)
complete its review of post-LOCA                        complete long term cooling boric acid precipitation. (Section 15.3.1)
IHPB  Response provided in TVA to NRC letter dated June 7, 2011.
(85)     The 95/95 peak local oxidation was    NRR              Response provided in TVA to     Never issued in SSER calculated to be 1.04 percent, while                    NRC Letter dated July 18, 2011.
Complete. Never issued in SSER, issued as RAI questions. TVA provided information in February 25, 2011 letter. See also letter of 6/7/11.
core-wide oxidation was calculated                      complete to be much less than 0.1 percent.
(53)  TVA should provide an update to the FSAR reflecting the information provided in its letter dated October 4, 2010, regarding the WBN radiation protection design features, including controlled access areas, decontamination areas, and onsite IHPB  Never issued in SSER, issued as RAI questions. TVA provided information in February 25, 2011 letter.
TVA should provide to the NRC staff the value of the decay heat multiplier used for this limiting large break, in order for the staff to complete its evaluation. (Section 15.3.1)
APPENDIX HH STATUS - (12/
(86)     TVA should demonstrate to the staff,  NRR              Response provided in TVA to     Never issued in SSER in the WCOBRA/TRAC analysis of                           NRC Letter dated July 18, 2011.
06 30/2011)  Page 34 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERlaboratories and counting rooms. (Section 12.4)
the limiting break, that the core                        complete remains covered with a two-phase mixture and can be cooled for an indefinite period of time. (Section 15.3.1)
(54) TVA should provide adequate technical justification to the staff to relax the frequency of the radiation monitor channel quarterly operability tests. TVA should provide sufficient information to the staff to determine that the portable airborne radiation monitors comply with the requirements of 10 CFR 20.1501. TVA should provide sufficient information to the staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4)
(87)      In order for the staff to complete its NRR              Response provided in TVA to     Never issued in SSER evaluation, TVA should provide (1) a                    NRC Letter dated July 18, 2011.
IHPB  On bucket list. Calculation has been issued and is ready to submit.
time step sensitivity study for the                      complete limiting break displaying downcomer boiling, (2) a list of ten key parameter plots for the worst case downcomer boiling transient, (3) values for the lateral k-factors used in the evaluation, and (4) the manner in which condensation was modeled in the downcomer.
Meeting with NRC next week Never issued in SSER, issued as RAI questions. TVA to provide revised wording in FSAR to discuss statistically sound justification to justify relaxation of channel check frequency.
(Section 15.3.1)
(55)  TVA should provide sufficient information to the staff to demonstrate that the two area radiation monitors for the Spent Fuel Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4) IHPB  TVA to NRC letter submitted July 14, 2011. A 105 Change package prepared Never issued in SSER, issued as RAI questions. TVA clarify previous RAI response from letter 2/25/11 in new letter of 6/14/11.
Page 37 of 50
(56) CI TVA should update the FSAR to reflect the information regarding the dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)
IHPB  Never issued in SSER, issued as RAI questions.


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 35 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(57) CI TVA should update the FSAR to reflect the qualification standards of the RPM as provided in its letter to the NRC dated October 4, 2010. (Section 12.6)
Item Type             Action Required             NRC     TVA       TVA Action Required to Close    NRC Action Required to Close     Due SSER Lead  Response                                                                      Date Required/
IHPB  Never issued in SSER, issued as RAI questions.
TVA Lead (88)     It is also unclear to the staff that the NRR              Response provided in TVA to     Never issued in SSER entrainment correlation information                        NRC Letter dated July 18, 2011.
(58) CI The staff has insufficient information to conclude that TVA has taken appropriate actions to reduce radiation levels and increase the capability of operators to control and mitigate the consequences of an accident at WBN Unit 2, in accordance with the guid ance of NUREG-0737, Item II.B.2, or can maintain occupational doses to plant operators within the requirements of GDC 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1) IHPB  (I&C Matrix Item 349) WBNAPS3-126, "EQ Dose in the U1/U2 Auxiliary Instrument Rooms and the Computer Room in the Control Building" WBNAPS3-127 "EQ Dose in the Control Building" TVA to review Never issued in SSER, issued as RAI questions. TVA provided information in February 25, 2011 letter. TVA to provide calculation or summary of calculation when complete.
has been incorporated into the EOP,                        complete to ensure that operators do not initiate hot and cold side injection during the period of time that entrainment could preclude injection into the hot legs. TVA should provide the EOP guidance/instructions for the operators to the staff for review.
(62) CI Confirm TVA's change to FSAR Section 10.4.9 to reflect its intention to operate with each CST isolated from the other. (SSER 23, Section 10.4.9) SBPB Yes Response provided in TVA to NRC letter dated June 7, 2011. Complete Closed in SSER 24, Section 10.4.9.
(Section 15.3.1)
TVA provided information in letter of 6/7/11 and A103. NRR tech staff review and update status in Appendix HH.
(89)     TVA should demonstrate,                 NRR              Response provided in TVA to     Never issued in SSER quantitatively, the applicability of the                  NRC Letter dated July 18, 2011.
24 (68) TVA should clarify to the NRC staff how the CSS complies with GDC 5. (Section 9.2.2)
generic analysis to WBN Unit 2, to                         complete demonstrate that the EOP instructions to the operators can effectively deal with the failure of a bottom mounted instrument tube in the lower head. (Section 15.3.1)
SBPB  Never issued in SSER  (72) The NRC staff should complete its review and evaluation of the additional information provided by TVA regarding the ICC instrumentation. (SSER 23, Section 4.4.8, pg 4-22) EICB No/ I&C EC:Complete FC: N/A Open pending NRC review Responses provided in multiple TVA to NRC letters. I&C Matrix Item 041,  ,  244, 245, Closed in SSER 25, Section 7.5.2.2.
(92)      The NRC staff should perform an          RII                                              Never issued in SSER inspection in accordance with NRC Temporary Instruction 2515/087, Inspection of Licensees Implementation of Multi-Plant Action A-17: Instrumentation for Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident (Regulatory Guide 1.97). (Section 7.5.2.1.4)
NRR tech staff reviewing provided information and will document in SSER 25. I&C Matrix Items 041, 043, 067,  25 APPENDIX HH STATUS - (12/
(95)     TVA should update FSAR Table 7.1-       EICB     Yes/     EC: Complete                   Closed in SSER 25, Section 7.5.2.2.       25 1, Watts Bar Nuclear Plant NRC                    I&C     FC: N/A Regulatory Guide Conformance, to                          Response provided in TVA to     NRR tech staff reviewing provided reference IEEE Std. 603-1991 for                          NRC letter dated May 6, 2011   information and will document in the WBN Unit 2 Common Q PAMS.                             I&C Matrix Item: 364 Item 2    SSER 25.
06 30/2011)  Page 36 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER246, 250, 251, 252, 367, 368, 372, 373, and 374 068, 069, 074, 081, 086, 101, 138, 142, 143, 144, 145, 183, 185, 202, 212, 244, 245, 246, 250, 251, 252, 367, 368, 372, 373, and 374 (76) CI The NRC staff will verify that the derivative time constant is set to zero in WBN Unit 2 before fuel load.  (SSER 23, Section 7.8.3, pg 7-167) RII No/ PSE EC: PSE:  07/01/12 FC: For NRC Inspection / Review Provide copies of test procedures for inspection. Closed in Inspection Report 05000391/2011607, dated September 30, 2011, ADAMS Accession No. ML112730197.
Page 38 of 50
25 (78)  TVA intends to issue a revised calculation reflecting that the TID in the control room is less than 1x10 3 rads, which will be evaluated by the NRC staff.  (SSER 23, Section 7.5.2.3, pg 7-110, 7-116)
EICB Yes/ I&C EC: Complete. FC: N/A Provide requested calculation I&C Matrix Item 349 -  Calculation WBNAPS3-127 "EQ Dose in the Control Building" is ready to submit Calculation submitted in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.3.  


NRR tech staff reviewing provided information and will document in SSER 25. TVA to provide revised calculation WBNAPS3-127 "EQ Dose in the Control Building."  NRR tech staff review and document in SER. I&C matrix item 349 25 (82) The staff concluded that the information provided by TVA pertaining to the in-containment LPMS equipment qualification for vibration was incomplete. TVA should provide (item number 362 of ADAMS Accession No. ML111050009), documentation that demonstrates the LPMS in-containment equipment has been qualified to remain functional in its normal operating vibration environment, per RG 1.133, Revision 1. (SSER 23, Section EICB Yes Response provided in TVA to NRC letter dated June 10, 2011 I&C Matrix Item 362 Complete - Staff accepted the response and closed the I&C Matrix Item as of 7/11/11. Closed in SSER 24, Section 7.6.1.4.5.  
APPENDIX HH STATUS - (12/0630/2011)
Item  Type            Action Required          NRC      TVA      TVA Action Required to Close    NRC Action Required to Close      Due  SSER Lead  Response                                                                      Date Required/
TVA Lead (SSER 23, Section 7.5.2.2.3, pg 7-
: 50)                                                    Addressed in Amendment 105 (change package 1-105-13)
Response provided in TVA to NRC letter dated August 4, 2011 (96)      TVA should (1) update FSAR Table    EICB    Yes/    EC: Complete                    Closed in SSER 25, Section 7.5.2.2.      25 7.1-1 to include RG 1.100, Revision            I&C    FC: N/A 3, for the Common Q PAMS, or (2)                      Response provided in TVA to    NRR tech staff reviewing provided demonstrate that the Common Q                          NRC letter dated May 6, 2011    information and will document in PAMS is in conformance with RG                        I&C Matrix Item 366            SSER 25.
1.100, Revision 1, or provide justification for not conforming.                      Addressed in Amendment 105 (SSER 23, Section 7.5.2.2.3, pg 7-                    (change package 1-105-13) 52, 7-76)                                              Response provided in TVA to NRC letter dated August 4, 2011 (97)      TVA should demonstrate that the     EICB    Yes/    EC: Complete                    Closed in SSER 25, Section 7.5.2.2.      25 WBN Unit 2 Common Q PAMS is in                 I&C    FC: N/A conformance with RG 1.153,                             Response provided in TVA to    NRR tech staff reviewing provided Revision 1, or provide justification                  NRC letter dated May 6, 2011    information and will document in for not conforming. (SSER 23,                         I&C Matrix Item 367            SSER 25.
Section 7.5.2.2.3, pg 7-53)                            Needs to be in Table 7.1-1 Response provided in TVA to NRC letter dated August 4, 2011 (99)      TVA should update FSAR Table 7.1-    EICB    Yes/    EC: Complete                   Closed in SSER 25, Section 7.5.2.2.      25 1 to reference IEEE 7-4.3.2-2003 as            I&C     FC: N/A being applicable to the WBN Unit 2                    Provide response that Common    NRR tech staff reviewing provided Common Q PAMS. (SSER 23,                               Q PAMS meets these              information and will document in Section 7.5.2.2.3, pg 7-53)                            requirements and update FSAR    SSER 25.
in A105 I&C Matrix Item 369 Addressed in Amendment 105 (change package 1-105-13)
Response provided in TVA to NRC letter dated August 4, 2011 Page 39 of 50


TVA provided LPMS equipment vibration qualification in letter of 6/10/11. NRR tech staff review and document in SER.
APPENDIX HH STATUS - (12/0630/2011)
I&C matrix item 362 24 APPENDIX HH STATUS - (12/
Item Type             Action Required           NRC     TVA       TVA Action Required to Close    NRC Action Required to Close     Due  SSER Lead   Response                                                                       Date Required/
06 30/2011)  Page 37 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER7.6.1) (84) TVA should provide additional information for the NRC staff to complete its review of post
TVA Lead (100)     TVA should update FSAR Table 7.1-     EICB     Yes/     EC: Complete                   Closed in SSER 25, Section 7.5.2.2.       25 1 to reference RG 1.168, Revision 1;            I&C     FC: N/A IEEE 1012-1998; and IEEE 1028-                          Response provided in TVA to     NRR tech staff reviewing provided 1997 as being applicable to the                        NRC letter dated May 6, 2011   information and will document in WBN Unit 2 Common Q PAMS.                               I&C Matrix Item 370            SSER 25.
-LOCA long term cooling boric acid precipitation.  (Section 15.3.1)
(SSER 23, Section 7.5.2.2.3, pg 7-                     Addressed in Amendment 105
NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER  (85)  The 95/95 peak local oxidation was calculated to be 1.04 percent, while core-wide oxidation was calculated to be much less than 0.1 percent. TVA should provide to the NRC staff the value of the decay heat multiplier used for this limiting large break, in order for the staff to complete its evaluation.  (Section 15.3.1)
: 54)                                                    (change package 1-105-13)
NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER  (86)  TVA should demonstrate to the staff, in the WCOBRA/TRAC analysis of the limiting break, that the core remains covered with a two
Response provided in TVA to NRC letter dated August 4, 2011 (102)     TVA should update FSAR Table 7.1-     EICB     Yes/     EC: Complete                   Closed in SSER 25, Section 7.5.2.2.       25 1 to reference RG 1.209 and IEEE               I&C    FC: N/A Std. 323-2003 as being applicable to                                                   NRR tech staff reviewing provided the WBN Unit 2 Common Q PAMS.                           Provide response that Common    information and will document in (SSER 23, Section 7.5.2.2.3, pg 7-                     Q PAMS meets these              SSER 25.
-phase mixture and can be cooled for an indefinite period of time.  (Section 15.3.1) NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER  (87)  In order for the staff to complete its evaluation, TVA should provide (1) a time step sensitivity study for the limiting break displaying downcomer boiling, (2) a list of ten key parameter plots for the worst case downcomer boiling transien t, (3) values for the lateral k
54, 7-75)                                               requirements and update FSAR in A105 I&C Matrix Item 371 Item 1 Addressed in Amendment 105 (change package 1-105-13)
-factors used in the evaluation, and (4) the manner in which condensation was modeled in the downcomer.  (Section 15.3.1)
Response provided in TVA to NRC letter dated August 4, 2011 (103)      TVA should demonstrate that the      EICB    Yes/    EC: Complete                    Closed in SSER 25, Section 7.5.2.2.       25 WBN Unit 2 Common Q PAMS                       I&C    FC: N/A conforms to RG 1.209 and IEEE                           I&C Matrix Item 371 Item 2      NRR tech staff reviewing provided Std. 323-2003, or provide                               Response provided in TVA to    information and will document in justification for not conforming.                       NRC letter dated August 4, 2011 SSER 25.
NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER APPENDIX HH STATUS - (12/
(SSER 23, Section 7.5.2.2.3, pg 7-55)
06 30/2011)  Page 38 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(88)  It is also unclear to the staff that the entrainment correlation information has been incorporated into the EOP, to ensure that operators do not initiate hot and cold side injection during the period of time that entrainment could preclude injection into the hot legs. TVA should provide the EOP guidance/instructions for the operators to the staff for review.  (Section 15.3.1)
(104)  CI  The NRC staff will review the WEC    EICB     Yes/     EC: Complete                   Closed in SSER 25, Section 7.5.2.2.       25 self assessment to verify that it the           I&C    FC: N/A WBN Unit 2 PAMS is compliant to                         Response provided in TVA to    NRR tech staff reviewing provided the V&V requirements in the SPM or                     NRC letter dated June 10, 2011 information and will document in that deviations from the                                I&C Matrix Item 041             SSER 25.
NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER  (89)  TVA should demonstrate, quantitatively, the applicability of the generic analysis to WBN Unit 2, to demonstrate that the EOP instructions to the operators can effectively deal with the failure of a bottom mounted instrument tube in the lower head.  (Section 15.3.1)
requirements are adequately Page 40 of 50
NRR  Response provided in TVA to NRC Letter dated July 18, 2011. complete Never issued in SSER  (92)  The NRC staff should perform an inspection in accordance with NRC Temporary Instruction 2515/087, "Inspection of Licensee's Implementation of Multi
-Plant Action A-17: Instrumentation for Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident (Regulatory Guide 1.97)."  (Section 7.5.2.1.4) RII    Never issued in SSER  (95)  TVA should update FSAR Table 7.1-1, "Watts Bar Nuclear Plant NRC Regulatory Guide Conformance," to reference IEEE Std. 603-1991 for the WBN Unit 2 Common Q PAMS. EICB Yes/ I&C  EC: Complete FC: N/A Response provided in TVA to NRC letter dated May 6, 2011 I&C Matrix Item: 364 Item 2  Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 APPENDIX HH STATUS - (12/
06 30/2011)  Page 39 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(SSER 23, Section 7.5.2.2.3, pg 7-50)  Addressed in Amendment 105 (change package 1-105-13)  Response provided in TVA to NRC letter dated August 4, 2011 (96)  TVA should (1) update FSAR Table 7.1-1 to include RG 1.100, Revision 3, for the Common Q PAMS, or (2) demonstrate that the Common Q PAMS is in conformance with RG 1.100, Revision 1, or provide justification for not conforming.  (SSER 23, Section 7.5.2.2.3, pg 7-52, 7-76) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated May 6, 2011 I&C Matrix Item 366 Addressed in Amendment 105 (change package 1-105-13)  Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (97)  TVA should demonstrate that the WBN Unit 2 Common Q PAMS is in conformance with RG 1.153, Revision 1, or provide justification for not conforming.  (SSER 23, Section 7.5.2.2.3, pg 7-53) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated May 6, 2011 I&C Matrix Item 367  Needs to be in Table 7.1-1  Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (99)  TVA should update FSAR Table 7.1-1 to reference IEEE 7-4.3.2-2003 as being applicable to the WBN Unit 2 Common Q PAMS.  (SSER 23, Section 7.5.2.2.3, pg 7-53) EICB Yes/ I&C EC: Complete FC: N/A Provide response that Common Q PAMS meets these requirements and update FSAR in A105 I&C Matrix Item 369 Addressed in Amendment 105 (change package 1-105-13) Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 APPENDIX HH STATUS - (12/
06 30/2011) Page 40 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER(100)  TVA should update FSAR Table 7.1-1 to reference RG 1.168, Revision 1; IEEE 1012-1998; and IEEE 1028-1997 as being applicable to the WBN Unit 2 Common Q PAMS.  (SSER 23, Section 7.5.2.2.3, pg 7-54) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated May 6, 2011 I&C Matrix Item 370 Addressed in Amendment 105 (change package 1-105-13)  Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (102)  TVA should update FSAR Table 7.1-1 to reference RG 1.209 and IEEE Std. 323-2003 as being applicable to the WBN Unit 2 Common Q PAMS. (SSER 23, Section 7.5.2.2.3, pg 7-54, 7-75) EICB Yes/ I&C EC: Complete FC: N/A  Provide response that Common Q PAMS meets these requirements and update FSAR in A105 I&C Matrix Item 371 Item 1 Addressed in Amendment 105 (change package 1-105-13) Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (103)  TVA should demonstrate that the WBN Unit 2 Common Q PAMS conforms to RG 1.209 and IEEE Std. 323-2003, or provide justification for not conforming. (SSER 23, Section 7.5.2.2.3, pg 7-55) EICB Yes/ I&C EC: Complete FC: N/A I&C Matrix Item 371 Item 2 Response provided in TVA to NRC letter dated August 4, 2011 Closed in SSER 25, Section 7.5.2.2.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (104) CI The NRC staff will review the WEC self assessment to verify that it the WBN Unit 2 PAMS is compliant to the V&V requirements in the SPM or that deviations from the requirements are adequately EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 10, 2011 I&C Matrix Item 041 Closed in SSER 25, Section 7.5.2.2.  


NRR tech staff reviewing provided information and will document in SSER 25. 25 APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011)  Page 41 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERjustified. (SSER 23, Section 7.5.2.2.3.4.2, pg 7-62, 7-63, 7-65, 7-70) Self Assessment is available for NRC review at the WEC Rockville Office For NRC Inspection / Review (106) TVA should produce a final WBN Unit 2 Common Q PAMS SRS that is independently reviewed. (SSER 23, Section 7.5.2.2.3.4.3.1, pg 7-71) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 10, 2011 I&C Matrix Item 372 item 2
Item Type           Action Required             NRC     TVA       TVA Action Required to Close      NRC Action Required to Close     Due SSER Lead  Response                                                                        Date Required/
TVA Lead justified. (SSER 23, Section                             Self Assessment is available for 7.5.2.2.3.4.2, pg 7-62, 7-63, 7-65, 7-                   NRC review at the WEC Rockville
: 70)                                                      Office For NRC Inspection / Review (106)     TVA should produce a final WBN         EICB    Yes/    EC: Complete                    Closed in SSER 25, Section 7.5.2.2.      25 Unit 2 Common Q PAMS SRS that                   I&C    FC: N/A is independently reviewed. (SSER                         Response provided in TVA to      NRR tech staff reviewing provided 23, Section 7.5.2.2.3.4.3.1, pg 7-71)                   NRC letter dated June 10, 2011  information and will document in I&C Matrix Item 372 item 2      SSER 25.
NRC review pending (107)  CI  TVA should provide to the NRC staff    EICB     Yes/     EC: Complete                    Closed in SSER 25, Section 7.5.2.2.      25 documentation to confirm that the                I&C    FC: N/A final WBN Unit 2 Common Q PAMS                          Response provided in TVA to      NRR tech staff reviewing provided SDDs that are independently                              NRC letter dated June 10, 2011  information and will document in reviewed. (SSER 23, Section                              I&C Matrix Item 373              SSER 25.
7.5.2.2.3.4.3.2, pg 7-71)
NRC review pending (109)      TVA should demonstrate to the NRC      EICB    Yes/    EC: Complete                     Closed in SSER 25, Section 7.5.2.2.      25 staff acceptable data storm testing              I&C    FC: N/A of the Common Q PAMS. (SSER                              Response provided in TVA to     NRR tech staff reviewing provided 23, Section 7.5.2.2.3.7.1.8, pg 7-78,                    NRC letter dated June 10, 2011   information and will document in 7-81)                                                    I&C Matrix Item None            SSER 25.
NRC review pending (119)      TVA should submit WNA-CN-00157-        EICB    Yes/    EC: Complete.                    Closed in SSER 25, Section 7.7.1.9.      25 WBT, Revision 0, to the NRC by                  I&C    FC: N/A letter. The NRC staff should confirm                                                      NRR tech staff reviewing provided by review of WNA-CN-00157-WBT,                          Response provided in TVA to      information and will document in Revision 0, that no credible source                      NRC letter dated Sept. 1, 2011. SSER 25.
of faulting can negatively impact the CETs or PAMS train. (SSER 24, Section 7.7.1.9.5)
(122)      TVA should confirm to the NRC staff    EICB    Yes/    EC: Complete.                    Closed in SSER 25, Section 7.7.1.9.      25 that different divisions of safety              I&C    FC: N/A Page 41 of 50


NRC review pending Closed in SSER 25, Section 7.5.2.2.
APPENDIX HH STATUS - (12/0630/2011)
NRR tech staff reviewing provided information and will document in SSER 25. 25 (107) CI TVA should provide to the NRC staff documentation to confirm that the final WBN Unit 2 Common Q PAMS SDDs that are independently reviewed. (SSER 23, Section 7.5.2.2.3.4.3.2, pg 7-71) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 10, 2011 I&C Matrix Item 373 NRC review pending Closed in SSER 25, Section 7.5.2.2.
Item  Type            Action Required            NRC      TVA     TVA Action Required to Close      NRC Action Required to Close      Due SSER Lead  Response                                                                        Date Required/
NRR tech staff reviewing provided information and will document in SSER 25. 25 (109)  TVA should demonstrate to the NRC staff acceptable data storm testing of the Common Q PAMS.  (SSER 23, Section 7.5.2.2.3.7.1.8, pg 7-78, 7-81) EICB Yes/ I&C EC: Complete FC: N/A Response provided in TVA to NRC letter dated June 10, 2011 I&C Matrix Item None NRC review pending  Closed in SSER 25, Section 7.5.2.2.
TVA Lead power are supplied to the IIS SPS                      Response provided in TVA to       NRR tech staff reviewing provided cabinets, with the power cables                        NRC letter dated Sept. 30, 2011   information and will document in routed in separate shielded                                                              SSER 25.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (119)  TVA should submit WNA-CN-00157-WBT, Revision 0, to the NRC by letter. The NRC staff should confirm by review of WNA-CN-00157-WBT, Revision 0, that no credible source of faulting can negatively impact the CETs or PAMS train. (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: Complete. FC: N/A  Response provided in TVA to NRC letter dated Sept. 1, 2011. Closed in SSER 25, Section 7.7.1.9.
conduits. (SSER 24, Section 7.7.1.9.5)
NRR tech staff reviewing provided information and will document in SSER 25. 25 (122)  TVA should confirm to the NRC staff that different divisions of safety EICB Yes/ I&C EC: Complete. FC: N/A Closed in SSER 25, Section 7.7.1.9.
(124)      While the BEACON datalink on the      EICB     Yes/   EC: Complete.                     Closed in SSER 25, Section 7.7.1.9.       25 Application server can connect to               I&C     FC: N/A either BEACON machine, only                                                              NRR tech staff reviewing provided BEACON A is used for                                    Response provided in TVA to       information and will document in communication. TVA should clarify                      NRC letter dated Sept. 1, 2011. SSER 25.
25 APPENDIX HH STATUS - (12/
to the NRC staff whether automatic switchover to the other server is not permitted. (SSER 24, Section 7.7.1.9.5)
06 30/2011)  Page 42 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERpower are supplied to the IIS SPS cabinets, with the power cables routed in separate shielded conduits. (SSER 24, Section 7.7.1.9.5) Response provided in TVA to NRC letter dated Sept. 30, 2011 NRR tech staff reviewing provided information and will document in SSER 25. (124)  While the BEACON datalink on the Application server can connect to either BEACON machine, only BEACON A is used for communication. TVA should clarify to the NRC staff whether automatic switchover to the other server is not permitted. (SSER 24, Section 7.7.1.9.5) EICB Yes/ I&C EC: Complete. FC: N/A  Response provided in TVA to NRC letter dated Sept. 1, 2011. Closed in SSER 25, Section 7.7.1.9.
(128)      TVA should submit the seismic        EICB     Yes/   EC: Complete.                     Closed in SSER 25, Section 7.7.1.9.       25 qualification test report procedures         ELE, I&C  FC: N/A and results for the SPS cabinets to                                                       NRR tech staff reviewing provided the NRC staff for review. (SSER 24,                     Response provided in TVA to      information and will document in Section 7.7.1.9.5)                                     NRC letter dated Sept. 1, 2011. SSER 25.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (128)  TVA should submit the seismic qualification test report procedures and results for the SPS cabinets to the NRC staff for review. (SSER 24, Section 7.7.1.9.5) EICB Yes/ ELE, I&C EC: Complete. FC: N/A  Response provided in TVA to NRC letter dated Sept. 1, 2011. Note that the non-prop/affidavits to be provided by 12/1/11 Closed in SSER 25, Section 7.7.1.9.
Note that the non-prop/affidavits to be provided by 12/1/11 (130)      TVA should provide a summary to      EICB      Yes/    EC:11/14/11                      Closed in SSER 25, Section 7.7.1.9.       25 the NRC staff of the EMC                     ELE, I&C  FC: N/A qualification test results of the SPS                                                     NRR tech staff reviewing provided cabinets. (SSER 24, Section                             WEC Complete; WBT-D-3453          information and will document in 7.7.1.9.5)                                             engineering review complete: to   SSER 25.
NRR tech staff reviewing provided information and will document in SSER 25. 25 (130)  TVA should provide a summary to the NRC staff of the EMC qualification test results of the SPS cabinets. (SSER 24, Section 7.7.1.9.5) EICB Yes/ ELE, I&C EC:11/14/11  FC: N/A  WEC Complete; WBT-D-3453 engineering review complete: to be documented in 11/14/11 letter to NRC. Response provided in TVA to NRC letter dated Sept. 1, 2011. Note that the non-prop/affidavits to be provided by 12/1/11 Closed in SSER 25, Section 7.7.1.9.  
be documented in 11/14/11 letter to NRC.
Response provided in TVA to NRC letter dated Sept. 1, 2011.
Note that the non-prop/affidavits to be provided by 12/1/11 (135)      TVA has not provided the analysis    IHPB      Yes/    EC: Complete.                    Closed in SSER 25, Section 11.3.         25 required by 10 CFR Part 50,                    LIC    FC: N/A Page 42 of 50


NRR tech staff reviewing provided information and will document in SSER 25. 25 (135)  TVA has not provided the analysis required by 10 CFR Part 50, IHPB Yes/ LIC EC: Complete. FC: N/A Closed in SSER 25, Section 11.3.
APPENDIX HH STATUS - (12/0630/2011)
25 APPENDIX HH STATUS - (12/
Item Type           Action Required           NRC     TVA       TVA Action Required to Close          NRC Action Required to Close     Due SSER Lead  Response                                                                          Date Required/
06 30/2011) Page 43 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERAppendix I, subsection II.D. TVA must demonstrate with a cost-benefit analysis that a sufficient reduction in the collective dose to the public within a 50-mile radius would not be achieved by reasonable changes to the design of the WBN gaseous effluent processing systems. (SSER 24, Section 11.3)
TVA Lead Appendix I, subsection II.D. TVA                                                           NRR tech staff reviewing provided must demonstrate with a cost-                           TVA 07/28/11 letter to NRC          information and will document in benefit analysis that a sufficient                     (T02 110728 004)                    SSER 25.
TVA 07/28/11 letter to NRC (T02 110728 004) NRR tech staff reviewing provided information and will document in SSER 25. TVA 1  The audit mentioned on 2/2/22 above, was performed 2/28-3/4/2011 (ML110980761). This audit report documents WBN2 specific and generic actions required to address the conditions identified during the audit.
reduction in the collective dose to the public within a 50-mile radius would not be achieved by reasonable changes to the design of the WBN gaseous effluent processing systems. (SSER 24, Section 11.3)
EICB I&C Matrix Item 043  Item is verified to be duplicate of activity already documented in matrix Closing to OI 72   TVA 2 TVA to respond to open items in CQ PAMS SE. See ML111150287 Section 7.5.2.2.3.4.2.5 on page 24 and Section 7.5.2.2.3.4.3.1 on page 26.
TVA       The audit mentioned on 2/2/22         EICB              I&C Matrix Item 043                Closing to OI 72 1      above, was performed 2/28-                             Item is verified to be duplicate of 3/4/2011 (ML110980761). This                           activity already documented in audit report documents WBN2                             matrix specific and generic actions required to address the conditions identified during the audit.
EICB  I&C Matrix Item 142, 143, 144, 145, 183, 185 Item is verified to be duplicate of activity already documented in matrix Closing to OI 72  TVA NRC to confirm receipt of the following:
TVA      TVA to respond to open items in CQ    EICB             I&C Matrix Item 142, 143, 144,      Closing to OI 72 2       PAMS SE.                                               145, 183, 185 See ML111150287 Section                                 Item is verified to be duplicate of 7.5.2.2.3.4.2.5 on page 24 and                         activity already documented in Section 7.5.2.2.3.4.3.1 on page 26.                     matrix TVA       NRC to confirm receipt of the                           Documents submitted on TVA          Item is closed. This is already be 3      following:                                             letter to NRC dated July 15,        tracked on bucket list. Waiting for The non-proprietary versions of the                     2010.                              document control processing.
The non-proprietary versions of the following RM
following RM-1000, Containment High Range Post Accident Radiation                     I&C Matrix Item 101 Monitor documents will be provided by June 30, 2010.                                       NRC action pending
-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010. 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100
: 2. System Description 04508100-1TM
-1TM 3. Qualification Reports 04508905
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP Page 43 of 50
-QR, 04508905
-1 SP, 04508905
-2SP, 04508905
-3SP   Documents submitted on TVA letter to NRC dated July 15, 2010. I&C Matrix Item 101 NRC action pending Item is closed. This is already be tracked on bucket list. Waiting for document control processing.


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011) Page 44 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER4. Functional Testing Report 04507007-1TR TVA Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011. Response in letter dated 11/24/10 I&C Matrix Item 327 NRC Review Pending Item is closed. 11/24/10 letter reviewed and drawings were included.
Item Type             Action Required             NRC     TVA       TVA Action Required to Close          NRC Action Required to Close   Due SSER Lead  Response                                                                        Date Required/
TVA All safety related work must be quality controlled per 10CFR50, App. B. TVA to confirm that the procedure used for the RM-1000 system verification tests (04507007) was actually a procedure that was prepared per 10CFR50, App. B. 7.5.2.3 EICB I&C EC: Complete FC: N/A  Response provided in letter dated 10/13/11. I&C Matrix Item 346 Closed per internal memo dated 10/31/11. See OI 77  TVA 6 Was the CERPI system developed under a 10 CFR 50 Appendix B compliant program? EICB I&C EC: Complete FC: N/A Response in letter dated 4/15/11 I&C Matrix Item 359 NRC Review Pending NRR staff has reviewed the information provided by the staff and based on this information, is closing this item.
TVA Lead
TVA Was the Foxboro IA system developed under a 10 CFR 50 Appendix B compliant program?
: 4. Functional Testing Report 04507007-1TR TVA       Attachment 36 contains Foxboro                           Response in letter dated 11/24/10  Item is closed. 11/24/10 letter 4      proprietary drawings 08F802403-                                                               reviewed and drawings were SC-2001 sheets 1 through 6. An                           I&C Matrix Item 327                included.
EICB I&C EC: Complete FC: N/A Response in letter dated 4/15/11 I&C Matrix Item 361 NRC Review Pending Closed per internal memo dated 12/7/11. TVA On 5/6/2010 (See Open Item No. 81) the NRC Staff requested an evaluation of the Common Q PAMS against the current staff position.
affidavit for withholding and non-                       NRC Review Pending proprietary versions of the drawings will be submitted by January 31, 2011.
By letter dated 2/25/11 (ML110620219), TVA docketed a response: "that WBN2 is not committed in complying with Reg. Guide 1.75-Since WBN2 is not EICB  Item is verified to be duplicate of activity already documented in matrix. Response submitted in letter dated 5/16/11 I&C Matrix Item 365 Closing to OI 98 Formatted:
TVA       All safety related work must be         EICB      I&C    EC: Complete                        Closed per internal memo dated 5      quality controlled per 10CFR50,                           FC: N/A                            10/31/11.
Highlight Formatted:
App. B. TVA to confirm that the procedure used for the RM-1000                           Response provided in letter dated  See OI 77 system verification tests (04507007)                     10/13/11.
Highlight Formatted:
was actually a procedure that was prepared per 10CFR50, App. B.                             I&C Matrix Item 346 7.5.2.3 TVA      Was the CERPI system developed          EICB     I&C     EC: Complete                       NRR staff has reviewed the 6       under a 10 CFR 50 Appendix B                             FC: N/A                             information provided by the staff compliant program?                                        Response in letter dated 4/15/11   and based on this information, is I&C Matrix Item 359                closing this item.
Highlight Formatted:
NRC Review Pending TVA       Was the Foxboro IA system               EICB     I&C     EC: Complete                       Closed per internal memo dated              Formatted: Highlight 7      developed under a 10 CFR 50                              FC: N/A                             12/7/11.                                    Formatted: Highlight Appendix B compliant program?                            Response in letter dated 4/15/11 I&C Matrix Item 361                                                             Formatted: Highlight NRC Review Pending                                                             Formatted: Highlight TVA       On 5/6/2010 (See Open Item No. 81) the EICB              Item is verified to be duplicate of Closing to OI 98                            Formatted: Highlight 9      NRC Staff requested an evaluation of                     activity already documented in the Common Q PAMS against the                             matrix.                                                                        Formatted: Highlight current staff position.                                   Response submitted in letter By letter dated 2/25/11 (ML110620219),
Highlight Formatted:
dated 5/16/11 TVA docketed a response: that WBN2                       I&C Matrix Item 365 is not committed in complying with Reg.
Highlight Formatted:
Guide 1.75Since WBN2 is not Page 44 of 50
Highlight APPENDIX HH STATUS - (12/
 
06 30/2011) Page 45 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERcommitted to RG 1.75 or IEEE-384, no comparison is required-"
APPENDIX HH STATUS - (12/0630/2011)
However, WBN2 is committed to RG 1.75 Rev. 2, "Physical Independence of Electric Systems.RG 1.75 Rev. 3 and IEEE Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3. Based upon the review of this item, the staff finds the following open item:
Item Type             Action Required               NRC     TVA       TVA Action Required to Close  NRC Action Required to Close     Due SSER Lead  Response                                                                    Date Required/
TVA Lead committed to RG 1.75 or IEEE-384, no comparison is required However, WBN2 is committed to RG 1.75 Rev. 2, Physical Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3.
Based upon the review of this item, the staff finds the following open item:
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.
1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.
The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev. 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:
The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev.
2 TVA to evaluate Common Q PAMS and the Sorrento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.
: 2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:
Submit FSAR amendment to reflect changes TVA 10  Reference-EDCR # 52321, Revision A-EDCR Unit Difference Form --- Bechtel Document Page 2 -Maintenance Difference-The proposed In-Core Instrument EICB Response submitted 6/13/11 I&C Matrix Item 376 NRC Review pending Closed. SE received from the staff with no open item in this area.  
2         TVA to evaluate Common Q PAMS and the Sorrento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.
Submit FSAR amendment to reflect changes TVA       ReferenceEDCR # 52321,                     EICB             Response submitted 6/13/11   Closed. SE received from the staff 10      Revision AEDCR Unit Difference                              I&C Matrix Item 376          with no open item in this area.
Form --- Bechtel Document NRC Review pending Page 2 -Maintenance Difference The proposed In-Core Instrument Page 45 of 50


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011) Page 46 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERThimble Assemblies (IITAs) which will replace Movable In-Core Detectable Systems (MIDs) have the following features:
Item Type           Action Required             NRC     TVA       TVA Action Required to Close  NRC Action Required to Close Due SSER Lead  Response                                                                Date Required/
TVA Lead Thimble Assemblies (IITAs) which will replace Movable In-Core Detectable Systems (MIDs) have the following features:
(1) IITAs are not fully extracted and they are held in a movable frame assembly.
(1) IITAs are not fully extracted and they are held in a movable frame assembly.
(2) IITAs exert lower vibration amplitude and therefore, aging degradation due to wear does not occur.
(2) IITAs exert lower vibration amplitude and therefore, aging degradation due to wear does not occur.
(3) Loss of reactor coolant system pressure boundary due to breach of IITA outer sheath does not occur.
(3) Loss of reactor coolant system pressure boundary due to breach of IITA outer sheath does not occur.
Question: The staff believes that the licensee should provide an inspection program to confirm that the aforementioned attributes associated with IITAs are valid and this inspection program can be a part of a routine maintenance program. Replacement of 58 CETs for the current 65 CETs -to be addressed by the fuels division. TVA 11  Non-Proprietary description of the qualification of the MI cable assemblies with references to any EICB Response submitted 6/13/11 I&C Matrix Item 381 NRC Review pending Closing to OI 127 APPENDIX HH STATUS - (12/
Question:
06 30/2011) Page 47 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSEREQ report (if applicable) - June 10th TVA 12  Non-Proprietary description of the qualification of the IITA with references to EQ report(s)
The staff believes that the licensee should provide an inspection program to confirm that the aforementioned attributes associated with IITAs are valid and this inspection program can be a part of a routine maintenance program.
NRC Update (Alvarado) - need the proprietary versions of reports, such as EQ tests, EMI/RFI tests, calculations, and other documents to make a safety determination, not non-proprietary reports that reference these reports and calculations.  
Replacement of 58 CETs for the current 65 CETs -to be addressed by the fuels division.
TVA       Non-Proprietary description of the     EICB             Response submitted 6/13/11   Closing to OI 127 11      qualification of the MI cable                            I&C Matrix Item 381 assemblies with references to any                        NRC Review pending Page 46 of 50
 
APPENDIX HH STATUS - (12/0630/2011)
Item Type             Action Required             NRC     TVA       TVA Action Required to Close  NRC Action Required to Close       Due SSER Lead  Response                                                                      Date Required/
TVA Lead EQ report (if applicable) - June 10th TVA       Non-Proprietary description of the     EICB              I&C Matrix Item 383          Closing to OI 126 12      qualification of the IITA with references to EQ report(s)
NRC Update (Alvarado) - need the proprietary versions of reports, such as EQ tests, EMI/RFI tests, calculations, and other documents to make a safety determination, not non-proprietary reports that reference these reports and calculations.
NRC update (RA) 6/16: The report will be available after June 30. This is still an open item TVA      Provide the following documents,        EICB              I&C Matrix Item 388          Closed. Staff has finished its review 13      which describe operation of the                                                        and issued its safety evaluation and WINCISE Application Server.                                                            no longer requires these
* Sections 1 and 2 of the                                                          documents.
WNA-GO-00075-WBT, WINCISE Signal Processing System Cabinet Operation &
Maintenance Manual.
Revision 0.
* WNA-DS-01811-WBT, WINCISE Signal Processing
 
===System Design===
Requirements. Revision 0, May 2010
* 420A90, WINCISE Functional Specification for Watts Bar Unit 2. Revision Page 47 of 50
 
APPENDIX HH STATUS - (12/0630/2011)
Item Type              Action Required          NRC      TVA      TVA Action Required to Close  NRC Action Required to Close Due  SSER Lead  Response                                                                Date Required/
TVA Lead 2.
TVA      Provide the proprietary version of    EICB              I&C Matrix Item 389          Closing to OI 119 14      the calculation described in WNA-CN-00157-WBT, Watts Bar 2 IIS Signal Processing System Isolation Requirements. Revision 0.
TVA      Westinghouse has indicated that the    EICB              I&C Matrix Item 390          Closing to OI 124 15      WINCISE Application Servers, as well as the BEACON are redundant.
However, the WINCISE Application Server communicates only with Beacon A. Westinghouse also explained that to switch from Beacon A to Beacon B, the operator must perform this manually. After reviewing Westinghouse documents, we couldnt find explanation that automatic switchover to the other server is not permitted.
TVA      Clarify the type of connector used    EICB              I&C Matrix Item 391          Closing to OI 125 16      with the MI cable in Unit 2. During this review, we identified the following connectors, but we could not establish which one will be used in unit 2. Also explain if the qualification performed is still valid or if it is going to be revised.
o Whittaker connectors o Litton connectors o Electronic Resources Division (ERD) connectors Page 48 of 50


NRC update (RA) 6/16: The report will be available after June 30. This is still an open item EICB I&C Matrix Item 383 Closing to OI 126  TVA 13  Provide the following documents, which describe operation of the WINCISE Application Server.
APPENDIX HH STATUS - (12/0630/2011)
* Sections 1 and 2 of the WNA-GO-00075-WBT, WINCISE Signal Processing System Cabinet Operation & Maintenance Manual. Revision 0.
Item Type            Action Required          NRC      TVA      TVA Action Required to Close  NRC Action Required to Close Due  SSER Lead  Response                                                                Date Required/
* WNA-DS-01811-WBT, WINCISE Signal Processing System Design Requirements. Revision 0, May 2010
TVA Lead TVA      Clarify the logic to subtract failed EICB             I&C Matrix Item 392          Closing to OI 118 and OI 123 17      detectors from the algorithm used to calculate core power. During the May 12 meeting with Westinghouse and TVA, Westinghouse explained that the WINCISE Application Server includes an algorithm to subtract failed detectors. However, during our review in Westinghouse office, we could not find description on how this algorithm is accomplished.
* 420A90, WINCISE Functional Specification for Watts Bar Unit 2. Revision EICB I&C Matrix Item 388 Closed. Staff has finished its review and issued its safety evaluation and no longer requires these documents.  
Furthermore, the document BEACON Data Processing Application Program Software Requirements Specification includes the following assumption:
BEACON will perform the subtraction between various length elements for the vanadium detector design. This is appropriate, as BEACON is more equipped to support the replacement value algorithm should an element fail.
BEACON has knowledge of the flux shape which is critical to this process.
TVA      Clarify if the IITA assembly and the EICB             I&C Matrix Item 393          Closing to OI 121 18      6-to-1 transition cable have been subjected to the 600VDC dielectric strength test. Document Watts Bar 2 IIS Signal Processing System Isolation Requirements states that the MI and IITA assemblies need to be subjected to a 600VDC dielectric strength test. Letter LTR-ME-10-3 Page 49 of 50


APPENDIX HH STATUS - (12/
APPENDIX HH STATUS - (12/0630/2011)
06 30/2011) Page 48 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSER 2. TVA 14  Provide the proprietary version of the calculation described in "WNA-CN-00157-WBT, Watts Bar 2 IIS Signal Processing System Isolation Requirements". Revision 0. EICB  I&C Matrix Item 389 Closing to OI 119  TVA 15  Westinghouse has indicated that the WINCISE Application Servers, as well as the BEACON are redundant. However, the WINCISE Application Server communicates only with Beacon A. Westinghouse also explained that to switch from Beacon A to Beacon B, the operator must perform this manually. After reviewing Westinghouse documents, we couldn't find explanation that automatic switchover to the other server is not permitted. EICB  I&C Matrix Item 390 Closing to OI 124   TVA 16  Clarify the type of connector used with the MI cable in Unit 2. During this review, we identified the following connectors, but we could not establish which one will be used in unit 2. Also explain if the qualification performed is still valid or if it is going to be revised.
Item Type           Action Required         NRC     TVA       TVA Action Required to Close  NRC Action Required to Close Due  SSER Lead   Response                                                               Date Required/
o Whittaker connectors o Litton connectors o Electronic Resources Division (ERD) connectors EICB  I&C Matrix Item 391 Closing to OI 125 APPENDIX HH STATUS - (12/
TVA Lead summarizes the result for the MI cable. However, similar documentation was not available for the IITA assembly.
06 30/2011)  Page 49 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERTVA 17 Clarify the logic to subtract failed detectors from the algorithm used to calculate core power. During the May 12 meeting with Westinghouse and TVA, Westinghouse explained that the WINCISE Application Server includes an algorithm to subtract failed detectors. However, during our review in Westinghouse office, we could not find description on how this algorithm is accomplished. Furthermore, the document BEACON Data Processing Application Program Software Requirements Specification includes the following assumption: "BEACON will perform the subtraction between various length elements for the vanadium detector design. This is appropriate, as BEACON is more equipped to support the replacement value algorithm should an element fail. BEACON has knowledge of the flux shape which is critical to this process." EICB  I&C Matrix Item 392 Closing to OI 118 and OI 123   TVA 18  Clarify if the IITA assembly and the 6-to-1 transition cable have been subjected to the 600VDC dielectric strength test. Document Watts Bar 2 IIS Signal Processing System Isolation Requirements states that the MI and IITA assemblies need to be subjected to a 600VDC dielectric strength test. Letter LTR-ME-10-3 EICB  I&C Matrix Item 393 Closing to OI 121 APPENDIX HH STATUS - (12/
TVA       Confirm that power supply cables to EICB              I&C Matrix Item 394          Closing to OI 120 19      the WINCISE SPS cabinet are not routed with cables that are greater than 264V.
06 30/2011)  Page 50 of 50 Item Type Action Required NRC Lead TVA Response Required/ TVA Lead TVA Action Required to CloseNRC Action Required to Close Due Date SSERsummarizes the result for the MI cable. However, similar documentation was not available for the IITA assembly.
TVA      Confirm that power supply to the    EICB             I&C Matrix Item 395          Closing to OI 122 20     WINCISE SPS cabinet are from isolated 1E sources, such that power supply routed to PAMS train A is the same routed to SPS cabinet 1, and power supply routed to PAMS train B is the same routed to SPS cabinet 2.
TVA 19  Confirm that power supply cables to the WINCISE SPS cabinet are not routed with cables that are greater than 264V.
Page 50 of 50}}
EICB I&C Matrix Item 394 Closing to OI 120  TVA 20 Confirm that power supply to the WINCISE SPS cabinet are from isolated 1E sources, such that power supply routed to PAMS train A is the same routed to SPS cabinet 1, and power supply routed to PAMS train B is the same routed to SPS cabinet 2.
EICB  I&C Matrix Item 395 Closing to OI 122}}

Revision as of 10:25, 12 November 2019

2012/01/18 Watts Bar 2 OL - FW: Updated Hh Open Item Status Lists
ML12023A194
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/18/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12023A194 (52)


Text

WBN2Public Resource From: Bryan, Robert H Jr [rhbryan@tva.gov]

Sent: Wednesday, January 18, 2012 3:18 PM To: Poole, Justin Cc: Arent, Gordon; Boyd, Desiree L

Subject:

FW: Updated HH Open Item Status Lists Attachments: WATTS BAR 2 APPENDIX HH Status 12-30-11.docx

Justin, I have updated TVA actions. I noted items that are addressed in the 1/19/12 I&C letter that is in concurrence.

From: Poole, Justin [1]

Sent: Thursday, January 12, 2012 8:20 AM To: Arent, Gordon Cc: Bryan, Robert H Jr; WBN2HearingFile Resource

Subject:

Updated HH Open Item Status Lists

Bob, Here is the list as I had updated it over the holidays plus some things that we talked about yesterday. Thanks.

1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 634 Mail Envelope Properties (2C6C555CFCCE9A4697B80C42FB52CF8003E1427C)

Subject:

FW: Updated HH Open Item Status Lists Sent Date: 1/18/2012 3:18:17 PM Received Date: 1/18/2012 3:18:25 PM From: Bryan, Robert H Jr Created By: rhbryan@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office: TVANASXVS2.main.tva.gov Files Size Date & Time MESSAGE 479 1/18/2012 3:18:25 PM WATTS BAR 2 APPENDIX HH Status 12-30-11.docx 134930 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

APPENDIX HH STATUS - (12/0630/2011)

WATTS BAR UNIT 2 ACTION ITEMS TABLE This table provides a status of required action items associated of all open items, confirmatory issues, and proposed license conditions that the staff has identified.

CI - Confirmatory Issue Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (1) CI Review evaluations and corrective EEEB Yes/ EC:5/1/12 TVA to provide letter to NRR 26 actions associated with a power ELE FC: documenting any power assisted assisted cable pull. (NRC safety TVA to provide letter to NRR cable pulls if performed. NRR evaluation dated August 31, 2009, documenting any power assisted and/or RII to review calculations on ADAMS Accession No. cable pulls if performed. NRR any power assisted cable pulls.

ML092151155) and/or RII to review calculations Results documented in inspection on any power assisted cable report. Letter from TVA if no power pulls. Results documented in assisted cable pulls were done.

inspection report. Letter from TVA if no power assisted cable pulls were done. NRR Calculation Review Addressed by Maximo Commitment Closure package 10181059 (2) CI Conduct appropriate inspection RII No/ EC: 02/29/2012 Include in inspection planning and 26 activities to verify cable lengths used Elec FC: conduct inspection. Reference in calculations and analysis match For NRC Inspection / Review closure in IR and SER.

as-installed configuration. (NRC Provide NRC Residents access safety evaluation dated August 31, to as-constructed ICRDS Pending TVAs completion of cable 2009, ADAMS Accession No. database and associated calcs. installation and update of ICRDS for ML092151155) as-installed cable lengths Note: Pending completion of the cable pull effort and updating ICRDS for as-installed cable lengths by construction.

Page 1 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (4) CI Conduct appropriate inspection RII No EC: Complete Include in inspection planning and 26 activities to verify that TVAs FC: N/A conduct inspection. Reference maximum SWBP criteria for signal Closed by IR 2010604 closure in IR and SER.

level and coaxial cables do not exceed the cable manufacturers See IR 2010-604 maximum SWBP criteria. (NRC safety evaluation dated August 31, 2009, ADAMS Accession No.

ML092151155)

(5) CI Verify timely submittal of pre-startup SRXB Yes EC: Complete NRR review and evaluate pre- 26 core map and perform technical FC: N/A startup core map. Document in review. (TVA letter dated September Response provided in TVA to SER.

7, 2007, ADAMS Accession No. NRC letter dated April 6, 2011.

ML072570676) See Att 1 to 4/6/11 Ltr provides.

(6) CI Verify implementation of TSTF-449. ITSB/ Yes EC: Complete NRR confirm TSs for proper 26 (TVA letter dated September 7, EICB FC: N/A implementation.

2007, ADAMS Accession No. Response provided in TVA to ML072570676) NRC letter dated April 6, 2011. See current TSs Rev. B (7) CI Verify commitment completion and RII No/ EC: Ongoing Include in inspection planning and 26 review electrical design calculations. Elec FC: N/A conduct inspection. Reference (TVA letter dated October 9, 1990, For NRC Inspection / Review closure in IR and SER. Specific ADAMS Accession No. See commitments in TVA Letter. actions need to be clarified with ML073551056) Provide Guillermo Crespo a copy EEEB.

of related electrical calculation procedures and provide NRC access to calculations (8) CI TVA should provide a pre-startup SRXB Yes EC: Complete NRR review and evaluate pre- 2526 map to the NRC staff indicating the FC: N/A startup core map. Document in rodded fuel assemblies and a Response provided in TVA to SER. Conduct with item (5) above.

projected end of cycle burnup of NRC letter dated April 6, 2011.

each rodded assembly for the initial NRR to verify that Att 1 to 4/6/11 fuel cycle 6-months prior to fuel letter is acceptable.

load. (NRC safety evaluation dated May 3, 2010, ADAMS Accession No.

Page 2 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead ML101200035)

(9) CI Confirm that education and RII No/ EC: Complete RII include in inspection planning 26 experience of management and LIC FC: N/A and conduct inspection. Reference principal supervisory positions down For NRC Inspection / Review closure in IR and update status in through the shift supervisory level Education and experience Appendix HH.

conform to Regulatory Guide 1.8. information has been provided to (SSER 22, Section 13.1.3., pg 13-2) NRC Residents on 9/21/11. TVA to provide education and experience info to RII staff.

(10) CI Confirm that TVA has an adequate RII No/ EC: Complete RII include in inspection planning 26 number of licensed and non- OPS FC: N/A and conduct inspection. Reference licensed operators in the training For NRC Inspection/ Review closure in IR and update status in pipeline to support the Information for closure provided Appendix HH.

preoperational test program, fuel to RI on 9/28/11.

loading, and dual unit operation.

(SSER 22, Section 13.1.3, pg 13-2)

(12) TVAs implementation of DORL Yes EC: 2/10/12 TVA provided letter on 6/17/11 26 NGDC PP-20 and EDCR Appendix J FC: N/A summarizing QA audits of licensing is subject to future NRC audit and For NRC Inspection / Review basis program. NRR conduct inspection. (SSER 22, Section 25.9, review/audit of the program.

pg 25-3) Licensing to perform self Document in audit report and assessment in January, 2012. update status in Appendix HH.

(13) TVA is expected to submit an IST CPTB Yes/ EC: 3/15/12 NRR tech staff review of ISI/IST 27 program and specific relief requests ISO FC: N/A programs upon receipt from TVA.

for WBN Unit 2 nine months before Provide submittal addressing IST Document in letter and staff the projected date of OL issuance. program and relief requests. evaluation.

(SSER 22, Section 3.9.6, pg 3-11)

(16) Based on the uniqueness of EQ, the RII/ No/ EC: Ongoing Inspection Conduct EQ inspection. Document 26 NRC staff must perform a detailed EEEB ELE FC: N/A in IR and update status in Appendix inspection and evaluation prior to HH.

fuel load to determine how the WBN For NRC Inspection / Review Unit 2 EQ program complies with the Provide NRC Lisa Castelli copies requirements of 10 CFR 50.49. of EQ documents as requested Page 3 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (SSER 22, Section 3.11.2, pg 3- for the onsite inspections.

12/13)

(17) The NRC staff should verify the RII/ No/ EC: Ongoing Inspection Conduct EQ inspection. Document 26 accuracy of the WBN Unit 2 EQ list EEEB ELE FC: N/A in IR and update status in Appendix prior to fuel load. (SSER 22, Section HH.

3.11.2.1, pg 3-13) For NRC Inspection/Review:

provide NRC Lisa Castellicopies of EQ documents as requested for the onsite inspections.

(23) Resolve whether or not TVAs EEEB Yes/ EC: Complete NRR reviewing the April 6, 2011 26 reasoning for not upgrading the ELE FC: N/A response. TVA stated that the MSIV solenoid valves to Category I Response provided in TVA to MSIV solenoids would be upgraded is a sound reason to the contrary, as NRC letter dated April 6, 2011. to Cat I.

specified in 10 CFR 50.49(l). (SSER 22, Section 3.11.2.2.1, pg 3-15)

(25) Prior to the issuance of an operating PFAIB Yes EC: 7/1/12 TVA to provide indemnity letter for 28 license, TVA is required to provide LIC FC: N/A tech staff review and update status satisfactory documentation that it TVA to sign indemnity letter and in Appendix HH. Include indemnity has obtained the maximum provide to NRC. agreement with operating license.

secondary liability insurance coverage pursuant to 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to property insurance, and the NRC staff has reviewed and approved the documentation. (SSER 22, Section 22.3, pg 22-1)

(26) For the scenario with an accident in EEEB Yes EC: Open TVA provided information in April 6, 26 one unit and concurrent shutdown of FC: N/A 2011 letter. Additional RAIs were the second unit without offsite Response provided in TVA to sent to TVA on 11/18/2011. NRR power, TVA stated that Unit 2 pre- NRC letter dated April 6, 2011. tech staff review and document in operational testing will validate the SER. This item was also partially Page 4 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead diesel response to sequencing of reviewed during EDSFI. EEEB to loads on the Unit 2 emergency review results of IDVP and EDSFI diesel generators (EDGs). The NRC reports for impact in this area.

staff will evaluate the status of this issue and will update the status of the EDG load response in a future SSER. (SSER 22, Section 8.1)

(30) TVA should confirm that all other RII/ NO/ EC: Complete TVA submitted letter dated August 26 safety-related equipment (in addition EEEB ELE FC: N/A 12, 2011. NRR tech staff review to the Class 1E motors) will have Submitted letter 8/12/11. and document in SER.

adequate starting and running voltage at the most limiting safety Will review during Unit 1 CDBI, related components (such as motor January 2012.

operated valves, contactors, solenoid valves or relays) at the degraded voltage relay setpoint dropout setting. TVA should also confirm that the final Technical Specifications are properly derived from these analytical values for the degraded voltage settings. (SSER 22, Section 8.3.1.2, , pg 8-10)

(32) TVA should provide to the NRC staff EEEB Yes/ Due date: TBD (Hilmes) TVA to provide information on EDG 26 the details of the administrative ELE FC: N/A admin limits. NRR tech staff review limits of EDG voltage and speed and document in SER. TVA to range, and the basis for its Tech Spec review is with submit amendment to TSs for Unit conclusion that the impact is Corporate Licensing (Joe Shea). 12. (FYI we decided to submit on negligible, and describe how it Provide response for submittal to U2 first) accounts for the administrative limits NRR.

in the Technical Specification surveillance requirements for EDG voltage and frequency. (SSER 22, Section 8.3.1.14, pg 8-14) Note - NRC RII may have an issue with the actual DG loading Page 5 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (33) CI TVA stated in Attachment 9 of its RII/ Yes/ EC: Complete TVA provided information in April 6, 26 letter dated July 31, 2010, that EEEB FC: 2011 letter. TVA to notify RII when certain design change notices Response provided in TVA to work completed. RII to verify (DCNs) are required or anticipated NRC letter dated April 6, 2011. completion of DCNs and include in for completion of WBN Unit 2, and IR. Update status in Appendix HH.

that these DCNs were unverified assumptions used in its analysis of the 125 V dc vital battery system.

Verification of completion of these DCNs to the NRC staff is necessary prior to issuance of the operating license. (SSER 22, Section 8.3.2.3, pg 8-16)

(35) TVA should provide information to CSGB/ Yes/ EC: Complete TVA provided information on water 26 the NRC staff that the CCS will DORL LIC FC: N/A purity in 6/7/11 letter. NRR tech produce feedwater purity in Response provided in TVA to staff review and document in SER.

accordance with BTP MTEB 5-3 or, NRC letter dated June 7, 2011.

alternatively, provide justification for producing feedwater purity to another acceptable standard. (SSER 22, Section 10.4.6, pg 10-9)

(37) CI The NRC staff will review the NSIR Yes/ EC: 06/1/12 TVA to provide Appendix C within 6 26 combined WBN Unit 1 and 2 REP FC: N/A months of fuel load. NSIR to review Appendix C prior to issuance of the Submit final Unit 1/2 REP to NRC and document in SER.

Unit 2 OL to confirm (1) that the (Appx C and NP-REP are ready proposed Unit 2 changes were for LIC review) incorporated into Appendix C, and (2) that changes made to Appendix C for Unit 1 since Revision 92 and the changes made to the NP-REP since Revision 92 do not affect the bases of the staffs findings in this SER supplement.

(SSER 22, Section 13.3.2, pg 13-8)

Page 6 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (38) CI The NRC staff will confirm the RII/ Yes/ EC: 11/14/11 TVA states that ERDS software 2627 availability and operability of the NSIR REP FC: 6/15/12 previously modified and tested for ERDS for Unit 2 prior to issuance of For NRC Inspection / Review Unit 2 addition and to send data the Unit 2 OL. (SSER 22, Section The Emergency Response Data from the WBN PEDS to the CECC.

13.3.2.6, pg 13-14) System software has previously Official list of points for WBN 2 has been modified and tested for the not been provided to TVA Computer Watts Bar Unit 2 addition. This Engineering Group for addition to unit can be selected from the the ERDS software; official testing ERDS menu to send data to the of software cannot be completed NRC at this time. In addition, the with NRC to declare the WBN 2 software has been developed and ERDS operational. NRC needs list tested to send data from the to add to the NRC data systems, WBN PEDS to the CECC. The write the test, schedule the test with final WBN 2 list of ERDS data TVA/NRC, run the test, and TVA points has been provided to the submit the results.

TVA Computer Engineering Group for addition to the ERDS RII to review and document in IR.

software. As a partial response NSIR to update status in Appendix to this item, the WBN 2 list of HH.

ERDS data points will be provided to the NRC on I&C response letter scheduled for 11/14/11. A commitment to update the data point list (if required) based on the results of PER 450041 will be included in the letter with a 6/15/12 due date. The due date is based on the Corporate Computer Engineering PER action completion date of 4/27/12. Once this list has been received by the NRC, it would require one month to add the list to the NRC data systems, write the test, schedule Page 7 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead the test with TVA/NRC, run the test, and TVA submit the results.

(Detchemendy)

(39) CI The NRC staff will confirm the RII/ Yes/ EC: Complete Closed by IR 05000391/2011609, 26 adequacy of the communications NSIR REP FC: N/A dated 12/16/2011. ADAMS capability to support dual unit NRC completed inspection wk of Accession No. ML11350A229.

operations prior to issuance of the 10/17/11 and stated intent to Unit 2 OL. (SSER 22, Section close item. Provide NRC NSIR staff does not believe that, 13.3.2.6, pg 13-14) Residents copies of related based on what is currently present documents as requested for the in the TVA Action Required to onsite inspection. Close column, that the response to OI 38 would cover OI 39. OI 39 Detchemendy deals with all other communications, not specifically ERDS.

(40) CI The NRC staff will confirm the RII/ Yes/ EC: Complete TVA to perform self assessment to 26 adequacy of the emergency facilities NSIR REP FC: N/A verify processes and materials in and equipment to support dual unit For NRC Inspection / Review MCR, TSC, OSC, EOF and local operations prior to issuance of the Perform self assessment to verify recovery facility. Provide RI staff Unit 2 OL. (SSER 22, Section processes and materials in main copies of self assessment 13.3.2.8, pg 13-15) control room, TSC, OSC, EOF documents. RII to review and and local recovery facility. document in IR. NSIR to update Provide NRC Residents copies of status in Appendix HH.

self assessment documents for the onsite inspection.

SA WBN-F-11-007 provided to residents on 9/21/11.

(Detchemendy)

(41) CI TVA committed to (1) update plant RII/ Yes/ TVA to provide demonstration of 27 data displays as necessary to NSIR PSE EC: 11/14/11 (Detchemendy) capability of SPDS, ICS and PEDS include Unit 2, and (2) to update data system displays by 7/1/12; and dose assessment models to provide Will submit during OCT24 NRR to submit EPIP-13. (describe RED, capabilities for assessing releases audit. FRED and BRED data systems) by Page 8 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead from both WBN units. The NRC 10/1/11. RII to review and staff will confirm the adequacy of document in IR. NSIR to update these items prior to issuance of the 1) Submit EPIP-13 (Describe status in Appendix HH.

Unit 2 OL. (SSER 22, Section RED, FRED and BRED data 13.3.2.9, pg 13-16) systems).

  • Confirm calcs OK for U2 EC: Done
  • Revise EPIP-13 EC:

TBD

  • CEG revise dose assessment code EC:

TBD PSE: 7/1/12 (Olson)

2) For NRC Inspection / Review.

Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.

(42) CI The NRC staff will confirm the RII/ Yes/ Closed by IR 05000391/2011609, 27 adequacy of the accident NSIR PSE EC: 11/14/11 (Detchemendy) dated 12/16/2011. ADAMS assessment capabilities to support Accession No. ML11350A229.

dual unit operations prior to issuance of the Unit 2 OL. (SSER Will submit during OCT24 NRR RII to review and document in IR.

22, Section 13.3.2.9, pg 13-16) audit. NSIR to update status in Appendix HH. Complete with Item 41.

1) Submit EPIP-13 (Describe RED, FRED and BRED data systems).
  • Confirm calcs OK for U2 EC: Done
  • Revise EPIP-13 EC:

TBD Page 9 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead

  • CEG revise dose assessment code EC:

TBD FC: 7/1/12 (Olson)

2) For NRC Inspection / Review.

Provide demonstration of capability of SPDS, ICS and PEDS data system displays for Unit 2 at WBN and Corporate.

(43) CI Section V of Appendix E to 10 CFR NSIR Yes/ EC: 5/1/12 TVA to submit EPIPs 6 months 27 Part 50 requires TVA to submit its REP FC: N/A before OL. NSIR to update status detailed implementing procedures TVA to answer later. in Appendix HH.

for its emergency plan no less than Submit Unit 1/2 REP 180 days before the scheduled implementing procedures (EPIP-1 issuance of an operating license. thru EPIP-17) to Completion of this requirement will NRC.(Detchemendy) be confirmed by the NRC staff prior to the issuance of an operating license. (SSER 22, Section 13.3.2.18, pg 13-23)

(47) The NRC staff noted that TVAs SCVB Yes EC: Complete TVA to provide correction in future 2526 changes to Section 6.2.6 in FSAR FC: N/A amendment (A105) to FSAR. See Amendment 97, regarding the Response provided in TVA to also info in letter of 6/7/11. NRR implementation of Option B of NRC letter dated June 7, 2011. tech staff review and document in Appendix J, were incomplete, However, one FSAR Note was SER.

because several statements missed.

remained regarding performing A105 corrected FSAR (8/12/11).

water-sealed valve leakage tests as specified in 10 CFR [Part] 50, Appendix J. With the adoption of Option B, the specified testing requirements are no longer applicable; Option A to Appendix J Page 10 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead retains these requirements. The NRC discussed this discrepancy with TVA in a telephone conference on September 28, 2010. TVA stated that it would remove the inaccurate reference to Appendix J for specific water testing requirements in a future FSAR amendment. (SSER 22, Section 6.2.6, pg 6-12)

(48) CI The NRC staff should verify that its DORL/ Yes EC: Complete Upon NRR completion of SER 2526 conclusions in the review of FSAR AADB FC: N/A Chapter 15 review, tech staff review Section 15.4.1 do not affect the Response provided in TVA to and document in SER update to conclusions of the staff regarding NRC letter dated June 7, 2011. section 6.5.3. See also info in TVA the acceptability of Section 6.5.3. letter of 6/7/11.

(SSER 22, Section 6.5.3, pg 6-15)

(49) CI The NRC staff was unable to RII No EC: Complete TVA provided RI staff with how the 2526 determine how TVA linked the FC: N/A refurb training requirements are training qualification requirements of For NRC Inspection / Review linked to the ANSI standard.

ANSI N45.2-1971 to TVA Procedure Provided NRC Residents how the Provided training records for refurb TI-119. Therefore, the refurb training requirements are inspectors. RII to review and implementation of training and linked to the ANSI standard. document in IR and update status in qualification for inspectors will be the Provided the training records for Appendix HH.

subject of future NRC staff refurb inspectors.

inspections. (NRC letter dated July 2, 2010, ADAMS Accession No.

ML101720050)

(50) CI TVA stated that about 5 percent of RII No/ EC: Ongoing Inspection TVA to notify RI staff of anchor bolt 26 the anchor bolts for safety-related Plant FC: pull tests. RII to review and pipe supports do not have quality Design For NRC Inspection / Review document in IR and update status in control documentation, because the Notify NRC Residents of anchor Appendix HH.

pull tests have not yet been bolt pull tests.

performed. Since the documentation is still under Inspection of pull tests ongoing development, the NRC staff will (Gilley) conduct inspections to follow-up on Page 11 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead the adequate implementation of this construction refurbishment program requirement. (NRC letter dated July 2, 2010, ADAMS Accession No.

ML101720050)

(51) CI The implementation of TVA RII No/ EC: Ongoing inspection RII to review and document in IR 26 Procedure TI-119 will be the subject Moll FC: and update status in Appendix HH.

of NRC follow-up inspection to For NRC Inspection / Review determine if the construction Provide NRC Residents the refurbishment program requirements results of the refurb program.

are being adequately implemented.

(NRC letter dated July 2, 2010, (Moll)

ADAMS Accession No.

ML101720050)

(59) The staffs evaluation of the CVIB Yes EC: Open Tech staff review and document in 2526 compatibility of the ESF system FC: N/A SER.

materials with containment sprays Response provided in TVA to and core cooling water in the event NRC letter dated June 7, 2011.

of a LOCA is incomplete pending resolution of GSI-191 for WBN Unit

2. (SSER 23, Section 6.1.1.4, pg 6-2)

(60) CI TVA should amend the FSAR SBPB Yes EC: Complete TVA provided information in A103. 2526 description of the design and FC: N/A NRR tech staff review and update operation of the spent fuel pool Response provided in TVA to status in Appendix HH.

cooling and cleanup system in NRC letter dated June 7, 2011.

FSAR Section 9.1.3 as proposed in its December 21, 2010, letter to the NRC. (SSER 23, Section 9.1.3, pg 9-3 )

(61) TVA should provide information to SNPB Yes Will result in a License Condition. NRR tech staff review and 26 the NRC staff to demonstrate that document in SER. May require PAD 4.0 can conservatively Is an Additional Submittal license condition.

calculate the fuel temperature and Required?

other impacted variables, such as Page 12 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead stored energy, given the lack of a fuel thermal conductivity degradation model. (SSER 23, Section 4.2.2, pg 4-5)

(63) CI TVA should confirm to the NRC staff RII No/ EC: RII to inspect testing and document 27 that testing prior to Unit 2 fuel load PSE FC: 7/1/12 in IR. Update status in Appendix has demonstrated that two-way Hot functional testing. HH. From I&C matrix 171 communications is impossible with I&C Matrix Item None the Eagle 21 communications This will be addressed by a interface. (SSER 23, Section License Condition (Duplicate of 7.2.1.1, pg 7-7) SSER 23 Item 93)

(64) CI TVA stated that, Post modification RII No/ EC: 12/9/11 RII to inspect testing and document 26 testing will be performed to verify PSE FC: 1/31/12 in IR. Update status in Appendix that the design change corrects the FCN issued 10/14/11; to be HH. From I&C matrix 127 Eagle 21, Rack 2 RTD accuracy incorporated into an EDCR, to issue prior to WBN Unit 2 fuel load. issue Mod is 12/9/11; and to This issue is open pending NRC implement Mod and Test 1/31/12 staff review of the testing results.

(SSER 23, Section 7.2.1.1, pg 7-8) For NRC Inspection / Review I&C Matrix Item None Provide requested info (65) TVA should provide justification to EICB Yes/ EC: Complete NRR tech staff reviewing provided 2526 the staff regarding why different I&C FC: N/A information and will document in revisions of WCAP-13869 are Response provided in TVA to SSER 26 referenced in WBN Unit 1 and Unit NRC letter dated June 7, 2011.

2. (SSER 23, Section 7.2.1.1, pg 7- I&C Matrix Item 323 Tech staff review and document in 3/4, 7-10) Changes are reflected in FSAR SER. Changes in FSAR A104 Amendment 104.

I&C matrix 323 (66) CI TVA should clarify FSAR Section SBPB Yes/ EC: Complete TVA to provide information in future 2526 9.2.5 to add the capability of the Mech FC: N/A amendment. NRR tech staff review UHS to bring the non-accident unit A105 update of the FSAR. and update status in Appendix HH.

to cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(SSER 23, Section 9.2.5, pg 9-8)

Page 13 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (67) CI TVA should confirm, and the NRC RII No/ EC: Complete TVA provided EDCR closure 27 staff should verify, that the Civil FC:7/1/12 document to RI staff on installation component cooling booster pumps For NRC Inspection / Review of CCS thermal barrier booster for Unit 2 are above PMF level. Provide EDCR closure pump dike. RII to review, inspect (SSER 23, Section 9.2.2, pg 9-6) documentation for installation of installation, and document in IR and CCS thermal barrier booster update status in Appendix HH.

pump dike. AA FCR issued.

Inspect after field complete (69) CI The WBN Unit 2 RCS vent system is RII No EC: N/A TVA to provide EDCR closure 27 acceptable, pending verification that Mech FC: 7/1/12 document for installation of RCS the RCS vent system is installed. For NRC Inspection / Review vents to RI staff. RII to review, (SSER 23, Section 5.4.5, pg 5-5) Provide EDCR closure inspect, and document in IR and documentation for installation of update status in Appendix HH.

vents.

(70) TVA should provide the revised CVIB Yes/ EC: 3/1/12 (Tinley) TVA needs to provide PSI program 26 WBN Unit 2 PSI program ASME ISO FC: N/A information to NRR. NRR tech staff Class 1, 2, and 3 Supports Provide requested info review and document in SER.

Summary Tables, to include numbers of components so that the NRC staff can verify that the numbers meet the reference ASME Code. (Section 3.2.3 of Appendix Z of SSER 23, pg z-11, z-13)

(71) By letter dated April 21, 2011 CVIB Yes/ EC: Complete TVA requested to withdraw 26 (ADAMS Accession No. Mech FC: N/A commitment to replace X-750 bolts ML111110513), TVA withdrew its Initial response provided in TVA by letter dated April 21, 2011. NRR commitment to replace the Unit 2 to NRC letter dated June 7, 2011. tech staff reviewing request. TVA clevis insert bolts. TVA should needs to justify use on low-temp provide further justification for the TVA to NRC letter dated heat treated bolts. TVA provided decision to not replace the bolts to 10/24/2011, provided additional additional information in the the NRC staff. (SSER 23, Section justification (from WEC) for this 10/24/11 letter.

3.9.5, pg 3-2/3) commitment withdrawal (i.e., to not replace the bolts). NRR staff reviewing provided information and will document in SSER 26.

Page 14 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (73) CI The NRC staff will inspect to confirm RII No/ EC: 2/1/12 TVA to provide EOPs to RI staff. 26 that TVA has completed the WBN OPS FC: N/A RII to review and document in IR Unit 2 EOPs prior to fuel load. For NRC Inspection / Review and update status in Appendix HH.

(SSER 23, Section 7.5.3, pg 7-119) Provide copies of EOPs for inspection.

(74) CI The NRC staff will verify installation RII No/ EC: 5/1/12 TVA to provide EDCR closure 27 of the acoustic-monitoring system I&C FC: documentation for acoustic monitors for the power-operated relief valve For NRC Inspection / Review to RI staff. RII to review and (PORV) position indication in WBN Provide EDCR closure document in IR and update status in Unit 2 before fuel load. (SSER 23, documentation for installation of Appendix HH.

Section 7.8.1, pg 7-167) acoustic monitors.

Panels installed 5/18/11 Probes not installed (75) CI The NRC staff will verify that the test RII No/ EC: N/A RII to review and document in IR 26 procedures and qualification testing PSE PSE: 7/1/12 and update status in Appendix HH.

for auxiliary feedwater initiation and FC: N/A control and flow indication are For NRC Inspection / Review completed in WBN Unit 2 before fuel Provide copies of test procedures load. (SSER 23, Section 7.8.2, pg 7- for inspection.

167)

(77) It is unclear to the NRC staff which EICB Yes/ EC: Complete NRR tech staff reviewing 26 software V&V documents are I&C FC: N/A September 1 and November 14, applicable to the HRCAR monitors. Response provided in TVA to 2011 letters. Staff still has a TVA should clarify which software NRC letter dated Sept. 1, 2011. question on procedure used for V&V documents are applicable, in Proprietary information provided system verification tests. See TVA order for the staff to complete its in TVA to NRC letter dated 5.

evaluation. (SSER 23, Section 10/13/11 and non-proprietary 7.5.2.3, pg 7-109) versions provided in TVA to NRC TVA needs to obtain V&V letter dated 7/15/10. This older documents from vendor and provide submittal discussed in 11/14/11 to NRR. NRR tech staff review and TVA to NRC letter. document in SER.

(79) CI TVA should perform a radiated EICB Yes/ EC: 7/1/12 TVA to provide confirmation of 27 susceptibility survey, after the Hilmes, FC: satisfactory completion of rad installation of the hardware but prior Brehm survey/testing. NRR tech staff Page 15 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead to the RM-1000 being placed in For NRC Inspection / Review review and document in SER.

service, to establish the need for I&C Matrix Item 355 (closed to I&C matrix item 355 exclusion distance for the HRCAR commitment) monitors while using handheld portable devices (e.g., walkie-talkie) TVA made a commitment to in the control room, as documented perform the survey and provide in Attachment 23 to TVAs letter results to NRC dated February 25, 2011, and item number 355 of TVAs letter dated Owner: R. Brehm April 15, 2011. (SSER 23, Section 7.5.2.3, pg 7-110)

(80) TVA should provide clarification to EICB Yes/ EC: Open NRR tech staff reviewed May 6, 26 the staff on how TVA Standard I&C FC: N/A 2011 letter and determined that Specification SS-E18-14.1 meets additional information is required.

the guidance of RG 1.180, and Responses to items 1 and 2.i in RAI letter dated 9/21/11. Staff should address any deviations from letter dated 10/13/11. TVA reviewing RAI response dated the guidance of the RG. (SSER 23, 9/30/11 letter to NRC addressed 9/30/11. Additional RAI on Section 7.5.2.3, pg 7-115) 2ii thru ix; the same letter 11/18/11.

committed to responding to 1 & 2i within two weeks of response I&C matrix item 340 from vendor (GA-ESI).

Response provided in TVA to NRC letter dated May 6, 2011, has been reviewed.

I&C Matrix Item 340 -- submitted Additional response submitted in TVA letter to NRC dated 12/22/11 (81) The extent to which TVAs supplier, EICB Yes/ EC: Open TVA to provide revised procedure 26 General Atomics (GA), complies I&C FC: N/A on GA commercial dedication with EPRI TR-106439 and the Revised procedure submitted process based on NRC letter of methods that GA used for its 9/30/11. White paper and 7/11/11. Staff reviewing RAI commercial dedication process attachment submitted 10/13/11. response dated 9/30/11.

should be provided by TVA to the NRR tech staff review and NRC staff for review. (SSER 23, NRC comments on GA procedure document in SER. Additional RAI Page 16 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead Section 7.5.2.3, pg 7-117) received 7/11/11 sent to GA for on 11/18/11.

resolution.

11/18/11 RAI response provided I&C matrix item 353 in TVA letter to NRC dated 12/22/11.

(83) CI TVA should confirm to the NRC staff EICB Yes/ EC: Open TVA to provide confirmation of 27 the completion of the data storm test PSE PSE: 07/01/12 satisfactory completion of testing.

on the DCS. (SSER 23, Section FC: NRR tech staff review and 7.7.1.4, pg 7-159) For NRC Inspection / Review document in SER.

I&C Matrix Item None Provide requested info (90) CI The NRC staff should verify that the RII/ No/ EC: N/A RII to inspect the satisfactory 27 ERCW dual unit flow balance SBPB Mech FC: 7/1/12 completion of ERCW testing. RII to confirms that the ERCW pumps Complete ERCW Flow Balance. review and document in IR and meet all specified performance update status in Appendix HH.

requirements and have sufficient capability to supply all required ERCW normal and accident flows for dual unit operation and accident response, in order to verify that the ERCW pumps meet GDC 5 requirements for two-unit operation.

(SSER 23, Section 9.2.1, pg 9-4)

(91) TVA should update the FSAR with SBPB Yes/ EC: Complete TVA provided updated information 26 information describing how WBN MECH FC: N/A in A106 to section 9.2.2. Staff is Unit 2 meets GDC 5, assuming the looking for TVA to provide similar worst case single failure and a Response provided TVA letter to information in Section 9.2.1 in future LOOP, as provided in TVAs letter NRC, dated 11/17/11, FSAR amendment. TVA provided dated April 13, 2011. (SSER 23, Amendment 107. update in A107. NRR tech staff to Section 9.2.1, pg 9-5) confirm and update status in Appendix HH.

(93) CI TVA should confirm to the staff that CI Yes/ EC: RII to inspect testing and document 27 testing of the Eagle 21 system has PSE PSE: 7/1/12 in IR. Update status in Appendix sufficiently demonstrated that two- FC: HH.

way communication to the ICS is TVA to answer later.

Page 17 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead precluded with the described I&C Matrix Item None configurations. (SSER 23, Section Complete - This will be 7.9.3.2, pg 7-175) addressed by a License Condition (Duplicate of SSER 23 Item 63(F))

(94) TVA should provide to the staff EICB Yes/ EC: Open. NRR tech staff reviewing 26 either information that demonstrates I&C FC: N/A September 1, 2011, letter.

that the WBN Unit 2 Common Q Response provided in TVA to Additional RAI in 11/18/11 letter.

PAMS meets the applicable NRC letter dated Sept. 1, 2011.

requirements in IEEE Std. 603-1991, Response provided in TVA to NRR tech staff review and or justification for why the Common NRC Letter 5/6/11 document in SSER.

Q PAMS should not meet those I&C Matrix Item 364 item 1, 367, requirements. (SSER 23, Section 372 7.5.2.2.3, pg 7-50, 7-87)

(98) TVA should demonstrate that the EICB Yes/ EC: Complete TVA to provide additional 26 WBN Unit 2 Common Q PAMS is in I&C FC: N/A information. Additional RAI in conformance with RG 1.152, Response provided in TVA to 11/18/11 letter.

Revision 2, or provide justification NRC letter dated May 6, 2011 for not conforming. (SSER 23, I&C Matrix Item 368 NRR tech staff review and Section 7.5.2.2.3, pg 7-53, 7-60, 7- Needs to be in Table 7.1-1 document in SSER.

102) Response provided in TVA to NRC letter dated August 4, 2011 (101) TVA should demonstrate that the EICB Yes/ EC: Open NRR staff reviewing information 26 WBN Unit 2 Common Q PAMS I&C FC: N/A provided by TVA on 10/13/11. NRR application software is in tech staff review and document in conformance with RG 1.168, Analysis to demonstrate SSER.

Revision 1, or provide justification compliance provided in letter for not conforming. (SSER 23, dated 10/13/11. Initial response Section 7.5.2.2.3, pg 7-54, 7-60, 7- was not accepted by staff. WEC

65) to provide analysis similar to the one for IEEE 603 demonstrating compliance.

Response provided in TVA to NRC letter dated February 25, 2011.

Page 18 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead Additional information provided in TVA to NRC letter dated 12/22/11.

Additional response scheduled for 2/24/12 I&C Matrix Item 081 (105) TVA should produce an acceptable EICB Yes/ EC: Open. TVA to provide additional 26 description of how the WBN Unit 2 I&C FC: N/A information. Additional RAI in Common Q PAMS SysRS and SRS Response provided in TVA to 11/18/11 letter.

implement the design basis NRC letter dated Sept. 1, 2011.

requirements of IEEE Std. 603-1991 NRR tech staff review and Clause 4. (SSER 23, Section Response scheduled for 2/24/12 document in SSER.

7.5.2.2.3.4.3.1, pg 7-71)

I&C Matrix Item 213 & 372 (108) TVA should demonstrate to the NRC EICB Yes/ EC: Open. Additional RAI in 11/18/11 letter. 26 staff that there are no synergistic I&C FC: N/A effects between temperature and Response provided in TVA to NRR tech staff reviewing provided humidity for the Common Q PAMS NRC letter dated Sept. 1, 2011. information.

equipment. (SSER 23, Section 7.5.2.2.3.5.2, pg 7-75) Response provided in TVA to NRC letter dated 12/22/11.

Additional response in TVA to NRC letter dated 1/19/12.

I&C Matrix Item None (110) TVA should provide information to EICB Yes/ EC: Complete. TVA to provide additional 26 the NRC staff describing how the I&C FC: N/A information. NRR tech staff review WBN Unit 2 Common Q PAMS Response provided in TVA to and document in SSER.

design supports periodic testing of NRC letter dated Sept. 1, 2011.

the RVLIS function. (SSER 23, I&C Matrix Item None Section 7.5.2.2.3.9.2.6, pg 7-93)

(111) TVA should confirm to the staff that EICB Yes/ EC: Complete TVA to provide additional 26 there are no changes required to the I&C FC: N/A information. NRR tech staff review technical specifications as a result of Response provided in TVA to and document in SSER.

Page 19 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead the modification installing the NRC letter dated May 6, 2011 Common Q PAMS. If any changes I&C Matrix Item 374 to the technical specifications are required, TVA should provide the changes to the NRC staff for review.

(SSER 23, Section 7.5.2.2.3.11, pg 7-102)

(112) CI TVA should provide an update to the IHPB Yes/ EC: Complete. NRR tech staff review A105 and 26 FSAR reflecting the radiation LIC FC: N/A document in SSER.

protection design features Addressed in A105 - change descriptive information provided in package 2-105-04 its letter dated October 4, 2010.

(SSER 24, Section 12.4)

(113) CI TVA should provide an update to the IHPB Yes/ EC: Complete. NRR tech staff review A015 and 26 FSAR reflecting the justification for I&C FC: N/A document in SSER.

the periodicity of the COT frequency A105 update of the FSAR -

for WBN non-safety related area change package 2-105-07 radiation monitors. (SSER 24, Section 12.4)

(114) CI TVA should update the FSAR to IHPB Yes/ EC: Complete. NRR tech staff review A105 and 26 reflect that WBN meets the radiation LIC FC: N/A document in SSER.

monitoring requirements of 10 CFR Addressed in A105. - change 50.68. (SSER 24, Section 12.4) package 2-105-01 (115) CI TVA should update the FSAR to IHPB Yes/ EC: Complete TVA to provide additional 26 reflect the information regarding LIC FC: N/A information. NRR tech staff review design changes to be implemented and document in SSER.

to lower radiation levels as provided FSAR updated in A105 (Section in its letter the NRC dated June 3, 4.3.2.7) 2010. (SSER 24, Section 12.5)

(116) CI TVA should update the FSAR to IHPB Yes/ EC: Complete. NRR tech staff review A105 and 26 reflect the qualification standards of LIC FC: N/A document in SSER.

the RPM as provided in its letter to Addressed in A105. - change the NRC dated October 4, 2010. package 2-105-06.

(SSER 24, Section 12.6)

Page 20 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (117) CI TVA should update the FSAR to IHPB Yes/ EC: 1/27/12 TVA to provide additional 26 reflect the calculational basis for LIC FC: N/A information. NRR tech staff review access to vital areas as provided in and document in SSER.

its letter dated February 25, 2011. Update FSAR.

(SSER 24, Section 12.7.1)

(118) TVA should provide to the NRC staff EICB Yes/ EC: Complete TVA provided additional information 26 Formatted Table a description of how the other I&C FC: N/A on 9/30/11 and 10/13/11. NRR tech vanadium detectors within the IITA staff review and document in SSER.

would be operable following the Additional information provided in failure of an SPND. (SSER 24, letter dated 10/13/11. Response Section 7.7.1.9.2) provided in TVA to NRC letter dated Sept. 30, 2011.

(120) TVA should confirm to the NRC staff EICB Yes/ EC: OpenClosed NRR tech staff has reviewed 26 that the maximum over-voltage or I&C FC: N/A September 1, 2011, letter and surge voltage that could affect the Provide a revised response determined that additional system is 264 VAC, assuming that Response provided in TVA to information is required. NRR staff the power supply cable to the SPS NRC letter dated Sept. 1, 2011. needs conformation that the power cabinet is not routed with other Note that the non-prop/affidavits supply cable to the SPS is not cables greater than 264 VAC. to be provided by 12/1/11 routed with other cables greater (SSER 24, Section 7.7.1.9.5) than 264 VAC.

Open items completed by TVA to NRC letter dated 12/22/11 (121) TVA should submit the results to the EICB Yes/ EC: CompleteOpen TVA to provide additional 26 NRC staff of a 600 VDC dielectric I&C FC: N/A information. NRR tech staff review strength test performed on the IITA and document in SSER.

assembly. (SSER 24, Section Response provided TVA letter to 7.7.1.9.5) NRC, dated 11/30/11.

Further response provided in TVA to NRC letter dated 1/19/12.

(123) TVA should provide an explanation EICB Yes/ EC: Complete TVA provided additional information 26 to the NRC staff of how the system I&C FC: N/A on 9/30/11. NRR tech staff review will assign a data quality value to and document in SSER.

notify the power distribution Response provided in TVA to calculation software to disregard NRC letter dated Sept. 30, 2011 Page 21 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead data from a failed SPND. (SSER 24, Section 7.7.1.9.5)

(125) TVA should provide clarification to EICB Yes/ EC: Complete TVA provided additional information 26 the NRC staff of the type of I&C FC: N/A on 9/30/11. NRR tech staff review connector used with the MI cable in and document in SSER.

Unit 2, and which EQ test is Response provided in TVA to applicable. (SSER 24, Section NRC letter dated Sept. 30, 2011 7.7.1.9.5)

(126) To enable the NRC staff to evaluate EICB Yes/ EC: Complete TVA provided additional information 26 and review the IITA environmental I&C FC: N/A on 9/30/11. Staff to review qualification, TVA should provide the documents in Westinghouse summary report of the Response provided TVA letter to Rockville office. NRR tech staff environmental qualification for the NRC, dated 11/30/11. review and document in SSER.

IITA. (SSER 24, Section 7.7.1.9.5)

(127) TVA should provide a summary to EICB Yes/ EC: Complete TVA provided additional information 26 the NRC staff of the electro- I&C FC: N/A on 9/30/11. NRR tech staff review magnetic interference/radio- and document in SSER.

frequency interference (EMI/RFI) Response provided in TVA to testing for the MI cable electro- NRC letter dated November 14, magnetic compatibility (EMC) 2011 qualification test results. (SSER 24, Section 7.7.1.9.5)

(129) TVA should verify to the NRC staff EICB Yes/ EC: Complete TVA provided additional information 26 resolution of the open item in WNA- ELE, I&C FC: N/A on 9/30/11. NRR tech staff review CN-00157-WBT for the power and document in SSER.

supply (to be installed in the SPS Response provided TVA letter to cabinet) to undergo EMC testing of 4 NRC, dated 11/30/11.

kV to validate the assumptions made in the Westinghouse analysis.

(SSER 24, Section 7.7.1.9.5)

(131) TVA should review the EOP action EICB Yes/ EC: Complete TVA provided additional information 26 level setpoint to account for the Koontz on 10/13/11. NRR tech staff review difference between core exit Response provided in letter dated and document in SSER.

temperature readings for Unit 1 and 10/13/11.

Unit 2 and confirm the EOP action Page 22 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead level setpoint to the NRC staff.

(SSER 24, Section 7.7.1.9.5)

(132) TVA must provide the NRC staff with SRXB Yes/ EC: 12/15/11 TVA to provide additional 26 analyses of the boron dilution event Mech FC: N/A information. NRR tech staff review that meet the criteria of SRP and document in SSER.

Section 15.4.6, including a Provide analysis results to NRC description of the methods and procedures used by the operators to Response provided by TVA to identify the dilution path(s) and NRC letter dated 1/12/12.

terminate the dilution, in order for the staff to determine that the analyses comply with GDC 10.

(SSER 24, Section 15.2.4.4)

(133) In order to confirm the stability EMCB Yes/ EC: Complete TVA to provide additional 26 analysis of the sand baskets used Licensing FC: N/A information. NRR tech staff review by TVA in the WBN Unit 2 licensing and document in SSER.

basis, TVA will perform either a 10/31/2011 TVA letter provided hydrology analysis without crediting analysis.

the use of the sand baskets at the Fort Loudoun dam for the seismic Letter committed to revising dam failure and flood combination, FSAR. (A107) or TVA will perform a seismic test of [Commitment 112870791]

the sand baskets, as stated in TVAs letter dated April 20, 2011. TVA will Information was incorporated in report the results of this analysis or FSAR A107.

test to the NRC by October 31, 2011. (SSER 24, Section 2.4.10)

(134) TVA should provide to the NRC staff EMCB Yes/ EC: 08/31/2012 TVA to provide additional 26 supporting technical justification for CORP FC: N/A information. NRR tech staff review the statements in Amendment 104 CIVIL and document in SSER.

of FSAR Section 2.4.4.1, Dam Provide analysis to NRC.

Failure Permutations, page 2.4-32 (in the section Multiple Failures) that, Fort Loudoun, Tellico, and Page 23 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead Watts Bar have previously been judged not to fail for the OBE (0.09 g). Postulation of Tellico failure in this combination has not been evaluated but is bounded by the SSE failure of Norris, Cherokee, Douglas and Tellico. (SSER 24, Section 2.4.10)

(136) CI TVA should provide an update to the AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. 26 WBN Unit 2 FSAR that includes the NRR tech staff to confirm and JFD summary for the 1991 through document in SSER.

2010 data period provided by e-mail dated July 20, 2011, and a discussion of the long term representativeness of these data.

NRC staff should confirm that these updates have been made, upon receipt of the updated FSAR.

(SSER 25, Section 2.3.3)

(137) CI TVA should incorporate, and the AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. 26 NRC staff should confirm upon NRR tech staff to confirm and receipt, that the updated CR /Q document in SSER.

values from TVAs September 15, 2011, letter have been integrated into a future amendment of the FSAR. (SSER 25, Section 2.3.4)

(138) CI Upon receipt of the updated ODCM, AADB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. 26 the NRC staff should confirm that NRR tech staff to confirm and corresponding revisions related to document in SSER.

the updated annual average /Q and D/Q values have been made to the ODCM. (SSER 25, Section 2.3.5)

(139) CI TVA should update the FSAR to IHPB Yes FSAR A107 11/18/11 TVA to provide updated FSAR. 26 reflect the results of the cost-benefit NRR tech staff to confirm and analysis required by 10 CFR Part document in SSER.

Page 24 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 50, Appendix I, subsection II.D.

(SSER 25, Section 11.3)

Proposed Open Items Outstanding I&C Matrix Items TVA All safety related work must be EICB I&C EC: Complete See OI 77 5 quality controlled per 10CFR50, FC: N/A App. B. TVA to confirm that the procedure used for the RM-1000 Response provided in letter dated system verification tests (04507007) 10/13/11.

was actually a procedure that was prepared per 10CFR50, App. B. I&C Matrix Item 346 7.5.2.3 TVA Was the Foxboro IA system EICB I&C EC: Complete 7 developed under a 10 CFR 50 FC: N/A Appendix B compliant program? Response in letter dated 4/15/11 I&C Matrix Item 361 NRC Review Pending TVA OI#199 requested TVA to provide EICB I&C EC: Complete 8 information concerning how TVA plans FC: N/A to meet regulatory criteria for Quality (10 CFR 50.55a(a)(1)) associated with the Response submitted in letter Technical Support Center and Nuclear Data Link. TVA responded in Letter dated 5/16/11 Dated October 5, 2010, Item 63; however, TVAs response does not I&C Matrix Item 363 address the quality aspects of these system features. A similar question had NRC Review pending been asked for Quality Criteria adherence for the SPDS and the BISI Additional information provided in functions of the Integrated Computer TVA to NRC letter dated 1/19/12.

System. In response to that request Page 25 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (same letter) TVA provided a description of TVA procedures, BISI software development procedures, and various management measures that will be taken to assure high quality in the design, operation, and maintenance of the SPDS and BISI functions of the ICS.

Since the TSC and Nuclear Data Link information originates in the SPDS function of the ICS, are there any aspects of the quality measures that apply to the TSC and NDL features developed as part of quality processes for the ICS that are applicable to the data communications features?

Specifically, what is the scope of TVA Procedure SPP-2.6 Computer Software Control? How does it apply to the ICS functions of a) SPDS, b) BISI, and c)

TSC and NDL functions? Wouldnt there be aspects of the quality procedures that apply to the development, maintenance, and operations of the software needed to support the data communications features. Also, what quality measures will be applied to develop, maintain, and operate the hardware that accomplishes the TSC and NDL functions to ensure that these features will be reliable and available when needed?

TVA Provide proprietary, non-proprietary EICB I&C EC: 11/14/11 21 versions and affidavits for FC: N/A withholding for the following documents: Provide response to NRC.

  • General Atomics Electronic Systems 04038903-1SP, Documents provided by letter Qualification Basis for dated 1/19/12.

Page 26 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 04031101-001 (2-RE-90-130 I&C Matrix Item 396

&131). 10/5/11

  • General Atomics Electron Systems 04038903-2SP, Qualification Basis for 04031301-001 (2_RE-90-106).

10/7/11

  • General Atomics Electronic Systems 04038903-4SP, Qualification Basis for 04031501-001 (2-RE-90-112).

10/21/11 License Amendment Requests (LARs) for WBN Unit 1 - Dual Unit Operation-Impact Licensing WBN Unit 2 1 Relief Request needed for WBN TVA Due Date 12/2011 - See Unit 1 refueling outage (RFO) that is (ML11252A530) scheduled for September 2012.

2 Technical Specification (TS) Task TVA Due Date 12/2011 - See Force -340 to allow a 7-day (ML11252A530) completion time for the turbine-driven auxiliary feedwater pump if inoperability occurs in reactor Mode 3 following a RFO is needed for WBN Unit 1 September 2012 RFO.

3 Emergency Diesel Generator (EDG) TVA Due Date 12/2011 - See Frequency Test TS change to (ML11252A530) perform an analysis for alignment with WBN Unit 2.

Page 27 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 4 Fuel Handling Accident TS change TVA Due Date 12/2011 - See to adopt partial Alternate Source (ML11252A530)

Term for alignment with WBN Unit 2.

5 Primary reactor coolant system TVA Due Date 12/2011 - See chemistry iodine concentration TS (ML11252A530) change to align with a regulatory guide.

6 Change reporting requirements for TVA Due Date 12/2011 - See WBN Unit 1 License Condition 2.G (ML11252A530) to align with Title 10 of the Code of Federal Regulations Sections 50.72 and 50.73 7 TS change to allow interchange of A TVA Due Date 12/2011 - See and B with C and 0 Common Station (ML11252A530)

Service Transformers.

8 Change EDG TS allowed outage TVA Due Date 12/2011 - See time from 72-hours to 7 -day or 14- (ML11252A530) day with a temporary EDG.

Closed (3) CI Confirm TVA submitted update to EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 FSAR section 8.3.1.4.1. (NRC safety NRC letter dated April 6, 2011.

evaluation dated August 31, 2009, Complete TVA to include in amendment to ADAMS Accession No. FSAR and highlight in transmittal ML092151155) letter. NRR staff review of FSAR update.

In 4/6/11 letter, TVA states it was in AMD 95.

(11) CI The plant administrative procedures IOLB No/ EC: Complete Closed in SSER 25, Section 13.1.3 25 should clearly state that, when the OPS FC: N/A Assistant Shift Engineer assumes TVA Letter dated 9/1/11 NRR tech staff reviewing provided his duties as Fire Brigade Leader, information and will document in Page 28 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead his control room duties are SSER 25.

temporarily assumed by the Shift Supervisor (Shift Engineer), or by another SRO, if one is available.

The plant administrative procedures should clearly describe this transfer of control room duties. (SSER 22, Section 13.1.3, pg 13-2)

(14) TVA stated that the Unit 2 PTLR is CVIB Yes EC: Complete Closed in SSER 25, Section 5.3.1 25 included in the Unit 2 System FC: N/A Description for the Reactor Coolant Response provided in TVA to NRR tech staff reviewing provided System (WBN2-68-4001), which will NRC letter dated April 6, 2011. information and will document in be revised to reflect required SSER 25.

revisions to the PTLR by September R. Bryans 10/11 e-mail provided 17, 2010. (SSER 22, Section 5.3.1, necessary portion of WBN2 pg 5-8) 4001 to NRR.

(15) TVA should confirm to the NRC staff CPNB Yes Response provided in TVA to Closed in SSER 24, Section 3.6.3. 24 the completion of Primary Stress NRC letter dated April 6, 2011.

Corrosion Cracking (PWSCC) Complete TVA submitted information in A103.

mitigation activities on the Alloy 600 NRR tech staff review and dissimilar metal butt welds (DMBWs) document in SER.

in the primary loop piping. (Section 3.6.3)

(18) Based on the extensive layup period RII/ No Response provided in TVA to Closed in Inspection Report 24 of equipment within WBN Unit 2, the EEEB NRC letter dated April 6, 2011. 0500391/2011604, dated June 29, NRC staff must review, prior to fuel Complete 2011, ADAMS Accession No.

load, the assumptions used by TVA ML111810890.

to re-establish a baseline for the qualified life of equipment. The Conduct EQ inspection. Document purpose of the staffs review is to in IR and update status in Appendix ensure that TVA has addressed the HH.

effects of environmental conditions on equipment during the layup See TVA response (RAI 3.11-EQ-period. (Section 3.11.2.2) 1) in letter dated 12/17/10.

Page 29 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (19) The NRC staff should complete its RII/ No For NRC Inspection / Review Closed in Inspection Report 24 review of TVAs EQ Program EEEB Provide NRC Residents copies of 0500391/2011604, dated June 29, procedures for WBN Unit 2 prior to EQ documents as requested for 2011, ADAMS Accession No.

fuel load. (Section 3.11.2.2.1) the onsite inspection ML111810890.

Complete - Expect NRC to close TVA to provide RI staff with copies in next inspection report of EQ documents. Conduct EQ inspection. Document in IR and update status in Appendix HH.

(20) Resolve whether or not routine RII/ Yes Response provided in TVA to Closed in Inspection Report 24 maintenance activities should result EEEB NRC letter dated April 6, 2011. 0500391/2011605, dated August 5, in increasing the EQ of the 6.9 kV Complete 2011, ADAMS Accession No.

motors to Category I status in ML112201418.

accordance with 10 CFR 50.49.

(SSER 22, Section 3.11.2.2.1). TVA submitted letter dated April 6, 2011. NRR tech staff review and document in SER.

(21) The NRC staff should confirm that RII/ No EC: Complete Closed in Inspection Report 25 the Electrical Penetration EEEB FC: N/A 05000391/2011607, dated Assemblies (EPAs) are installed in September 30, 2011, ADAMS the tested configuration, and that the Closed in IR 2011-607 (issued Accession No. ML112730197.

feedthrough module is manufactured 9/30/11 by the same company and is consistent with the EQ test report for the EPA. (SSER 22, Section 3.11.2.2.1, pg 3-14)

(22) TVA must clarify its use of the term EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 equivalent (e.g., identical, similar) NRC letter dated April 6, 2011.

regarding the replacement terminal Complete NRR in receipt of information to blocks to the NRC staff. If the address this item in TVA letter of blocks are similar, then a similarity 4/6/11. NRR tech staff review and analysis should be completed and document in SER.

presented to the NRC for review.

(Section 3.11.2.2.1)

Page 30 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (24) The NRC staff requires supporting EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 documentation from TVA to justify its NRC letter dated April 6, 2011.

establishment of a mild environment Complete TVA provided information in April 6, threshold for total integrated dose of 2011 letter. NRR tech staff review less than 1x103 rads for electronic and document in SER.

components such as semiconductors or electronic components containing organic material. (Section 3.11.2.2.1)

(27) TVA should provide a summary of EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 margin studies based on scenarios NRC letter dated April 6, 2011.

described in Section 8.1 for CSSTs Complete TVA provided information in April 6, A, B, C, and D. (SSER 22, Section 2011 letter. NRR tech staff review 8.2.2) and document in SER.

(28) TVA should provide to the NRC staff EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 a detailed discussion showing that NRC letter dated April 6, 2011.

the load tap changer is able to Complete TVA provided information in April 6, maintain the 6.9 kV bus voltage 2011 letter. NRR tech staff review control band given the normal and and document in SER.

post-contingency transmission operating voltage band, bounding voltage drop on the grid, and plant conditions. (SSER 22, Section 8.2.2)

(29) TVA should provide information EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 about the operating characteristics NRC letter dated June 7, 2011.

of the offsite power supply at the Complete TVA to provide updated grid stability Watts Bar Hydro Plant (for dual-unit analysis. TVA provided information operation), including the operating in letter of 6/7/11. NRR tech staff voltage range, postcontingency review and document in SER.

voltage drops (including bounding values and post-unit trip values),

and operating frequency range.

(SSER 22, Section 8.2.2) (corrected version of Open Item 29 from previous SSER Appendix HH)

Page 31 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (31) TVA should clarify the loading EEEB Yes Response provided in TVA to Closed in SSER 24, Section 8.1. 24 sequence as explained in its letter NRC letter dated April 6, 2011.

dated December 6, 2010 to the staff. Complete. TVA provided information in April 6, TVA should clarify whether the 2011 letter. NRR tech staff review existing statements in FSAR and document in SER.

regarding automatic sequencing logic are correct. If the FSAR description is correct, TVA should explain how the EDG and logic sequencing circuitry will respond to a LOCA followed by a LOOP scenario. (SSER 22, Section 8.3.1.11) (corrected version of Open Item 31 from SSER 22 Appendix HH)

(34) CI TVA stated that the method of SBPB Yes Response provided in TVA to Closed in SSER 24, Section 9.1.4. 24 compliance with Phase I guidelines NRC letter dated April 6, 2011.

would be substantially similar to the Complete. TVA submitted information in 4/6/11 current Unit 1 program and that a letter and A103. NRR tech staff new Section 3.12 will be added to review and document in SER.

the Unit 2 FSAR that will be materially equivalent to Section 3.12 of the current Unit 1 FSAR. (SSER 22, Section 9.1.4)

(36) TVA should provide information to CSGB/ Yes Response provided in TVA to Closed in SSER 24, Section 10.4.8. 24 the NRC staff to enable verification DORL NRC letter dated April 6, 2011.

that the SGBS meets the Complete. TVA provided information in April 6, requirements and guidance 2011 letter. NRR tech staff review specified in the SER or provide and document in SER.

justification that the SGBS meets other standards that demonstrate conformance to GDC 1 and GDC

14. (SSER 22, Section 10.4.8)

Page 32 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (44) TVA should provide additional CVIB Yes EC: Complete. Closed in SSER 25, Section 5.3.1. 25 information to clarify how the initial FC: N/A and irradiated RTNDT was Response provided in TVA to NRR tech staff reviewing provided determined. (SSER 22, Section NRC letter dated April 6, 2011. information and will document in 5.3.1, pg 5-9, 5-11, 5-13, 5-17, 5-28, SSER 25.

5-29, 5-31, 5-32)

(45) CI TVA stated in its response to RAI CVIB Yes EC: Complete Closed in SSER 25, Section 5.3.2. 25 5.3.2-2, dated July 31, 2010, that the FC: N/A PTLR would be revised to Response provided in TVA to NRR tech staff reviewing provided incorporate the COMS arming NRC letter dated April 6, 2011. information and will document in temperature. (SSER 22, Section SSER 25.

5.3.2, pg 5-28/29, 5-32) R. Bryans 10/11 e-mail provided necessary portion of WBN2 4001 to NRR.

(46) CI The LTOP lift settings were not CVIB Yes EC: Complete Closed in SSER 25, Section 5.3.2. 25 included in the PTLR, but were FC: N/A provided in TVAs response to RAI Response provided in TVA to NRR tech staff reviewing provided 5.3.2-2 in its letter dated July 31, NRC letter dated April 6, 2011. information and will document in 2010. TVA stated in its RAI SSER 25.

response that the PTLR would be R. Bryans 10/11 e-mail provided revised to incorporate the LTOP lift necessary portion of WBN2 settings into the PTLR. (SSER 22, 4001 to NRR.

Section 5.3.2, pg 5-28/29, 5-32) )

(52) TVA should provide an update to the IHPB Response provided in TVA to Never issued in SSER, issued as FSAR replacing Table 12.2-3 with NRC letter dated June 7, 2011. RAI questions. TVA provided the expected source strength values Complete. information in February 25, 2011 of the freshly irradiated IITAs. letter. See also letter of 6/7/11.

(Section 12.3)

(53) TVA should provide an update to the IHPB Never issued in SSER, issued as FSAR reflecting the information RAI questions. TVA provided provided in its letter dated October information in February 25, 2011 4, 2010, regarding the WBN letter.

radiation protection design features, including controlled access areas, decontamination areas, and onsite Page 33 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead laboratories and counting rooms.

(Section 12.4)

(54) TVA should provide adequate IHPB On bucket list. Never issued in SSER, issued as technical justification to the staff to Calculation has been issued and RAI questions. TVA to provide relax the frequency of the radiation is ready to submit. revised wording in FSAR to discuss monitor channel quarterly operability statistically sound justification to tests. TVA should provide sufficient Meeting with NRC next week justify relaxation of channel check information to the staff to determine frequency.

that the portable airborne radiation monitors comply with the requirements of 10 CFR 20.1501.

TVA should provide sufficient information to the staff to determine that the licensing or TVA program requirements for the calibration and operability testing of area radiation monitors are sufficient to meet the regulatory requirements of 10 CFR 20.1501. (Section 12.4)

(55) TVA should provide sufficient IHPB TVA to NRC letter submitted July Never issued in SSER, issued as information to the staff to 14, 2011. RAI questions. TVA clarify previous demonstrate that the two area A 105 Change package prepared RAI response from letter 2/25/11 in radiation monitors for the Spent Fuel new letter of 6/14/11.

Pit comply with the requirements of 10 CFR 70.24 and 10 CFR 50.68 for radiation monitoring in areas where fuel is handled or stored. (Section 12.4)

(56) CI TVA should update the FSAR to IHPB Never issued in SSER, issued as reflect the information regarding the RAI questions.

dose assessment program provided in its letter the NRC dated June 3, 2010. (Section 12.5)

Page 34 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (57) CI TVA should update the FSAR to IHPB Never issued in SSER, issued as reflect the qualification standards of RAI questions.

the RPM as provided in its letter to the NRC dated October 4, 2010.

(Section 12.6)

(58) CI The staff has insufficient information IHPB (I&C Matrix Item 349) Never issued in SSER, issued as to conclude that TVA has taken WBNAPS3-126, EQ Dose in the RAI questions. TVA provided appropriate actions to reduce U1/U2 Auxiliary Instrument information in February 25, 2011 radiation levels and increase the Rooms and the Computer Room letter. TVA to provide calculation or capability of operators to control and in the Control Building summary of calculation when mitigate the consequences of an complete.

accident at WBN Unit 2, in WBNAPS3-127 EQ Dose in the accordance with the guidance of Control Building NUREG-0737, Item II.B.2, or can maintain occupational doses to plant TVA to review operators within the requirements of GDC 19. Therefore, the staff cannot conclude that the plant shielding for WBN Unit 2 is acceptable. (Section 12.7.1)

(62) CI Confirm TVAs change to FSAR SBPB Yes Response provided in TVA to Closed in SSER 24, Section 10.4.9. 24 Section 10.4.9 to reflect its intention NRC letter dated June 7, 2011.

to operate with each CST isolated Complete TVA provided information in letter of from the other. (SSER 23, Section 6/7/11 and A103. NRR tech staff 10.4.9) review and update status in Appendix HH.

(68) TVA should clarify to the NRC staff SBPB Never issued in SSER how the CSS complies with GDC 5.

(Section 9.2.2)

(72) The NRC staff should complete its EICB No/ EC:Complete Closed in SSER 25, Section 7.5.2.2. 25 review and evaluation of the I&C FC: N/A additional information provided by Open pending NRC review NRR tech staff reviewing provided TVA regarding the ICC Responses provided in multiple information and will document in instrumentation. (SSER 23, Section TVA to NRC letters. SSER 25.

4.4.8, pg 4-22) I&C Matrix Item 041, , 244, 245, I&C Matrix Items 041, 043, 067, Page 35 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 246, 250, 251, 252, 367, 368, 068, 069, 074, 081, 086, 101, 138, 372, 373, and 374 142, 143, 144, 145, 183, 185, 202, 212, 244, 245, 246, 250, 251, 252, 367, 368, 372, 373, and 374 (76) CI The NRC staff will verify that the RII No/ EC: Closed in Inspection Report 25 derivative time constant is set to PSE PSE: 07/01/12 05000391/2011607, dated zero in WBN Unit 2 before fuel load. FC: September 30, 2011, ADAMS (SSER 23, Section 7.8.3, pg 7-167) For NRC Inspection / Review Accession No. ML112730197.

Provide copies of test procedures for inspection.

(78) TVA intends to issue a revised EICB Yes/ EC: Complete. Closed in SSER 25, Section 7.5.2.3. 25 calculation reflecting that the TID in I&C FC: N/A the control room is less than 1x103 Provide requested calculation NRR tech staff reviewing provided rads, which will be evaluated by the I&C Matrix Item 349 - information and will document in NRC staff. (SSER 23, Section Calculation WBNAPS3-127 EQ SSER 25.

7.5.2.3, pg 7-110, 7-116) Dose in the Control Building is ready to submit TVA to provide revised calculation Calculation submitted in TVA to WBNAPS3-127 EQ Dose in the NRC letter dated August 4, 2011 Control Building. NRR tech staff review and document in SER.

I&C matrix item 349 (82) The staff concluded that the EICB Yes Response provided in TVA to Closed in SSER 24, Section 24 information provided by TVA NRC letter dated June 10, 2011 7.6.1.4.5.

pertaining to the in-containment I&C Matrix Item 362 LPMS equipment qualification for TVA provided LPMS equipment vibration was incomplete. TVA Complete - Staff accepted the vibration qualification in letter of should provide (item number 362 of response and closed the I&C 6/10/11. NRR tech staff review and ADAMS Accession No. Matrix Item as of 7/11/11. document in SER.

ML111050009), documentation that demonstrates the LPMS in- I&C matrix item 362 containment equipment has been qualified to remain functional in its normal operating vibration environment, per RG 1.133, Revision 1. (SSER 23, Section Page 36 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 7.6.1)

(84) TVA should provide additional NRR Response provided in TVA to Never issued in SSER information for the NRC staff to NRC Letter dated July 18, 2011.

complete its review of post-LOCA complete long term cooling boric acid precipitation. (Section 15.3.1)

(85) The 95/95 peak local oxidation was NRR Response provided in TVA to Never issued in SSER calculated to be 1.04 percent, while NRC Letter dated July 18, 2011.

core-wide oxidation was calculated complete to be much less than 0.1 percent.

TVA should provide to the NRC staff the value of the decay heat multiplier used for this limiting large break, in order for the staff to complete its evaluation. (Section 15.3.1)

(86) TVA should demonstrate to the staff, NRR Response provided in TVA to Never issued in SSER in the WCOBRA/TRAC analysis of NRC Letter dated July 18, 2011.

the limiting break, that the core complete remains covered with a two-phase mixture and can be cooled for an indefinite period of time. (Section 15.3.1)

(87) In order for the staff to complete its NRR Response provided in TVA to Never issued in SSER evaluation, TVA should provide (1) a NRC Letter dated July 18, 2011.

time step sensitivity study for the complete limiting break displaying downcomer boiling, (2) a list of ten key parameter plots for the worst case downcomer boiling transient, (3) values for the lateral k-factors used in the evaluation, and (4) the manner in which condensation was modeled in the downcomer.

(Section 15.3.1)

Page 37 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (88) It is also unclear to the staff that the NRR Response provided in TVA to Never issued in SSER entrainment correlation information NRC Letter dated July 18, 2011.

has been incorporated into the EOP, complete to ensure that operators do not initiate hot and cold side injection during the period of time that entrainment could preclude injection into the hot legs. TVA should provide the EOP guidance/instructions for the operators to the staff for review.

(Section 15.3.1)

(89) TVA should demonstrate, NRR Response provided in TVA to Never issued in SSER quantitatively, the applicability of the NRC Letter dated July 18, 2011.

generic analysis to WBN Unit 2, to complete demonstrate that the EOP instructions to the operators can effectively deal with the failure of a bottom mounted instrument tube in the lower head. (Section 15.3.1)

(92) The NRC staff should perform an RII Never issued in SSER inspection in accordance with NRC Temporary Instruction 2515/087, Inspection of Licensees Implementation of Multi-Plant Action A-17: Instrumentation for Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident (Regulatory Guide 1.97). (Section 7.5.2.1.4)

(95) TVA should update FSAR Table 7.1- EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 1, Watts Bar Nuclear Plant NRC I&C FC: N/A Regulatory Guide Conformance, to Response provided in TVA to NRR tech staff reviewing provided reference IEEE Std. 603-1991 for NRC letter dated May 6, 2011 information and will document in the WBN Unit 2 Common Q PAMS. I&C Matrix Item: 364 Item 2 SSER 25.

Page 38 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (SSER 23, Section 7.5.2.2.3, pg 7-

50) Addressed in Amendment 105 (change package 1-105-13)

Response provided in TVA to NRC letter dated August 4, 2011 (96) TVA should (1) update FSAR Table EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 7.1-1 to include RG 1.100, Revision I&C FC: N/A 3, for the Common Q PAMS, or (2) Response provided in TVA to NRR tech staff reviewing provided demonstrate that the Common Q NRC letter dated May 6, 2011 information and will document in PAMS is in conformance with RG I&C Matrix Item 366 SSER 25.

1.100, Revision 1, or provide justification for not conforming. Addressed in Amendment 105 (SSER 23, Section 7.5.2.2.3, pg 7- (change package 1-105-13) 52, 7-76) Response provided in TVA to NRC letter dated August 4, 2011 (97) TVA should demonstrate that the EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 WBN Unit 2 Common Q PAMS is in I&C FC: N/A conformance with RG 1.153, Response provided in TVA to NRR tech staff reviewing provided Revision 1, or provide justification NRC letter dated May 6, 2011 information and will document in for not conforming. (SSER 23, I&C Matrix Item 367 SSER 25.

Section 7.5.2.2.3, pg 7-53) Needs to be in Table 7.1-1 Response provided in TVA to NRC letter dated August 4, 2011 (99) TVA should update FSAR Table 7.1- EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 1 to reference IEEE 7-4.3.2-2003 as I&C FC: N/A being applicable to the WBN Unit 2 Provide response that Common NRR tech staff reviewing provided Common Q PAMS. (SSER 23, Q PAMS meets these information and will document in Section 7.5.2.2.3, pg 7-53) requirements and update FSAR SSER 25.

in A105 I&C Matrix Item 369 Addressed in Amendment 105 (change package 1-105-13)

Response provided in TVA to NRC letter dated August 4, 2011 Page 39 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead (100) TVA should update FSAR Table 7.1- EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 1 to reference RG 1.168, Revision 1; I&C FC: N/A IEEE 1012-1998; and IEEE 1028- Response provided in TVA to NRR tech staff reviewing provided 1997 as being applicable to the NRC letter dated May 6, 2011 information and will document in WBN Unit 2 Common Q PAMS. I&C Matrix Item 370 SSER 25.

(SSER 23, Section 7.5.2.2.3, pg 7- Addressed in Amendment 105

54) (change package 1-105-13)

Response provided in TVA to NRC letter dated August 4, 2011 (102) TVA should update FSAR Table 7.1- EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 1 to reference RG 1.209 and IEEE I&C FC: N/A Std. 323-2003 as being applicable to NRR tech staff reviewing provided the WBN Unit 2 Common Q PAMS. Provide response that Common information and will document in (SSER 23, Section 7.5.2.2.3, pg 7- Q PAMS meets these SSER 25.

54, 7-75) requirements and update FSAR in A105 I&C Matrix Item 371 Item 1 Addressed in Amendment 105 (change package 1-105-13)

Response provided in TVA to NRC letter dated August 4, 2011 (103) TVA should demonstrate that the EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 WBN Unit 2 Common Q PAMS I&C FC: N/A conforms to RG 1.209 and IEEE I&C Matrix Item 371 Item 2 NRR tech staff reviewing provided Std. 323-2003, or provide Response provided in TVA to information and will document in justification for not conforming. NRC letter dated August 4, 2011 SSER 25.

(SSER 23, Section 7.5.2.2.3, pg 7-55)

(104) CI The NRC staff will review the WEC EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 self assessment to verify that it the I&C FC: N/A WBN Unit 2 PAMS is compliant to Response provided in TVA to NRR tech staff reviewing provided the V&V requirements in the SPM or NRC letter dated June 10, 2011 information and will document in that deviations from the I&C Matrix Item 041 SSER 25.

requirements are adequately Page 40 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead justified. (SSER 23, Section Self Assessment is available for 7.5.2.2.3.4.2, pg 7-62, 7-63, 7-65, 7- NRC review at the WEC Rockville

70) Office For NRC Inspection / Review (106) TVA should produce a final WBN EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 Unit 2 Common Q PAMS SRS that I&C FC: N/A is independently reviewed. (SSER Response provided in TVA to NRR tech staff reviewing provided 23, Section 7.5.2.2.3.4.3.1, pg 7-71) NRC letter dated June 10, 2011 information and will document in I&C Matrix Item 372 item 2 SSER 25.

NRC review pending (107) CI TVA should provide to the NRC staff EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 documentation to confirm that the I&C FC: N/A final WBN Unit 2 Common Q PAMS Response provided in TVA to NRR tech staff reviewing provided SDDs that are independently NRC letter dated June 10, 2011 information and will document in reviewed. (SSER 23, Section I&C Matrix Item 373 SSER 25.

7.5.2.2.3.4.3.2, pg 7-71)

NRC review pending (109) TVA should demonstrate to the NRC EICB Yes/ EC: Complete Closed in SSER 25, Section 7.5.2.2. 25 staff acceptable data storm testing I&C FC: N/A of the Common Q PAMS. (SSER Response provided in TVA to NRR tech staff reviewing provided 23, Section 7.5.2.2.3.7.1.8, pg 7-78, NRC letter dated June 10, 2011 information and will document in 7-81) I&C Matrix Item None SSER 25.

NRC review pending (119) TVA should submit WNA-CN-00157- EICB Yes/ EC: Complete. Closed in SSER 25, Section 7.7.1.9. 25 WBT, Revision 0, to the NRC by I&C FC: N/A letter. The NRC staff should confirm NRR tech staff reviewing provided by review of WNA-CN-00157-WBT, Response provided in TVA to information and will document in Revision 0, that no credible source NRC letter dated Sept. 1, 2011. SSER 25.

of faulting can negatively impact the CETs or PAMS train. (SSER 24, Section 7.7.1.9.5)

(122) TVA should confirm to the NRC staff EICB Yes/ EC: Complete. Closed in SSER 25, Section 7.7.1.9. 25 that different divisions of safety I&C FC: N/A Page 41 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead power are supplied to the IIS SPS Response provided in TVA to NRR tech staff reviewing provided cabinets, with the power cables NRC letter dated Sept. 30, 2011 information and will document in routed in separate shielded SSER 25.

conduits. (SSER 24, Section 7.7.1.9.5)

(124) While the BEACON datalink on the EICB Yes/ EC: Complete. Closed in SSER 25, Section 7.7.1.9. 25 Application server can connect to I&C FC: N/A either BEACON machine, only NRR tech staff reviewing provided BEACON A is used for Response provided in TVA to information and will document in communication. TVA should clarify NRC letter dated Sept. 1, 2011. SSER 25.

to the NRC staff whether automatic switchover to the other server is not permitted. (SSER 24, Section 7.7.1.9.5)

(128) TVA should submit the seismic EICB Yes/ EC: Complete. Closed in SSER 25, Section 7.7.1.9. 25 qualification test report procedures ELE, I&C FC: N/A and results for the SPS cabinets to NRR tech staff reviewing provided the NRC staff for review. (SSER 24, Response provided in TVA to information and will document in Section 7.7.1.9.5) NRC letter dated Sept. 1, 2011. SSER 25.

Note that the non-prop/affidavits to be provided by 12/1/11 (130) TVA should provide a summary to EICB Yes/ EC:11/14/11 Closed in SSER 25, Section 7.7.1.9. 25 the NRC staff of the EMC ELE, I&C FC: N/A qualification test results of the SPS NRR tech staff reviewing provided cabinets. (SSER 24, Section WEC Complete; WBT-D-3453 information and will document in 7.7.1.9.5) engineering review complete: to SSER 25.

be documented in 11/14/11 letter to NRC.

Response provided in TVA to NRC letter dated Sept. 1, 2011.

Note that the non-prop/affidavits to be provided by 12/1/11 (135) TVA has not provided the analysis IHPB Yes/ EC: Complete. Closed in SSER 25, Section 11.3. 25 required by 10 CFR Part 50, LIC FC: N/A Page 42 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead Appendix I, subsection II.D. TVA NRR tech staff reviewing provided must demonstrate with a cost- TVA 07/28/11 letter to NRC information and will document in benefit analysis that a sufficient (T02 110728 004) SSER 25.

reduction in the collective dose to the public within a 50-mile radius would not be achieved by reasonable changes to the design of the WBN gaseous effluent processing systems. (SSER 24, Section 11.3)

TVA The audit mentioned on 2/2/22 EICB I&C Matrix Item 043 Closing to OI 72 1 above, was performed 2/28- Item is verified to be duplicate of 3/4/2011 (ML110980761). This activity already documented in audit report documents WBN2 matrix specific and generic actions required to address the conditions identified during the audit.

TVA TVA to respond to open items in CQ EICB I&C Matrix Item 142, 143, 144, Closing to OI 72 2 PAMS SE. 145, 183, 185 See ML111150287 Section Item is verified to be duplicate of 7.5.2.2.3.4.2.5 on page 24 and activity already documented in Section 7.5.2.2.3.4.3.1 on page 26. matrix TVA NRC to confirm receipt of the Documents submitted on TVA Item is closed. This is already be 3 following: letter to NRC dated July 15, tracked on bucket list. Waiting for The non-proprietary versions of the 2010. document control processing.

following RM-1000, Containment High Range Post Accident Radiation I&C Matrix Item 101 Monitor documents will be provided by June 30, 2010. NRC action pending

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP Page 43 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead

4. Functional Testing Report 04507007-1TR TVA Attachment 36 contains Foxboro Response in letter dated 11/24/10 Item is closed. 11/24/10 letter 4 proprietary drawings 08F802403- reviewed and drawings were SC-2001 sheets 1 through 6. An I&C Matrix Item 327 included.

affidavit for withholding and non- NRC Review Pending proprietary versions of the drawings will be submitted by January 31, 2011.

TVA All safety related work must be EICB I&C EC: Complete Closed per internal memo dated 5 quality controlled per 10CFR50, FC: N/A 10/31/11.

App. B. TVA to confirm that the procedure used for the RM-1000 Response provided in letter dated See OI 77 system verification tests (04507007) 10/13/11.

was actually a procedure that was prepared per 10CFR50, App. B. I&C Matrix Item 346 7.5.2.3 TVA Was the CERPI system developed EICB I&C EC: Complete NRR staff has reviewed the 6 under a 10 CFR 50 Appendix B FC: N/A information provided by the staff compliant program? Response in letter dated 4/15/11 and based on this information, is I&C Matrix Item 359 closing this item.

NRC Review Pending TVA Was the Foxboro IA system EICB I&C EC: Complete Closed per internal memo dated Formatted: Highlight 7 developed under a 10 CFR 50 FC: N/A 12/7/11. Formatted: Highlight Appendix B compliant program? Response in letter dated 4/15/11 I&C Matrix Item 361 Formatted: Highlight NRC Review Pending Formatted: Highlight TVA On 5/6/2010 (See Open Item No. 81) the EICB Item is verified to be duplicate of Closing to OI 98 Formatted: Highlight 9 NRC Staff requested an evaluation of activity already documented in the Common Q PAMS against the matrix. Formatted: Highlight current staff position. Response submitted in letter By letter dated 2/25/11 (ML110620219),

dated 5/16/11 TVA docketed a response: that WBN2 I&C Matrix Item 365 is not committed in complying with Reg.

Guide 1.75Since WBN2 is not Page 44 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead committed to RG 1.75 or IEEE-384, no comparison is required However, WBN2 is committed to RG 1.75 Rev. 2, Physical Independence of Electric Systems. RG 1.75 Rev. 3 and IEEE Std. 384-1992 are used, in part, to address IEEE Std 603-1991 Clause 5.6.1. The current NRC staff position for RG 1.75 is documented in Rev. 3.

Based upon the review of this item, the staff finds the following open item:

1 TVA to updated FSAR (Amendment 103) Table 7.1-1 to include RG 1.75 Rev. 3 for WBN2 Common Q PAMS and the Sorrento Containment High Radiation monitor.

The Common Q PAMS was designed to meet the requirements of RG 1.75 Rev.

2. WBN2 did not perform an analysis to RG 1.75 Rev. 3. Based upon the review of this item, the staff finds the following open item:

2 TVA to evaluate Common Q PAMS and the Sorrento Containment High Radiation monitor for conformance with RG 1.75 Rev. 3.

Submit FSAR amendment to reflect changes TVA ReferenceEDCR # 52321, EICB Response submitted 6/13/11 Closed. SE received from the staff 10 Revision AEDCR Unit Difference I&C Matrix Item 376 with no open item in this area.

Form --- Bechtel Document NRC Review pending Page 2 -Maintenance Difference The proposed In-Core Instrument Page 45 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead Thimble Assemblies (IITAs) which will replace Movable In-Core Detectable Systems (MIDs) have the following features:

(1) IITAs are not fully extracted and they are held in a movable frame assembly.

(2) IITAs exert lower vibration amplitude and therefore, aging degradation due to wear does not occur.

(3) Loss of reactor coolant system pressure boundary due to breach of IITA outer sheath does not occur.

Question:

The staff believes that the licensee should provide an inspection program to confirm that the aforementioned attributes associated with IITAs are valid and this inspection program can be a part of a routine maintenance program.

Replacement of 58 CETs for the current 65 CETs -to be addressed by the fuels division.

TVA Non-Proprietary description of the EICB Response submitted 6/13/11 Closing to OI 127 11 qualification of the MI cable I&C Matrix Item 381 assemblies with references to any NRC Review pending Page 46 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead EQ report (if applicable) - June 10th TVA Non-Proprietary description of the EICB I&C Matrix Item 383 Closing to OI 126 12 qualification of the IITA with references to EQ report(s)

NRC Update (Alvarado) - need the proprietary versions of reports, such as EQ tests, EMI/RFI tests, calculations, and other documents to make a safety determination, not non-proprietary reports that reference these reports and calculations.

NRC update (RA) 6/16: The report will be available after June 30. This is still an open item TVA Provide the following documents, EICB I&C Matrix Item 388 Closed. Staff has finished its review 13 which describe operation of the and issued its safety evaluation and WINCISE Application Server. no longer requires these

  • Sections 1 and 2 of the documents.

WNA-GO-00075-WBT, WINCISE Signal Processing System Cabinet Operation &

Maintenance Manual.

Revision 0.

  • WNA-DS-01811-WBT, WINCISE Signal Processing

System Design

Requirements. Revision 0, May 2010

  • 420A90, WINCISE Functional Specification for Watts Bar Unit 2. Revision Page 47 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead 2.

TVA Provide the proprietary version of EICB I&C Matrix Item 389 Closing to OI 119 14 the calculation described in WNA-CN-00157-WBT, Watts Bar 2 IIS Signal Processing System Isolation Requirements. Revision 0.

TVA Westinghouse has indicated that the EICB I&C Matrix Item 390 Closing to OI 124 15 WINCISE Application Servers, as well as the BEACON are redundant.

However, the WINCISE Application Server communicates only with Beacon A. Westinghouse also explained that to switch from Beacon A to Beacon B, the operator must perform this manually. After reviewing Westinghouse documents, we couldnt find explanation that automatic switchover to the other server is not permitted.

TVA Clarify the type of connector used EICB I&C Matrix Item 391 Closing to OI 125 16 with the MI cable in Unit 2. During this review, we identified the following connectors, but we could not establish which one will be used in unit 2. Also explain if the qualification performed is still valid or if it is going to be revised.

o Whittaker connectors o Litton connectors o Electronic Resources Division (ERD) connectors Page 48 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead TVA Clarify the logic to subtract failed EICB I&C Matrix Item 392 Closing to OI 118 and OI 123 17 detectors from the algorithm used to calculate core power. During the May 12 meeting with Westinghouse and TVA, Westinghouse explained that the WINCISE Application Server includes an algorithm to subtract failed detectors. However, during our review in Westinghouse office, we could not find description on how this algorithm is accomplished.

Furthermore, the document BEACON Data Processing Application Program Software Requirements Specification includes the following assumption:

BEACON will perform the subtraction between various length elements for the vanadium detector design. This is appropriate, as BEACON is more equipped to support the replacement value algorithm should an element fail.

BEACON has knowledge of the flux shape which is critical to this process.

TVA Clarify if the IITA assembly and the EICB I&C Matrix Item 393 Closing to OI 121 18 6-to-1 transition cable have been subjected to the 600VDC dielectric strength test. Document Watts Bar 2 IIS Signal Processing System Isolation Requirements states that the MI and IITA assemblies need to be subjected to a 600VDC dielectric strength test. Letter LTR-ME-10-3 Page 49 of 50

APPENDIX HH STATUS - (12/0630/2011)

Item Type Action Required NRC TVA TVA Action Required to Close NRC Action Required to Close Due SSER Lead Response Date Required/

TVA Lead summarizes the result for the MI cable. However, similar documentation was not available for the IITA assembly.

TVA Confirm that power supply cables to EICB I&C Matrix Item 394 Closing to OI 120 19 the WINCISE SPS cabinet are not routed with cables that are greater than 264V.

TVA Confirm that power supply to the EICB I&C Matrix Item 395 Closing to OI 122 20 WINCISE SPS cabinet are from isolated 1E sources, such that power supply routed to PAMS train A is the same routed to SPS cabinet 1, and power supply routed to PAMS train B is the same routed to SPS cabinet 2.

Page 50 of 50